Cameron MBO Multi-Bowl Wellhead System

Similar documents
Multi-Bowl Applications

15,000 psi 20,000 psi. BigBore IIe HPHT SUBSEA WELLHEAD SYSTEMS

Working for the future POSGRIP Technology

BigBore IIe. 15,000 psi 20,000 psi SUBSEA WELLHEAD SYSTEMS

Friction Grip in Wellheads: An Innovative Approach to Load Support & Sealing

Cameron MOSAIC. Systems for the Malampaya Project

WRS Artificial Lift System

CONNECTION. Certified System Components. Subsea Connections

HorizontalBore SUBSEA TREE

Wellhead Control Products, Inc. Hangers

DXe SUBSEA WELLHEAD CONNECTORS

Land wellhead systems & offshore surface wellhead systems

TABLE OF CONTENTS Page

Heidrun Inverted Gas Lift System

Setting a Global Standard. General Catalog

SUBSEA 101. Find more Subsea 101 case studies online

Wellhead equipment CATALOG

An Introduction to Oil & Gas Drilling and Well Operations

GE Oil & Gas Drilling & Production. VetcoGray subsea wellhead systems. Advanced solutions for extreme conditions

Table Of Contents Casing Head 02 Christmas Tree & Tubing Head Tubing Spool 04 Contact Us

Training Fees 4,250 US$ per participant for Public Training includes Materials/Handouts, tea/coffee breaks, refreshments & Buffet Lunch

In any of the 5 star hotel. The exact venue will be intimated prior to course commencement.

Marginal Project Development

NORWAY. Norwegian Industrial Property Office (12) APPLICATION (19) NO (21) (13) A1. (51) Int Cl.

2016 Employee Product Education Courses

BP SWOPS Single Well Oil Production System. Sandy Meldrum CEng, MIMechE

Drilling Systems. Cameron Drilling Control Systems Applications. 1 Semi-submersible Platform Applicaton

Riserless Subsea P&A. Deepwater Decommissioning Workshop 2016 W I L D W E L L C O N T R O L S U B S E A I N T E R V E N T I O N

An Introduction to Grayloc Products! Serving your Piping and Pressure Vessel requirements for over 50 years!

Geoprober Drilling Moving from Ideas To Reality (Status August, 2005)

Wellhead and Production Equipment Catalogue January 2017

OIL INDIA LIMITED (A Govt. of India Enterprise) P.O. Duliajan , Assam. Fax No ,

Enhancing international subsea well incident intervention

Tech Unit No: Approved By: Quality Engineer Date: Lock-Set Packer

Riser Extension INSTALLATION GUIDE 40100AX35 / 40100AX18. Manual 40100X35-8

The intent of this guideline is to assist the Drilling Engineer in his preparation of the deepwater drill stem test design and procedure.

LEADING THE WAY IN WELLHEAD AND PIPELINE TECHNOLOGY. Wellheads Christmas Trees Gate Valves Surface Safety Valves Frac Trees Check Valves

Offshore Drilling Rigs

SAFER, SMARTER, GREENER

Oil and Gas UK Well Integrity Guidelines

W-K-M Model MA-1 DynaCentric Butterfly Valve

IMPORTANT INSTALLATION GUIDE VALENCIA SQUARE CORNER SHOWER READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE

Setting a Global Standard. Template Systems

3/14/2015 Contacted and Solicited bids from construction vendors to build location. (San Jan, Orbit, Sweat, Storm).

OPERATING MANUAL SHOCK TOOL OWS WENZEL DOWNHOLE TOOLS LTD.

Subsea Wellhead Solutions

MSR/MSB Mechanical Setting Tool

Deep Water Definitions

Advanced Well Completion Design. 30 Sep - 04 Oct 2018, Dubai. REP logo, PMI & PMP are registered trademarks of Project Management Institute, Inc.

Global Drilling Solutions, Inc

UCON Connection Systems

LAN84207 Installation Instructions Single Point Hydraulic Kit for 50 Series STS Combines. 270 West Park Avenue Huron, SD

The MUELLER method of making a main to service connection using the MUELLER E-5 Small Drilling Machine. Hand or power. kpa/34.

International Well Control Forum Well Intervention Pressure Control Subsea Syllabus

Airflex Product Line PDC Installation, Operation and Maintenance of PDC Assemblies

The MUELLER method of making a main to service connection using the MUELLER E-5 Small Drilling Machine. The main is drilled out under pressure.

Personalized Service, Industry Expertise. Franklin Howard

Send your directly to

Efficiency of Time Comparing with Modular Rigs for Workover Operation

Standard Horizontal Subsea Trees. Integrated offshore offering for reliable, high-quality, and capitalefficient

4" (DN 100) 5RET Tank Car Fire-Tite Bottom Unloading Valves. Installation, Maintenance and Operating Instructions

Innovative Subsea Engineering

MSR/MSB Mechanical Setting Tool

M-5 PRO CORE BORE PARTS LIST DRILLING MACHINE. (March 2017) Part #

37 th Gas-Lift Workshop Houston, Texas, USA February 3 7, Dag Almar Hansen, CEO Gas-Lift Workshop 1. Feb. 3-7, 2014

Casing Scrapers. Manual F620

United States Patent (19) Cobb

USER INSTRUCTIONS. Limitorque TM SR Series. Installation Operation Maintenance. Experience In Motion FCD LMENIM AQ 11/14

Well Abandonment Services. Plug into a New Approach

Efficiency of Time Comparing With Modular Rigs for Work-Over Operation

On-Site Machining Services Decommissioning Services In-Situ Portable Machine Rental Machining & Fabrication Services Machining & Project Management

Standard Subsea Wellheads. Integrated offshore offering for reliable, high-quality, and capital-efficient performance

Installation, Maintenance and Operating Instructions

MPD ACTIVE PRESSURE MANAGEMENT Next-generation MPD technology, built by manufacturing specialists

Designing Subsea Wells for Abandonment & Suspension

Emission-Pak Assemblies

03/31/2012. Site Preparation. Classifying Oil & Gas Operations. Presented By: Sharon Engle NSIPA & IAAW Annual Seminar April 19, 2012 Las Vegas, NV

VALVTECHNOLOGIES, INC. INSTALLATION, OPERATIONS & MAINTENANCE MANUAL STEAM CHOKE VALVES

Ladiz Niroo Company (Joint Stuck) Supplier of Drilling Equipment. Drilling Catalogue

Appendix F Lock-Down Sleeve Decision. Appendix F Lock-Down Sleeve Decision

Jim Britton Deepwater Corrosion Services Inc. Houston, TX. UTC 2008 Bergen

Offshore Systems. Cameron s Subsea Production Philosophy

MUELLER E-5TM. and D-5TM. Drilling Machines. Reliable Connections. E-5 General Information 2. D-5 General Information 3. Operating Instructions 4-5

Chapter 02. Casing and Tubing

AADE 01-NC-HO-02. Copyright 2001 AADE National Drilling Technical Conference

CATALOG FOR WOODCO USA Brand 150 TON SPIDER. API ROTARY TAPER TRADEMARK WOODCO BUY THE BRAND REG. U.S. PATENT OFFICE MANUFACTURER

Comprehensive Plug and Abandonment Systems

Mutineer-Exeter Development Drilling & Completions Challenges Darren Greer & Peter Dodd

Installation Instructions

B-Too Drilling and Tapping Machine Instruction and Maintenance Manual

Single / Dual Barrier HP Drilling Risers

HYY Hydrogen Patch Probe

Engineering Data Single Reduction Parts List Item # Description Basic Single Reduction Unit 1. Gear Housing 2. Pipe Plug 3. Vent Plug 4. Splash Guard

ClampStar Safe-T-Link Tether Installation Instructions for Deadends

(12) United States Patent (10) Patent No.: US 8,316,946 B2

VALENCIA CORNER DOOR WITH RETURN

OAK GROVE PLANT MAINTENANCE SECTION-MECHANICAL

SR-1.0 Manual, a.doc 11/14/2006 Page 1 of 17

Hunting PLC Annual Results 2010

Repair Manual MK40A-MK45A-MK50A MK55A-MK60A-MK65A. Ref Rev.C General Pump is a Member of The Interpump Group

Transcription:

Cameron MBO Multi-Bowl Wellhead System

MBO Multi-Bowl Wellhead System The Cameron MBO Multi-Bowl Wellhead System is a compact, unitized wellhead which can be used as an alternative to conventional wellhead systems in land and platform applications. The MBO Wellhead incorporates several features designed to substantially reduce installation time and improve safety. A Frelok diverter connector on top of the casing head facilitates installation and removal of the diverter. Removal of the diverter via the Frelok connection typically takes less than 15 minutes. Preinstalled segmented clamps are used on the wellhead connections and drilling adapters to further reduce rig time and eliminate handling of loose clamp parts. After installation of the drive pipe, the entire MBO Wellhead System is installed without cutting or welding. This eliminates the dependence on weather conditions and eliminates the need to shut in adjacent wells on platform developments. Wellhead housing and seals may be easily repaired or replaced without the need to cut through casing. Through-BOP operations minimize handling time. Featuring outlets and test ports only, no lockscrews, this system ensures minimum wellhead penetration. Components of the MBO Wellhead System are based on fieldproven technology and offer a range of features including: Lower Casing Head and Casing Hanger The MBO lower casing head is welded onto the drive pipe and is fitted with the Frelok connection on the top. The housing is a split design to facilitate the use of contingency equipment and maximize system maintenance during the life of the well. A simplified liner-style casing hanger lands in the lower casing head and suspends the conductor in the diverter adapter. This eliminates the need to install a starting head on the conductor, saving the time to remove the diverter from the drive pipe and reinstall it on the conductor. An integral annular seal in the casing hanger can be externally tested before cementing. The seal passes through a standard 21-1/4 diverter for strings up to 20. The casing hanger can be run on the casing, allowing full bore cementing. Wellhead Housing Lower Adapter The MBO wellhead housing lower adapter incorporates a casing hanger and landing ring. The adapter assembly is fluted for cementing and is installed on a full bore handling tool, allowing standard cementing procedures. The wellhead housing lower adapter incorporates an upper profile for connection of the wellhead housing. This eliminates the time associated with installing a head on the surface casing. n addition, this operation requires no cutting or welding and uses the time-saving FastClamp connector which engages a standard AP hub. An annular seal assembly is installed on the top of the wellhead housing lower adapter. This seal allows external testing and monitoring, and locks down the surface casing hanger. The seal assembly also acts as a cap to engage the Frelok profile and incorporates injectable seals to engage the lower adapter assembly. Wellhead Housing The wellhead housing is clamped to the top of the wellhead housing lower adapter via a SpeedClamp connection. The BOP stack mounts directly to the top of the housing and all subsequent operations continue without further stack handling. Mandrel Casing Hangers MBO Wellhead System casing hangers are fluted for cementing and are run on full bore handling tools to allow standard cementing operations. Casing hangers incorporate self-energizing lockdown rings which are retained in place by the handling tool during installation. These lockdowns can be verified before or after cementing operations. MBO casing hangers incorporate ES annulus seal assemblies, providing resilient elements with zero extrusion gap. Seals are designed to enable external testing and monitoring between the upper and lower seals during installation or production. The seals are tested prior to releasing the handling tool. Tubing Hanger The MBO Wellhead System tubing hanger offers the same lockdown and annular sealing features as the casing hangers with the addition of a continuous downhole control line. The continuous control line features an exit block on the wellhead housing. Dual tubing hangers are available.

MBO Multi-Bowl Wellhead System FastClamp Connector ES Annulus Seal Control and Exit Block Tubing Hanger Wellhead Housing SpeedClamp Connector Wellhead Housing Lower Adapter Annular Seal Assembly Frelok Connector Lower Casing Head Casing Hanger SD016665

MBO Features Frelok Connector Frelok Engaged Frelok Disengaged SD016644 A stab type connection that can be made up and tested in less than five minutes. Facilitates installation of the diverter with an appropriate cross-over, which can be preinstalled to minimize nipple up time. Disengages in less than 15 minutes to release the diverter. Control and Exit Block The control line enters and exits through the tubing hanger body. Fittings are provided in the control line entry and exit areas for isolation of the annulus. These fittings can be tested, via porting provided, before running the hanger. The control line exits the wellhead housing, as opposed to the tree adapter. The exit block is designed to reduce possible field damage, and has the line connected directly to the block minimizing the number of leak paths. Dual line exit blocks are available to facilitate dual completions without affecting the wellhead housing. SD016642 FastClamp Connector Fits standard clamp hub profiles using conventional AP ring gaskets. Clamp sections are preinstalled on the hub via the guide rods to eliminate safety concerns in handling the sections during installation. A lower make-up torque is obtained by reducing the size of the studs and increasing the quantity. n larger sizes, the torque has been reduced by as much as 95%. ES Annulus Seal Provides resilient elements with zero extrusion gap. Designed to enable external testing and monitoring between the upper and lower seals during installation or production, thereby enabling monitoring for diagnostic performance evaluation for maintenance planning. Pack-offs are tested prior to releasing the handling tool. SD016643 SD016645

MBO Time Savings Advantage Time Savings Comparison (Conventional vs. MBO Wellhead) Description of Operation Conventional MBO Time Savings (Hrs) Drive Pipe nstall and Nipple Up Diverter Connection 10 Hours 6 Hours 4 Hours Conductor Drive Pipe Subtotal: 4 Hours Wait On Cement 4 Hours 4 Hours Release Handling Tool 1 Hour -1 Hour Remove Diverter Flange and Cut Conductor Pipe 3 Hours 3 Hours nstall Casing Head 5 Hours 5 Hours Nipple Up Diverter 3 Hours 3 Hours Conductor Subtotal: 14 Hours Surface Casing Wait On Cement Before Lifting BOP Stack 6 Hours 6 Hours 0 Hours Nipple Down Diverter Connection 2 Hours.5 Hour 1.5 Hours nstall Annular Seal 1 Hour -1 Hour nstall Slip and Seal Hanger 1 Hour 1 Hour Nipple Up Wellhead Spool and BOP 18 Hours 16 Hours 2 Hours Production Casing Surface Casing Subtotal: 3.5 Hours Wait On Cement Before Lifting BOP Stack 6 Hours 6 Hours Remove Handling Tool and nstall Pack-off 2 Hours -2 Hours Break BOP Connection and nstall Slips and Seal 2 Hours 2 Hours Nipple Up Tubing Spool and BOP 16 Hours 16 Hours Production Casing Subtotal: 22 Hours Production Tree Nipple Up Tree Connection 2 Hours 1 Hour 1 Hour Production Tree Subtotal: Total MBO Time Savings: 1 Hour 44.5 Hours Summary of MBO Time Savings Time Spent with Flange Connections vs. Speed Connections Time Spent Waiting on Cement Time Spent Handling Well Control Equipment Time Spent nstalling Casing Head Total MBO Time Savings: 8.5 Hours 10.0 Hours 19.0 Hours 7.0 Hours 44.5 Hours A Cameron MBO Wellhead System in production, Gulf of Mexico SD24313

Western Hemisphere Cameron PO Box 1212 Houston Texas 77251-1212 Tel 713 939 2211 Fax 713 939 2620 http://www.camerondiv.com Eastern Hemisphere Cooper Cameron (U.K.) Ltd. 5 Mondial Way Harlington Hayes, UB3 5AR England Tel 011 44 181 990 1800 Fax 011 44 181 990 1888 http://www.camerondiv.com Asia Pacific/Middle East Cooper Cameron (Singapore) Pte. Ltd. No. 2 Gul Circle, Jurong ndustrial Est Locked Bag Service No. 3 Jurong Town Post Office Singapore 2262 Republic Of Singapore Tel 65 8613355 Fax 65 8616197 http://www.camerondiv.com Cameron, FastClamp, and SpeedClamp are trademarks of the Cooper Cameron Corporation Frelok is a trademark of Plexus Ocean Systems Ltd. Cooper Cameron Corporation, Cameron Division, Printed in USA, 2/98, TG/1M, WR6574/TC1263