Moyle Interconnector between Northern Ireland and Scotland. Methodology Statement for Determination of System-to-System Flow

Similar documents
BritNed Interconnector between Holland and England. Methodology Statement for Determination of System-to-System Flows

National Grid s commitments when undertaking works in the UK. Our stakeholder, community and amenity policy

Area Control Error (ACE) Equation Special Cases

Revision 24 of Issue 3 of the Grid Code has been approved by the Authority for implementation on 19 th November 2007.

INCIDENTS CLASSIFICATION SCALE METHODOLOGY

WP197 Capacity Market Metering Test

THE GRID CODE OC7.5 INTEGRAL EQUIPMENT TESTS

July Contents. Gas Demand Side Response Methodology Final Version. UK Gas Transmission

Orkney Electricity Network Reinforcement Stakeholder Consultation Response. August 2014

Capacity Market Prequalification

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

Demand Side Response Methodology (DSR) for Use after a Gas Deficit Warning (GDW) Background. Draft Business Rules

Answer: Qualification statement should be provided with the bid.

Standard Development Timeline

Indication of Dynamic Model Validation Process

Petroleum Safety Levy Methodology. Decision Paper

NETS SQSS Modification Proposal

G59 and G83 Protection Requirements

THE GRID CODE OC7.5 INTEGRAL EQUIPMENT TESTS GUIDANCE NOTES

OPERATING CODE NO. 5 (OC5)

Statement on variation of 900 MHz and 1800 MHz Wireless Telegraphy Act licences

G1 Capacity Market Metering

Guidance Notes for Power Park Developers

CMP298. Updating the Statement of Works process to facilitate aggregated assessment of relevant and collectively relevant embedded generation.

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

P292 Amending Supplier & Meter Operator Agent responsibilities for smart Meter Technical Details

EUROPEAN COMPLIANCE PROCESSES (post RfG Implementation) CONTENTS. (This contents page does not form part of the Grid Code) Paragraph No/Title

Draft ETSI EN V1.3.1 ( )

MEASURES TO INCREASE THE EFFICIENCY OF CIF COMMITTEES. CTF-SCF/TFC.11/7/Rev.1 January 27, 2014

Architectural Design Sketching and Drawing

EUROPEAN CONNECTION CONDITIONS (ECC) CONTENTS. (This contents page does not form part of the Grid Code)

MARKET ANCILLARY SERVICE SPECIFICATION

AEMO POWER OF CHOICE (POC) METER CHURN DISCUSSION

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

Energy Networks Association

European Update. 3 rd December 2015

ElectraLink s response to the ENA Open Networks Project Consultation on Phase 2 Work Programme.

SECTION A. RFI: Request from Contractor seeking interpretation, information, or clarification of the Contract Documents.

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

TERMS AND CONDITIONS. for the use of the IMDS Advanced Interface by IMDS-AI using companies

CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT

25 July 2017 Without prejudice [PROVISIONS IN RELATION TO TRADE IN GOODS ALREADY INCLUDED IN THE EU TEXT PROPOSAL FOR THE TRADE IN GOODS CHAPTER]

DraftETSI EN V1.2.1 ( )

Overview of Metering Assurance in the Capacity Market

This Licence replaces the licence issued by Ofcom on 22 April 2013 to British Telecommunications PLC.

Standard BAL b Automatic Generation Control

EE Limited - Public Wireless Network Licence Company Registration no First Issued: 26/03/93 - Licence Number: Rev: 20-10/01/17

EUROPEAN COMPLIANCE PROCESSES (post RfG Implementation) CONTENTS. (This contents page does not form part of the Grid Code) Paragraph No/Title

STATE LOTTERIES ACT 1966 LOTTERIES (SET FOR LIFE) RULES

ARTICLE 11. Notification and recording of frequency assignments 1, 2, 3, 4, 5, 6, 7, 7bis (WRC-12)

FORMAT: TO BE PREPARED ON VENDOR S FORMAT IN ACCORDANCE WITH VENDOR S PDDS SYSTEM.

Appendix A: Resolution 18 (1994) Review of the ITU s Frequency Coordination and Planning Framework for Satellite Networks

Revision 32 of Issue 3 of the Grid Code has been approved by the Authority for implementation on 8 th December 2008.

METERING REQUIREMENTS FOR INTERCONNECTION POINTS OF SERVICE

GSR018/GC0077: Sub-Synchronous Oscillations (SSO)

GSR018: Sub-Synchronous Oscillations (SSO) Workgroup Report

Table 1 - Assignment of BA Obligations... 8

SECTION 13. ACQUISITIONS

SSE Offices, Glasgow and Teleconference

Recognised Spectrum Access (RSA) for Receive Only Earth Stations Statement on the making of regulations to introduce RSA in the frequency bands 7850

SECTION SUBMITTAL PROCEDURES

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

Clarification Note on Dynamic versus Static Response

Lewis-Clark State College No Date 2/87 Rev. Policy and Procedures Manual Page 1 of 7

Licensing of Telemetry Systems in the VHF and UHF Spectrum Bands Guidelines for Applicants

New York University University Policies

CHESS Release Business and Technical Overview Client Segregation Enhancements to CHESS

Table of Contents. Introduction... 1

Seagreen Wind Energy Limited C/o SSE Renewables 1 Waterloo Street Glasgow G2 6AY

Improving the Transmission/ Distribution interface Statement of Works process. March 2018 progress report

G20 Capacity Market Metering Statement

Grid Code Review Panel. Information Required to Evaluate Subsynchrononous Resonance on the Transmission System

East Central College

SECTION SUBMITTAL PROCEDURES

Extract of Advance copy of the Report of the International Conference on Chemicals Management on the work of its second session

ARRANGEMENT. concerning use of the frequency bands MHz MHz for terrestrial systems in border areas

Form of the 2018 Electricity Ten Year Statement Consultation. UK electricity transmission

Herts Valleys Clinical Commissioning Group. Review of NHS Herts Valleys CCG Constitution

Implementation Plan Project Balancing Authority Reliability-based Controls - Reserves

Appendix D Fault Levels

Company Directive STANDARD TECHNIQUE: SD7F/2. Determination of Short Circuit Duty for Switchgear on the WPD Distribution System

Document C-29. Procedures for System Modeling: Data Requirements & Facility Ratings. January 5 th, 2016 TFSS Revisions Clean Open Process Posting

Section XV - PER, Design, and Construction Submittal Requirements

PCT Related Matters IP Information Roundtable

Standard BAL Frequency Response and Frequency Bias Setting

Climate Change response measures, and negotiations update

1. The Office of Communications (Ofcom) grants this wireless telegraphy licence ( the Licence ) to

NOTES TO ASG 11 ASG FIRE EXPERTS ACCESS AGREEMENT

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

The BioBrick Public Agreement. DRAFT Version 1a. January For public distribution and comment

Oakland County Michigan Register of Deeds Plat Engineering, GIS, & Remonumentation Dept. Ph: (248) Fax (248)

ISA 315 (Revised) Identifying and Assessing the Risks of Material Misstatement through Understanding the Entity and Its Environment

clarify the roles of the Department and minerals industry in consultation; and

General Support Technology Programme (GSTP) Period 6 Element 3: Technology Flight Opportunities (TFO)

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

Lecture 15 EMS Application II Automatic Generation Contol. Davood Babazadeh

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

Standard BAL b3 Automatic GenerationBalancing Authority Control DRAFT

UNOFFICIAL TRANSLATION

Load-Frequency Control and Reserves Network Code. David Bunney JESG 19 March 2013

Transcription:

Moyle Interconnector between Northern Ireland and Scotland Methodology Statement for Determination of System-to-System Flow 1. Requirement for Methodology Statement 1.1 This Methodology Statement is produced for the purposes of paragraph 7.5 of Section R of the Balancing and Settlement Code (BSC). 2. Objective of Methodology 2.1 The methodology given in section 3 below describes the basis on which the system-to-system flow will be determined for the purposes of paragraph 7.5.3 of Section R of the BSC. This description is supported by the information on implementation of the methodology set out in section 4. 3. Methodology 3.1 The system-to-system flow will be determined from Interconnector instructions issued by the Transmission Company (NGET) or the Externally Interconnected System Operator (SONI System Operator of Northern Ireland), or issued automatically by equipment armed by SONI to respond to events on the Total System or the External System. The acceptance by the Transmission Company of any Bid or Offer submitted by an Interconnector User in respect of an Interconnector BM Unit does not constitute an Interconnector instruction in this Methodology. 3.2 The system-to-system flow will be determined in manner consistent with paragraph 7.5 of Section R of the BSC. Accordingly any system-to-system flow on the Interconnector will not affect, or form part of, the Interconnector Scheduled Transfer (IST). If the difference between the IST and the physical capability of the Interconnector is reduced after an Interconnector instruction has been issued the system-to-system flow may be reduced as necessary. 4. Implementation 4.1 The implementation of this methodology is agreed between NGET and SONI. For information purposes an outline of the current plans to implement this methodology is given in Appendix A. However NGET recognises that any material changes to the way in which the methodology is implemented (as described in Appendix A) will require a revised Statement to be resubmitted to the Authority for further approval. 5. Definitions Page 1 of 7

5.1 Unless stated otherwise, terms and expressions used in this methodology statement shall have the same meanings given to them in the BSC. Page 2 of 7

Appendix A Operational Process for Determining the System-System Flow on the Moyle Interconnector (from April 2015) A1 Calculate the Interconnector Scheduled Transfer (IST) The Interconnector Scheduled Transfer is based on Moyle Nomination (MN) submitted by Interconnector Users in accordance with the Moyle Interconnector related sections of the Single Electricity Market (SEM) Trading and Settlement Code. MN data will be consistent with Physical Notifications submitted to NGET by SONI acting on behalf of Interconnector Users under the Moyle Interconnector Framework Deed, and must be within the Interconnector Capacity Entitlement (ICE) assigned to the Interconnector Users and the Net Transfer Capacity (NTC) as defined in the Operating Protocol. A2 Calculate the Scheduled Moyle Reference Program (SMRP) The Scheduled Moyle Reference Program is based on the same MN data that is used to determine the IST, subject to any Intraday Trading Limit(s) (ITL). The SEM facilitates multiple Users on the Interconnector, for this reason the dynamic characteristic of the Interconnector is not fully included in the MN data submitted. The SMRP will, as far as possible, give the same energy transfer in each trading period as the MN data used to determine the IST, within the agreed dynamic characteristic for the Interconnector. There will be one day-ahead Scheduled Moyle Reference Programme (SMRP), intraday revisions to which can be submitted up until 12 hours before real time at which point the SMRP is defined as the Final Scheduled Moyle Reference Programme (FSMRP) and is the base against which System-System Flows (SSF) will be calculated. The FSMRP is delivered to NGET by 1200 day ahead, but can be varied up to 2 ½ hours ahead of real time by actions taken by SONI undertaking Power Exchange Trades in GB market. A3 Variations to the FSMRP After the FSMRP has been agreed it may be necessary to vary the Moyle Reference Program (MRP). When this occurs for reasons other than those specified in paragraph 7 of section R of the BSC this will constitute a system-to-system flow (which may for example be recorded as Emergency Assistance, Emergency Instruction, or Constraint, or Cross Border Balancing). A4 Volume of System-to-System Changes Page 3 of 7

transfer National Grid plc March 2015 Where the instruction to change the MRP has been given for a reason that will give rise to a system-to system flow then the change to the MRP will be a system-tosystem change. The volume associated with a system-to-system change will be calculated from the previous MRP as described below: Consider the simple FSMRP shown in figure 1. time Settlement Periods Figure 1 Final Moyle Reference Programme NGET or SONI makes a request to vary the MRP (this request being accepted by the other party) or issued automatically by equipment armed by SONI to respond to events on the Total System or the External System. Page 4 of 7

transfer National Grid plc March 2015 time Figure 2 MRP revised for system-to-system flow Labelling the FSMRP as MRP 0, and the revised MRP as MRP 1 and any subsequent revisions to the MRP are numbered in sequence then the change in instructed transfer volume is calculated as the difference between the previous and revised programmes (MRP n-1 and MRP n, ) for the changes to the MRP. The change in the instructed transfer in settlement period j, caused by acceptance of the new Moyle Reference Programme n is given by: 30 T n, j capcollar, 0 where MRP n, j t, ICWEST, j t ICEAST, j t MRPn 1, j t dt MCP n,j (t) T n,j IC EAST,j (t) IC WEST,j (t) Is the instantaneous transfer t minutes from the start of settlement period j for Moyle Reference Programme n Is the change in transfer volume resulting from the acceptance of the revised MCRP (MCRP n) in settlement period j Is the actual instantaneous interconnector capability for active power flowing from Northern Ireland to Scotland, t minutes from the start of settlement period j. Such that the actual transfer is in the range 0 MW to IC EAST,j (t). Is the actual instantaneous interconnector capability for active power flowing from Scotland to Northern Ireland, t minutes from the start of settlement period j. Such that the actual transfer is in the range 0 MW to -ICWEST,j (t). Page 5 of 7

transfer National Grid plc March 2015 This is shown graphically below: Energy change resulting from acceptance of new MRP time Figure 3: Change in instructed transfer volume arising from change in MRP The total volume of system-to-system change (T j ) will be the sum of all changes in instructed transfer volume arising due to system-to-system flows. A5 Volume of System-to-System Flow (SSF) The MRP and the total volume of system-to-system change are calculated at the Scottish end of the Moyle Interconector. Hence interconnector losses have already been accounted for in these values and no adjustments for interconnector losses are required. A6 Metered Volume for Transmission Company Interconnector BM Units The system-to-system flow is calculated and the Metered Volume allocated to the Transmission Company Interconnector BM Units (TCIBMU) as shown below: If direction of SSF is from NI to Scotland SSF = T j TCIBMU(Production) = SSF TCIBMU(Consumption) = 0 If direction of SSF is from Scotland to NI SSF = T j TCIBMU(Production) = 0 TCIBMU(Consumption) = SSF Page 6 of 7

A7 Revisions to Appendix A This appendix is provided for information purposes only. If material changes occur to the planned operational process for determining the system-to-system flow on the Moyle Interconnector then this appendix will be revised accordingly. Revision No. 1 (effective from 1 April 2006) Appendix A has been revised to take account of the name change of NGC to NGET (National Grid Electricity Transmission) with effect from 26 th July 2005. Revision No. 2 (effective from 1 st April 2007) Minor change to reflect that Interconnector Instructions can also be initiated automatically by equipment armed by SONI. Revision N.o. 3 (effective from 1 st April 2009) A minor change has been introduced to reflect the combined Northern Ireland and Republic of Ireland markets through the Single Electricity Market (SEM). A clarification paragraph on intraday capability has also been added to section A2, correcting the previous version that referenced IFA and section A7. Revision No. 4 (effective from 1 st April 2015) Appendix A has been revised to take account of the alignment of the East West Interconnector and Moyle Interconnector contractual terms. Page 7 of 7