OPERA RPC: installation and underground test results

Similar documents
The trigger system of the muon spectrometer of the ALICE experiment at the LHC

An ASIC dedicated to the RPCs front-end. of the dimuon arm trigger in the ALICE experiment.

arxiv: v1 [physics.ins-det] 25 Oct 2012

LHCb Preshower(PS) and Scintillating Pad Detector (SPD): commissioning, calibration, and monitoring

Aging studies for the CMS RPC system

Operation and performance of the CMS Resistive Plate Chambers during LHC run II

A tracking detector to study O(1 GeV) ν μ CC interactions

CMS RPC HL-LHC upgrade with fast timing detectors

arxiv: v1 [physics.ins-det] 13 Jul 2018

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

Micromegas for muography, the Annecy station and detectors

1 Detector simulation

GEM beam test for the BESIII experiment

The (Speed and) Decay of Cosmic-Ray Muons

Resistive Plate Chambers for Experiments at India-based Neutrino Observatory(INO) Saikat Biswas VECC, Kolkata India

Measurement of Characteristic Impedance of Silicon Fiber Sheet based readout strips panel for RPC detector in INO

Full characterization tests of Micromegas with elongated pillars

Gas Electron Multiplier Detectors

The CMS Outer HCAL SiPM Upgrade.

AIDA-2020 Advanced European Infrastructures for Detectors at Accelerators. Deliverable Report. CERN pixel beam telescope for the PS

Study of Resistive Plate Chambers Scintillation detectors and Reconstruction of muon tracks in RPCs

Pixel hybrid photon detectors

Trigger Rate Dependence and Gas Mixture of MRPC for the LEPS2 Experiment at SPring-8

Development of large readout area, high time resolution RPCs for LEPS2 at SPring-8

arxiv: v1 [physics.ins-det] 9 Aug 2017

CONTROL AND READOUT ELECTRONICS OF THE TIME- OF-FLIGHT SYSTEM OF THE MPD

A METHOD TO ADJUST THE IMPEDANCE OF THE SIGNAL TRANSMISSION LINE IN A MULTI-STRIP MULTI-GAP RESISTIVE PLATE COUNTER

Construction and Performance of the stgc and Micromegas chambers for ATLAS NSW Upgrade

Development and Characterization of 2m x 2m Glass Resistive Plate Chambers

Resolution studies on silicon strip sensors with fine pitch

Tracking and Alignment in the CMS detector

The Multigap RPC: The Time-of-Flight Detector for the ALICE experiment

Gas Detectors for μ systems

Spectrometer cavern background

AIDA-2020 Advanced European Infrastructures for Detectors at Accelerators

The CMS Muon Detector

The 1st Result of Global Commissioning of the ATALS Endcap Muon Trigger System in ATLAS Cavern

Backgrounds in DMTPC. Thomas Caldwell. Massachusetts Institute of Technology DMTPC Collaboration

Draft proposal for the LHCb muon detector using RPC

irpc upgrade project for CMS during HL-LHC program

Plans for RPC DHCAL Prototype. David Underwood Argonne National Laboratory

MuLan Experiment Progress Report

LA MICROSCOPIA AUTOMATICA

Lecture 11. Complex Detector Systems

Multianode Photo Multiplier Tubes as Photo Detectors for Ring Imaging Cherenkov Detectors

Novel MPGD based Detectors of Single Photons for COMPASS RICH-1 Upgrade

Construction and Performance of the stgc and MicroMegas chambers for ATLAS NSW Upgrade

FAST KICKERS LNF-INFN

arxiv: v2 [physics.ins-det] 20 Oct 2008

8.882 LHC Physics. Detectors: Muons. [Lecture 11, March 11, 2009] Experimental Methods and Measurements

Micromegas TPC. SLAC American LC Workshop. Magnetic field cosmic ray tests

Commissioning Status and Results of ATLAS Level1 Endcap Muon Trigger System. Yasuyuki Okumura. Nagoya TWEPP 2008

Improving the RPC rate capability

Attilio Andreazza INFN and Università di Milano for the ATLAS Collaboration The ATLAS Pixel Detector Efficiency Resolution Detector properties

THE LHC is expected to be upgraded to the HL-LHC

Stretched Wire Test Setup 1)

Studies of a Bulk Micromegas using the Cornell/Purdue TPC

FAST RF KICKER DESIGN

Scintillators as an external trigger for cathode strip chambers

Status of the PRad Experiment (E )

Development of Large Area and of Position Sensitive Timing RPCs

Performance of 8-stage Multianode Photomultipliers

arxiv: v1 [physics.ins-det] 3 Jun 2015

CALICE AHCAL overview

arxiv:physics/ v1 [physics.ins-det] 19 Oct 2001

Operation of a LAr-TPC equipped with a multilayer LEM charge readout

Large area position-sensitive CVD diamond detectors for X-ray beam monitoring with extreme position resolution

arxiv: v1 [physics.ins-det] 9 May 2016

Uva GEM R&D Update. Nilanga Liyanage

P ILC A. Calcaterra (Resp.), L. Daniello (Tecn.), R. de Sangro, G. Finocchiaro, P. Patteri, M. Piccolo, M. Rama

FABRICATION AND CHARACTERISATION OF RESISTIVE PLATE CHAMBER.

Study of the ALICE Time of Flight Readout System - AFRO

The on-line detectors of the beam delivery system for the Centro Nazionale di Adroterapia Oncologica(CNAO)

CH 1. Large coil. Small coil. red. Function generator GND CH 2. black GND

CATIROC a multichannel front-end ASIC to read out the SPMT system of the JUNO experiment

Phase 1 upgrade of the CMS pixel detector

Micromegas calorimetry R&D

DHCAL Prototype Construction José Repond Argonne National Laboratory

The Commissioning of the ATLAS Pixel Detector

A large area TOF-tracker

Octal ASD Certification Tests at Michigan

Characterization of the stgc Detector Using the Pulser System

TPC Readout with GEMs & Pixels

Current Status of ATLAS Endcap Muon Trigger System

The High-Voltage Monolithic Active Pixel Sensor for the Mu3e Experiment

Testing the Electronics for the MicroBooNE Light Collection System

Average energy lost per unit distance traveled by a fast moving charged particle is given by the Bethe-Bloch function

Muons & Particle ID. Muon/PID Studies

Beam Loss Monitoring (BLM) System for ESS

5. RESISTIVE PLATE CHAMBERS

CMS Silicon Strip Tracker: Operation and Performance

Design and Construction of Large Size Micromegas Chambers for the ATLAS Phase-1 upgrade of the Muon Spectrometer

A Large Low-mass GEM Detector with Zigzag Readout for Forward Tracking at EIC

High counting rate, differential, strip read-out, multi gap timing RPC

Multi-Wire Drift Chambers (MWDC)

Development of Floating Strip Micromegas Detectors

LABORATÓRIO DE INSTRUMENTAÇÃO E FÍSICA EXPERIMENTAL DE PARTÍCULAS

Test and Simulation of Plastic Scintillator Strips readout by Silicon Photomultipliers

DALLA LUCE VISIBILE AI RAGGI X: NUOVI RIVELATORI DI IMMAGINI PER RAGGI X A DISCRIMINAZIONE IN ENERGIA ED APPLICAZIONI

CMS Note Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

Transcription:

VII Workshop on Resistive Plate Chambers and Related Detectors Korea University, Seoul October 10-12, 2005 The OPERA RPC system: installation and underground test results A. Longhin (INFN & Padova University) on behalf of the OPERA RPC group (Bologna, LNF, LNGS-L'Aquila, Napoli, Padova, Zagreb)

Outline Introduction to the OPERA RPC system Installation of RPCs Underground RPC test results efficiency currents noise maps cluster size Conclusions and Outlook

The OPERA detector 2 SuperModules & 2 Spectrometers 31 walls/supermodule 52 x 54 bricks/wall Tot. 206.336 bricks 1.8 kton detector @ Gran Sasso Hall C

The OPERA detector RPCs!!! 2 SuperModules & 2 Spectrometers 31 walls/supermodule 52 x 54 bricks/wall Tot. 206.336 bricks 1.8 kton detector @ Gran Sasso Hall C

RPCs & the OPERA spectrometer coil iron top 200 1 i= Dipolar magnet (B=1.55 T) 22+2 layers equipped with horizontal and vertical digital strip readout 5 cm iron + 1 cm gap RPC iro bs a l ns RPC RPC XPC RPC A B= 5T 5. 1 ν 0.6 mm RPC + PET film + H/V strips planes + plastic foam iron base coil

OPERA RPCs Standard bakelite RPC (General Tecnica) Streamer mode operation Rectangular shape: area ~ 3.2 m2 + grooves to house the structure of bolts of the spectrometer Lexan spacers (10 cm pitch) Single 2 mm gap Plastic laminate (HPL) 2 mm thick electrodes ρ 1011-1012 Ω cm H.V. Graphite ρ 100 kω/ 190 µm PET film

The OPERA RPC system: layer During installation Ro Ro w Ro w w n.5 n.4 Ro w Ro w n. 7 n. 6 Bolts 1 Layer = 7 3 RPCs (~70 m2) n.3 A-type (upper row) Row n.2 Row n.1 B-type (lower rows)

The OPERA RPC system: layer Independent HV connections AE AI AE gas flow row n.6 BE BIM BE gas flow row n.5 gas flow row n.4 rock side 8m Each row is flushed separately from rock side to corridor side row n.7 row n.3 gas flow row n.2 gas flow row n.1 BES BI BES gas flow 8.75 m

The OPERA RPC system: layer Digital readout 336 vert. strips (26 mm wide) rock side 8.75 m

The OPERA RPC system: layer Digital readout 224 hor. strips (35 mm wide) rock side

The OPERA RPC system: S.M. 1 spectrometer = 22 layers ~ 500 RPCs ~ 1600 m2

The OPERA RPC system 2 spectrometers = 44 layers ~ 1000 RPCs ~ 3200 m2 BE AE AI 8 meters AE BIM BE BES BES BI ~ 25.000 channels

Installation Due to the nature of the detector the installation of RPCs and of the mechanical structure had to be synchronous. RPCs are safely locked inside the iron slabs and hence not fully accessible thereafter! beside detailed surface quality tests... ( The quality control tests for the RPCs of the OPERA experiment, Nucl. Instrum. Meth. A 533 (2004) 203)... several online checks on RPCs also performed during installation : Flux RPC rows with N2 for ~ 0.5 days, @ 6.5 kv measure currents vs time during irons slabs installation to check possible increase due to anomalous pressure/strains to check HV connections Check continuity of signal strips Check tightness of gas connections (over several hours)

Installation phases (I) signal cables vertical strips

Installation phases (II) 3 RPCs in one shot Gas + HV connections at gound level RPCs mounted by mean of a cradle

Installation phases (III)

Installation phases (IV)

Installation milestones 30th November 2003 First RPC wall completed 19th May 2004 First Spectrometer completed 16th March 2005 Second and Final Spectrometer completed

Underground test set-up A general test of installed RPCs became possible in spring 2005 4 full layers were instrumented to reconstruct real (cosmic) tracks and measure efficiency, strip multiplicity, tracking performances besides currents, and noise.

Underground test set-up (I) 4 RPC layers tested (~1/10 of the whole detector): n. 19 22 of spectrometer A 84 RPCs in total (4 layers 7 rows 3 RPCs) ~ 280 m2 ν beam

Underground test set-up (II) Final HV system and signal cabling Gas system: Ar / C2H2F4 / I-C4H10 / SF6 = 75.4 / 20 / 4 / 0.6 Premixed bottles (< 4 days autonomy at 5 refills/day) No exhaust, as gas flow (~ 0.1 m3/h) << air flow inside Hall C (~10000 m3/h) Dedicated Electronics: 896+1344 channels read out by MACRO FE boards Dedicated DAQ: CAMAC acquisition of a STAS system B=0

Underground test set-up (III) DAQ electronics OPERA HV-distributors and na-meters HV control + FE boards and DAQ system on top of the spectrometer DAQ PC HV Power Supply

FE electronics Horizontal strips FE board: 32 ch (7/layer 896 ch in total) Positive signal input 1.2 µs TTL output Vertical strips FE board: 8 ch (42/layer 1344 ch in total) Negative signal input 10 µs TTL output

FE electronics: horizontal strips MACRO FE boards originally designed for streamer tube strips (preamplifier + discriminator) Input signal Preamp. output Typical RPC signal: rise-time 10 ns trail-time 30 ns Digital Output 100 mv on preamp. output = 40 mv effective threshold on signals

FE electronics: vertical strips MACRO FE boards originally designed for streamer tube wires (no preamplifier, fixed threshold discriminator) Input signal Fixed threshold = 15 mv Output

Preliminary tests (I) Efficiency Efficiency The working voltage and thresholds were fixed according to the results of the cosmic rays surface tests at the external Gran Sasso laboratory Horizontal FE boards Working voltage: 5.6 kv On preamp. output V (kv) thr = 130 mv Threshold: Not too low noise Not too high low efficiency thr = 150 mv 150 mv looks appropriate for horizontal FE boards, but thr = 200 mv thr = 260 mv V (kv)

Preliminary tests (II) A good threshold for horizontal FE boards is 100 mv Efficiency Efficiency Signal cables: 7-13.5 m long 15 m long twisted flat cables lower signal amplitude significantly threshold = 150 mv no cable 15 m cable V = 5.65 KV 15 m cable no cable V (KV) threshold (mv)

Underground measurements ~ 60 h of data-taking ~ 1300 reconstructed µ (24 di-µ, 3 tetra-µ,1 hexa-µ) Efficiency and cluster size measurement (layer 20) Rate, operating current vs HV for all tested layers Noise maps for all tested layers

Event display: single µ Horizontal view Vertical view

Event display: di-µ Horizontal view Vertical view

Event display: µ bundle Horizontal view (very low angle!) Vertical view

Event display: µ bundle Horizontal view (very low angle!) Vertical view

Efficiency (II) geometrical limit (96%) Trigger : AND of layers 19, 21, 22 (horizontal strips) 19 20 21 22? vertical view horizontal view OR of both Off-line tracking Good efficiency! No difference among the two views no efficiency loss due to electronics

Counting rates (I) Vertical Rate (Hz/m2) Rate (Hz/m2) Horizontal V (kv) V (kv) @ 5.6 kv (working point) ~ 17 Hz/m2 (1.2 khz/layer - cosmics 6 mhz/layer!) Slightly lower for vertical strip planes Good uniformity among different layers (different colours in the plot)

Counting rates (II) Down Horizontal Up Corridor Vertical Rock 22 21 20 19

Noise maps counts Self-triggered layer AND of hor. and vert. strips Intrinsic noise location bins ~ 3 3 cm2 The most noisy rate: ~ 2 Hz / bin The Average: 0.015 Hz/bin The Quality test cut: 5 Hz/bin Some patterns seen at quality test at surface are confirmed Layer 20

i (na) Currents Layer 20 - row n.1 (1 row = 3 RPCs) Very low currents, also at low voltage Current @ V= 5.6 kv V (kv) Ohmic current slope di/dv = 23 na/kv All di/dv (na/kv) st e t 28 i5.6 = 260 na w o r ed s i (na)

Cluster size @5.2 kv C.S. = 2.0 vertical view horizontal view OR of both @5.6 kv C.S. = 2.8 @5.8 kv C.S. = 3.1 Cluster size V (kv) Vertical Horizontal V (kv)

Fit residuals in cluster-size bins Fit residuals Clust. Size = 1 Clust. Size = 2 Residuals Clust. Size = 3 Cluster size is function of: Electronics (threshold) well contained within 1 strip (~3 cm) extrapolation to OPERA not straightforward Particle impact point Cross-talk (high cluster size values) Clust. Size = 4

Cosmic muon simulation Parametrization of cosmic muon intensity based on the map of Gran Sasso rock (GENERA2 from MACRO) + GEANT3 simulation + digitisation

µ angular distributions & absolute rate All events: (visual scan to skip casual coincidences, noise) south north MC : (18.5 ± 0.4) µ/h Data: (21.0 ± 0.6) µ/h Absolute MC normalisation Clean events: (1 cluster/plane/view, χ2 < 2): MC : (15.2 ± 0.3) µ/h Data: (15.6 ± 0.5) µ/h Θhor< 0 Rock side (Teramo) Θhor > 0 Corridor side (L'Aquila) φver Corridor side (L'Aquila) Rock side (Teramo) Seen from top

Residuals Straight line fit Trigger planes (used in the fit) Layer 20 (not used in the fit) No alignment Absolute MC normalisation Residuals well described by MC!

Conclusions and Outlook Complete OPERA RPC system installed since March 2005 RPC commissioning started on 4 layers (over 44 of the two spectrometers) with no major problems (efficiency, currents, noise, grounding) Good efficiencies measured (96%, due to geometry) Low and stable currents observed (i5.6 = 260 na) Counting rates < 20 Hz/m2 (1.2 khz/layer @ 5.6 kv) Intrinsic detector noise not increased wrt to QC tests (noisemaps) Cosmic angular distributions: good MC description in shape and normalisation without hard tuning Satisfactory results, even with low statistics After this first validation, future tests (starting these days) tests will be with final electronics

s de sli ku p Ba c

Noise maps Layer 19

Noise maps Layer 21

Noise maps Layer 22

Event display: casual coincidence Horizontal view Vertical view

Event display: noise Horizontal view Vertical view

Event display: elevator induced noise Horizontal view Vertical view