Instruction Manual VB /8 Diameter Floor Socket with or without Floor Plates for Floating Wood Floors

Similar documents
FLOATING FLOOR SOCKET WITH BRASS FLOOR PLATE

FLOATING FLOOR SOCKET WITH HINGED FLOOR PLATE

Instruction Manual FLOATING FLOOR SOCKET WITH CHROME FLOOR PLATE

BISON GOOSENECK FOOTBALL 1 PAIR OF GOAL POSTS

INSTALLATION INTRUCTIONS

BASEBALL FOUL POLES SURFACE MOUNTED

Equilibrium. Conference Table. Installation Instruction. Revision B 11/07/16

Bulkhead Model Number and

A 1 Vertical Pole I 1 BA47/47A/47P Backboard (2 req d on Model BA872)

INSTALLATION INSTRUCTIONS

Vir Stil Console Lavatory INSTALLATION INSTRUCTIONS

33/3547A. Special tools needed: #10-24 tap Drill bits: #25, 5/16, 13/32, 1/2

Quick-Release Sliding Tail Vise 05G30.01

Installation Instructions

INSTALLATION INSTRUCTIONS

Full Overlay Door Panel Preparation and Installation Instructions for 2175, 2115, CLR2160 Models

INSTALLATION INSTRUCTIONS

Installation Instruction

Equilibrium Credenza

BASEBALL FOUL POLES GROUND SLEEVE MOUNTED

10x10 Trellis Pergola

Replacement Guide. For Handle Side Z-bar on Fullview Doors with Laminated Glass and Multi-Point Locking System RECOMMENDED TOOLS:

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS FOR INSTALLING T-SERIES EXTRA HEAVY DUTY LEVER LOCKSET

GE Monogram. Installation. Instructions. Microwave Oven. Under Cabinet Installation. and. JX827 Series Built-In Kit. Models.

How to fit an Internal Door

PROTECT-A-POOL INGROUND REMOVABLE SAFETY FENCE

33/35A Series. Devices covered by these instructions: Rim Exit Device. CD33/35A Rim Exit Device EL33/35A Rim Exit Device SS33/35A Rim Exit Device

3/8 FRAMELESS BYPASS SLIDING SHOWER ENCLOSURE

Custom Wood Frame Overlay for Glass Doors Installation Instructions

10x10 Trellis Pergola

Installation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 60" Plasma Screens

32 Gallon Perforated Square Receptacle

Preference Collection and Treatment Console INSTALLATION GUIDE

ROOM FOLD SLIDING FOLDING INTERNAL DOORSET FITTING & FIXING GUIDELINES

IMPORTANT: installation. FLOOR ANCHORED CEILING HUNG OVERHEAD BRACED FLOOR-TO- CEILING ANCHORED

33/3527A. Devices covered by these instructions: 33/3527A-F (Fire) Surface Vertical Rod Exit Device

INGROUND COVER INSTALLATION GUIDE

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS FREE STANDING TUB FILLERS

INSTALLATION GUIDE DUOFUSE SLAT WALL SYSTEM

installation instructions

A Disc Golf Course Is Built in Three Phases

installation instructions WC Frame 1180mm with Dual Flush Cistern

96 (Standard Length)

Installation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 60" Plasma Screens

Installation Instructions

Preference Collection 5543 Central Console INSTALLATION GUIDE

ASSEMBLY INSTRUCTIONS DIY WALL BED KIT QUEEN BI FOLD DOOR CABINET & MECHANISM. Tools Required For Assembly. 6.5mm Masonry Drill Bit

INSTALLATION INSTRUCTIONS

Medium Flat Panel Dual Swing Arm Wall Mount JWD-V

Murphy Door DIY Hardware Installation Manual

PORCH-LOC INSTALLATION INSTRUCTIONS

Frameless Fixed Panel Slider

McCue Bumper Installation Instructions

INSTRUCTION SHEET U19

Flat Panel Dual Swing Arm Wall Mount (FWD-110) MSP-SA

Wooden Plane. Hardware Kit. 05P Blade packaged separately.

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Gambrel Barn Construction Manual 8x8 through 16x24 Units

FRAMELESS DOOR / PANEL WITH WALL MOUNT HINGES QCI5274

PARTITION INSTALLATION INSTRUCTIONS

WALL MOUNT LOCKER ASSEMBLY. 208 Chestnut St, Reading, PA (610)

19 to 39 TV WALL MOUNT - FULL MOTION

A-935 RODA WALL MOUNT HINGES

INSTRUCTIONS TS93 GSR PT RIGHT HAND ACTIVE LEFT HAND INACTIVE RIGHT HAND INACTIVE LEFT HAND ACTIVE

The Vienna Trellis. Tools You Will Need. General Information

INSTALLATION INSTRUCTIONS

Preference Collection 5531 Accessory Console I NSTALLATION GUIDE

TOOLS REQUIRED Metal Wood Wood and Metal Screws. #16 Drill #12-24 Tap. 1/8 Drill

T A P N T W I S T INSTALLATION GUIDE

PFW 6851 Display Wall Mount, Turn & Tilt 80 kg INSTALLATION INSTRUCTIONS

Mount to the Wall INSTALLATION MANUAL

Plastibeton Trench System. Installation Packet

Installation Manual Flat Track Series

Shetland Stalls Installation Instructions

VINYL CLASSIC FREESTANDING PERGOLA ASSEMBLY INSTRUCTIONS

TS-20KD-1010 LOW PROFILE CARGO SCALE INSTALLATION GUIDE

Hinge Mortising Jig. One of the make it or break it parts of building a. 6 ShopNotes No. 74

Wood Duck Nest Box Design & Assembly Directions

Wooden Frame Type Instruction Manual

1. TOOLS + MATERIALS REQUIRED

Installation Instructions for Bike Fixtation Public Work Stand and Floor Pump Manual RevH

Gared Pro-S Portable Backstop

Salter Industries Spiral Stair

* * 98/9950WDC. Fire-Rated Devices include these. additional components. 1-Point Latch (LBL)

SAN213 Instruction Manual

Downtown Rack. Custom logo option available

Frameless Fixed Panel Slider QCI5279

Installation. Instructions. Built-In Microwave/Convection and Microwave Ovens. Models ZMC1095 JEB1095 JEB1055

10, 12 &14 Oval Gazebo Floor

PORTABLE ADJUSTABLE BASKETBALL SYSTEM

Woodware Designs -- Furniture Construction Hints

FRAMELESS GLASS FENCING DIY GUIDE

Planar FWMG-MXL INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Swerve Rack CUSTOM RACKS AVAILABLE

MFD-50 Microphone Rotating Lift

INSTALLATION INSTRUCTIONS

Transcription:

Instruction Manual VB24 2-3/8 Diameter Floor Socket with or without Floor Plates for Floating Wood Floors Customer Service (800) 247-7668 P A R T S L I S T Item Qty Description Item Qty Description A 1 VB24 Floor Socket B 1 VB24 Cap C VB22-CV or VB23-CV (ordered separately) Read all instructions before proceeding. VB24 Floor Socket Installation on Typical Ground Level Floating Wood Floors with VB23-CV Brass Floor Plate SEE FIGURE 1 CAUTION: Consult a professional installer if court is not on a floor with solid ground below the subfloor. 1. Determine the desired location for the VB24 floor sockets (A) (see volleyball or badminton court diagrams). Usually sockets will be installed 36 apart measured to the center of each post for volleyball and 20 apart for badminton. 2. Use the brass floor plate and a pencil to draw a circle on the floor at each location. 3. Cut a hole through the wood floor that is 1-1/2 SMALLER in diameter than the circle drawn in step #2 above. This hole should be approximately 5 in diameter. CAUTION: If you cut the hole on the large, pencil circle, it will not be possible to install the brass floor plate properly. 4. Measure the distance from the top of the floor to the concrete surface below. If the distance is greater than 3 call Bison Customer Service for guidance as you will need to make field modifications to your socket. 5. Drill or break out a 5 minimum diameter hole in the concrete either through the concrete or approximately 13 deep into the concrete if the concrete is extra deep. Use of a rotary hammer drill and a chisel or core drill is recommended. (see Figure 1) 6. If the thickness of the concrete allowed you to go through it, excavate the soil, sand, and gravel below the concrete to an approximate diameter of 20. The depth of the hole should be approximately 18 from the top surface of the wood floor. 7. Rout an accurate recess in the wood floor that allows flush and clean installation of the brass floor plate. This recess will be approximately 1/4 deep. Take caution in this step to avoid a sloppy, over sized, or over depth recess. (see Figure 1) You will need to rout relief in the wood to accommodate the hinge mechanism and the three thickened areas of the brass floor plate. Date: 5.18.2000 Rev: I.R. B.A. N.J.C. File: \\bisonserver\\publisher\instructions\ VB24inst.pub Ref#: 960171 1

8. Install duct tape over the top of the socket to avoid grout entering the socket during installation. 9. Set the socket into the prepared hole to insure that the socket fits neatly. Rework holes if necessary. 10. Fill the hole in the concrete with premixed, non-shrink grout to within approximately 4 of the top surface of the concrete. Using a pole, vibrate the grout to insure the hole is filled. 11. Install socket into hole. You will need to work assembly into hole to allow the grout to surround the sleeve. If grout does not flow out the top of the hole in the concrete, remove assembly and add more grout. 12. Install brass floor plate to floor using wood screws. It is best to drill a pilot hole into the wood. 13. CAUTION: Do not allow use of sockets for 10 days as permanent structural damage to the socket installation may occur. 14. Discard VB24 Floor Socket Cap (B). Figure 1 # 10 WOOD SCREW PROVIDED WITH VB23-CV VB23-CV ( C) PILOT DRILL FOR # 10 WOOD SCREW 1/4" Ø6-5/ 8" Ø5" HOLE CALL FOR ASSISTANCE IF THIS DISTANCE IS MORE THAN 3" FLOOR CONCRETE FLOOR 12.5" REF. 5" MIN NON- SHRINK GROUT 4" MIN 20" APPROX. VB24 Floor Socket Installation on Synthetic Over Concrete, Tile Over Concrete, or Concrete Floor SEE FIGURE 2 1. Determine the desired location of the floor sockets (see court diagrams). Usually sockets will be installed 36' apart measured to the center of each post for volleyball and 20 for badminton. 2. Use the top of the VB24 Socket (A) and a pencil to draw a circle on the floor at each location. 3. On synthetic floors use a razor blade knife to accurately cut away the synthetic flooring so that the top of the socket fits cleanly in the cutaway hole. On tile floors it is easier to remove all tiles that are affected by the hole being careful not to damage 2

tiles so they can be cut and reinstalled later. 4. Drill or break out a 5" minimum diameter hole in the concrete either through the concrete or approximately 13" deep into the concrete if the concrete is extra deep. Use of a rotary hammer drill and concrete chisel or core drill is recommended. 5. If the thickness of the concrete allowed you to go through it, excavate the soil, sand, and gravel below the concrete to an approximate diameter of 20". The depth of the hole should be approximately 16" from the playing surface. 6. Chisel away additional concrete to allow for the top ring of the socket until the socket fits neatly and straight in the prepared hole and so that the top of the socket ring will install flush with the original top of the synthetic, tile or concrete floor. 7. Fill the hole in the concrete with premixed, non-shrink grout to within approximately 4" of the top surface of the concrete subfloor. Using a pole, vibrate the grout to insure the hole is filled. 8. Install the socket into the hole. You will need to work assembly into the hole to allow the grout to surround the sleeve. If grout does not flow out of the top of the hole and around the upper ring, remove assembly and add more grout. Be careful not to allow excess grout into the socket. 9. Using a level on the inside of the socket verify that the socket is perpendicular to the playing surface. 10. Remove all excess grout and clean remaining synthetic or tile floor. 11. After allowing two (2) hours for the grout to set, clean socket, and install top cap (B). 12. CAUTION: Do not use for 10 days as permanent structural damage to the socket installation may occur. Figure 2 VB24 CAP MUST INSTALL FLUSH WITH FINAL FINISHED PLAYINGSURFACE CONCRETE FLOOR WITH TILE OR SYNTHETICFLOOR COVERING. CONCRETE FLOOR 5" MIN 12.5" REF. NON- SHRINKGROUT VB24 FLOOR SOCKET FLUSH WITH PLAYINGSURFACE 4" MIN 20" APPROX. 3

VB24 with VB22-CV Floor Socket Installation on Typical Ground Level Wood Floors (Disregard If Floor Sockets are Existing) SEE FIGURE 3 1. Determine the desired location of the floor sockets (see court diagrams). Usually sockets will be installed 36' apart measured to the center of each post for volleyball and 20 for badminton. 2. Use the outside diameter of the VB22-CV (C) machined floor plate and a pencil to draw a circle on the floor at each location. 3. Cut a hole in the wood floor that is 2 1/2" SMALLER in diameter than the circle drawn in #2 above. This hole should be approximately 5 1/2" diameter. CAUTION: If you cut a hole on the large pencil circle, it will not be possible to install the floor plate properly. (see Figure 3) 4. Measure the distance from the top of the floor to the concrete surface below. If distance is greater than 3" call Bison Customer Service for guidance as you will need to make field modifications to your socket. Figure 3 VB22-CV COVER(C) VB22-CV COVERFRAME ( C) CAP PIVOT BOLT #10 WOOD SCREW HEX KEY PROVIDED WITH COVER 7-7/8" Ø5-1/2" THRU HOLE CALL FORASSISTANCE IF THIS DISTANCE IS MORE THAN 3" 1/2" FLOOR CONCRETE FLOOR 5" MIN. 12.5" REF. NON- SHRINKGROUT 4" MIN 20" APPROX. 4

5. Drill or break out a 5" diameter hole in the concrete either through the concrete or approximately 13" deep into the concrete if the concrete is extra deep. Use of a rotary hammer drill and chisel or core drill is recommended. 6. If the thickness of the concrete allowed you to go through it, excavate the soil, sand, and gravel below the concrete to an approximate diameter of 20". The depth of the hole should be approximately 18" from the top surface of the wood floor. (see Figure 3) 7. Rout an accurate recess in the wood floor that allows flush and clean installation of the VB22-CV floor plate. This recess will be approximately 1/2" deep. Take caution in this step to avoid a sloppy, over sized, or over depth recess. (see Figure 3) 8. Set the socket into the prepared hole to insure that it will install perpendicular to the playing surface. Rework hole if necessary. 9. Fill the hole in the concrete with premixed, non-shrink grout to within approximately 4" of the top sur face of the concrete. Using a pole, vibrate the grout to insure the hole is filled. 10. Install socket into hole. You will need to work assembly into hole to allow the grout to surround the sleeve. If grout does not flow out the top of the hole in the concrete, remove assembly and add more grout. Be careful not to allow excess grout into the socket. 11. Using a level on the inside of the socket verify that the socket is perpendicular to the playing surface. 12. Assemble the 2 piece floor plate following the instructions provided with the floor plate. 13. Attach the machined floor plate to the wood floor using the brass wood screws provided. You will need to put a cutout in the floor for the cover pivot bolt. The floor plate should be oriented so that the cap swings away from the playing court when opened to install posts. When installed, the top of the floor plate should be flush with the top of the wood floor. 14. CAUTION: Do not allow use of sockets for 10 days as permanent structural damage to the socket installation may occur. 5

Volleyball Court Diagram Badminton Court Diagram 6