STATUS OF THE SUPERCONDUCTING CYCLOTRON PROJECT AT VECC

Similar documents
STATUS OF THE KOLKATA K500 SUPERCONDUCTING CYCLOTRON

STATUS OF THE SUPERCONDUCTING CYCLOTRON PROJECT AT KOLKATA

SC CYCLOTRON AND RIB FACILITIES IN KOLKATA

4. Superconducting sector magnets for the SRC 4.1 Introduction

TECHNICAL SPECIFICATIONS. FOR AN MRBR 7.0 TESLA / 160mm ACTIVELY SHIELDED ROOM TEMPERATURE BORE MAGNET SYSTEM

SPECIFICATION FOR A 7.0 TESLA/400MM ROOM TEMPERATURE BORE MAGNET SYSTEM

Amit Roy Director, IUAC

SPECIFICATIONS FOR AN MRBR 7.0 TESLA / 210MM ACTIVELY SHIELDED MAGNET SYSTEM

QUARTER WAVE COAXIAL LINE CAVITY FOR NEW DELHI LINAC BOOSTER*

SPECIFICATIONS FOR A 4.7 TESLA/310MM BORE ACTIVELY SHIELDED MAGNET SYSTEM

CEBAF Overview June 4, 2010

PRELIMINARY SPECIFICATIONS MRBR 7.0 TESLA / 210MM ACTIVELY SHIELDED CRYO-COOLED MAGNET SYSTEM

The Results of the KSTAR Superconducting Coil Test

HIGH MAGNETIC FIELD SUPERCONDUCTING MAGNETS FABRICATED IN BUDKER INP FOR SR GENERATION

Superconducting Medical Accelerators at IBA

A Penning Trap for Precision Spectroscopy of Highly Charged Ions at HITRAP. Jörg Krämer University of Mainz

The design of a radio frequency quadrupole LINAC for the RIB project at VECC Kolkata

OPTIMIZED MAGNET FOR A 250 MEV PROTON RADIOTHERAPY CYCLOTRON

The VARIAN 250 MeV Superconducting Compact Proton Cyclotron

High Voltage Instrumentation Cables for the ITER Superconducting Magnet Systems

Experimental Plan for Testing the UNM Metamaterial Slow Wave Structure for High Power Microwave Generation

RF STATUS OF SUPERCONDUCTING MODULE DEVELOPMENT SUITABLE FOR CW OPERATION: ELBE CRYOSTATS

Magnets Y.C. Saxena Institute for Plasma Research. 1/16/2007 IPR Peer Review Jan

DEVELOPMENT OF QUARTER WAVE RESONATORS

The Current Cyclotron Development Activities at CIAE. Current acyclotron

TESLA Quad Package With BPM

Packaging of Cryogenic Components

K1200 Stripper Foil Mechanism RF Shielding

Physical Design of Superconducting Magnet for ADS Injection I

HTS PARTIAL CORE TRANSFORMER- FAULT CURRENT LIMITER

Testing of the Toroidal Field Model Coil (TFMC)

COMMISSIONING OF THE ACCEL 250 MEV PROTON CYCLOTRON

COIL WINDING ISSUES P. Fabbricatore INFN Genova LCD - Magnet 13Oct09. Coil winding issues

Supplementary Figure S1. Schematic representation of different functionalities that could be

Status of the KSTAR Superconducting Magnet System Development

Study of Design of Superconducting Magnetic Energy Storage Coil for Power System Applications

FREIA Facility for Research Instrumentation and Accelerator Development Infrastructure and Control Architecture

2.3 PF System. WU Weiyue PF5 PF PF1

S. Ghosh On behalf of Linac, IFR, Cryogenics, RF and beam transport group members. Inter University Accelerator Centre New Delhi India

ITER NEWSLINE - Central solenoid fabrication: a photo reportage. 18 Jul,

Frequency Tuning and RF Systems for the ATLAS Energy Upgrade. Gary P. Zinkann

EVOLUTION OF THE CRYOGENIC EDDY CURRENT MICROPROBE

Superconducting linear accelerator system for NSC

Superconducting RF Cavity Performance Degradation after Quenching in Static Magnetic Field

Status of ATLAS & CMS Experiments

DEVELOPMENT OF A BETA 0.12, 88 MHZ, QUARTER WAVE RESONATOR AND ITS CRYOMODULE FOR THE SPIRAL2 PROJECT

KEYWORDS: ATLAS heavy ion linac, cryomodule, superconducting rf cavity.

DESIGN AND CONSTRUCTION PROGRESS OF CYCIAE-100, A 100 MEV H- CYCLOTRON AT CIAE *

Measurement of the SEISM

Micro-sensors - what happens when you make "classical" devices "small": MEMS devices and integrated bolometric IR detectors

Millikelvin measurement platform for SQUIDs and cryogenic sensors

Residual Resistivity Ratio (RRR) Measurements of LHC Superconducting NbTi Cable Strands

Physical Properties Measurement System (PPMS): Detailed specifications: Basic unit cryogen- free

THE CRYOGENIC SYSTEM OF TESLA

New Tracking Gantry-Synchrotron Idea. G H Rees, ASTeC, RAL, U.K,

Cryogenic Testing of Superconducting Corrector Magnets for the LHC Main Dipole

12 GeV Upgrade Project DESIGN SOLUTIONS DOCUMENT. Upgrade Hall A

CRYOGENIC CURRENT COMPARATOR FOR STORAGE RINGS AND ACCELERATORS

Density and temperature maxima at specific? and B

Superconducting RF Cavities Development at Argonne National Laboratory

Design of ESS-Bilbao RFQ Linear Accelerator

Figure 1. TAMU1 dipole cross-section. Figure 2. Completed TAMU1 dipole and group that built it.

ECRH on the Levitated Dipole Experiment

Development of a noval Switched Beam Antenna for Communications

CMS Beam Condition Monitoring Wim de Boer, Hannes Bol, Alexander Furgeri, Steffen Muller

ReA3 Marc Doleans (On behalf of the ReA3 team)

APAC 2007, Raja Ramanna Centre for Advanced Technology(RRCAT), Indore, India LHC STATUS. Lyndon Evans, CERN, Geneva, Switzerland

Beam Infrared Detection with Resolution in Time

200 MHz 350 MHz 750 MHz Linac2 RFQ2 202 MHz 0.5 MeV /m Weight : 1000 kg/m Ext. diameter : 45 cm

Tutorial: designing a converging-beam electron gun and focusing solenoid with Trak and PerMag

version 7.6 RF separator

Ad Astra Rocket Company. Ad Astra Rocket Company. R&D Support Services

Resonator System for the BEST 70MeV Cyclotron

ASG presentation and activities. Roberto Penco (consultant to ASG)

Circumference 187 m (bending radius = 8.66 m)

REVIEW OF HIGH POWER CW COUPLERS FOR SC CAVITIES. S. Belomestnykh

Present and future beams for SHE research at GSI W. Barth, GSI - Darmstadt

MRI SYSTEM COMPONENTS Module One

Analysis of a PCB-Chassis System Including Different Sizes of Multiple Planes Based on SPICE

Electromagnetic Characteristics of a Superconducting. Magnet for 28GHz ECR Ion Source according to the. Series Resistance of a Protection Circuit

In the meantime other components, notably the

Herwig Schopper CERN 1211 Geneva 23, Switzerland. Introduction

CAGE CAVITY: A LOW COST, HIGH PERFORMANCE SRF ACCELERATING STRUCTURE*

RF CAVITY SIMULATIONS FOR SUPERCONDUCTING CYCLOTRON C400 Y. Jongen, M. Abs, W. Kleeven, S. Zaremba IBA, Louvain-la-Neuve, Belgium

NEWS Danish Technological Institute is the New Owner of Danfysik A/S

PI piezo Life Time Test Report. A. Bosotti, R. Paparella, F. Puricelli

Superconducting Magnets theory and design. Guillaume Donnier-Valentin

Tests of the Spoke Cavity RF Source and Cryomodules in Uppsala

Market Survey for the F4E Diagnostics Team

Use of inductive heating for superconducting magnet protection*

PROGRESS IN IFMIF HALF WAVE RESONATORS MANUFACTURING AND TEST PREPARATION

THE HIGH LUMINOSITY PERFORMANCE OF CESR WITH THE NEW GENERATION SUPERCONDUCTING CAVITY

JIJL NIOBIUM QUARTER-WAVE CAVITY FOR THE NEW DEEM BOOSTER LINAC

3 General layout of the XFEL Facility

two pairs of dipole steering windings that t inside the quadrupole yoke an RF beam position monitor (BPM) consisting of a pill box RF cavity,

A few results [2,3] obtained with the individual cavities inside their horizontal cryostats are summarized in Table I and a typical Q o

COUPLER DESIGN CONSIDERATIONS FOR THE ILC CRAB CAVITY

Liquid Helium Heat Load Within the Cornell Mark II Cryostat

HIGH POWER INPUT COUPLERS FOR THE STF BASELINE CAVITY SYSTEM AT KEK

Proceedings of the Fourth Workshop on RF Superconductivity, KEK, Tsukuba, Japan

Transcription:

STATUS OF THE SUPERCONDUCTING CYCLOTRON PROJECT AT VECC Bikash Sinha and R. K. Bhandari Variable Energy Cyclotron Centre, Department of Atomic Energy, Kolkata 700 064, India Abstract A superconducting cyclotron with K bend =520 and K foc =160 is under construction at this centre. Heavy-ion beams of 80 MeV/nucleon energy will be available from this cyclotron. Fabrication and development of most of the major systems have advanced significantly. The 80 tonne main magnet iron structure has been successfully fabricated and is being installed in the new cyclotron building at VECC campus. The superconducting coil was wound on the cryostat bobbin late last year using a specially developed winding set up. The liquid helium chamber housing the coil has been welded shut. The cryostat containing the superconducting coil is being assembled. The cryogenic delivery system both for LHe and LN2 for the main magnet cryostat is also being fabricated. The 200W (at 4.5K) helium liquefier / refrigerator is being relocated and re-commissioned in the main accelerator building complex. Main magnet power supply along with dump resistors and control logistics has been installed and tested in position. Trim coil power supplies are also being commissioned. We expect to begin the energization trials of the superconducting coil (stored energy about 22 MJ at full excitation) in the third quarter of 2004. Development of the elaborate magnetic field measurement set up is also near completion. Extensive measurement of magnetic field and its harmonics has been planned to evaluate the beam dynamics. Work is also proceeding on fabrication of the intricate RF cavities that will operate at room temperature. Various groups are engaged in the development of other systems such as RF amplifiers, LHe cooled cryopanels, ECR ion source and injection, extraction, diagnostics, controls, beamlines etc. Funding has recently been approved by the government for development of elaborate experimental facilities to utilize effectively the cyclotron beams. They include a large scattering chamber, charge particle detector array, ion trap and irradiation facilities. The superconducting cyclotron will become a national facility for various universities and institutes. It will also be open to the international experimental physics community. INTRODUCTION The K=130 room temperature variable energy cyclotron (VEC) has been accelerating light heavy ions (oxygen, neon, sulphur, argon etc.) over the years [1]. The cyclotron is equipped with two ECR ion sources, an indigenously developed 6.4 GHz ECR source and a 14 GHz ECR source supplied by M/s PANTECHNIK, the later one is able to produce also metal ions for injection into the VEC. Thus, VEC provides low to medium energy heavy ion beams to the experimentalists. In order to extend the scope of the research with heavy ion beams at VECC, the superconducting cyclotron project was conceived in the early 90s. The design is similar to the cyclotrons operating at National Superconducting Cyclotron Laboratory (NSCL), East Lansing [2] and the Cyclotron Institute, College Station [3]. After some initial delay in progress due to various unavoidable reasons [4], the superconducting cyclotron project is now smoothly and rapidly moving towards the commissioning phase. Figure 1 shows the beamlines layout for the superconducting cyclotron facility. 25500 22500 8000 13000 1741 VECC K-500 SUPERCONDUCTING CYCLOTRON EXTERNAL BEAM HANDLING SYSTEM R 3,048 11250 4750 7,848 R3,500 11250 32 0' 18 0' 2,924.5 5,008 17,019 2,180.3 32 0' 37000 3,000 7,812 6700 17250 3500 11000 3500 Figure 1: Beamlines layout for the superconducting cyclotron at Kolkata STATUS OF VARIOUS SYSTEMS Main Magnet Frame M/s Heavy Engineering Corporation Ltd., Ranchi (about 400 km from Kolkata) have machined the main magnet iron frame in several parts. The composition of the magnet iron has been made from same heat of steel to get near uniformity of chemical composition, physical homogeneity and grain size. The achieved chemical composition is as follows: C 0.12 0.15%, Mn 0.21 0.25%, Si 0.1 0.18%, S 0.007 0.017% and P 0.005 0.010%. The magnet frame assembly is being installed in the new cyclotron building at VECC campus. Magnet pier supporting systems have been fabricated, installed and levelled within 800-micron accuracy. Then the pole base has been mounted on the pier supports. Figure 2 shows the lower pole cap mounted on the pier supports in the cyclotron building. Lower pole tips have been installed on the pole base and levelling achieved within specified tolerance (figure 3). 18000 473

Figure 2: Main magnet pole base mounted on the pier support in the cyclotron building. Figure 4: Superconducting coil winding in progress Figure 3: Pole tips installed on the pole base. Superconducting Coil Winding of the main superconducting coil on the bobbin made from SS316L was completed in September 2003 as per specifications. The coil winding was done inhouse using an automatic winding setup developed based on our conceptual design by a reputed vendor (Figure 4). Strict quality control was enforced during coil winding. NbTi multifilamentary composite superconducting cable (I c = 1030 A at 5.5 Tesla and 4.2 K), consisting of 500 filaments of 40 micron diameter embeded in copper matrix was used. The characteristic details of the coils are given in the table 1. Table 1 α coil No. of turns/coil 1084 Total Length (km) 5.7 ID and OD (mm) 1521and 1793 Inductance (H) 13.8 β coil No. of turns/coil 2234 Length (km) 11.7 ID and OD (mm) 1521 and 1793 Inductance (H) 27.6 Figure 5: Superconducting coil for the cyclotron magnet Cryostat The cryostat is now in the final stage of assembling in the cyclotron building. Necessary cryogenic instrumentation such as LHe level sensors, temperature sensors, strain gauges etc. have been installed inside the LHe chamber. This chamber has been insulated with multilayer insulation and LN2 cooled radiation shield assembled around it. The current leads, refrigeration lines and vent lines have also been welded to the LHe chamber and insulated (Figure 6). Finally, the whole insulated assembly has been welded inside the iron vacuum chamber (so called Coil Tank, Figure 7). Median plane penetrations for several extraction and diagnostic elements are being positioned and welded. After the final assembly, helium leak test will be performed and then the cryostat assembly will be shifted to cyclotron vault and installed on the magnet frame. 474

Figure 6: Cryostat bobbin with multilayer insulation and LN- 2 cooled radiation shield. Support links are also shown. Figure 8: Final assembled cryostat without median plane inserts. Cryogenic Delivery System The cryogenic delivery system will supply cryogens, i.e., liquid helium and liquid nitrogen to the main magnet cryostat and the cryopanels used for evacuating the acceleration chamber. The design of the cryogenic delivery system has been finalized. The vacuum jacketed and liquid nitrogen shielded transfer lines have already been fabricated and tested successfully at manufacturers site (Figure 9). Figure 7: The insulated cryostat bobbin and LN2 shield assembly is being installed within the iron vacuum chamber (Coil Tank). Figure 9: Vacuum jacketed and liquid nitrogen shielded cryogenic transfer lines under fabrication. Other major components such as PLC control system, liquid helium and liquid nitrogen valves, instrumentation components etc. are being purchased. Various sensors for this cryogenic system, viz., temperature, level, pressure, 475

strain, vacuum and their measuring units have already been tested thoroughly. Radiofrequency System The RF system has frequency range 9 to 27 MHz and the maximum dee voltage about 100 kv. Some of the RF cavity components such as panels, moving short, contact fingers, drive mechanisms etc. have already been fabricated/ purchased by the Centre for Design and Manufacture at BARC, Mumbai in consultation with VECC engineers. Other major components such as the inner and outer conductors, dee shells, liners etc. are currently on order. The electronics part of the RF system is being developed in-house at VECC. Most of the major components like power tubes, amplifiers, diagnostic equipment etc. are now available with RF group at VECC. The PCBs for various circuits have been designed and are in the process of getting fabricated. Accelerator physicists are developing codes for processing and analysing the measured field data. To correct for the field imperfections, if any, and to find out the operational parameters of the cyclotron for efficient beam acceleration and extraction, the orbit tracking codes, developed at MSU and VECC, will be used Figure 10: Computer generated model of inner and outer conductor of RF resonator with cooling lines. Trim Coils All the 78 trim coils, made of water-cooled copper conductor, have been wound successfully. Two trials of vacuum impregnation with epoxy resin for inner pole tip have been made. In order to improve on the shortcoming of impregnation process, it has been decided to make one more trial of vacuum impregnation with outer coil. Finally, after field measurements, the trim coils will be mounted on the pole tip and then vacuum impregnation will be done with epoxy resin and re-assembled. Magnetic Field Measurement System The entire set up for carrying out elaborate measurements of magnetic field and the harmonic components with high degree of accuracy is being developed, both in house and by M/s. Patel Analog and Digital Measurements Co. Pvt. Ltd., Pune. The measurement schemes have been prepared by the accelerator physicists and engineers involved in the project. We expect to start magnetic field measurements around the end of 2004 and complete by September 2005. Figure 11: Trim coils wound on pole-tip. ECR Ion Sources In addition to the 14 GHz ECR ion source already operating at VECC, an indigenously designed source is being constructed. This source will also operate at 14 GHz microwave frequency. The axial mirror peak field is 12 kg on the injection side and 10.75 kg on extraction side. Power Supplies The 10 ppm class power supply for the main coil along with dump resistors has been installed in position after elaborate tests using a dummy load. The control logistics have been developed by our engineers and tested. Eighteen trim coil power supplies have also been tested and are awaiting installation in the cyclotron building basement area. Extraction System The extraction system consists of two electrostatic deflectors and nine magnetic channels. The M9 magnetic channel involves major design change as compared to the Texas K500 machine. We are going to make it active rather than a passive channel. Detailed calculations of the beam dynamics through the extraction system have been done. Control System and Beam Diagnostics All the technical systems of the cyclotron will be computer controlled. We are planning to have a distributed control system connected through ETHERNET LAN. Mostly PCs with Windows and UNIX based systems will be used. A number of single and multi-tasking applications have been developed. Those are being tested with the existing cyclotron. Developmental work in the area of capacitive as well as 476

scintillation detector phase probes and image digitisation has been carried out. Beamlines and Experimental Facilities The layout of the experimental area is shown in the figure 1. Preliminary design calculations on the beam steering and phase space matching, immediately after the extraction of beam from cyclotron, have been carried out. The external beam transport system uses two bending magnets to reduce the dispersion coefficients to a certain extent. The ion optics beyond the second bending magnet is telescopic in nature. Experimental facilities planned for the superconducting cyclotron include a large multipurpose scattering chamber, a 4π charged particle array, high energy gamma detector array etc. Several national groups are working on the development of these experimental facilities. ACKNOWLEDGEMENTS Construction of the superconducting cyclotron is a team work of several scientists, engineers and administrative staff of the centre. We are grateful to all of them for their contribution. Our special thanks are due to Mr. Malay Kanti Dey for the help in preparing this paper. REFERENCES [1] C. Mallik, Heavy Ion Acceleration Using 224 cm Cyclotron at Kolkata, paper at this conference. [2] H.G. Blosser, The Michigan State University Superconducting Cyclotron Program, IEEE Trans. on Nuclear Science, Vol. NS-26, No.2, April 1979, p.2024. [3] D.P. May et al., Status of the Texas A&M University K500 Superconducting Cyclotron, Proc. 10 th Int. Conf. on Cyclotrons and their Applications, April 30-May 3, 1984, ed. F. Marti, p. 195. [4] R.K. Bhandari, Status of the Calcutta K500 Superconducting Cyclotron Project, 16 th Intl. Conf. on Cyclotrons and their Applications, May 13 May 17 2001, edited by F. Marti, p. 84. 477