SCHWARTZ SOLVENT-BASE WOOD FLOOR SEALER AND SOLVENT-BASE POLYURETHANE FLOOR FINISH

Similar documents
Sutherland Welles Ltd.

Wood Floors. Protected. Who is Pallmann?

Finishes and Finishing Techniques

Sketchpaint. Ideal for turning any smooth surface into a whiteboard. Ready to use in 5 days

Magnetpaint & Sketchpaint

The Most Beautiful, Longest-Lasting, High Gloss Shine for Brightwork VARNISH

PBWWinc. Technical Data Sheet. GERLINE Gameline Paint Instructions for Sport Flooring. General Guidelines:

PBWWinc. GEN-U-LINE 4000 Series Application Guide. Technical Data Sheet. General Guidelines:

Installation Instructions for Bifold Doors (JII103)

WATER AND WOOD DON T MIX KEEPING YOUR TRIÂNGULO HARDWOOD FLOOR BEAUTIFUL SCRATCHES, INDENTATIONS AND GOUGES

APPLICATION INSTRUCTIONS

EarthpaintTM. because you care

Do it yourself! Tips for best results

Low V.O.C. 2-Component Polyurethane Game Line Paint System

Fiddes Premier Water-based Floor Lacquers

Pettit Technical Bulletin Applying Topside Finishes

UNIT 11: PAINTING, STAINING, AND FINISHING

DULUX WOODGARD EXTERIOR TIMBAPRESERVATIVE

Wood Turning Finishing Process. Compiled And Presented by Pete Marken For The 2018 Segmented Woodturners Symposium St Louis Missouri.

maintenance guide For more details about Blanchon products and the maintenance of wood floors, please contact your specialist.

CTL LEATHER INC. About Leather Care & Maintenance CTL LEATHER INC

INTERIOR TIMBER PROJECT GUIDE

D D. Wood Doors Catalogue

Natural hardwood flooring

wiping Varnish Wipe it on for a low-luster look or brush it on for a higher sheen

Paint and Decals. Adequate ventilation is required when working in a confined area with paint and paint-related chemicals.

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Big Sky Product Information Sheet. Epoxy Prime Primer/Sealer PS3042 (Lt. Gray) PS3044 (Dk. Gray) PS3045 (Black) PS3047 (Yellow Oxide)

DULUX UNIVERSAL UNDERCOAT

MAINTENANCE OF MIKASA FLOORS

Alterna Grouting Tiles & Planks

INSTRUCTION MANUAL WOODY. By HAY

Sign Maintenance. Sign Maintenance

WOOD REPAIR TECHNIQUES

TORLYS LEATHER PLANK INSTALLATION INSTRUCTIONS

READ PRIOR TO BEGINNING INSTALLATION

INSTALLATION INSTRUCTIONS

General Installation Instructions

DESIGNER EDITION L EXINGTON

Surfaces Garage Doors Fiberglass Doors

TILE CARE & MAINTENANCE

LUXAPOOL EPOXY POOL COATING APPLICATION GUIDE. New Cement Pools

HR175 Sash Replacement Kit Installation Instructions

C O M P A N Y C O M P A N Y

The Path to a Perfect Finish. A guide to our most advanced line of gelcoat and paint refinishing products.

Loose Lay Luxury Vinyl Plank

Woodworking & Solid Surface Finishing Products

Floor care & maintenance

SHER-WOOD FINISHING SYSTEMS

A. Section includes surface preparation and the application of paint systems on the following exterior substrates: 1. Steel and iron.

CETOL INTERIOR STAIN PREPARATION

Industry Trend. Ceramic Tile And Stone Consultants (CTaSC) provides ceramic tile research and marketing services.

Product Care & Maintenance Guide

BRUSH APPLICATION INSTRUCTIONS

BOIS CHAMOIS VINTAGE HARDWOOD FLOORING

VERTICAL STILE ABOVE HORIZONTAL TRIM VERTICAL STILE BELOW COVE BASE ADHESIVE. 1" [25.4mm] BASE DETAIL

Premium quality tools are important; not only will high quality rollers, brushes, and products create a better result, they ll make your job easier.

Shutter Installation Instructions

Mold Release, Break-In, Maintenance and Storage. Linda Bergstrom

Maintenance Guide for pre oiled floors

Consistent Performance

The Path to a Perfect Finish

BOIS CHAMOIS VINTAGE HARDWOOD FLOORING

High quality Dutch paint solutions

HOGNOSE PSALTERY KIT Assembly Instructions

EXTERIOR PAINTING

RENOVATING WOOD. 2 - Planning your work

Titan Installation Instructions

Start. with wood, finish with. Blanchon. How to keep your wood floor looking beautiful? maintenance guide

cabinet & commitment some helpful tips on how to look after your Gillies cabinet Living in style

It s a seemingly simple equation Maintenance + Proper Cleaning = Decades of beautiful floors.

SPECTRALOCK PRO Premium Grout*

FLEXITEEK INSTALLATION INSTRUCTIONS

IDEAPAINT SUBSTRATE SPECIFIC INSTALLATION INSTRUCTIONS

IMPORTANT NOTES ABOUT YOUR FLOORING PLEASE READ BEFORE INSTALLING INSTALLATION & MAINTENANCE FOR ENGINNERED HERRINGBONE

SURFACE FINISH MAINTENANCE

INSTALLATION INSTRUCTIONS of Chevron and Herringbone Engineered Hardwood Flooring

JUNCKERS HEXPARKET LAYING INSTRUCTIONS

COPENHAGUE TABLE CPH30

Painting Wood. 1 of /01/27 01:45 PM. One-component paint system on wood (all wood types)

For purchasing information visit: Osmo Polyx Oil Rapid

Harrogate Care Guide. Information. By Neptune. neptune.com

What are all these pads for? Let s go through them one by one

Hand Sanding. 4 ALI INDUSTRIES, INC. :: Sanding Sheets

Timberlac TimberCoat SolarShield WoodGuard Aqua WoodGuard

Paint Spraying: Spray gun parts Student A:

Quality Marine Equipment Since Antifouling Paint For Metal Under The Waterline ROLLER. Application Instructions.

OWENS FLOORING LLC MAINTENANCE AND WARRANTY

FLOORING CLEANING/CARE RENOVATION

A. Section includes surface preparation and the application of paint systems on exterior substrates.

Installation Instructions

Please read through the entire document before starting your installation process to better understand what is required.

Special Order Program. 1 of 16

CIRRUS AIRPLANE MAINTENANCE MANUAL MODELS SR22 AND SR22T CHAPTER 56-30: DOOR GENERAL. Door 56-30: DOOR. 1. General

Arla WOODEN CARE GUIDE BY DIRECT OUTDOOR LIVING

POLYCARBONATE RECTIFICATION PROCEDURES

Frame Finishing Instructions

TECHNICAL DATA SHEETS

TECHNICAL INFORMATION CLEAR CONCENTRATED INDUSTRIAL VARNISH BARNIZ INDUSTRIAL CONCENTRADO TRANSPARENTE

Quick Guide to Painting with Autentico

Transcription:

TECHNICAL BULLETIN Fax (905) 428-2057 SCHWARTZ SOLVENT-BASE WOOD FLOOR SEALER AND SOLVENT-BASE POLYURETHANE FLOOR FINISH A Complete Guide for Preparation, Application, Curing and Maintenance for use with Schwartz Solvent-base Floor Finish System. 1C259 1C360 80C80LV 80C70LV 80C50LV 80C30LV 80C20LV Wood Floor Sealer Floor Sanding Sealer Premium High Gloss Polyurethane Classic High Gloss Polyurethane Classic Semi-Gloss Polyurethane Classic Satin Polyurethane Classic Matte Polyurethane Above products can only be used by properly trained individuals. Improper use can pose a risk of physical injury or property damage. Risks include, but are not limited to, chemical burns, fire, and improper application. It is the trained finisher s responsibility and obligation to know all the safety precautions and recommended application process, therefore, Schwartz disclaims any and all warranties, express or implied, including warranties of merchantability or fitness for a particular purpose. Schwartz products are subject to a limited warranty. For full details please visit our website at or contact our office at (905) 683-0411 to request a copy. I. General Guidelines A. New Floor Ensure that new wood floors have properly acclimated for 5-7 days in the building at normal living conditions for temperature and humidity before starting the finishing process. As a general rule, normal living conditions mean a temperature of 18-30 C (64-86 F) and a relative humidity range of 40 60%. The equilibrium moisture of wood must be 6 10%. By not observing these guidelines, the application may lead to failures. Schwartz recommends using a wood moisture meter to determine suitability. 1

TECHNICAL BULLETIN Fax (905) 428-2057 B. Old Floor Inspect floors thoroughly to make sure wood boards are still sound. In the event that water damage is confirmed, make all effort to address this issue first before proceeding. Replace damaged and split boards, and follow recommended acclimation method in (I-A). C. Ambient Conditions During and after application of finishing system, maintain temperature at 18-30 C (64-86 F) and a relative humidity range of 40 60%. Low temperature and high humidity can prolong dry times. For optimal curing/drying, adequate fresh air movement or ventilation is critical. Make all effort to ensure that dirt and dust are not tracked into the jobsite. D. Sanding and Screening 1. New Hardwood Floors Floors should be sanded with minimum three cuts using coarse (36,40), medium (80-120) and a used or fine 150-grit screen. This final sanding should provide a smooth and even surface, free from scratches, drum stop marks or gouges. Thoroughly sweep and vacuum to remove all sanding dust. Tack using method in Section I-D4. 2. Old Hardwood Floors To remove old finish, use coarse to medium grit (36 80) depending on the build-up of old finish. Finish off with used grit 80 150 sandpaper or screen for final cut. Thoroughly sweep and vacuum to remove all sanding dust. Tack using method in Section I-D4. 3. Parquet Floors (New and Old) New Start with a 60-grit belt and move diagonally across the grain. Next is to use 80-grit belt on the opposite diagonal. Use the buffer and screen or disc (80-grit) to make a final cut with the room s longest dimension. Next, tackle edges with an edger using the same grit sequence. Move the edger along the direction of the grain. If necessary, use appropriate filler to fill gaps, let dry thoroughly before buffing. Lastly, buff with 120-grit screen. Thoroughly sweep and vacuum to remove all sanding dust. Tack using method in Section I-D4. Old Start with a 40-grit belt and move diagonally across the grain to remove the old finish. Next, use a 60-grit belt and move in the opposite diagonal. Use the buffer and screen or disc (80-grit) to make a final cut with the room s longest dimension. Next, tackle edges with an edger using the same grit sequence. Move the edger along the direction 2

TECHNICAL BULLETIN Fax (905) 428-2057 of the grain. If necessary, use appropriate filler to fill gaps, let dry thoroughly before buffing. Lastly, buff with 120-grit screen. Thoroughly sweep and vacuum to remove all sanding dust. Tack using method in Section I-D4. Parquet Floor Parquet Floor Source: NOFMA 4. Tacking Method Tack with damp cloth to remove all dry residue. Rinse soiled tack cloth and repeat tacking procedure until no dust is found on the floor. Let floor dry completely (approximately 1 hour) or wait until floor meets the General Guidelines found in section I-A. Apply finish system. Note floors should be sealed as soon as possible after final sanding. If prepared floors have been left for several hours or overnight, repeat tacking procedure before applying the finish system. II. Gym Floors A. Newly Installed Floor 1. Sealer - Follow recommendations on Sections I-A for acclimation, I-C for ambient conditions, and I-D1 for sanding and screening. Thoroughly sweep and vacuum to remove all sanding dust and follow I-D4 for tacking method. Seal floor with 1 coat of 1C259 or 1C360 Sealer using T-bar, wood block mop or roller with synthetic pad, or lambs wool. Let dry 1 hour. Note failure to follow proper dry times of 1C259 or 1C360 can result to whitening of subsequent polyurethane topcoat. Buff with used 120-grit screen or maroon pad. Thoroughly 3

TECHNICAL BULLETIN Fax (905) 428-2057 sweep and vacuum to remove all sanding dust. Tack using method in section I-D4. If a lower odour sealer is preferred, use 1 coat of 80C80LV instead of 1C259 or 1C360 as sealer using same applicator type. Let dry for at least 8 hours or overnight. Buff with used 120-grit screen or maroon pad. Thoroughly sweep and vacuum to remove all sanding dust. Tack using method in section I-D4. Good ventilation and fresh air movement are critical for 80C80LV to properly cure. Application conditions different from the ambient conditions guidelines set in section I-C can result to abnormally longer cure times manifested as a gummy or extremely soft coating. In such instances, the surface must be re-sanded in full. 2. Game Line Paints Apply appropriate game line paints following MFMA specifications. Always prepare a test panel beforehand to ensure compatibility with Schwartz finishing system. Mask game lines using precision taping machines or striping tools. Apply game line paints and allow to dry following manufacturer s recommendation. Depending on hiding power of paint, a second coat maybe required. Please follow recoat time as per manufacturer s recommendation. When using masking tape, pull tapes as soon as paint begins to dry or set. Let dry/cure for 24 hours before coating with the finish. Buff the entire floor with used 120 150 grit screen or maroon pad. Thoroughly sweep and vacuum to remove all sanding dust. Tack following section I-D4. 3. Topcoat Apply 2 coats of 80C80LV following normal cure times. Buff with used 120-grit screen or maroon pad in between coats. Thoroughly sweep and vacuum to remove all sanding dust. Tack following section I-D4. A third coat of 80C80LV maybe applied for an added protection. Good ventilation and fresh air movement are critical for 80C80LV to properly cure. Application conditions different from the ambient conditions guidelines set in section I-C can result to abnormally longer cure times manifested as a gummy or extremely soft coating. In such instances, the surface must be resanded in full. Allow final finish coat to dry for a minimum of 24 hours before floor can be walked on. Avoid dragging any object across the floor, as it s still susceptible to scuffing. Do not replace mats before full cure. Under normal conditions, curing process takes approximately 14 days. Resume normal activity after full cure. Avoid cleaning with water for 2 weeks, use dry cloth only. 4

TECHNICAL BULLETIN Fax (905) 428-2057 B. Resurfacing and Finishing an Old Floor Per MFMA, complete resurfacing is typically performed every 8-10 years depending on many factors. This will restore luster and excellent performance of your gymnasium surface. 1. Sealer - Follow recommendations on Sections I-C for ambient conditions, I-B for old floors, and I-D2 for sanding and screening. Thoroughly sweep and vacuum to remove all sanding dust and follow I-D4 for tacking method. Seal floor with 1 coat of 1C259 or 1C360 Sealer using T-bar, wood block mop or roller with synthetic pad, or lambs wool. Let dry 1 hour. Note failure to follow proper dry times of 1C259 or 1C360 can result to whitening of subsequent polyurethane topcoat. Buff with used 120-grit screen or maroon pad. Tack using method in section I-D4. If a lower odour sealer is preferred, use 1 coat of 80C80LV instead of 1C259 or 1C360 as sealer using same applicator type. Let dry for at least 8 hours or overnight. Buff with used 120-grit screen or maroon pad. Tack using method in section I-D4. Good ventilation and fresh air movement are critical for 80C80LV to properly cure. Application conditions different from the ambient conditions guidelines set in section I-C can result to abnormally longer cure times manifested as a gummy or extremely soft coating. In such instances, the surface must be re-sanded in full. 2. Game Line Paints follow procedure in II-A2 3. Topcoat follow procedure in II-A3 C. Annual Maintenance/Refinishing (Buff and Recoat) Periodic refinishing should be considered as a maintenance plan to preserve the beauty and life of your gymnasium floors. MFMA recommends gym floors to be recoated annually. 1. Buff inspect and sweep the entire floor to make sure all dust, dirt and foreign matter have been removed. Buff with used 120-150 grit screen or maroon pad. Thoroughly sweep and vacuum to remove all sanding dust. Tack using method in section I-D4. 2. Game Lines if necessary, touch up game lines or markings following manufacturer s recommendation. Allow to dry 24 hours. Lightly abrade entire surface with used 120-150 grit screen or maroon pad. Thoroughly sweep and vacuum to remove all sanding dust. Tack using method in section I-D4. 3. Topcoat apply 1 coat of 80C80LV using T-bar, wood block mop or roller with synthetic pad or lambs wool. Good ventilation and fresh air movement are critical for 80C80LV to properly cure. Application conditions different from the ambient conditions guidelines set in 5

TECHNICAL BULLETIN Fax (905) 428-2057 section I-C can result to abnormally longer cure times manifested as a gummy or extremely soft coating. In such instances, the surface must be re-sanded in full. Allow final finish coat to dry for a minimum of 24 hours before floor can be walked on. Avoid dragging any object across the floor, as it is still susceptible to scuffing. Do not replace mats before full cure. Under normal conditions, curing process takes approximately 14 days. Resume normal activity after full cure. Avoid cleaning with water for 2 weeks, use dry cloth only. III. Residential and Commercial Floors A. Newly Installed Floors 1. Unstained Floor - Follow recommendations on Sections I-A for acclimation, I-C for ambient conditions, and I-D1 for sanding and screening or I-D3 for parquet floor. Thoroughly sweep and vacuum to remove all sanding dust and follow I-D4 for tacking method. a. Sealer Seal floor with 1 coat of 1C259 or 1C360 Sealer using T- bar, wood block mop or roller with synthetic pad, or lambs wool. Let dry 1 hour. When using multiple coats of 1C259 or 1C360, allow recoat time of 1 hour. Note failure to follow proper dry times of 1C259 or 1C360 can result to whitening of subsequent polyurethane topcoat. Buff with used 120-grit screen or maroon pad in between coats. Thoroughly sweep and vacuum to remove all sanding dust. Tack using method in section I- D4. If a lower odour sealer is preferred, use 1 coat of any 80C finish (Premium or Classic) instead of 1C259 or 1C360 as sealer using same applicator type. If using a matte to semi-gloss finish, ensure that product is mixed/stirred well before use to ensure uniform sheen. Avoid excessive mixing/shaking, which can cause bubbles to appear. Let dry for at least 8 hours or overnight. Buff with used 120-grit screen or maroon pad. Thoroughly sweep and vacuum to remove all sanding dust. Tack using method in section I-D4. Good ventilation and fresh air movement are critical for 80C finishes to properly cure. Application conditions different from the ambient conditions guidelines set in section I-C can result to abnormally longer cure times manifested as a gummy or extremely soft coating. In such instances, the surface must be resanded in full. b. Topcoat Apply 2 coats of 80C Classic Polyurethane Finish using T-bar, wood block mop or roller with synthetic pad or lambs wool. If a more durable Gloss Finish is required, use 80C80LV instead of 80C70LV. Let dry for at least 8 hours or overnight. Buff with used 120-grit screen or maroon pad in between coats. Thoroughly sweep and vacuum to remove 6

TECHNICAL BULLETIN Fax (905) 428-2057 all sanding dust. Tack following section I-D4. Good ventilation and fresh air movement are critical for 80C finishes to properly cure. Application conditions different from the ambient conditions guidelines set in section I-C can result to abnormally longer cure times manifested as a gummy or extremely soft coating. In such instances, the surface must be re-sanded in full. Allow final finish coat to dry for a minimum of 24 hours before floor can be walked on. Furniture can be placed onto the floor after 72 hours being careful not to drag or slide, as it s still susceptible to scuffing. Do not replace mats before full cure. Under normal conditions, curing process takes approximately 14 days. Resume normal activity after full cure. Avoid cleaning with water for 2 weeks, use dry cloth only. 2. Stained Floors - Follow recommendations on Sections I-A for acclimation, I-C for ambient conditions, and I-D1 for sanding and screening or I-D3 for parquet floor. Thoroughly sweep and vacuum to remove all sanding dust and follow I-D4 for tacking method. a. Stain Method I-D4 helps wood to pop grain, which will aid in stain acceptance and colour uniformity. Apply stain and allow to dry per manufacturer s recommendation. Typically, stains are allowed to dry for at least 24 hours under normal conditions. Always prepare a test panel to verify compatibility of stain and Schwartz Finish System. b. Topcoat Apply 2 coats of 80C Classic Polyurethane Finish using T- bar, wood block mop or roller with synthetic pad or lambs wool. If a more durable Gloss Finish is required, use 80C80LV instead of 80C70LV. Let dry for at least 8 hours or overnight. Buff with used 120- grit screen or maroon pad in between coats. Thoroughly sweep and vacuum to remove all sanding dust. Tack following section I-D4. Good ventilation and fresh air movement are critical for 80C finishes to properly cure. Application conditions different from the ambient conditions guidelines set in section I-C can result to abnormally longer cure times manifested as a gummy or extremely soft coating. In such instances, the surface must be re-sanded in full. Allow final finish coat to dry for a minimum of 24 hours before floor can be walked on. Furniture can be placed onto the floor after 72 hours being careful not to drag or slide, as it s still susceptible to scuffing. Do not replace mats before full cure. Under normal conditions, curing process takes approximately 14 days. Resume normal activity after full cure. Avoid cleaning with water for 2 weeks, use dry cloth only. 7

TECHNICAL BULLETIN Fax (905) 428-2057 B. Refinishing Old Floors 1. Unstained Floor Follow recommendations on Sections I-A for acclimation, I-C for ambient conditions, and I-D2 for sanding and screening for old hardwood floor or I-D3 for parquet floor. Thoroughly sweep and vacuum to remove all sanding dust and follow I-D4 for tacking method. a. Sealer follow III-A1-a b. Topcoat follow III-A1-b 2. Stained Floors - Follow recommendations on Sections I-A for acclimation, I-C for ambient conditions, and I-D2 for sanding and screening for old hardwood floor or I-D3 for parquet floor. Thoroughly sweep and vacuum to remove all sanding dust and follow I-D4 for tacking method. a. Stain follow III-A2-a b. Topcoat follow III-A2-b Sources: NWFA/NOFMA and MFMA Guidelines Schwartz Technical Data Sheet Date Created: January 28, 2014/MV 8