Section 7 Notes and Annotations

Similar documents
Survey Data and TOPO Checklist

Florida's Turnpike Enterprise Roadway Phase III (90%) & Phase IV (100%) Check List Per FDM and TDH Part 3

TYPICAL SECTIONS TYPICAL NO. 1 (MAINLINE) STA TO STA STA TO STA ROUNDING DETAIL TYPICAL NO.

CONTRACT PLANS READING

Maintenance of Traffic sequence of operations including any phasing and detour maps;

Town of Westlake Construction Plans Review Checklist

Section 4-02 Typical Sections TABLE OF CONTENTS. INTRODUCTION...2 General...2

Construction Plan Reading Basics & Applications

STATE OF KANSAS DEPARTMENT OF TRANSPORTATION PLAN AND PROFILE OF PROPOSED STATE HIGHWAY FEDERAL AID PROJECT 1 PAWNEE COUNTY US-56

PLAN RATINGS & COMMON ERRORS TO WATCH FOR IN PLANS

50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges

CHAPTER 3 INFORMATION REQUIRED FOR PUBLIC IMPROVEMENT CONSTRUCTION PLANS TABLE OF CONTENTS

The several methods for making linear measurements are quite simple and straightforward. They are described below:

DESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA

B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422

Project Name: County File No.: Checked by: For: Date:

MICHIGAN DESIGN MANUAL ROAD DESIGN CHAPTER

Survey Control Point Observations

LONGITUDINAL PROFILE COMPLETION

Plan Preparation Checklist

ROUTES: 65 SECTIONS: miles in length. THE FOLLOWING ITEMS AND APPROXIMATE QUANTITIES ARE INVOLVED:

DEVELOPMENT PLAN CHECKLIST

MSD STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY

Porter County Plan Commission

INSTRUCTIONS: 1. Record the transmittal letter number, date, and subject on the transmittal record sheet located in the front of the manual.

LOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee)

Please remove and replace the entire Table of Contents, Section A to Section J and all Appendices.

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS

SurvCADDR. Section - Profile Module. File Modify Display Draw Inq-Set Pnts Profiles Design Sections Misc PRODUCT DESCRIPTION BENEFITS & ADVANTAGES

MAINTENANCE HOLES, CATCH BASINS AND DITCH INLETS - MTC FORM 407 INDEX

Plan Submittal Checklist for Permit Projects Compliance Required Information. (Answer Yes or Not Applicable (NA)) Yes NA

Appendix E-4. City of Fort Collins. Requirements for Utility Plans

CITY OF MUSKEGO DRAFTING STANDARDS

Manhole or Catch Basin Type A & B Cone Sections Precast - Design F Manhole or Catch Basin Cover (Reducer Cone Section Precast) Design D

Government Of Newfoundland & Labrador Municipal Water, Sewer And Roads Master Construction Specifications

James P. Erb, CPA Auditor-Controller Treasurer-Tax Collector James W. Hamilton, CPA Assistant Auditor-Controller Treasurer-Tax Collector

AMENDMENT TO ADVERTISED CONTRACT

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST

Chapter 13 Plan Submittals

City of Massillon Site Plan Checklist

IF YOU WERE GIVEN the task of installing a drainage

CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION:

City of Beaumont. Public Works Engineering. Street Improvement Plan Checklist REV 4/18/16

SECTION 6A ROADWAY PLAN PREPARATION

Standard Plate 7036 is discontinued. It is replaced by Standard Plan Pedestrian Curb Ramp Details.

REPORT TO COUNCIL DORWICK DITCH PETITION REHABILITATION PROJECT JUNE 8, 2016

RRR Design & Modeling with the FDOT Civil 3D State Kit

Sewer Line Extension Permit Design Checklist

Plan Preparation Guide. Chapter 18 QUALITY CONTROL / QUALITY ASSURANCE

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST

PROJECT NAME: TRACT, PARCEL MAP PROJECT ID NO. PLAN CHECKED BY: 1ST CHECK 3RD CHECK 2ND CHECK COMMENTS FINAL MYLAR DATE CHECKED:

3. The PAC (Permit Application Center) will notify the design professional of plan review results.

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS

Current Standard Plates including Transmittal Letters are available on the web at:

Authorized Agent: City of Manassas Check List Attached: Contact: Address: Phone Number: Fax Number: Developer s Name: Phone Number:

SUBJECT: Standard Plate Turf Establishment Areas (at Pipe Culvert Ends)

SUBJECT: Standard Plate 9102 Turf Establishment Areas At Pipe Culvert Ends

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360)

Existing and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards.

2. Remove from the Standard Plate manual: Standard Plate Index, Sheets 1-4 of 4, Numerical Index of Standard Plates (August 31, 2012)

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

SHLDR + + Ê HOMINY TRAIL #4 REBAR 24"O.C. 4" TYPE 5 AGG. BASE TRAIL WALL 9 5' SHLDR 2' SHLDR Ê TRAIL #4 24" O.C.

3.4 The Slope of a Line

CHECKLIST 9-O. 24. Area of project in square feet and acres? C-1 d

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST

CITY OF DANA POINT DEVELOPMENT REVIEW

Council Policy Engineering Drawing Submission Requirements

SUBJECT: Standard Plates 4132, 4155, Drainage Structures and Castings Info

580 - NOISE BARRIERS OPSS 580 INDEX

REQUIREMENTS. for ENGINEERING SERVICES PUBLIC CONSTRUCTION PROJECTS

TYPICAL SECTION OF IMPROVEMENT

SECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS

SUBDIVISION APPLICATION FOR DRT SUBMITTAL PUBLIC WORKS DEPARTMENT

ACSA PLAN REVIEW CHECKLIST (Guideline Only) (4) Standard water and sewer general plan notes (attached).

Exhibit A Scope of Services and Deliverables West Swan River Bridge Approaches

B-PERMIT PLAN CHECK MANUAL

STANDARD DRAWINGS INDEX MODIFIED FOR CENTRAL REGION Revised August 6, 2018

SD DEPARTMENT OF TRANSPORTATION OFFICE OF ROAD DESIGN

STANDARD BID ITEM NUMBERS

CHAPTER 2C - PRELIMINARY DESIGN. General... 2C-1. Review of Work Load... 2C-2 Establishing Priorities... 2C-2

MOUNTAIN VIEW CORRIDOR PROJECT OVERVIEW MAP SHEET A

MINIMUM DRAWING REQUIREMENTS FOR WATER AND SEWER LINE PROJECTS

CHAPTER 11. Plan Standards

NEWTON COUNTY WATER AND SEWERAGE AUTHORITY RESIDENTIAL, COMMERCIAL, INSTITUTIONAL AND INDUSTRIAL SUBDIVISIONS CONSTRUCTION PLANS CHECK LIST

3. DESIGN SPECIFICATIONS

7000 Fifteen Mile Road Sterling Heights, Michigan

Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02

PRECISE GRADING PLAN CHECKLIST

DIVISION A GENERAL AND DRAFTING ENGINEERING STANDARDS

CHECKLIST 8-O. Highlands County Engineering Department Improvement Plan Checklist

Bestall Collaborative Limited Planning Environment Construction Management Development

Section 101. Street Design

8.1 Control. 8.2 Sheet Setup

Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project

Washington County Road Engineering Plan Submittal/Review Checklist

TURNPIKE DESIGN HANDBOOK (TDH) DESIGN CRITERIA PART 2

Zoning District: R-1, R-2, and R-4 Applicant: Exeter Rose Farm, LLC, 953 Islington Street #23D Portsmouth, NH 03801

Detail Design for State Project

REQUEST FOR PROPOSAL AERIAL PHOTOGRAPHY & DIGITAL MAPPING ROADS DEPARTMENT

Transcription:

Section 7 Notes and Annotations Drive Structure Fence Begin/End Project, Crossing Utilities, Eisting Ground, Finished Grade, Flow Lines Guardrail, Mailbo, Present/Proposed/Temporary Right of Way Special Ditches, Special/Typical Paved Ditches, Superelevation, Top of Cut/Toe of Slope Numbering Format and Rounding Chart

Drive Notes Permanent Drives: OF DRIVEWAYS STATION LT. RT. TYPE LENGTH WIDTH LT. RADII RT. PLAN VIEW PROFILE VIEW CROSS SECTION SHEET +. ASPH. TYPE 1 00.00' 12' 10' 10' +. CONC. TYPE 1 00.00' 12' 10' 10' TYPE 1 DR. TYPE 1 DR. TYPE 1 DR. TYPE 1 DR. +. ASPH. TYPE 2 00.00' 17' 15' 15' TYPE 2 DR. TYPE 2 DR. +. CONC. TYPE 2 00.00' 18' 15' 15' TYPE 2 DR. TYPE 2 DR. +. ASPH. TYPE 2A 00.00' 17' 15' 5' TYPE 2A DR. TYPE 2A DR. +. CONC. TYPE 2A 00.00' 18' 5' 15' +. ASPH. STREET 00.00' 26' 25' 25' +. CONC.STREET 00.00' 26' 25' 25' +. ASPH. SL 00.00' 26' 25' 25' +. CONC.SL 00.00' 26' 25' 25' +. TBSC SL 00.00' 28' 25' 25' TYPE 2A DR. STREET STREET AS DIKE SL SL AS DIKE CONST. TBSC SL W/ " CGSPA SD TYPE 2A DR. SL STREET AS DIKE STREET SL AS DIKE CONST. TBSC SL W/ " CGSPA SD +. ASPH. DR. 00.00' 12' 15' 15' DR. W/ CGSPA SD DR. W/ CGSPA SD +. CONC. DR. 00.00' 12' 15' 15' DR. W/ CGSP SD DR. W/ CGSP SD +. TBSC DR. 00.00' 15' 15' 15' CONST. TBSC DR. AS DIKE CONST. TBSC DR. AS DIKE 7.1.1

Drive Notes Temporary Drives: OF DRIVEWAYS STATION LT. RT. TYPE LENGTH WIDTH LT. RT. RADII PLAN VIEW PROFILE VIEW CROSS SECTION SHEET +. TEMP TBSC DR. 0.00' 12' 15' 15' +. TEMP TBSC DR. 0.00' 12' 15' 15' +. +. TEMP TBSC SL TEMP TBSC SL TETURN 0.00' 27' 25' 25' 0.00' 26' 25' 25' CONST. TEMP. TBSC DR. TBSC DR. TBSC SL TBSC SL TBSC DR. TBSC DR. TBSC SL TBSC SL Permanent and temporary drive notes are usually combined into one summary. All stations and measurements will use a 2 decimal numeral rounding. Event points should be added to the design surface and CrossSections at all Permanent and Temporary drive locations. Plan View CrossSection View 7.1.2

Structure Notes Permanent Structures: OF DRAINAGE STRUCTURES STR. NO. P&P SHT. NO. STATION DESCRIPTION PLAN VIEW PROFILE VIEW CROSS SECTION SHEET 1 +. CONST. _' _' _._' LG. RCB _._ LG. LT. & _._' LG. RT 1 STR. 1 CONST. _' _' _._' LG. RCB _._ LG. LT. & _._' LG. RT. STR. 1 CONST. _' _' _._' LG. RCB _._ LG. LT. & _._' LG. RT. 2 +. CONST. _' _' _._' LG. RCB SKEW _ RT. FWD. _._' LG. LT. & _._' LG. RT. 2 STR. 2 CONST. _' _' _._' LG. RCB SKEW _ RT. FWD. _._' LG. LT. & _._' LG. RT. STR. 2 CONST. _' _' _._' LG. RCB SKEW _ RT. FWD. _._' LG. LT. & _._' LG. RT. 3 +. ET. EIST. _' _' _._' RDY. RCB _._ LG. LT. & _._' LG. RT 3 STR. 3 ET. EIST. _'_' _._' RDY. RCB _._ LG. LT. & _._' LG. RT. STR. 3 ET. EIST. _' _' _._' RDY. RCB _._ LG. LT. & _._' LG. RT. 4 +. ET. EIST. _' _' _._' RDY. RCB SKEW _ LT. FWD. _._' LG. LT. & _._' LG. RT. 4 STR. 4 ET. EIST. _' _' _._' RDY. RCB SKEW _ LT. FWD. _._' LG. LT. & _._' LG. RT. STR. 4 ET. EIST. _' _' _._' RDY. RCB SKEW _ LT. FWD. _._' LG. LT. & _._' LG. RT. 5 +. CONST. _" _' LG. RCP 5 STR. 5 CONST. _" _' LG. RCP STR. 5 CONST. _" _' LG. RCP 6 +. CONST. _" _' LG. RCP SKEW _ LT. FWD. 6 STR. 6 CONST. _" _' LG. RCP SKEW _ LT. FWD. STR. 6 CONST. _" _' LG. RCP SKEW _ LT. FWD. 7 +. ET. EIST. _" _._' RDY. RCP 7 STR. 7 ET. EIST. _" _._' RDY. RCP STR. 7 ET. EIST. _" _._' RDY. RCP 8 +. ET. EIST. _" _._' RDY. RCP SKEW _ LT. FWD. 8 STR. 8 ET. EIST. _" _._' RDY. RCP SKEW _ LT. FWD. STR. 8 ET. EIST. _" _._' RDY. RCP SKEW _ LT. FWD. 9 +. 10 +. 11 +. CONST. " ' CGSP SD W/ CET. ' LT. CONST. " " ' CGSPA SD W/ PCES. ' RT. CONST. " " ' CGSP SD W/ SCES. ' RT. 9 (See Drive Note) (See Drive Note) 10 (See Drive Note) (See Drive Note) 11 (See Drive Note) (See Drive Note) Denotes the length of the eisting structure. 7.2.1

Structure Notes Temporary Structures: OF DRAINAGE STRUCTURES ST R. NO. P&P SHT. NO. STATION DESCRIPTION PLAN VIEW PROFILE VIEW CROSS SECTION SHEET T1 +. CONST. TEMP. _' _' _._' LG. RCB _._ LG. LT. & _._' LG. RT T1 STR. 1 CONST. TEMP. _' _' _._' LG. RCB _._ LG. LT. & _._' LG. RT. STR. 1 CONST. TEMP. _' _' _._' LG. RCB _._ LG. LT. & _._' LG. RT. T2 +. CONST. TEMP. " ' CGSP SD W/ CET. ' LT. T2 (See Drive Note) (See Drive Note) Permanent and temporary structures are usually combined into one summary. All stations and measurements will use a 2 decimal numeral rounding. Event points should be added to the design surface and CrossSections at: o crossing perpendicular structures locations o wingwall endpoints o Inlet, outlet and center line crossing locations on all skewed structures o storm sewer inlet/manhole locations Plan View 7.2.2

Profile View CrossSection View 7.2.3

Fence Notes OF FENCE STATION TO STATION LT. RT. PLAN VIEW PROFILE VIEW CROSS SECTION SHEET +. to +.. TO. CONST. FENCE STYLE SWF (5BW) +. to +.. TO. CONST. FENCE STYLE CLF ( HIGH) W/ GATES +. to +.. TO. CONST. FENCE STYLE WWF W/ GATES Stations limits are not confined to the P&P sheet. Summary should include note: ALL CLF & WWF ECLUDE GATE WIDTH. All stations and measurements will use a 2 decimal numeral rounding. Plan View 7.3.1

Summary, Plan, Profile & Cross Section Notes BEGIN AND END PROJECT BEGIN INCIDENTAL CONSTRUCTION BEGIN INCIDENTAL CONSTRUCTION STA. 2045+00.00 BEGIN PROJECT BEGIN PROJECT END PROJECT END INCIDENTAL CONSTRUCTION AND BEGIN PROJECT END PROJECT AND BEGIN INCIDENTAL CONSTRUCTION END INCIDENTAL CONSTRUCTION BEGIN PROJECT END PROJECT END INCIDENTAL CONSTRUCTION AND BEGIN PROJECT END PROJECT AND BEGIN INCIDENTAL CONSTRUCTION END INCIDENTAL CONSTRUCTION CROSSING UTILITIES PLAN VIEW PROFILE VIEW CROSS SECTION SHEET STA. 2080+85.97 2-WIRE POWER O.H. ""ING! LOW WIRE ELEV.= 1060.18' WATER LINE CROSSING ELEVATION UNKNOWN EISTING NOTE SHOULD BE PROVIDED BY SURVEY EISTING GROUND PLAN VIEW PROFILE VIEW CROSS SECTION SHEET EISTING * *! SURVEY, CRL, DETOUR FINISHED GRADE PLAN VIEW PROFILE VIEW CROSS SECTION SHEET FINISH GRADE * *! SURVEY, CRL, DETOUR FG= 1234.56 FG= 1234.56 FLOW LINES PLAN VIEW PROFILE VIEW CROSS SECTION SHEET STA. 2080+79.15! 24"81.4' RDY. RCP ""ING! 26.9' RT. & 30.7' LT. \ ELEV. = 1032.79 RT. & 1032.14 LT. EISTING FLOW LINES SHOULD BE PROVIDED BY SURVEY RT. \= 123.45 LT. \= 123.47 EIST. RT. \= 123.45 EIST. LT. \= 123.47 RT. \= 123.45 LT. \= 123.47 EIST. RT. \= 123.45 EIST. LT. \= 123.47 7.4.1

Summary, Plan, Profile & Cross Section Notes GUARDRAIL STATION TO STATION LT. RT. CONST. GUARDRAIL _+_._ to _+_. +_._ to _+_._ MAILBO PLAN VIEW PROFILE VIEW CROSS SECTION SHEET STATION TO STATION LT. RT. 324+22.49 STA. 324+22.49 25' LT. MAILBO INSTALLATION SINGLE, TYPE 1 PRESENT RIGHT OF WAY PRES. R/W PROPOSED RIGHT OF WAY R/W R/W PRES R/W TEMPORARY RIGHT OF WAY TEMP. R/W TEMP RW TO CONSTRUCT_ TEMP R/W 7.4.2

Summary, Plan, Profile & Cross Section Notes SPECIAL DITCHES SP. DITCH RT. SP. DITCH LT. 1029.46 SPECIAL PAVED DITCHES STATION TO STATION _+_._ to _+_._ LT. RT. SP. DITCH RT. _+_._ to _+_._ SP. DITCH LT. 1029.46 TYPICAL PAVED DITCHES STATION TO STATION LT. RT. _+_._ to _+_. +_._ to _+_._ SUPERELEVATION CURVE #1 PI STA= 821+33.06 = 2069051.5126 Y= 306772.8740 = 40^08'03.63" LT D= 1^46'01.96" T= 1184.36' L= 2271.06' R= 3242.16' E= 209.55' EMA=.08 S=.076 V= 70 mph -2.00% 3.20% -3.20% -2.00% FULL SUPER 407+52.49 DISPLAY SLOPE VALUES AND KEY POINTS! SURVEY TOP OF CUT/TOE OF SLOPE TOC/TOS 7.4.3

Cross Section Labels The following Labels should be placed on the Cross Section Sheets above the Station. LABEL ALL CROSS SECTION PROJECT LIMIT LOCATIONS (*Only if included in limits of Cross Section set.) *BEGIN INCIDENTAL *END INCIDENTAL *END INCIDENTAL & BEGIN PROJECT *END PROJECT AND BEGIN INCIDENTAL BEGIN DETOUR END DETOUR BEGIN PROJECT END PROJECT PROJECTS WITH A BRIDGE OR EARTHWORK ECEPTION BEGIN EARTHWORK ECEPTION END EARTHWORK ECEPTION PROJECTS WITH SUPERELEVATION BEGIN SUPERELEVEATION RUNOFF BEGINS STATION REVERSE CROSS SLOPE STATION BEGIN OUTSIDE SHOULDER ROTATION BEGIN FULL SUPERELEVATION BEGIN FULL SHOULDER ROTATION STATION END FULL SHOULDER ROTATION STATION END FULL SUPERELEVATION END OUTSIDE SHOULDER ROTATION REVERSE CROSS SLOPE STATION RUNOFF ENDS STATION 7.5.1

Number Formatting/Rounding Chart Formatting Rounding Guideline Description Eample Feet & Inches Zero Decimal Places 2 Decimal Places 3 Decimal Places 5 Decimal Places Decimal Places Not Limited Normal Rounding Practices Not Rounded Do Not Round, Store in Calculator Rounded up to the net whole value Rounded to the closest half inch Rounded to the closest inch Round up the closest half foot Round up to the net value divisible by 2 Project Length Feet 6,515.52' (Br. & Roadway) Project Length Miles 1.234 mi (Br. & Roadway) Stations 123+45.67 DHV 123 Fle ESALs (Final Answer in Millions) 1.23M Control Sub-Section Number 12.34 Depth Below Finish Grade 0.83' Back Fill Width 12'-3" Ditch Depth 1'-2" Asphalt Thinning 12" (i.e. pinch down) Quantity Calculations 123.45648 Final Quantities 123.45 "K" Rate 0.1234567 Superelevation Load Sheet Superelevation Rate Calculations on Super Load 0.12345 Sheet Pipe and Bo Load Sheets 1,234.56 Final Pipe Length 1,234' Final Bo Length 123' Summary Sheets 123.45 Pay Quantity Sheet 123 Mass Diagram Sheets 1234 7.6.1