3/14/2015 Contacted and Solicited bids from construction vendors to build location. (San Jan, Orbit, Sweat, Storm).

UK EXPLORATION WHERE NEXT? OIL & GAS UK BREAKFAST 8 DECEMBER 2015

Gannet A Story of Recovery

An Introduction to Oil & Gas Drilling and Well Operations

Macquarie Oil & Gas Explorers Conference. 9 January 2012

Further information about the Duhat Prospect is set out in the Appendix attached to this announcement. --Ends--

PROSPEX. UKCS Exploration & Appraisal Status. Gunther Newcombe Director Operations. December 2016

Gannet A Story of Recovery

A Step Change in Activity

ANADARKO PETROLEUM CORPORATION

Oil and Gas Exploration Economic Model Manual. Version Introduction

Relinquishment Report P.1120, P.1320 Ockley

Moduels in PetroTrainer. PetroTrainer. How PetroTrainer is used

Quad 204 Schiehallion Field Restarting a brownfield subsea development

Phoenix South-3 drilling update 29 June 2018

For personal use only

Analysis of Non-Productive Time in Geothermal Drilling Operations-A Case Study of Olkaria, Kenya

AVOID THE IRRESISTIBLE Daniel Baltar London February, 2015

QUARTERLY ACTIVITY REPORT

Experience, Role, and Limitations of Relief Wells

Block 9 Prospectivity Assessment Identifies Multiple High Impact Exploration Drilling Opportunities

Case Study: Value in Drilling Derived From Application-Specific Technology Diane Langley, JPT Features Editor

GWF-1 Development DrillWell

Suspended Subsea Well Monitoring CaTS TM Wireless Technology. Donald Horsfall RPLM (ECIS)

Faroe Petroleum plc ( Faroe, the Company ) Asset swap transaction Maria discovery swapped for Norwegian production assets

SOUTHWESTERN ENERGY PROVIDES THIRD QUARTER 2003 OPERATIONAL UPDATE

E&P in the Netherlands; challenges and opportunities

For personal use only

NTL No N06 Information Requirements for EPs, DPPs and DOCDs on the OCS Effective June 18, 2010

: Unlocking material value in the UK North Sea through development

ASX ANNOUNCEMENT (ASX: BRU) 4 May 2011

Subsea Field Development

Buffalo field moving closer to production 3 May 2018

For personal use only

Analyst / Investor Presentation. Interim Results 28 th March 2011

Subsea Intervention: Is It Worth It? Drummond Lawson

NCS Prospects Conference

Kinsale Area Gas Fields Decommissioning Project Information Leaflet

MEO Australia Limited ABN ASX & Media Release

This presentation (the "Presentation") contains forward-looking information relating to, among other things, (a) the future financial performance and

Casing and Completion Technologies. Run casing strings & completions without string rotation without wiper trips without risk

The intent of this guideline is to assist the Drilling Engineer in his preparation of the deepwater drill stem test design and procedure.

THE OFFSHORE PETROLEUM PRODUCTION AND PIPE-LINES (ASSESSMENT OF ENVIRONMENTAL EFFECTS) REGULATIONS 1999 (AS AMENDED) PETROLEUM OPERATIONS NOTICE No.

Report. Temporary abandoned wells on NCS. Subtitle. Author(s) Nils Totland. SINTEF Petroleum Research Well Integrity

2009 Interim Results Presentation 23 rd March 2009

12Future developments

Persistence, partnership and the prize

OTTO TO DRILL 400 MILLION BARREL NANUSHUK OIL PROSPECT ON ALASKA NORTH SLOPE IN EARLY 2019

FASTER. SIMPLER. BETTER. P&A AND SLOT RECOVERY; REDEFINED.

Canadian Discovery Ltd.

Wintershall Production Optimisation Initiative Value Creation through Innovation. Michael Damm Wintershall Noordzee BV

Annex- II MARGINAL/ STRANDED GAS FIELDS- GAS PRICING CRITERIA AND GUIDELINES, 2013 GOVERNMENT OF PAKISTAN MINISTRY OF PETROLEUM & NATURAL RESOURCES

From late-life reservoir management through to final permanent abandonment, we create bespoke solutions to meet your specific well requirements.

Dorado-1 drilling commenced 5 June 2018

ATP Oil & Gas Corporation

Annual General Meeting 11 September 2017

Draft Myanmar Environmental Impact Assessment (EIA) Procedures: Comments 1 on aspects relevant to Offshore Oil and Gas Exploration and Production

Phoenix South-3 drilling commenced 17 April 2018

For personal use only

Preliminary Results 2010 Presentation. oil & gas. 9 November Version 3.4

We ll Get You There. Petroxin Petroleum Solutions 2016

Cluff Natural Resources Plc / Index: AIM / Epic: CLNR / Sector: Natural Resources

INNOVATIVE CASING DRILLING TECHNOLOGY IMPROVED THE ABILITY TO SET THE CASING DEEPER THROUGH PROBLEMATIC ZONE IN INDONESIA GEOTHERMAL OPERATION

Status på Dvalin-prosjektet. Roy Padget, Topside Host Manager

Casing while Drilling. Enhanced Casing Installation

3D Oil Limited Accelerated Growth Strategy

oil & gas Deutsche Bank Conference - 23 September September 2010 Deutsche Bank 10 th Oil & Gas Conference

Quarterly Activities Report 31 January 2013

Geosteering Workflow Considerations of How and Why?

Dussafu Gabon Update January, 2018

Cluff Natural Resources Plc / Index: AIM / Epic: CLNR / Sector: Natural Resources. Cluff Natural Resources Plc ('CLNR' or 'the Company')

ROTARY STEERABLE SYSTEMS TO REDUCE THE COST AND INCREASE THE ENERGY VALUE OF DRILLING DIRECTIONAL WELLS IN OLKARIA GEOTHERMAL FIELD

Marginal Project Development

ASX Release. 20 April Dear Shareholder, ADX Dougga Presentation to ETAP and Ministry in Tunisia

For personal use only

ASX Release NILDE AREA PERMIT FARMOUT OFFSHORE ITALY. Highlights

Introducing the UNFC Why classify our resources? David MacDonald, Vice President Segment Reserves 27 September, Mexico City

For personal use only

Syllabus CH EN 6181 Drilling and Completions Fall 2015

For personal use only

Forward looking statements

The Directors wish to inform you about recent exploration activities:

Deepwater riserless (RLWI) enablers for increased oil recovery. Bringing shallow water experience to deepwater.

THE FISHSAFE INFORMATION PROJECT -

PETROMINERALES ANNOUNCES 2013 CAPITAL PLAN, OPERATIONAL UPDATE AND INCREASED CREDIT FACILITY

oil & gas Oilbarrel Conference 9th September 2010 Kevin Hart, Chief Executive

STERLING RESOURCES LTD

June 24, 2010 RPSEA Project 1502 Thomas E. Williams int.com

Siem WIS. Siem WIS AS. Closed Loop Drilling CLD. August Siem WIS AS.

For personal use only

EUOAG Workshop. Workshop on decommissioning of offshore installations Challenges, options and lessons learned PP&A

Surveyors in The Oil & Gas Industry. Walter Jardine Lead Surveyor, BP North Sea Region Hydrofest 13 April 2011

How it works and Stakeholder Benefits

NON-EXCLUSIVE AGREEMENT TO EXPLORE MARENGO GAS FIELD GREATER AREA

Europa Oil & Gas plc / Index: AIM / Epic: EOG / Sector: Oil & Gas 02 March 2015 Europa Oil & Gas (Holdings) plc ( Europa' or the Company') Newsletter

Offshore Drilling Rigs

Transcription:

LICENCE P.691 RELINQUISHMENT REPORT 1. Licence Information Licence Number: P.691 Licence Round: 11, in 1989 Licence Type: Traditional Block Number: 44/17a DECC is free to publish the Report, and all 3rd party ownership rights (on any contained data and/or interpretations) have been considered and appropriately cleared for publication purposes. 2. Licence Synopsis Hawksley was under Fallow Discovery status at the time of partial surrender of Licence P.691. The Licence was awarded to ConocoPhillips U.K. in 1989 with 65% equity and GdF Suez E&P with 35% equity. Below is a history of Licence updates and the corresponding work obligations. I. At the time the Licence was awarded: Carry out not less than 150km of seismic survey work; and Drill four exploration wells, provided that the Licensee will not be obligated to drill a fourth if the Licensee satisfies the Minister that the drilling of such a well is not justifiable. II. Deed of Variation dated 1996, which extended the initial term from six to eight years: Acquire a 3D seismic survey to complete the coverage of the whole block 44/17; Review seismic interpretation with DTI before expiry of 30 September 1996; and Drill one exploration well, provided that the Licensee will not be obligated to drill said well if the Licensee satisfies the Minister that drilling is not justifiable. III. Deed of Variation dated 1998, which extended the initial term from eight to nine years: Drill not less than two exploration wells. IV. In 1998, the Licence entered the second term. V. In 2007, the Licence entered the third term. VI. As of February 28, 2014, partial relinquishment of the area outlined in Figure 1 was complete. 3. Work Programme Summary Work obligations as they relate to the initial term were satisfied, and the Licence was in the third term at the time of surrender.

Wells: A wildcat well in the Hawksley area, 44/17a-3, commenced drilling 1 st May 1994 and reached its total depth of 12,840 MD (-12,718 TVDSS) in the Westphalian B on 21 st June 1994. Although this well discovered unexpected significant reservoir sands in the Westphalian C/D (WpC/D) and a potential secondary reservoir in the Lower Leman Sandstone, it was permanently abandoned as a dry hole without any well tests. The Hawksley Field was discovered in 1998 by the 44/17a-4 well. Drilling commenced on 19 th December 1997 and reached its total depth of 12,960 MD (-12,631 TVDSS) in the Westphalian B Murdoch Sandstone on 23 rd February 1998 and was temporarily suspended as a gas discovery. The 44/17a-4 well was later permanently abandoned by removing the wellhead on 26 th November 2001, which was confirmed by a DSV Aquamarine survey. The development well, 44/17a-6, was the only planned development well to access gas in the Hawksley accumulation. Drilling commenced on 9 th April 2002 but failed to reach planned TD. The BHA became stuck in the top Leine Halite at 10,792 MD and after pumping freshwater pills and jarring, a fish was left in the hole comprising the bit and motor. No attempt was made to fish the lost BHA, and subsequently, a cement plug was set above the fish and the 44/17a-6 well was sidetracked as 44/17a-6Z from 10,375 MD on 17 th May 2002. 44/17a-6Z also failed to reach planned TD following well control problems. Lost circulation occurred at 12,728 MD in the Silverpit Formation, and lowering the mud weight from 14.5 ppg to 12.7 ppg and spotting LCM pills halted static losses. However, severe dynamic losses continued and were such that a cement plug was required to be set below the 9 5/8 shoe, between 12,728-10,848 MD. Well 44/17a-6Z was inadvertently sidetracked as 44/17a-6Y from a depth of 10,780 MD on 6 th June 2002. The 44/17a-6Y well reached a total depth of 14,800 MD (-11,784 TVDSS). This well was completed on 30 th July 2002 as a directional wellbore. It began production in September 2002 at an initial rate of 165mmscf/d and declined steadily until being backed out by production from the Munro field in 2007 after 47.6BCf of production. Problems with a number of well valves led to failed efforts to reinstate the well, and it was subsequently plugged and sealed in 2011. The Hawksley Field was developed using subsea technology and is part of the CMSIII Northern Lobe system, which currently also includes the Murdoch K and McAdam subsea manifolds and the Munro satellite platform. It is tied back to the Murdoch complex by gas and methanol pipelines and an electro-hydraulic control umbilical to the subsea manifolds. Seismic: ConocoPhillips acquired the 2D survey C44/92-100 in 1992 (Figure 2), followed by the 3D seismic survey CN953F0001 in 1995; the latter covers the western portion of the Hawksley field as part of the larger region outlined in Figure 3. These data were subsequently merged with the 3D survey AT933F0002 provided by Arco. The merged survey provides full coverage of the Hawksley field determination area and completes coverage of the whole of block 44/17 as per the terms of the 1996 Deed of Variation.

4. Database Figures 2 and 3 provide maps of the seismic and well database over the relinquishment area as summarized in Section 3. 5. Prospectivity Update Remaining prospectivity of the surrendered area is very limited. Figures 4 and 5 show the structural closure at the primary producing zone, the Lower Ketch. MBal modeling of the Lower Ketch 2 GIIP yields 51Bcf, which is in line with the mapped GIIP of around 60Bcf. Additional gas support is believed to be from the Lower Leman and Upper Ketch intervals, which together contain a mapped GIIP of 26Bcf but are expected to have a low recovery factor due to poor rock quality. Of the total approximate GIIP of 77Bcf, the field has produced 47Bcf, leaving 30Bcf. A similar recovery factor of ~60% from a follow-up development well would yield 18Bcf, as captured in Table 1. Production to date is from the fault block labelled Polygon A in Figure 4. A small Lower Ketch closure to the south remains untested and is captured as a potential lead in Table 1. 6. Resource Risk Summary Discovery Name Hawksley Hawksley, S Fault Block P L D D Resource and Risk Summary Unrisked Recoverable Stratigraphic Level Resources geological Risked P50 chance of Gas BCF Mmboe success % Low Central High Lower Ketch (with support from Lower Leman and Upper 14 18 23 100 18 Ketch) L Lower Ketch 8 10 13 50 5 Table 1. Resource and Risk Summary for relinquishment area. 7. Conclusions The remaining potential over the relinquishment area is not deemed sufficient to justify further development. 8. Clearance Clearance has been granted by all parties in the relinquished area.

9. Maps and Figures Figure 1. Relinquishment area map. Figure 2. Map of 2D seismic coverage over 44/17.

Figure 3. Map of 3D seismic and well database over relinquishment area. Figure 4. Lower Ketch 2 / BPU depth structure map (CI: 100ft, UTM 31 ED50).

Figure 5. Hawksley field depth map and cross sections.

Figure 6. Illustrative seismic sections.