SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

Similar documents
Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

SECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER.

Section Meetings Section Material and Equipment. None Required

East Central College

SECTION SUBMITTAL PROCEDURES

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

SECTION SUBMITTAL PROCEDURES

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

STANDARD SPECIFICATIONS SECTION SUBMITTAL PROCEDURES

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

SECTION SUBMITTAL PROCEDURES

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION SUBMITTAL PROCEDURES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

2016 CDM Smith All Rights Reserved July 2016 SECTION PROJECT MEETINGS

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

SECTION OPERATION AND MAINTENANCE DATA

SECTION SUBMITTALS

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS:

What Are Submittals?

SECTION ADMINISTRATIVE REQUIREMENTS

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS

SECTION SCHEDULE OF VALUES PART 1 - GENERAL 1.1 THE REQUIREMENT A. This Section defines the process whereby the Schedule of Values (Lump Sum

SUBMITTAL PROCEDURES

Working Drawing Manual

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS

SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS

Jacksonville District Master

submittals 1s e c t i o n

Answer: Qualification statement should be provided with the bid.

Facility Services Subgroup Preface for Divisions 21` through 28

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.:

[Note to PSC: Include these sections in the Contract Documents, even though some are not included in the U of I Facilities Standards]

SECTION A. RFI: Request from Contractor seeking interpretation, information, or clarification of the Contract Documents.

2017 CDM Smith All Rights Reserved November 2016 SECTION PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS)

SECTION 2 GENERAL REQUIREMENTS

SECTION III SUBMITTALS AND APPROVALS

01100 SUMMARY OF WORK

PROCEDURE FOR PROCESSING WORKING DRAWINGS

TABLE OF CONTENTS. 1.0 Scope. 2.0 References. 3.0 Definitions. 4.0 Submission and Design Requirements. 5.0 Materials 5.1 General 5.

This specification describes the general requirements for Engineering Services provided to Vale.

DWG, Inc. Coastal Carolina University State Project No. Consulting Engineers HTC Arena Lighting H17-N112-JM

Submittal Packages Detailed with Items and Reviewers

SECTION LIGHTING PART 1- GENERAL

Working Drawing Procedure

CHAPTER 10 MICHIGAN DESIGN MANUAL BRIDGE DESIGN (SI) SHOP DRAWING REVIEW TYPES OF SHOP DRAWINGS Structural Steel

Designer CM/Owner s Rep Prime Contractor SubContractor Supplier Manufacturer

REMARKS: The A.F.F. dimension noted on the drawings to the bottom of the grid is 15 0, this dimension should be 16 0.

Chapter 1 General Design Information

Construction Phase Project Management and Documentation

SAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT FORMAL INVITATION FOR BIDS ANNUAL CONTRACT FOR WELL MAINTENANCE SERVICES ADDENDUM NO.

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Booster Pumping Station 115 Booster Pump Procurement

SUBMITTAL LETTER Capital Renewal Scoates Hall, Texas A &M University, College Station, TX TAMUS Project

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS

SPECIAL PROVISION Description of Project, Scope of Contract and Sequence of Work

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

The enclosed information is provided for consideration in the preparation of your response to the abovereferenced

REVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty

SECTION CONSTRUCTION PHOTOGRAPHS AND VIDEO RECORDING

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS

WTP FILTERS REHABILITATION (FILTERS 1, 2, 3, & 7) CITY OF CARTERSVILLE

Spec Section: , Complete Elec, Comm, and Fire Alarm , Complete Elec, Comm, and Fire Alarm Data Sheets RAN/GCAN

The GMFI Process. Design Intent Document Preparation. Enroll in GMFI Program. Image Consultation. You are here. Design Intent Document.

BAE Systems Combat Vehicles Supplier Quality Assurance AS9102 Requirement

NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP July 28, 2017

STATE OF TEXAS Agreement of Sale COUNTY OF TARRANT

SECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts.

VIRGINIA RAILWAY EXPRESS AMENDMENT OF SOLICITATION INVITATION FOR BIDS (IFB) ADDENDUM No. 3. Issued: February 23, 2016

UNIFIED FACILITIES GUIDE SPECIFICATIONS *************************************************************************** SECTION

Recommended Practice PS-24 Tracking the Procurement Process (TCM Framework Reference 7.7)

00-General Drawings. Doc. no.: NA-00-STS002

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018

List of Figures. List of Forms

Stanford University-Facilities Design Guideline SECTION Plans Review Submission Guidelines

SECTION SHORT CIRCUIT, COMPONENT PROTECTION, FLASH HAZARD AND SELECTIVE COORDINATION STUDY

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014)

UNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** SECTION TABLE OF CONTENTS

Submittal Review SW Macadam Ave Suite 200 ATTENTION: Riley Tobin. Portland, OR RE: BSD Sunset High School

FTEV Repair Mezzanine Bldg Hurlburt Field, Florida SECTION DESIGN AFTER AWARD

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

SEI Certification Program Manual

STANDARD SPECIFICATION FOR CONTRACTOR'S DRAWING AND DATA TRANSMITTAL CONTRACTOR S DRAWING AND DATA TRANSMITTAL STANDARD SPECIFICATION FOR

FAST TRACK WORKSHOP OBJECTIVES

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST

Transcription:

SECTION 01334 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.01 SUMMARY A. Submit to the ENGINEER for review, such working drawings, shop drawings, test reports and data on materials and equipment (hereinafter in this article called data), and material samples (hereinafter in this article called samples) as are required for the proper control of work, including but not limited to those working drawings, shop drawings, data and samples for materials and equipment specified elsewhere in the Specifications and in the Contract Drawings. B. Submit two (2) copies of shop drawings or other data to the ENGINEER. C. Submit to the ENGINEER a complete list of preliminary data for which shop drawings are to be submitted. 1. Submit within thirty (30) calendar days after the date of the Notice of Award. 2. Included in this list shall be the names of proposed manufacturers furnishing specific items. D. Review of this list by the ENGINEER shall in no way expressed or implied relieve the CONTRACTOR from submitting complete shop drawings and providing materials, equipment, fully in accordance with the Specifications. E. Maintain an accurate updated submittal log and bring this log to each scheduled progress meeting with the OWNER and ENGINEER. 1. This log should include the following items: a. Submittal-Description and Number assigned. b. Date to ENGINEER. c. Date returned to CONTRACTOR (from ENGINEER). d. Status of Submittal (Approved/Resubmit/Rejected). e. Date of Resubmittal and Return (as applicable). f. Date material released (for fabrication). g. Projected date of fabrication. h. Projected date of delivery to site. i. Status of O & M submittal. 01334-1

F. Designate in the construction schedule, or in a separate coordinated schedule, the dates for submission and the dates that reviewed shop drawings, Working Drawings and Samples will be needed. 1.02 RELATED SECTIONS: A. Standard General Conditions of the Construction Contract - Division 0. B. Scheduling of Construction - Division 1. C. Material and Equipment - Division 1. D. Project Record Documents - Division 1. E. Operating and Maintenance Data - Division 1. 1.03 CONTRACTOR'S RESPONSIBILITY A. Check drawings, data and samples prepared by or for him before submitting them to the ENGINEER for review. 1. The drawings and data sheets shall bear CONTRACTOR's stamp. a. The CONTRACTORs un-stamped or improperly stamped drawings and data sheets will be returned to the CONTRACTOR for conformance with this requirement. 2. Shop drawings shall indicate deviations in the submittal from requirements of the Contract Documents. B. Determine and verify: 1. Field measurements 2. Field construction criteria 3. Catalog numbers and similar data 4. Conformance and Specifications C. Furnish the ENGINEER a schedule of shop drawing submittals fixing the respective dates for the submission of shop and working drawings, the beginning of manufacture, testing and installation of materials, supplies and equipment. 1. This schedule shall indicate those that are critical to the progress schedule. D. Begin no work covered by a drawing, data, or a sample returned for correction until a revision or correction thereof has been reviewed and returned to him, by the ENGINEER approved. E. Submit to the ENGINEER drawings and schedules sufficiently in advance of construction requirements to provide no less than twenty-one (21 ) calendar days for checking and appropriate action from the time the ENGINEER receives them. 01334-2

F. Submit five (5) copies of descriptive or product data submittals to complement shop drawings for the ENGINEER plus the number of copies which the CONTRACTOR requires. 1. Blueprint shop drawings shall be submitted with one (1 ) set of reproducible and four (4) sets of print. 2. The ENGINEER will review the drawings and return to the CONTRACTOR the set of marked-up drawings with appropriate review comments. G. Accept responsibility for and bear cost of damages which may result from the ordering of material or from proceeding with part of work prior to the review by ENGINEER of the necessary shop drawings. 1.04 ENGINEER'S REVIEW OF SHOP DRAWINGS: A. The ENGINEER's review of drawings, data and samples submitted by the CONTRACTOR will cover only general conformity to the Specifications, external connections, and dimensions which affect the installation. 1. The ENGINEER's review will not constitute an approval of dimensions, quantities, and details of the material, equipment, device, or item shown. B. The review of drawings and schedules will be general, and shall not be construed: 1. as permitting departure from the Contract requirements; 2. as relieving the CONTRACTOR of responsibility for errors, including details, dimensions, and materials; 3. as approving departures from details furnished by the ENGINEER, except as otherwise provided herein. C. If the drawings or schedule as submitted describe variations and show a departure from the Contract requirements which ENGINEERs finds to be in the interest of the OWNER and to be minor as not to involve a change in the Contract Price or time for performance, the ENGINEER may return the reviewed drawings without noting an exception. D. When reviewed by the ENGINEER, each of the shop drawings will be identified as having received such review being so stamped and dated. 1. Shop drawings stamped "REJECTED" and with required corrections shown will be returned to the CONTRACTOR for correction and resubmittal. E. Resubmittals will be handled in the same manner as the first submittals. 1. On resubmittals, direct specific attention, in writing or on resubmitted shop drawings, to revisions other than the corrections requested by the ENGINEER on previous submissions. 2. Make corrections required by the ENGINEER. 01334-3

F. If the CONTRACTOR considers correction indicated on the drawings to constitute a change to the Contract Drawings or Specifications, give written notice thereof to the ENGINEER. G. The ENGINEER will review a submittal/resubmittal a maximum of three (3) times after which cost of review will be borne by the CONTRACTOR. 1. The cost of Engineering shall be equal to the ENGINEER's charges to the OWNER under the terms of the ENGINEER's agreement with the OWNER. H. When the shop drawings have been approved, carry out the construction in accordance therewith and make no further changes therein except upon written instructions from the ENGINEER. I. No partial submittals will be reviewed. 1.05 SHOP DRAWINGS 1. Submittals not complete will be returned to the CONTRACTOR, and will not be considered "Rejected" until resubmitted. A. When used in the Contract Documents, the term "Shop Drawings" shall be considered to mean CONTRACTOR's plans for material and equipment which become an integral part of the Project. 1. These drawings shall be complete and detailed. 2. Shop drawings shall consist of fabrication, erection and setting drawings and schedule drawings, manufacturer's scale drawings, and wiring and control diagrams. a. Reinforced structures shall be signed and Sealed by a Florida Registered Professional Engineer, with a specialty in Structures. 3. Cuts, catalogs, pamphlets, descriptive literature, and performance and test data, shall be considered only as supportive to required Shop. B. Drawings and schedules shall be checked and coordinated with work of trades involved, before they are submitted for review by the ENGINEER and shall bear the CONTRACTOR's stamp of approval as evidence of such checking and coordination. 1. Drawings or schedules submitted without this stamp of approval shall be returned to the CONTRACTOR for resubmission. C. Each shop drawing, shall have a blank area 4 inches by 4 inches, located adjacent to the title block. 1. The title block shall display the following: a. Number and title of the drawing. b. Date of drawing or revision. 01334-4

c. Name of project building or facility. d. Name of CONTRACTOR and subcontractor submitting drawing. e. Clear identification of contents and location of work. f. Specification title and number. D. If drawings show variations from Contract requirements because of standard shop practice or for other reasons, describe such variations in his letter of transmittal. 1. If acceptable, proper adjustment in the Contract shall be implemented where appropriate. 2. If the CONTRACTOR fails to describe such variations he shall not be relieved of the responsibility for executing the work in accordance with the Contract, even though such drawings have been reviewed. E. Data on materials and equipment include, without limitation, materials and equipment lists, catalog data sheets, cuts, performance curves, diagrams, materials of construction and similar descriptive material. 1. Materials and equipment lists shall give, for each item thereon, the name and location of the supplier or manufacturer, trade name, catalog reference, size, finish and other pertinent data. F. For mechanical and electrical equipment furnished, provide a list including the equipment name, address and telephone number of the manufacturer's representative and service company so that service and spare parts can be readily obtained. 1. Submit along with each shop drawing submittal a maintenance and lubrication schedule for each piece of equipment. G. Manufacturers or equipment supplier who propose to furnish equipment or products under Divisions 1, 12, 13, 14, 15 and 16 shall submit an installation list to the ENGINEER along with the required shop drawings. 1. The installation list shall include at least five installations where identical equipment has been installed and has been in operation for a period of at least one (1) year. H. Only the ENGINEER will utilize the color "red" in marking shop drawing submittals. I. Before final payment is made, furnish to ENGINEER two (2) sets of record shop drawings clearly revised, complete and up to date showing the permanent construction as actually made for reinforcing and structural steel, miscellaneous metals, process and mechanical equipment, yard piping, electrical system and instrumentation system. 1.06 WORKING DRAWINGS A. When used in the Contract Documents, the term "working drawings shall be considered to mean the CONTRACTOR's plans for temporary structures such as temporary bulkheads, support of open cut excavation, support of utilities, ground water 01334-5

control systems, forming and false-work; for underpinning; and for such other work as may be required for construction, but does not become an integral part of the project. B. Submit copies of working drawings to the ENGINEER where required by the Contract Documents or requested by the ENGINEER. 1. Submit at least thirty (30) calendar days (unless otherwise specified by the ENGINEER) in advance of their being required for work. C. Working drawings shall be signed by a Registered Professional ENGINEER, currently licensed to practice in the State of Florida and shall convey, or be accompanied by, calculation or other sufficient information to completely explain the structure, machine, or system described and its intended manner of use. 1.07 SAMPLES 1. Prior to commencing such work, working drawings must have been reviewed without specific exceptions by the ENGINEER, which review will be for general conformance and will not relieve the CONTRACTOR in way from his responsibility with regard to the fulfillment of the terms of the Contract. 2. Risks of error are assumed by the CONTRACTOR; the OWNER and ENGINEER shall have no responsibility therefore. A. Furnish, for the approval of the ENGINEER, samples required by the Contract Documents or requested by the ENGINEER. 1. Samples shall be delivered to the ENGINEER as specified or directed. 2. Prepay shipping charges on samples. 3. Materials or equipment for which samples are required shall not be used in work until approved by the ENGINEER. B. Samples shall be of sufficient size and quantity to clearly illustrate: 1. Functional characteristics of the product, with integrally related parts and attachment devices. 2. Full range of color, texture and pattern. 3. A minimum of two samples of each item shall be submitted. C. Each sample shall have a label indicating: 1. Name of Project 2. Name of CONTRACTOR and Subcontractor 3. Material or Equipment Represented 4. Place of Origin 01334-6

5. Name of Producer and Brand (if any) 6. Location in Project 7. Samples of finished materials shall have additional marking that will identify them under the finished schedules. D. Prepare a transmittal letter in triplicate for each shipment of samples. 1. Enclose a copy of the transmittal letter with the shipment and send a copy of this letter to the ENGINEER. 2. Approval of a sample shall be only for the characteristics or use named in such approval and shall not be construed to change or modify Contract requirements. E. Approved samples not destroyed in testing shall be sent to the ENGINEER or stored at the site of the work. 1. Approved samples of the hardware in good condition will be marked for identification and may be used in the work. 2. Materials and equipment incorporated in work shall match the approved samples. 3. Samples which failed testing or were not approved samples will be returned to the CONTRACTOR at his expense, if so requested at time of submission. PART 2 PRODUCTS (Not Used) PART 3 EXECUTION (Not Used) END OF SECTION 01334-7