Metro - Let me know about major weekend traffic impacts

Similar documents
Updated: April 7, 2016

Hwy 36 to Lexington Ave. Add a lane in each direction Recommend a MNPASS Lane Several spot improvements to roadway included Concrete pavement Noise

This page is intentionally left blank

Demolition of Ramp C (SN ): Westbound Ontario Street to Eastbound I-90/94) over I-90/94 (JF Kennedy Expressway)

CLINTON CLOSURE DETOURS

WELCOME. Open House. meeting is downstairs in the Foot Room RED WING BRIDGE PROJECT. US 63 River Bridge and Approach Roadways.

Planarization & Routing Guide

ACEC OC February 22, 2017

Purple Line Extension Section 3 Pre-Construction Community Meeting March 22, 2018

Single Point Urban Interchange (SPUI) with Signals

Locate Request Information

Currently 2 vacant engineer positions (1 Engineer level, 1 Managing Engineer level)

Allowable Lane Closure Hours. for the. State Highway System. Hampton Roads District. Virginia Department of Transportation.

Allowable Lane Closure Hours. for the. State Highway System. Hampton Roads District. Virginia Department of Transportation

2018 District 1 Highway Construction Program

ENTERPRISE Transportation Pooled Fund Study TPF-5 (231)

Purple Line Extension Section 3 Pre-Construction Community Meeting June 21, 2018

CONCURRENT OPTIMIZATION OF SIGNAL PROGRESSION AND CROSSOVER SPACING FOR DIVERGING DIAMOND INTERCHANGES

2007 Construction Information/Season Notes

PORT SUSAN MIDDLE SCHOOL SPORTS SEASONS DIRECTIONS

I-405 Sepulveda Pass Improvements Project. Community Advisory Committee September 23, 2010

2012 MnDOT Greater Minnesota Construction Projects

ZOO INTERCHANGE PROJECT

Driving directions during the closure of Business 40 for the following downtown Winston-Salem facilities in Innovation Quarter:

Diversion Analysis. Appendix K

2011 Mn/DOT Greater Minnesota Construction Projects Source: Minnesota Department of Transportation

King Mill Lambert DRI# 2035 Henry County, Georgia

Route:C JGLNam JOHN GLENN MS C

Move In Directions for First-year and Transfer Students Douglass Campus Gibbons Residence Hall A & B

2018 High School Overall Team Results

Environmental Consultants List Guidance Document 22

BOSTON EVERETT HORIZON WAY BROADWAY ALFORD ST BOW ST BOSTON CITY LINE EVERETT CITY LINE DEXTER ST MYSTIC ST COURTLAND ST LYNDE ST THORNDIKE ST

Minnesota Department of Transportation 2011 Greater Minnesota Construction Projects

A. INTRODUCTION PRINCIPAL CONCLUSIONS

Exit 61 I-90 Interchange Modification Justification Study

Pinellas County Proposed Roadway Projects for the 2040 LRTP DRAFT %&g( %&g( Legend. SR686 Inset Map HILLSBOROUGH COUNTY.

FROM APSU DUNN CENTER DRANE STREET CLARKSVILLE, TN 37040:

Managing traffic through Signal Performance Measures in Pima County

FORT SMITH. LOCATION #: DESCRIPTION: I ft W/O Lee Creek Rd SS CITY:

The Shoppes at Forney Crossings

In-state Hurricane Evacuation Routes

Appendix B: Transportation B-10 Toll Plaza Analysis

State Road A1A North Bridge over ICWW Bridge

SE Office 5,000-10,000 SF For Sale

TABULATIONS SHOWING PROPOSALS ISSUED BY THE ALABAMA DEPARTMENT OF TRANSPORTATION TUESDAY, AUGUST 16, 2016 FOR SPECIAL LETTING AUGUST 26, 2016

2017 San Juan College Luminarias 6:00pm - 11:30pm

ANALYTICAL TOOLS FOR LOOP DETECTORS, TRAFFIC MONITORING, AND RAMP METERING SYSTEMS.

Future Projects. District 3 Central Minnesota. mndot.gov/d3

Elk Grove: 9381 East Stockton Blvd., Suite 220 Laguna Chiropractic

0-6920: PROACTIVE TRAFFIC SIGNAL TIMING AND COORDINATION FOR CONGESTION MITIGATION ON ARTERIAL ROADS. TxDOT Houston District

Appendix G. Visual Simulations and Illustrations

WSDOT LED Adaptive Roadway Lighting & Illumination Reform

TCAG Annual Intersection Monitoring Program

Abilene District Traffic Signal Timing and Capacity Analysis

Appendix C HCS 7 ANALYTICAL REPORTS: MITIGATED SIGNALIZED AND NON-SIGNALIZED INTERSECTIONS. Draft

City of Surrey Adaptive Signal Control Pilot Project

Arkansas State Highway and Transportation Department

TCAG Annual Intersection Monitoring Program

SCPW FIELD DIRECTIONS

CHIPPEWA FALLS. Chippewa Falls High School 735 Terrill Street Chippewa Falls WI 54729

%&g( %&g( ) Bridge Projects DRAFT

I-405 Sepulveda Pass Improvements Project. Community Advisory Committee April 28, 2011

Methuen Rotary Project Meeting Summary: March 24, 2009; 4:30 p.m. 6:30 p.m. Merrimack Valley Methuen Branch YMCA

I-405 Sepulveda Pass Improvements Project. Quarterly Community Meeting December 9, 2010

Chesapeake Science Point Bus Routes

HURRICANE GUIDE. Like us on Facebook, follow us on Twitter and subscribe to our YouTube Channel at MississippiDOT.

DESIGN PUBLIC HEARING

Directions for Soccer

INNOVATIVE DEPLOYMENT OF DYNAMIC MESSAGE SIGNS IN SAFETY APPLICATIONS

I-20 East Texas Corridor Implementation Plan DALLAS DISTRICT Updated May Install cable barrier system in median

SDSU NEW STUDENT HOUSING PROJECT ENVIRONMENTAL IMPACT REPORT Final EIR Comments and Responses

APPENDIX Q MSP 2020 Improvements EA Traffic Noise Proposed Roadway Improvements Memorandum

ANDOVER HIGH SCHOOL 2115 Andover Blvd 169 North to Hwy 10 East to Hanson Blvd Left (north) to Andover Blvd. Left on Andover 1/2 mile to the school

2003 Greater Vancouver Travel Time Survey. Regional Maps. and Travel Time Matrices

Tour - Short Landscape

Service Recommendations

MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER PERFORMANCE MEASURES. August 2017

Appendix D. Traffic Noise Analysis Report. I-94 St. Michael to Albertville Minnesota Department of Transportation

Amajor transportation infrastructure undertaking, billed

Interchange Feasibility Study

TYPICAL SECTION OF IMPROVEMENT

Dakota County Star Quilters Bits and Pieces April See you at our meeting on Tues., April 12, 1:00 PM and 7:00 PM

MERAMEC VALLEY R-III SCHOOL DISTRICT ESY 2014 Bus # 8 AM -- Coleman Elementary

ACE VENTURA ROUTE INSTRUCTIONS GROUPS R and X September 8, 2012

Reprioritized Projects in the Highway and Bridge Construction Schedule RSMo (2)

SECTION 4. Future Conditions

Task 27: Prepare the Experiment. Center for Infrastructure and Transportation Studies Technical Report No: October 25, 2008

From Atlanta. Amy s Creek 1 Driving Directions Cabin Address: 5025 Highway 17 Clarkesville, GA Phone at Property:

the victory companies

ASSESSING THE POTENTIAL FOR THE AUTOMATIC DETECTION OF INCIDENTS ON THE BASIS OF INFORMATION OBTAINED FROM ELECTRONIC TOLL TAGS

Directions to Shore Conference Fields

1050 Page Mill Road Office Development

CHATHAM COUNTY EMERGENCY OPERATIONS PLAN ESF-1 ANNEX APPENDIX 1-1 TAB A EVACUATION ROUTES AND TRAFFIC CONTROL POINTS

DIRECTIONS TO GAMES. BIBLE BAPTIST CHRISTIAN SCHOOL 2724 Margaret Wallace Rd Matthews, NC

Legislative Joint Transportation Committee Meeting. Arkansas Convention Center Texarkana Thursday, November 21, 2013

Office: From Atlanta VIA I 85 Directions to Alpine Helen from Outback Lodge

BUFFALO TENAYA TROPICANA E F HACIENDA. Durango HS. Opportunity Village D PATRICK TENAYA BUFFALO

Prefabricated Elements Case Study

Straight Line Diagram. Lawrence 37. January 2010

Directions to Away Schools

Transcription:

Highway 100 Construction Traffic Impacts Dates may change due to weather. West 36th St to Hwy 62 Currently April 4-mid Aug 50th St. ramp to NB Hwy 100 will close. The ramp will reopen in mid-august. Upcoming Detour: Motorists traveling WB on W 50th St. will be detoured to SB Hwy 100 to Hwy 62 loop to NB Hwy 100. April 11-mid July Two lanes of traffic on NB Hwy 100 between Benton Ave. and W 36th St. All lanes will reopen in mid-july April 14-mid July Two lanes of traffic on SB Hwy 100 between Benton Ave. and W 36th St. All lanes will reopen in mid-july Metro - Let me know about major weekend traffic impacts

Major impacts to traffic this weekend (May 6-8)

Hwy 5 Hwy 5 between Davern St in St. Paul and Hwy 55 will be reduced to one lane in each direction through Nov. 2016. Several ramps closed, too. Hwy 5 Chanhassen Right turns to eastbound Hwy 5 from Market Blvd and Dakota Ave. will be closed and detoured May 2 through July 30. Hwy 7 over Hwy 100 Hwy 7 between Wooddale Ave. and Beltline is closed until Nov. 2016. Several ramp closures, including: All ramps to and from both directions of Hwy 100 and Hwy 7, Minnetonka Blvd to SB Hwy 100, 36th Street ramp to NB Hwy 100, and NB Hwy 100 to 36th St. (through Aug. 2016). Hwy 8 in Taylors Falls Hwy 8 closed in both directions between the south and north intersections of Hwy 95 in Franconia/Shafer Townships and Taylors Falls until October. Detour through Osceola using Hwy 95, Hwy 243 and Wisconsin Hwy 35. Special note: The Wisconsin Fishing Opener begins this weekend. Hwy 36 in Roseville Ramps at eastbound Hwy 36 and Lexington Ave. closed through mid-sept. Hwy 61 & Hwy 97 in Forest Lake Both directions of Hwy 61 between the north intersection of Hwy 97/Scandia Trl and 202nd St traffic will be reduced to a single lane on the east side of the road. Hwy 77 in Apple Valley Palomino Drive over Hwy 77 in Apple Valley closed May 2 through May 17.

Hwy 100 from West 36th St to Hwy 62 Hwy 100 is reduced to two lanes in each direction through late July. Also, southbound Hwy 100 ramp to Benton Ave. closed May 3 through May 9. Other ramp closures include: 50th St. ramp to NB Hwy 100 (through Aug.) and 70th Street ramp to SB Hwy 100 (through June). Hwy 169 in New Hope Ramp closures through mid-july: Northbound Hwy 169 ramp to 49th Ave. and Rockford Rd Ramp to northbound Hwy 169. Hwy 280 in St. Paul and Lauderdale The interchange of Hwy 280 and I-35W closed May 2 through mid-june (north of Broadway St.), also resulting in ramps between Hwy 280 and I-35W being closed. The ramp from Larpenteur Ave. closes at 6 a.m. May 5 and will remain closed and detoured until mid-june. Hwy 280 south of Broadway St. will be reduced to a single lane of traffic. I-35E in St. Paul All I-35E ramps at Phalen Blvd/Pennsylvania Ave. are permanently closed until the project is completed. L Orient St. will be closed between Genessee St. and Acker St. for several months beginning May 9. I-35E in Vadnais Heights Northbound I-35E is now restricted to a single lane of traffic between Co Rd E and Goose Lake Rd. Hwy 96 is also reduced to a single lane of traffic between White Bear Pkwy and Centerville Rd in both directions. There are also several ramp closures, including: NB I- 35E ramp to Co Rd E, Co Rd E ramp to NB I-35E, SB I-35E ramp to Hwy 96 and Access from eastbound Hwy 96 to NB I-35E. I-35W in New Brighton The ramps between NB I-35W and Co Rd E2 on the east side of the interstate are closed.

I-494 in Eagan Pilot Knob Rd at I-494 in Eagan reduced to one lane through May 17. I-494 West Metro 10 p.m. May 6 through 5 a.m. May 7 northbound I-494 ramps to and from Bass Lake Road closing. I-494 between I-94/I-694 in Maple Grove and I-394 in Minnetonka will have several types of closures, including ramp and lane closures. I-94 in St. Paul Cretin Ave bridge closed from 5 a.m. May 5 through 5 a.m. May 26. Lexington Ave. Bridge over I-94 Bridge will close and be detoured through May 8. I-94 from St. Paul to Maplewood The ramp from eastbound I-94 to E. 7th St. is closed until early June. Also, ramps are closed from Century Ave. to Eastbound I-94 and Westbound I-94 to Century Ave. and Ruth St. to Westbound I-94. The White Bear Ave. ramp to Eastbound I-94 closed through early May. For more info Visit: mndot.gov/weekendtrafficimpacts/ MnDOT mndot.gov Stay Connected with Minnesota Department of Transportation: