Risk - A Drilling Contractor s Perspectives. Anton Dibowitz, Vice President Marketing Paris, September 20 th 2011

Similar documents
Noble Corporation. Don Jacobsen Senior Vice President Industry & Government Relations Marine/Offshore Industry Conference 29 March 2012

4 Briefing. Responsible investor

Defining the New Normal for Offshore Drilling Copenhagen 16 June Alan Spackman Vice President, Offshore Regulatory & Technical Affairs

MTS Outlook Conference Equipment Manufacturers and Supplies. March 26, 2015

Industry Response - Post Macondo

7 Briefing. Responsible investor

Industry & Govt Changes Post Macondo. Charlie Williams Chief Scientist Shell Executive Director - Center for Offshore Safety

Drilling Market Outlook

Credit Suisse Energy Summit Transocean Ltd.

Mid-Atlantic Investor Meetings. February 2013

Sanford Bernstein Strategic Decisions Conference. May 2013

Pareto s Annual Oil & Offshore Conference

Enhancing Industry Capability for drilling Deepwater Wells A Chevron Perspective

Interspill UK Response Readiness. Mick Borwell Environmental Issues Director Oil & Gas UK

Subsea Tieback Forum

Macondo Blowout Lessons Learned for Prevention and Mitigation

Sanford Bernstein Strategic Decisions Conference. May 2014

The Future of Offshore Drilling: Beyond Ultra Deep. Chris Beckett, CEO Pacific Drilling S.A. September 22, 2014

New Developments in Regulation of U.S. Offshore Oil and Gas Operations

DEA Quarterly Meeting 18 November Bill Pike NISC, an IBM Company

Howard Weil Energy Conference

Overview. Introduction to Zenith. The Zenith Team. Current Projects. Kiln Lane. Summary. References

Goldman Sachs Global Energy Conference. January 2014

Oil & Gas Activity in the Canadian Arctic and Eastern Canada Activity

Well Control Contingency Plan Guidance Note (version 2) 02 December 2015

North Sea Safety Regulators responses to Macondo/Montara

I. Executive Summary. In addition to CRE s incorporated ICR comments, CRE makes the following comments.

EC-Drill MPD Dual Gradient Drilling

Subsea 7 Norway. Monica Th. Bjørkmann Sales and Marketing Director

Offshore Construction Management Services. Capability & Experience

Pareto Securities 20 th Annual Oil & Offshore Conference. Dan Rabun, Chairman & CEO. 4 September 2013

Presenter: John T. Gremp President and Chief Operating Officer. February 2011

DEA Technology Forum 17 Nov. 2011

What made Norway a deepwater hub

Offshore Regulatory Oversight on the U.S. Arctic Outer Continental Shelf

Marine Risers. Capability & Experience

Morgan Stanley Houston Energy Summit

Jefferies 2014 Global Energy Conference. Maryann Seaman Executive Vice President and Chief Financial Officer

To attract people and capital, industry must educate the public

SUBSEA 7 AND GRANHERNE ALLIANCE. Engaging Early to Deliver Value

Development. JOGMEC Techno Forum November 2014 Japan Drilling Co., Ltd. Drilling Technology Department Masahiro Nakamura

Resources for the Future. Arctic Potential

Analyst Day Real change starts here. Doug Pferdehirt, Chief Executive Officer

Introduction to Subsea Production Systems. What is Subsea? 02 What is Subsea? DNV GL DNV GL 2013 September 2014

JOINT INDUSTRY OFFSHORE OPERATING PROCEDURES TASK FORCE, JOINT INDUSTRY OFFSHORE EQUIPMENT TASK FORCE, JOINT INDUSTRY SUBSEA WELL CONTROL AND

September 12,

Accident prevention in the Barents Sea

Performance-Based Safety Regulation

Upstream at a Turning Point? Oil & Gas Summit 2014

InterMoor Innovation in Action. InterMoor: USA Mexico Brazil Norway Singapore & Malaysia UK West Africa

International Association of Drilling Contractors Policy, Governmental and Regulatory Affairs Strategy 2014

BT-4000 LIGHT WORKOVER UNIT

Preferred partner. Aker Solutions. Nordic Energy Summit 2013, 21 March Leif Borge CFO

i-tech SERVICES DELIVERING INTEGRATED SERVICES AND PRODUCTS ACROSS THE FIELD LIFE CYCLE

Husky Energy East Coast Update

Q Q Q Q Q % % 46.8% 61.0% 35.6% 57.5% 52.1% 60.5% 44.6% 63.3% 15,267 15,081 15,260 15,265 16,299

WELLVANTAGE REMOTE OPERATIONS DEEPWATER

New realities re-inventing our industry

Moving Boundaries Within Offshore Drilling Pareto's 18th annual Oil & Offshore Conference, Oslo, 31 th August 2011

GLOBAL RIG AND OFFSHORE CONSTRUCTION MARKETS

Rod Larson President, Latin America. Houston, Texas March 9-10, 2011

FMC Technologies Overview Fourth Quarter Director, Investor Relations Matt Seinsheimer

Title of Presentation. Presenter s Name Date of Presentation

Industry & Govt Changes Post Macondo

Arctic and Cold Climate. Capability & Experience

Subject: IADC s three year tactical plan:

SUBSEA WELL CONTAINMENT. Global Basis. Deepwater & Emerging Technologies Group (DETG) AADE Houston Chapter 25 January 2012

Click to edit Master title style APPEA AWIC UPDATE. Self Audit Checklist Source Control First Response

Head of Strategy & Relations - Michael Harboe-Jørgensen. 16 June 2014, Lindø Industrial Park, Denmark

Advancing Global Deepwater Capabilities

36 th Annual Marine Technology Society Outlook Conference

Introduction to Subsea Production Systems. What is Subsea? 02 What is Subsea? DNV GL DNV GL 2013 August 2015

The Inside Track on the Subsea Oil &

Offshore 101. August 11-12, 2014 Hilton Long Beach & Executive Meeting Center Long Beach, CA

Oil and Gas UK Well Integrity Guidelines

Experience, Role, and Limitations of Relief Wells

A Rebirth in the North Sea or simply a False Dawn

Growing Deepwater Capability Subsea UK 2009 Conference at the 2009 Oil and Gas Asia Exhibition 11 June 2009, Kuala Lumpur

Shaping competitive solutions for the future

AADE Houston Chapter. Group. 26 January 2011

National Academies Committee Performance-Based Regulation

Investor Relations Presentation April 30, 2013

Pareto Oil & Offshore Conference 2010

WSOG History & Future. A summary of the Development & Worldwide use of Well-Specific Operating Guidelines

WWF-Canada s Recommendations to the National Energy Board Regarding Arctic Offshore Drilling Requirements

Oil & Gas Offshore. Industry challenges in deepwater discover

OCS leasing program draft PEIS comments Attachment A

Deep Water Technology A Focus on Drilling US-China Oil & Gas Industry Forum

Latest developments in Asset Management - Oil and Gas production via Internet?

Capital Markets Day 31st of May. DOF Group Brazil

Forward-Looking Statement

SOLSTAD OFFSHORE ASA

Sam Shen, COOEC April, 2012

Marvin J. Migura Sr. Vice President & CFO Oceaneering International, Inc.

Emergency response in case of a blowout in shallow waters

BSEE Mandate for RTM Affect on Drilling Contractors

M. Kevin McEvoy. Oceaneering International, Inc. President & CEO. December 2, 2014 New York, NY. Safe Harbor Statement

February 23, Re: EO & Well Control and Blowout Preventer Rule. Via Electronic Transmittal. Dear Mr. Whiteman:

Taking a broader view

Kuala Lumpur 3 October 2012 State of the Industry of Riserless Light Well Interventions (RLWI)

Transcription:

Risk - A Drilling Contractor s Perspectives Anton Dibowitz, Vice President Marketing Paris, September 20 th 2011

The Cliff Notes The next barrels of oil are more challenging: More complex wells (deeper, HPHT, highly deviated, managed pressure) In more challenging locations (harsh environment, remote / frontier area) Under increased regulatory oversight (politically challenging areas, local content issues) After Macondo, everything has changed or has it? Changed perceptions/ attitudes towards risk Challenges to knock-for-knock indemnities Reactions and responses Managing risk QHSE focus Client base, geographic diversification, contract timing Asset integrity, personnel competence, management systems 2

3 The bigger finds are in deeper water

Deepwater brings technical challenges Challenges More remote locations Extreme pressures and temperatures Bigger wells, heavier loads Extended reach, highly deviated, longer horizontals More challenging reservoirs, more complexity 3km 324m 4

Major deepwater regions all have challenges Trend towards more complex and challenging resource plays 5

Selected deepwater finds 2011 Mauritania Sierra Leone French Guiana Tanzania Ghana Sao Tome & Principe Mozambique Democratic Republic of Congo 6 Significant finds in frontier plays

Arctic Drilling: Great Promise / Great Challenge Arctic developments to date have been in the least severe ice regimes Industry is moving to basins where water is deeper and ice environments are more severe Limited open water season creates challenges. Example Canadian Beaufort Sea Shelf (20-50m WD): 85 day season Shelf Edge (50-70m WD): 70 day season Slope (70-1200m WD): 50 day season Same season relief well (SSRW) capability (required in Canada, USA, Norway and Greenland) Alternatives to traditional relief wells will have to be found Ice flow severity by location 7

8 Access challenges

9 Infrastructure challenges

Political Instability Challenges Security concerns Protection of crews and assets Stunted development of local support, infrastructure, competence Tend to be areas of: High corruption: bureaucracy often implemented to compensate High cost: unattractive economics Contract issues War Risk, Force Majuere 10

Regulatory Challenges Access to emerging markets 11 75% of world known conventional resources are closed to international oil companies (Andy Gould, SLB) Restricted access from citizens groups and lobbyists Oil companies move further offshore, more remote, harsher environments Local Content Often high on the political agenda, regardless of practicality. Brazil: Crew, assets, pace Angola: Crew, local partners Nigeria: Asset ownership, currency Indonesia: Assets ownership China / Vietnam: NOC rig ownership Other Regulatory Issues Nigeria : Petroleum Industry Bill UK: Tax increases US GoM: Permitting process

Operators perception on risk 12

Post Macondo: Big picture Public perception of risks has changed Regulatory environment has changed If risk management has failed yet again, are there grounds for challenging the fundamental approach to risk and risk management? If management has failed yet again, are there grounds for challenging the fundamental approach being taken to management and control? Magne Ognedal, Director General PSA Operators expectations have changed Increased focus on higher specification assets Increased technical acceptance / inspection Focus on training and personnel competency Re-examination of contractual risk allocation 13

What are the operators saying? Question: How will oil services companies be exposed to risk from contracts (going forward)? Nothing has changed? 14

What are the operators doing? There has been a long standing agreement on allocation of risks between contractors and operators Risk goes with reward contractor is responsible its rig & crew, operator responsible for its well. BP / Transocean challenges this split Significant implications if indemnity provisions are negated by court Attitudes of some operators appear to already have changed Changed perception of risk? Opportunism? Regular business cycle give and take? Prudent / established contractors will just walk away Some contractor may take on liabilities they can t cover In the long run operators will end up bearing the risk anyway. 15

Post Macondo : Creating positives from tragedy The blow-out was ultimately stopped Any complacency that may have existed is gone Proactive responses from operators and contractors Increased focus / cooperation on blow-out response and capping systems US GoM: Marine Well Containment Company North Sea / Worldwide: Subsea Well Response Project 16

How are drilling contractors reacting? Numerous joint industry task forces (API, OGP) Revised IADC Guidelines (HSE Case for MODU s, DW Well Control) Redundancy (7 ram stacks, Dual BOP s) 17 Post Macondo orders favor established contractors

Evolving where we focus our QHSE efforts Source: Peter Sharpe EVP Shell, Shell Global Solutions International 18

Worldwide operations 6 units -3 Semis -2 Jack-up -1 Drillship 6 units - 2 Drillships - 2 Semi-tenders - 2 Jack-ups 10 units North America -2 Semis -1 Jack-up -1 Semi-tender Central & South America - 3 Semis - 1 Drillship - 2 Jack-ups - 2 Semis - 3 Drillships Newbuilds 14 units - 1 HE jack-ups - 4 BE jack-ups -3 Tender rigs -1 semi-tender 24 units - 2 Semis - 4 Semi-tenders - 9 Tender rigs - 8 Jack-ups 19 Worldwide operations diversifies risk

Floating Rig Availability Unit Customer 1Q 2011 2012 2013 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2014 2Q 3Q 4Q 2015 1Q 2Q 3Q 4Q West Leo - Newbuild West Capricorn - Newbuild West Polaris Exxon US$560,000 US$618,000 West Navigator 1, 4 Shell US$610,000 West Aquarius Exxon US$525,000 West Auriga - Newbuild West Hercules 3 Husky US$515,000 US$495,000 US$490,000 West Vela - Newbuild West Tellus - Newbuild West Gemini Total US$445,000 US$445,000 West Alpha 1, 4 BG Consortium US$503,000 US$477,500 US$477,500 West Capella Total US$542,000 West Sirius BP US$474,000 West Phoenix 1, 4 Total US$547,000 US$445,000 West Taurus 2, 3 Petrobras US$650,000 West Eminence 2, 3 Petrobras US$618,500 West Venture 1, 4 Statoil US$440,000 07.2017 West Orion 2, 3 Petrobras US$618,500 07.2016 West Pegasus PEMEX Newbuild Transit US$465,000 08.2016 Contract Option Yard plus transit period 20 Staggered contract rollover dates spreads risk

Customer base 21 Worldwide Prime client operations base reduces diversifies risk risk

Reducing risk by Setting the Standard Asset Integrity Focus on modern high specification assets Asset management to maintain competitive cost structure with sustainable integrity Consistent worldwide management systems / performance Minimum operational standards Verification of operational change / deviations from agreed standards Technical specification and maintenance philosophies Experience and best practice transfer Personnel training and competence Attract top class talent Position specific training and competence assurance Demonstration of training, competence, and reporting 22

Setting the Standard in Drilling Being our customers' most important partner in making oil and gas available through combination of: Competence High integrity assets Consistent and effective performance Delivering wells safely, efficiently and cost-effectively 23