DNVGL-SE-0478 Edition July 2017

Similar documents
TECHNOLOGY QUALIFICATION MANAGEMENT

Technology qualification management and verification

DNVGL-CP-0338 Edition October 2015

Type Approval JANUARY The electronic pdf version of this document found through is the officially binding version

SERVICE SPECIFICATION. Certification of subsea equipment and components DNVGL-SE-0045: DNV GL AS

DNVGL-CP-0212 Edition March 2016

GENERAL DESCRIPTION OF THE CMC SERVICES

DNVGL-CG-0214 Edition September 2016

Marine operations and marine warranty

DNVGL-RP-A203 Edition June 2017

DNVGL-CP-0293 Edition July 2018

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

DNV GL approval of service supplier scheme

Integrity Management of Offshore Assets

PRIMATECH WHITE PAPER COMPARISON OF FIRST AND SECOND EDITIONS OF HAZOP APPLICATION GUIDE, IEC 61882: A PROCESS SAFETY PERSPECTIVE

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

(Non-legislative acts) DECISIONS

ISO INTERNATIONAL STANDARD

Joint ILAC CIPM Communication regarding the. Accreditation of Calibration and Measurement Services. of National Metrology Institutes.

Couplings used for torque transmission in propulsion or auxiliary plants

Phase 2 Executive Summary: Pre-Project Review of AECL s Advanced CANDU Reactor ACR

Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines and Equipment API RECOMMENDED PRACTICE 17U FIRST EDITION, FEBRUARY 2015

4 Briefing. Responsible investor

Send your directly to

Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

16/09/2014. Introduction to Subsea Production Systems. Module structure. 08 Production Control Systems

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

Standard Horizontal Subsea Trees. Integrated offshore offering for reliable, high-quality, and capitalefficient

THE USE OF A SAFETY CASE APPROACH TO SUPPORT DECISION MAKING IN DESIGN

SAFER, SMARTER, GREENER

Subsea UK Neil Gordon Chief Executive Officer Championing the UK Subsea Sector Across the World

East Central College

Specification for Subsea Umbilicals

1 SERVICE DESCRIPTION

ENGINEERING INNOVATION

ISO INTERNATIONAL STANDARD. Petroleum and natural gas industries Offshore production installations Basic surface process safety systems

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

Turning the wheels of your success

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

NTL No N05 Increased Safety Measures for Energy Development on the OCS Effective June 8, 2010

SECTION SUBMITTAL PROCEDURES

SPE A Systematic Approach to Well Integrity Management Alex Annandale, Marathon Oil UK; Simon Copping, Expro

OBSERVATORY SERVICING AND MAINTENANCE

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

Standard Subsea Wellheads. Integrated offshore offering for reliable, high-quality, and capital-efficient performance

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

Technological and Logistical Challenges during Construction & Installation of Deepwater Mega Subsea Development in West Africa

IAASB Main Agenda (March, 2015) Auditing Disclosures Issues and Task Force Recommendations

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

SAUDI ARABIAN STANDARDS ORGANIZATION (SASO) TECHNICAL DIRECTIVE PART ONE: STANDARDIZATION AND RELATED ACTIVITIES GENERAL VOCABULARY

Technical Specifications: Supply of Seamless Grade TP304L Pipe and Grade WP304L Pipework Fittings to the ITER Organization (IO).

ISO INTERNATIONAL STANDARD. Non-destructive testing of welds Radiographic testing Part 1: X- and gamma-ray techniques with film

REVIEW AND APPROVAL OF NOVEL CONCEPTS

RELIANCE INDUSTRIES LIMITED

NZFSA Policy on Food Safety Equivalence:

Implementing FPSO Digital Twins in the Field. David Hartell Premier Oil

NZ China EEEMRA. Topics:

Onshore & Offshore Engineering and Management of Subsea Cables and Pipelines

SECTION SUBMITTAL PROCEDURES

INFCIRC/57. 72/Rev.6. under. Safetyy. read in. Convention. involve. National Reports. on Nuclear 2015.

SECTION SUBMITTAL PROCEDURES

Investigation i of potentially contaminated sites - Code of Practice. Richard Owen Ove Arup & Partners Limited

PRACTICE NOTE NO: 13 Version 1 Amended March 2001 Page 1 of 6 PRECAST CONCRETE ELEMENT DESIGN RESPONSIBILITIES AND CONTRACTUAL ARRANGEMENTS

This document is a preview generated by EVS

Recommended Practice for Flexible Pipe

Nauticus (Propulsion) - the modern survey scheme for machinery

Details of the Proposal

Planned Obsolescence and Mid Life Updates -

AGREEMENT on UnifiedPrinciples and Rules of Technical Regulation in the Republic of Belarus, Republic of Kazakhstan and the Russian Federation

7 Briefing. Responsible investor

ENGINEERING DRAWINGS MANAGEMENT POLICY (IFC/AS BUILTS)

Connecting Systems for Cable Repair (Cable Splices)

Deepsea technologies INTEGRATED INTERVENTION SYSTEMS. Lowering Costs and Risks with Customized Tools and Application Expertise

Brad Luke. Director Peddle Thorp Auckland

TABLE OF CONTENTS Page

In practice, the question is frequently raised of what legislation applies to clamping devices that are intended to be used on machines.

TECHNICAL AND OPERATIONAL NOTE ON CHANGE MANAGEMENT OF GAMBLING TECHNICAL SYSTEMS AND APPROVAL OF THE SUBSTANTIAL CHANGES TO CRITICAL COMPONENTS.

Consideration of External Pressure in the Design and Pressure Rating of Subsea Equipment API TECHNICAL REPORT 17TR12 FIRST EDITION, MARCH 2015

A NEW APPROACH FOR VERIFICATION OF SAFETY INTEGRITY LEVELS ABSTRACT

By RE: June 2015 Exposure Draft, Nordic Federation Standard for Audits of Small Entities (SASE)

TYPE APPROVAL PROCEDURE

Cathodic Protection & Monitoring

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SUBSEA 7 AND GRANHERNE ALLIANCE. Engaging Early to Deliver Value

Summary of Changes and Current Document Status

June Phase 3 Executive Summary Pre-Project Design Review of Candu Energy Inc. Enhanced CANDU 6 Design

(R) Aerospace First Article Inspection Requirement FOREWORD

Standard for Subsea High Integrity Pressure Protection Systems (HIPPS) API STANDARD 17O SECOND EDITION, JULY 2014

Introductory remarks

Network Standard NS

LICENSING THE PALLAS-REACTOR USING THE CONCEPTUAL SAFETY DOCUMENT

Opportunities and Challenges in Deepwater West Africa Projects

DNVGL-SI-0167 Edition July 2015

Monopile Upending Tool (MP-UT)

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

Guide on the General and Administrative Aspects of the Voluntary System of Modular Evaluation of Measuring instruments

ISO ISO ISO ISO TC 8888/SC 1111/ WG 1/ N393N

Risk Based Classification of Offshore Production Systems Matthew D. Tremblay, ABS; Jorge E. Ballesio, ABS; Bret C. Montaruli, ABS

Transcription:

SERVICE SPECIFICATION DNVGL-SE-0478 Edition July 2017 The electronic pdf version of this document, available free of charge from http://www.dnvgl.com, is the officially binding version.

FOREWORD DNV GL service specifications contain procedural requirements for obtaining and retaining certificates and other conformity statements to the objects, personnel, organisations and/or operations in question. July 2017 Any comments may be sent by e-mail to rules@dnvgl.com This service document has been prepared based on available knowledge, technology and/or information at the time of issuance of this document. The use of this document by others than DNV GL is at the user's sole risk. DNV GL does not accept any liability or responsibility for loss or damages resulting from any use of this document.

CHANGES CURRENT General This document supersedes the June 2004 edition of DNV-OSS-306. The purpose of the revision of this service document is to comply with the new DNV GL document reference code system and profile requirements following the merger between DNV and GL in 2013. Changes mainly consist of updated company name and references to other documents within the DNV GL portfolio. Some references in this service document may refer to documents in the DNV GL portfolio not yet published (planned published within 2017). In such cases please see the relevant legacy DNV or GL document. References to external documents (non-dnv GL) have not been updated. Changes - current Editorial corrections In addition to the above stated changes, editorial corrections may have been made. Service specification DNVGL-SE-0478. Edition July 2017 Page 3

CONTENTS Changes current... 3 Section 1 General...5 1.1 General... 5 1.2 Risk based verification... 7 1.3 Defining a verification plan...8 1.4 DNV GL subsea facility statements of compliance...8 1.5 Definitions/abbreviations... 8 1.6 References... 11 Contents Section 2 Service overview... 12 2.1 General... 12 2.2 Service process...12 2.3 Project initiation... 14 2.4 Project realization... 14 2.5 Project operation... 20 2.6 Verification documents... 21 Appendix A Selection of verification level...22 A.1 General... 22 A.2 Trigger questions...22 Appendix B Detailed example scope of work tables for verification... 25 B.1 General... 25 B.2 of terms used in the verification lists...25 B.3 Overall project management... 27 B.4 Design...27 B.5 Construction... 47 Appendix C Examples of verification documents...67 C.1 Verification documents... 67 C.2 Use of quality management systems... 69 C.3 Document forms... 71 Changes historic...77 Service specification DNVGL-SE-0478. Edition July 2017 Page 4

SECTION 1 GENERAL 1.1 General 1.1.1 Introduction 1.1.1.1 This DNV GL service specification gives criteria for and guidance on verification of the integrity and function of parts or phases of subsea facilities. The suite of inter-related DNVGL-SE documents consist of a general description of the verification systematics (DNVGL-SE-0474) and object specific documents - this document (DNVGL-SE-0478) offers the reader the application of the common framework and overview of processes in risk verification, to subsea facilities. It introduces a levelled description of verification involvement during all phases of an asset's life. The document facilitates a categorisation into risk levels high, medium and low, assisting in an evaluation of the risk level. The document assists in planning the verification through the making of a verification plan, and describes the DNV GL documentation of the process throughout. The document provides an international standard allowing transparent and predictable verification scope, as well as defining terminology for verification involvement. 1.1.1.2 This specification falls under the top level document DNVGL-SE-0474 Risk based verification. 1.1.1.3 The descriptions in this specification directly support a simplified verification planning as described in DNVGL-SE-0474 Sec.2. When using the advanced or combined planning, the descriptions will give good references and starting points. Guidance note: The latest revision of all DNV GL documents may be found in the publications list in the DNV GL web site www.dnvgl.com. ---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e--- 1.1.2 Objectives 1.1.2.1 The objectives of this specification are to describe the following for a subsea facility: preparation of a verification plan using DNV GL s risk differentiated levels of verification activities and detailed example scope of work tables DNV GL s implementation and reporting of the verification plan. 1.1.3 Scope of application for verification 1.1.3.1 This specification may be adopted for the verification of parts of subsea facilities or selected project phases. 1.1.3.2 Subsea facilities typically comprise the following systems: downhole system subsea wellhead and tree system (including: choke, tubing hanger and connection systems) manifold, foundations and template flowlines and risers (including dynamic umbilical risers) subsea control umbilicals subsea production control system subsea processing system Service specification DNVGL-SE-0478. Edition July 2017 Page 5

well intervention/completion/workover system ROT intervention system. which are applied in various configurations and tailored to each particular project s specific requirements. 1.1.3.3 This specification describes the principles of a levelled verification involvement. These principles may be applied both for planning of any need or obligations for independent external verification (third party) as well as internal company verification (second party). 1.1.4 Structure of this document This section explains the relationship between this document and DNV GL s overall risk based verification systematics. Sec.2 describes the activities for each project and the project phases for a subsea system. App.A poses trigger questions to assist in the selection of verification level example. App.B gives detailed scope of work tables for the different phases and levels of involvement. These tables are the basis for the development of project specific scope of work tables. App.C gives example verification documents and describes the documents issued during and as a result of the verification process. The use of quality management systems is addressed here also. Service specification DNVGL-SE-0478. Edition July 2017 Page 6

1.2 Risk based verification 1.2.1 Elements of the service 1.2.1.1 The risk based verification concept is described in DNVGL-SE-0474 and visualized by Figure 1-1. Figure 1-1 The DNV GL risk based verification chain 1.2.1.2 The verification plan is the pivot element, with the asset specification, risk assessment and definition of involvement level as input and the verification execution being the implementation. Service specification DNVGL-SE-0478. Edition July 2017 Page 7

1.3 Defining a verification plan 1.3.1 Risk based verification planning 1.3.1.1 The selection of the level of verification shall depend on the risk level of each element having an impact on the management of hazards and associated risk levels of the asset. The planning can be simplified or detailed. This is further described in DNVGL-SE-0474. 1.3.1.2 This specification mainly aids in a simplified preparation of the verification plan. Guidance note: Risk can be evaluated based on safety, environmental impact, economics, schedule, public relations, reputation or other criteria set by the owner. The example tables are mainly generated on the basis of safety and integrity risks. With business risk being the driver for verification involvement this will normally warrant a need to use the analytical approach and no the simplified one. ---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e--- 1.4 DNV GL subsea facility statements of compliance 1.4.1 General on verification 1.4.1.1 Verification describes the individual activities undertaken by DNV GL at the various stages of design, construction and operation of the subsea facility. The scope of the verification plan is ultimately determined by the owner. 1.4.2 Statement of conformity 1.4.2.1 A statement of conformity may be issued by DNV GL to confirm compliance according to the scope of work. 1.4.3 General on certification 1.4.3.1 Certification describes the totality of verification activities leading up to the issue of a certification of conformity. The scope of work and verification plan, called a certification plan, is set by DNV GL. All design and construction aspects, related to subsea facility safety and integrity, must be covered by the certification plan. 1.4.3.2 This service specification does not define the scope of work necessary to achieve a DNV GL certificate of conformity. 1.5 Definitions/abbreviations 1.5.1 General 1.5.1.1 Relevant definitions in ISO 13620-8 also apply to this document. Service specification DNVGL-SE-0478. Edition July 2017 Page 8

1.5.2 Abbreviations Table 1-1 Abbreviations Abbreviation DCS EDU EPU ETU HPU HTP MCC MCS MQC PT SCM SCMMB SCR SCU SDU SEM SPCU TT TUTU UPS distributed control system electrical distribution unit electrical power unit electronic test unit hydraulic power unit hydraulic test panel motor control centre master control station multi quick connector pressure transmitter subsea control module SCM mounting base subsea control room subsea control unit subsea distribution unit subsea electronic module subsea power and communication unit temperature transmitter topside umbilical termination unit uninterrupted power supply 1.5.3 Verbal forms Table 1-2 Definitions of verbal forms Term shall should may Definition indicates requirements strictly to be followed in order to conform to this document and from which no deviation is permitted indicates that among several possibilities, one is recommended as particularly suitable, without mentioning or excluding others, or that a certain course of action is preferred but not necessarily required, other possibilities may be applied subject to agreement verbal form used to indicate a course of action permissible within the limits of the document Service specification DNVGL-SE-0478. Edition July 2017 Page 9

1.5.4 Definitions Table 1-3 Definitions of terms Terms client construction phase design design phase fabrication hazard hazard and operability study (HAZOP) installation (activity) manufacture operations (phase) risk Definition DNV GL s contractual partner, it may be the purchaser, the owner or the contractor all phases during construction, including fabrication, installation, testing and commissioning, up until the installation or system is safe and operable for intended use In relation to subsea facilities, this include transportation, on-shore and on-barge assembly, installation, rectification, tie-in, pressure testing, commissioning and repair. all related engineering to design the subsea facilities including both structural as well as material and corrosion an initial phase that takes a systematic approach to the production of specifications, drawings and other documents to ensure that the subsea facilities meets specified requirements (including design reviews to ensure that design output is verified against design input requirements) activities related to the assembly of objects with a defined purpose In relation to subsea facilities, fabrication typically refers to the process of assembly or transformation of e.g. plates, profiles and pipes etc into production facilities and (installation/ intervention) tools. a deviation (departure from the design and operating intention) which could cause damage, injury or other form of loss (Chemical Industries Association HAZOP guide) the application of a formal systematic critical examination to the process and engineering intentions of new or existing facilities to assess the hazard potential of mal-operation or malfunction of individual items of equipment and their consequential effects on the facility as a whole (Chemical Industries Association HAZOP guide) the operations related to installing the equipment or structure, e.g. marine operations related to placing equipment on seabed, tie-in, piling of structure etc., including final testing and preparation for operation making of articles or materials, often in large volumes, in relation to subsea facilities, this typically refers to activities for the production of various components under contracts from one or more contractor or supplier the phase when the subsea facilities are being used for the purpose for which it was designed the qualitative or quantitative likelihood of an accident or unplanned event occurring, considered in conjunction with the potential consequences of such a failure In quantitative terms, risk is the quantified probability of a defined failure mode times its quantified consequence. Guidance note: Risk is not only related to physical failure modes, but also to operational errors, human errors and so on. For some risks the functional failures or physical failure modes contributes less than 20% while more than 80% of the risk relates to other devices. ---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e--- Service specification DNVGL-SE-0478. Edition July 2017 Page 10

Terms risk reduction measures Definition those measures taken to reduce the risks to the operation of subsea facilities and to the health and safety of personnel associated with it or in its vicinity by: reduction in the probability of failure mitigation of the consequences of failure. Guidance note: The usual order of preference of risk reduction measures is: a) inherent safety b) prevention c) detection d) control e) mitigation f) emergency response. ---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e--- safety objectives statement of conformity verification the safety goals for the construction, operation and decommissioning of the subsea facilities including acceptance criteria for the level of risk acceptable to the owner a statement or report signed by a qualified party affirming that, at the time of assessment, the defined subsea facilities phase, or collection of activities, met the requirements stated by the owner an examination to confirm that an activity, a product or a service is in accordance with specified requirements Guidance note: The examination shall be based on information, which can be proved true, based on facts obtained through observation, measurement, test or other means. ISO 8402: 1994: Verification: Confirmation by examination and provision of objective evidence that specified requirements have been fulfilled. ---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e--- 1.6 References Table 1-4 References Document code A Guide to Hazard and Operability Studies ISO 8402 BS 4778 EN 45011 EN ISO 13628 Title Chemical Industries Association Limited, London (1979) Quality Vocabulary, 1994, International Organization for Standardization, Geneva Quality Vocabulary, Part 2 Quality Concepts and Related Definitions, 1991, British Standards Institute, London General Criteria for Certification Bodies Operating Product Certification, 1998, European Committee for Standardization, Brussels Design and operation of subsea production systems - series Service specification DNVGL-SE-0478. Edition July 2017 Page 11

SECTION 2 SERVICE OVERVIEW 2.1 General 2.1.1 Objectives 2.1.1.1 The objectives of this section are to provide: an overview of life cycle verification activities relating to the system details of DNV GL's verification services for subsea facilities. 2.2 Service process 2.2.1 General principles 2.2.1.1 The description of the process of DNV GL s verification of subsea facilities is based on distinct project phases and the recognition of key milestones. 2.2.1.2 Verification performed by DNV GL normally progresses through one or more of these project phases and may include all or selected aspects of the project. 2.2.1.3 The risk based verification process is described in relation to the normal project phases: Project initiation: conceptual design. Project realisation: detail design construction manufacturing of subsea facilities manufacturing and fabrication of subsea facilities components and assemblies installation project completion (pre-commissioning) commissioning issue of as-built/as-installed documentation, including design fabrication and installation (DFI) resume. Project operation: issue of operation manuals operations, maintenance and repair. Project abandonment: decommissioning removal. 2.2.2 Simplified verification planning 2.2.2.1 The steps in the simplified verification planning are as follows: Use trigger questions to assess the overall risk level of the project (or manageable elements thereof). Service specification DNVGL-SE-0478. Edition July 2017 Page 12

Evaluate the risk against the relevant owner or project acceptance criteria (often this can be directly tied to the owner core values or a sub-set of these) and decide whether the general verification involvement shall be low, medium or high. Use the example detailed scope of work tables in App.B to make a first draft of a verification plan Generate the project specific verification plan by including a project specific engineering judgment or risk analysis to adjust the table to suit the project. Perform the verification execution according to the verification plan, making revision to the plan if and when necessary. Report the verification. 2.2.2.2 The trigger questions are included in App.A. 2.2.2.3 Generic scopes of work for verification at the three levels of verification, low (L), medium (M) and high (H), are given in the tables in this section. 2.2.2.4 Project specific detailed scope of work descriptions, based on the generic scopes of work tables and showing all the activities to be verified, should be made. Examples of the level of detail are given in App.B. 2.2.2.5 It is the tables in this section that give the principle difference between the levels of verification involvement. The detailed example tables are to be treated as examples only. They shall not be used without a project specific confirmation of their completeness. 2.2.2.6 The project specific scope of work definition, derived from the tables in App.B (or similar), shall be part of the final DNV GL verification report. 2.2.3 Selection of level of verification 2.2.3.1 The selection of the level of verification for the simplified verification planning is facilitated by the trigger questions included in App.A. 2.2.4 Codes, standards and reference documents 2.2.4.1 The verification process described in this document is not tailored to a specific technical standard, code or reference document. 2.2.4.2 It is recommended to use internationally recognised codes or standards. Where combinations of standards and external criteria are used the exact terms of reference and documents to be issued shall be agreed at the beginning of the project and formally defined in the contract. 2.2.4.3 It is recommended strongly not to mix standards due to the possible differences in safety philosophies. Guidance note: Most standards are a coherent collection of requirements for all the relevant aspects of a pipeline system. These aspects, e.g. load and resistance, are normally among themselves adjusted to give an overall acceptable safety level. To pick requirements from different standards can then easily result in unpredictable (low) levels of safety, and non-uniform level of safety. ---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e--- Service specification DNVGL-SE-0478. Edition July 2017 Page 13

2.3 Project initiation 2.3.1 Verification during conceptual design 2.3.1.1 Verification during the conceptual and/or feasibility studies of a project and in the early stages of a project can reduce the need for verification during the design and construction phases, and can reduce costs during the long term operation, inspection and maintenance phases. 2.3.1.2 It is recommended to combine the mechanical design verification during project initiation phase with additional review of: environmental aspects project schedule cost. 2.3.1.3 During this phase it can be beneficial to make an initial verification plan. Risk evaluations are carried out during this phase and should be used to get an indication of the general verification level: low, medium or high. 2.4 Project realization 2.4.1 General 2.4.1.1 All design and construction aspects, relevant to subsea facility, may be covered by the life cycle verification. 2.4.1.2 In this specification the split in the scope of work between design and construction is made between sets of requirements (specifications) developed during design and description of the steps necessary to satisfy the specification (procedures) showing how construction will be implemented. Guidance note: The split between design and construction may vary, but it is useful spend some time on the definition to reduce interface problems later. ---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e--- 2.4.2 Verification of overall project management 2.4.2.1 Verification of the overall project management is the examination of the means of controlling the entire subsea development project, or the phase for which verification is undertaken. 2.4.2.2 This verification should confirm that the necessary controls are in place to ensure information flow across the various interfaces. It is especially important where separate contractors have been employed for different phases of the project such as design and installation. 2.4.2.3 Typically the documentation is expected to be in line with ISO 9000 requirements. 2.4.2.4 Definition of scope of work for verification of overall project management should follow Table 2-1. Service specification DNVGL-SE-0478. Edition July 2017 Page 14

Table 2-1 Scope of work for verification of overall project management Verification activity L M H Review of the project management process by review of project quality management documentation. x x x audit of project quality management system x x review of sub-contractor control x x review of interface controls x x review of methods of information flow x x 2.4.2.5 The verification of the overall project management quality system and documentation is optional. The reviews and audits should typically be performed if an extensive verification of a project is performed, while might be omitted for smaller sub-phase verifications. 2.4.3 Verification during design 2.4.3.1 Design verification is the examination of the assumptions, methods and results of the design process and is performed at the specified level of verification to ensure that the specified requirements of the subsea facility will be achieved. 2.4.3.2 Design verification should consist of one, or some, of the following: review of the design process review of specifications for design (asset specifications) review of design reports and drawings performing of independent parallel calculations review of specifications for construction and operation, resulting from design. 2.4.3.3 The documents that shall be produced in the project should as a minimum satisfy the requirements of the selected code. Service specification DNVGL-SE-0478. Edition July 2017 Page 15

2.4.3.4 Definition of scope of work for verification of design should follow Table 2-2. Table 2-2 Scope of work for verification of design Verification activity L M H Review of specifications for design by review of the design basis with emphasis on the design criteria x x x Review of design reports and drawings by review of the main documentation to ensure that the main load conditions have been accounted for in design, that the governing conditions are identified, and that the chosen design philosophies are in accordance with specified codes and standards x x x evaluation of the main methods used and spot checks of the input data and the calculation results x x detailed review of main design reports x Performing independent parallel calculations by check of pressure containment or overall structural integrity x x x simplified independent analysis/calculation(s) performed by spot checks x x advanced independent analysis/calculation(s) performed by spot checks x Review of specifications for construction and operation by spot check of critical aspects x x x review of main specifications x x thorough review of main specifications x Review of specific operational challenges (e.g. flow assurance) general principles x x x review of main documents supported by simplified analyses x x Guidance note: Design verification activities may be split up between basic design and detailed design, or other sub-phases, depending on type of contract. ---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e--- 2.4.4 Verification during construction 2.4.4.1 The construction phase comprises fabrication, manufacturing, sub-unit/unit integration testing, installation and commissioning. An important element is to ensure that the contractual design requirements are incorporated in the purchase documentation, and that correct materials, joining and corrosion control, have been applied, and that pressure rating, capacity and function are meeting the requirements as per Service specification DNVGL-SE-0478. Edition July 2017 Page 16

approved specifications and procedures. It is imperative that relevant preparations for this is started as early as possible, e.g. by the appointment of a vendor supply verification co-ordinator. 2.4.4.2 Verification during construction is carried out by means of full time attendance, audits, inspection or spot checks of the work, as appropriate, in sufficient detail to ensure that the specified requirements of the subsea facility will be achieved. 2.4.4.3 Verification of these activities relates not only to the contractor s work but also to the monitoring of this work carried out by others. 2.4.4.4 During construction verification should consist of one, or some, of the following: reviewing the construction process reviewing construction procedures reviewing qualification process surveillance during construction activities reviewing final documentation. 2.4.4.5 The documents that should be produced in the project and submitted for review prior to start up are typically: manufacturing procedure specification (MPS) manufacturing procedures, including test requirements and acceptance criteria, repairs, personnel qualification records etc. material specifications quality plans welding procedure specifications (WPS)/welding procedure qualification record (WPQR) NDT procedures manufacturing procedure qualification test (MPQT) results manufacturer s/fabricator s quality system manual. 2.4.4.6 Particularly for installation it is highly recommended to prepare a formal ready for start of installation document to be verified prior to commencement. 2.4.4.7 The as-built documentation to be submitted after manufacturing should include but not be limited to: manufacturing procedures including test requirements and acceptance criteria, repairs, personnel qualification records etc. material certificates production test records (visual, NDT, test samples, dimensional, heat treatment etc.) hydrostatic test report commissioning report relevant statistics of chemical composition, mechanical properties and dimensions for the deliveries relevant logs. 2.4.4.8 Definition of scope of work for verification of manufacturing and fabrication Table 2-3 and Table 2-4 for installation and Table 2-5 for final testing and completion. Service specification DNVGL-SE-0478. Edition July 2017 Page 17

Table 2-3 Scope of work for verification of manufacturing and fabrication Verification activity L M H Review of the manufacturing and fabrication process Review of manufacturing and fabrication management systems x x x Audit of the quality management system (x) x Review of manufacturing and fabrication procedures Review manufacturing, fabrication and inspection procedures for confirmation of compliance with the manufacturing specification x x x Review method statements x x Review of qualification process Review the manufacturing procedure specification, (MPS), manufacturing procedure qualification test (MPQT), as applicable x x x Full time attendance during MPQT, as applicable, or first day production x x Surveillance during manufacturing and fabrication activities Visit-based attendance during testing, to ensure, based on spot checks, that the delivered products have been produced in accordance with the manufacturing specification x x x Visit-based or full-time attendance during manufacturing and fabrication to ensure, based on spot checks, that the delivered products have been produced in accordance with the manufacturing specification Full-time attendance during manufacturing and fabrication to ensure, based on spot checks, that the delivered products have been produced in accordance with the manufacturing specification x x x Review of final documentation x x x Guidance note: Materials may be ordered with certificates of varying degrees of independent 3 rd party verification (e.g. 3.1C according to EN 10204). This can this be integrated in the overall verification activities, so not to duplicate work. ---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e--- Service specification DNVGL-SE-0478. Edition July 2017 Page 18

Table 2-4 Scope of work for verification of installation Verification activity L M H Review of installation procedures Spot check of installation manual, (IM) x x x For critical operations (identified from the FMEA and HAZOP studies) review the IM x x Review of qualification process For critical operations, review the qualification of the IM x x x Full time attendance during qualification tests, if applicable, or production start-up x x Surveillance during installation activities Visit-based attendance during start up of each offshore operation (i.e. installation, completion, intervention works, etc). x x x Full time attendance during defined test and trials x x Review of final documentation x x x Table 2-5 Scope of work for verification of final testing for operation, including as-built survey and project completion Verification activity L M H Review of procedures Review of the procedures for infield tests and commissioning to ensure that the procedure adequately covers the system in accordance with the design requirements x x x Surveillance during testing and completion activities Full time attendance during commissioning x x Full time attendance during specific tests testing and audit based attendance during ongoing testing x Review of test results x x x Review of final documentation Spot check of as-built documentation x x x Review of as-built documentation x Service specification DNVGL-SE-0478. Edition July 2017 Page 19

2.5 Project operation 2.5.1 Verification during operation 2.5.1.1 Verification during operation is carried out by audit or spot check of the work in sufficient detail to ensure that the specified requirements of the subsea facilities continue to be achieved. 2.5.1.2 Assessment of these activities will relate to the owner s, as well as any contractor s, work. 2.5.1.3 During operations, these assessments should consist of: review of operations processes: review of operations management systems audit of the quality management system, if necessary review of operations specifications and procedures: confirmation of design assumptions method statements inspection plans inspection methods procedures for evaluation of inspection results attendance during operations activities: attendance during inspections review of inspection records. 2.5.1.4 In order to be able to carry out periodical surveys, the minimum documentation should include: personnel responsible for the operation of the subsea facilities history of the subsea facilities operation with reference to events that may have significance with respect to safety and functionality installation condition data as required physical and chemical characteristics of transported media including sand and sand detection measures inspection and maintenance/intervention philosophy, schedules and records inspection/intervention procedures and results as appropriate. 2.5.1.5 Definition of verification of the operations phase should follow Table 2-6. Table 2-6 Scope of work for verification of operations Verification activity General review of the main document(s) to check compliance with applicable design documentation. Audit during repair and modification. L M H x x x Audit attendance during start-up of periodical survey, modification and repair activities. For critical aspects, as identified by the contract, audit attendance throughout the activities. Review of contractors' documentation of the survey/modification. x x Service specification DNVGL-SE-0478. Edition July 2017 Page 20

Verification activity Review of the main document(s) to check compliance with applicable codes and standards. Audit attendance during start-up and performance of periodical survey, modification and repair activities. For critical aspects, as identified by the contract, full attendance throughout the preparations of and the activities. Issuing of independent confirmation documentation of the survey/modification. L M H x 2.5.1.6 Verification during operations is carried out to confirm that the subsea facilities continue to meet the Owner s specified requirements. 2.5.1.7 Annual assessments may be carried out to confirm that any deterioration of the subsea facilities are within acceptable limits and that the facilities continues to be fit for the intended purpose. Guidance note: Annual assessments do not necessarily involve annual inspections as such regular inspections may not be required under a riskbased inspection strategy. Annual assessments may be limited to review of records confirming that the subsea facilities have been operated within its design limits. ---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e--- 2.5.1.8 Additional assessments should be carried out to confirm that any damage, deterioration or modification to the pipeline system or other systems does not render the subsea facilities unsuitable for the intended purpose. 2.6 Verification documents 2.6.1 General 2.6.1.1 The hierarchy of verification document is given in DNVGL-SE-0474 App.B. The descriptions of the content of these documents as well as examples of document forms are given in App.C to this specification. Service specification DNVGL-SE-0478. Edition July 2017 Page 21

APPENDIX A SELECTION OF VERIFICATION LEVEL A.1 General A.1.1 General principles A.1.1.1 The selection of the level of verification depends on the risk level of each of the elements that have an impact on the management of risks to the asset. A.1.1.2 Verification shall direct greatest effort at those elements of the asset where the risk is highest and whose failure or reduced performance will have the most significant impact on the project objective and goals, e.g.: safety risks environmental risks economic risks. A.1.1.3 Suitable selection factors include, but are not limited to, the: overall safety and other objectives for the asset assessment of the risks associated with the asset and the measures taken to reduce these risks degree of technical innovation in the asset experience of the contractors in carrying out the work quality management systems of the owner and its contractors. A.1.1.4 Due to the diversity of various subsea systems, their contents, their degree of innovation, the geographic location, et cetera, it is not possible to give precise guidelines on how to decide what level of verification is appropriate for each particular subsea system. A.1.1.5 Therefore, guidance is given as a series of questions that should be answered when deciding the appropriate level of verification for a subsea system. This list is not exhaustive and other questions should be added to the list if appropriate for a particular subsea system. A.1.1.6 It must be emphasised that the contribution of each element should be judged qualitatively and/ or quantitatively. Wherever possible quantified risk assessment data should be used to provide a justifiable basis for any decisions made. A.1.1.7 Depending of the stage of the project, the activities may not have taken place yet in which case the questions can also be posed in another form, i.e. Is. planned to be? A.2 Trigger questions A.2.1 Overall project objective and goals Does the safety objective address the main safety goals? Does the safety objective establish acceptance criteria for the level of risk acceptable to the owner? Is this risk (depending on the subsea system and its location) measured in terms of human injuries as well as environmental, economic and political consequences? Guidance note: Substitute safety objective with other relevant objectives for the project, and go through all of them. ---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e--- Service specification DNVGL-SE-0478. Edition July 2017 Page 22

A.2.2 Assessment of risk Has a systematic review been carried out to identify and evaluate the probabilities and consequences of failures in the subsea system? Has this review judged the contribution of each element qualitatively and/or quantitatively and used, where possible, quantified risk assessment data to provide a justifiable basis for any decisions made? Does the extent of the review reflect the risk level of the subsea system, the planned operation and previous experience with similar subsea systems? Does this review identify the risk to the operation of the subsea system and to the health and safety of personnel associated with it or in its vicinity? Has the extent of the identified risks been reduced to a level as low as reasonably practicable by means of one or both of: Reduction in the probability of failure? Mitigation of the consequences of failure? Has the result of the systematic review of the risks been measured against the owner s safety (or other) objective? Has the result of this review been used in the selection of the appropriate verification activity level? A.2.3 Technical innovation Has the degree of technical innovation in the subsea system been considered? Has it been considered that risks to the subsea system are likely to be greater with a high degree of technical innovation than with a subsea system designed, manufactured and installed to well-known criteria in well-known waters? Have factors been considered in the selection of the appropriate verification level such as: degree of difficulty in achieving technical requirements knowledge of similar subsea systems effect of the new subsea system on the surrounding area. A.2.4 Contractors experience Has the degree of risk to the subsea system been considered where design, construction or installation contractors are inexperienced? Has the degree of risk been considered where the contractors are experienced but not in similar work? Has the degree of risk been considered where the work schedule is tight? Service specification DNVGL-SE-0478. Edition July 2017 Page 23

A.2.5 Quality management systems Have all parties involved in the subsea system implemented an adequate quality management system to ensure that gross errors in the work are limited? Do these parties include the: Owner? Design contractor? Construction contractors? Installation contractor? Operator? Do the factors being considered when evaluating the adequacy of the quality management system include: Whether or not an ISO 9000 or equivalent certified system is in place? Results from external audits? Results from internal audits? Experience with contractors previous work? Project work force familiarity with the quality management system? Service specification DNVGL-SE-0478. Edition July 2017 Page 24

APPENDIX B DETAILED EXAMPLE SCOPE OF WORK TABLES FOR VERIFICATION B.1 General B.1.1 General introduction B.1.1.1 This appendix provides the format of the detailed verification lists (tables), generated for typical systems comprising a subsea facility: 1) downhole system 2) subsea wellhead and tree system (including: choke, tubing hanger and connection systems) 3) manifold, foundations and template 4) flowlines and risers (including dynamic umbilical risers) 5) subsea control umbilicals 6) subsea production control system 7) subsea processing system 8) well intervention/completion/workover system 9) ROT intervention systems. which shall be made for each particular project. B.1.1.2 The detailed project-specific verification lists for the chosen level of verification shall be based on these tables. For project scenarios or components not covered in this appendix, similar lists with the same degree of detail shall be made. Guidance note: s of these systems can be found on top of the design tables. ---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e--- B.1.1.3 If any of the activities are moved from one phase to another, then this must be identified clearly identified on the list where it is removed. Similarly, the detailed list for the phase to where it is moved shall be amended. Guidance note: Typically, contractual boundaries may give natural splits of activities between phases. However, then it is then even more important to ensure that there is a traceably as to which phases what activity belong and that this is also conveyed to the contractors also. ---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e--- B.2 of terms used in the verification lists B.2.1 General B.2.1.1 The following abbreviations have been used. The definition contents of which are given subsequently given: A S H R = audit = surveillance = hold point = review Service specification DNVGL-SE-0478. Edition July 2017 Page 25

B.2.1.2 These abbreviations are DNV GL s preferred terms and will normally be used in DNV GL-generated documents. However, other terms, for example monitoring or witnessing, will be used by DNV GL if these are the terms commonly used in documents, such as inspection and test plans, generated by others. In that case, it is expected that these other terms are defined in these documents. B.2.2 Audit B.2.2.1 Systematic and independent examination to determine whether quality activities and related results comply with planned arrangements and whether these arrangements are implemented effectively and are suitable to achieve objectives (ISO 8402:1994). Guidance note: This activity differs from the surveillance by being focused on the adherence to and completeness and robustness of the procedures and not on the actual result of the procedure (although this is not ignored). Further, the audit is normally a one-off activity as opposed to the continuity in monitoring. ---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e--- B.2.3 Surveillance B.2.3.1 Continual monitoring and verification of the status of an entity and analysis of records to ensure that specified requirements are being fulfilled (ISO 8402:1994). Guidance note: Other commonly used terms for surveillance are monitoring or witnessing. ---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e--- B.2.3.2 The amount of work involved in surveillance is not described in detail in the tables. This shall be part of the final contractual scope of work which shall define the frequency of surveillance based on the overall surveillance and the quality control performed by other parties as well as DNV GL s experience. B.2.3.3 The following shall be used to describe the frequency if nothing else is specifically defined: S1 S2 S3 = surveillance on a visit basis, e.g. frequency minimum once per week = surveillance frequency minimum once per day = surveillance frequency minimum once per shift. Guidance note: These surveillance frequencies may be modified to correspond with production work flow. ---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e--- B.2.4 Hold point witnessing B.2.4.1 A point, defined in an appropriate document, beyond which an activity must not proceed without the approval of a designated organization or authority (ISO 8402:1994). B.2.5 Review B.2.5.1 Systematic examination of reports and documentation. The depth of review will depend both on the type of document and the level of involvement. Service specification DNVGL-SE-0478. Edition July 2017 Page 26

B.2.5.2 The following shall be used to describe the extent of the review if nothing else is specifically defined: I R1 R2 = for information only = review of principles and general aspects = comprehensive review Guidance note: Review of production records does not guarantee their correctness. It is a confirmation to DNV GL that the manufacturer and/or sub-contractor has preformed the required activity and issued a report. ---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e--- B.2.5.3 Documents that are reviewed by DNV GL will, unless otherwise agreed, not be signed and stamped. B.3 Overall project management B.3.1 General B.3.1.1 The project quality management documentation, if part of scope, should be available at the early stages of the project, preferably before design is underway, to ensure that the necessary controls are in place. Table B-1 Overall project management Item 1 review of project quality management documentation. R1 R2 R2 2 audit of project quality management system R1 R2 R2 3 review of sub-contractor control R1 R2 R2 4 review of interface controls R1 R2 R2 5 review of methods of information flow R1 B.4 Design B.4.1 General B.4.1.1 For design verification a list similar to that given in Table B-2 to Table B-11 shall be made for the specifics of the minimum requirement to documentation for each subsea facility. B.4.2 Design verification B.4.2.1 Table B-2 to Table B-11describe issues to be verified. Table B-12 to Table B-20 identifies relevant independent analyses/calculations included in the three verification levels. Service specification DNVGL-SE-0478. Edition July 2017 Page 27

B.4.3 Low level design verification B.4.3.1 The initial low level design verification consists of a detailed document review of the design basis, risk assessment/analysis documentation, quality management documentation and (if they exist) method or design philosophy documents. The presumed high risk aspects of the project shall be identified by DNV GL from the initial review and conveyed to the owner and designer for discussion and agreement on correct understanding. B.4.3.2 The subsequent verification consists of document review of the calculations analysis methods used to conclude the high risk aspects. Other design documents are used as information and a few will be spot checked for confirmation of the quality control. B.4.3.3 Implementation of the transfer of conclusions from design calculations and or reports into drawings and specifications is not included. B.4.4 Medium level design verification B.4.4.1 Medium level design verification consists of a review of all main design documents related to subsea facilities safety and integrity. Less critical aspects will be spot checked. The review will be detailed for high risk aspects and independent checks will be performed. B.4.4.2 A design quality management system audit will be performed. B.4.4.3 Implementation of the conclusions from design calculations/reports into drawings and specifications will be or is included on a spot check basis. B.4.5 High level design verification B.4.5.1 High level design verification consists of a full review of most of the produced documents related to integrity. The review will be detailed for all high risk aspects and independent checks shall be performed. B.4.5.2 Implementation of the conclusions from design calculations reports into drawings and specifications is included. Service specification DNVGL-SE-0478. Edition July 2017 Page 28

B.4.5.3 The main specifications are also checked for clearness and ambiguity. Table B-2 Subsea production system design Item General Availability/reliability of the systems: 1 System RAM analysis I R1 R2 The downhole system typically consists of the following systems and components, and the verification activities described in the following tables relate to safety, integrity, functionality and reliability of these systems/components and the interaction between them: downhole safety valve production tubing packer. Table B-3 Downhole system design Item Low Med. High General: 1 Safety objective I I I 2 Confirmation that the different contractors and sub-contractors quality systems meet the requirements of ISO 9000 R2 R2 R2 3 of subsea system and overall project organisation I I R1 4 Risk assessment and identification of critical aspects R2 R2 R2 5 Document register I R1 R2 Review of the design process by: 6 Review of design quality management documentation I R2 R2 7 Audit of design quality management documentation - A A Review of specifications for design: 8 Design basis (including pressure/thermal/structural/vibration/environmental/ transportation/installation/accidental loading premise) R2 R2 R2 9 Operation philosophy - R1 R2 10 Intervention philosophy - R1 R2 11 Internal/external corrosion protection philosophy I R1 R2 12 Material selection philosophy R1 R2 R2 13 Downhole safety valve specification R1 R2 R2 14 Production tubing specification I R1 R2 Service specification DNVGL-SE-0478. Edition July 2017 Page 29

Item Low Med. High 15 Packer specification R1 R2 R2 16 NDE specifications R1 R2 R2 17 Installation and commissioning philosophy - R1 R2 Review of design drawings and reports: 18 Component design and qualification reports R1 R2 R2 19 Environmental/structural/accidental loading report R1 R2 R2 20 Intervention tools design and qualification reports I R1 R2 21 Internal/external corrosion protection report - I R2 22 Tree mounted hydraulic/electric control interface selection and qualification reports - I R2 The subsea wellhead and tree system typically consists of the following systems and components, and the verification activities described in the following tables relate to safety, integrity, functionality and reliability of these systems/ components and the interaction between them. a) Subsea tree assembly, including: subsea tree tree connectors valves, valve blocks and valve actuators chokes and choke actuators tree cap tree piping tree guide frames tree mounted controls interfaces: instrumentation, sensors, control pod interface, hydraulic piping and fittings, electrical cables and fittings protection frame (if an individual frame is fitted directly to the tree assembly) ROV interfaces (e.g. main subsea tree valve overrides, choke/scm replacement, relevant docking points, again if these are fitted individually to each tree assembly). b) Subsea wellhead assembly, including: conductor housing wellhead housing casing hangers seal assemblies guide base bore protectors and wear bushings corrosion caps. c) Tubing hanger. d) Flowline and umbilical connectors. Service specification DNVGL-SE-0478. Edition July 2017 Page 30