GV Standard Sliding Over Roof Installation Instruction Manual

Similar documents
GV Standard Skyhatch Installation Instruction Manual

GV Standard Free Standing Box

GV Standard Three Wall Box

GV Standard PitchVent

INSTALLATION GUIDE SLIMLINE ROOF LANTERN 4 PANE CONFIGURATION

INFINITE RANGE - HINGE DOOR

GV Standard Pitchglaze

B A T H R O O M G L A S S

Installation Guide Simplicity Alfresco. V1.9 Lu070318

Installation Guide Contemporary Alfresco V1.3 LU

Installation instructions, accessories. Rails. Volvo Car Corporation Gothenburg, Sweden. Instruction No Version Part. No

mistley PELE Installation Guide vapr16 Mistley Bathroom Glass Limited No 4 One Mistley Quayside, High Street, Mistley, Essex CO11 1AL England

TONNEAU INSTALLATION INSTRUCTION

Gardman Lean-to Greenhouse Assembly Instructions

Monaco Installation Guide - Surface Profiles

Assembly guide. Before you start...check the pack and make sure all the components and fixings are included see. Tools required (Not Supplied)

MISCELLANEOUS CABINET REPAIRS

CONSERVATORY ROOF INSTALLATION GUIDE Issue

INFINITE RANGE - CENTRE FOLDING DOOR

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

ATLANTIS RAIL Contact Information

Installation Instructions

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

Eurocell conservatory roof system. Installation manual Issue 3

Perfect Fit blinds. Preparation. Measuring Instructions. Step 1 - Measure glass size. Step 2 - Measure window depth

a.k.a. casegoods instructions

Greenhouse Assembly Instructions

Portofino Installation Guide

INSTALLATION INSTRUCTIONS DANUBE ACRYLIC NEO ANGLE

Portofino Case2 Installation Guide

INSTALLING YOUR NEW SPRING LIFT ARM KIT

Assembly Instructions

Deauville Installation Guide

Installation Guide. Bi-fold Doors

SMART SYSTEMS VISOGLIDE+ INSTALLTION GUIDE

INSTRUCTIONS FOR ASSEMBLY 2355mm x 3125mm Workshop

BIFOLD FUTON FRAME TRINITY ARM. Seat Rails and Slats x 1. *Note: Use 4pc of 100mm Bolts and 4pc of 60mm Bolts to attach the arms to the Stretchers.

Studio Face Xtreme 6020 Installation Instructions (Nickel , Black )

INSTRUCTIONS FOR ASSEMBLY 2355mm x 4665mm Workshop

IF INSTALLING ANY OF THE PORTMAN SELF CLOSING SYSTEMS, PLEASE READ THE CORRESPONDING FITTING INSTRUCTIONS SUPPLIED WITH THE CLOSING SYSTEM FIRST

DESIGNER SERIES GUTTER SYSTEM INSTALLATION INSTRUCTIONS

Side Light Frame Pack Assembly Instructions

Jabiru Installation instructions

Side Light Frame Pack Assembly Instructions

Hinge Door + Inline Panel + Return Panel

ALLORA SWING PANEL INSTALLATION INSTRUCTIONS

Monaco Installation Guide - Surface Profiles - vjun16

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

INFINITE RANGE - CENTRE FOLDING DOOR

Deauville Installation Guide

INSTALLATION INSTRUCTIONS. Thermal Entrances AA 250/AA 425 THERMAL DOOR WITH TRIFAB 601/601T FRAMING

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

Patented Rail-Free Mounting System for Composition/Asphalt Shingle Roofs

TREX TRANSCEND RAILING

Potting Store Assembly Instructions

GROWING BETTER THROUGH DESIGN. 6ft Lean-To LEAN-TO. Assembly Instructions 04/02

Installation Guide Simplicity 6. v3.5 lu171117

FIXED FLAT ROOFLIGHT: INSTALLATION INSTRUCTIONS (Double & triple glazed)

Installation Guide. Evolve bi-fold. 8. Door restrictor- optional p9. 1. Before you start p2. 9. Adjustment. 2. Measuring and surveying p2

Cardo DOOR & RETURN SHOWER ENCLOSURE INSTALLATION PLEASE READ THESE INSTRUCTIONS CAREFULLY.

Strata. urniture. Adriana Instructions. Parts in the Arm Box: Parts in the Body Box: Watch our assembly videos at

Bathroom Installation Manual

Vertical Slider Section Detail

LOCKN LOAD FIRST TIME INSTALLATION

ASSEMBLY INSTRUCTION CONTENT

Ultra Fast Delivery SGL Toilet Cubicle Pack Fitting Instructions

9/16" (14mm) 1/2" (12mm)

WASP Extended Shuttle Fitting. Process Overview

BMW E46 Coupe 3dr MP Bolt in (BMW Race Days Only) Roll Cage (B045) Fitting Instructions

LOCKN LOAD FIRST TIME INSTALLATION

IMPORTANT INSTALLATION GUIDE VALENCIA ANGLE CORNER SHOWER READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION

Ford Pick Up Rear leaf Spring Kit Installation Instructions

CONSTRUCTION GUIDE 21ft Wide and 24ft Wide SHEEP HOUSE

PHTM200 - Phantom 200 Flat Screen Wall Mount with Wafer Thin Projection Fits Screens up to 50 lbs with 200mm Mounting Patterns

ASS 70 FD folding / sliding door. Installation Guide

Vanity Installation Instructions

BSM, GSM & GSS. Joint Kit Instruction. (Modified for IMPACT) (NSF Certified) Curved Glass Fresh Meat Delicatessen and Seafood Merchandisers

INS A KSR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Verify Curb Installation Required Installation Tools...

INSTALLATION INSTRUCTIONS for PYROCLASSIC FIRES LTD. 100mm SLOPING CEILING FLUE KIT

TRUE TECHNICAL SERVICE MANUAL - ALL MODELS. DOORS/DRAWERS/LIDS

ALL SEASON PATIO COVER

6MM ALLEN KEY FOR ROOF CLIPS PHILLIPS HEAD BIT FOR SCREWS FOR DOOR FRAME SPIRIT/LASER LEVEL TO LEVEL THE UNIT

Allora ALCOVE ENCLOSURE INSTALLATION BEFORE INSTALLATION CHECK THAT YOUR ALLORA SHOWER ENCLOSURE SYSTEM IS UNDAMAGED

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

Hinge Door + Side Panel

OXYGEN INSTALLATION. Revision date

Cold Frame Instructions

CROSSBAR RAFTER ISOMETRIC

Fitting Instructions

User Instructions Multiline Otter Scoreboard Caddy Assembly

PREMIER PENTAGON SHOWER ENCLOSURE

Sliding Glass Door Assembly and Installation Guide

Ceiling Tile Installations Part 1. Sheetrock Installations Part 2. WolfVision Support 2055 Sugarloaf Circle, Suite 125 Duluth, GA 30097

Art Rack Assembly Instructions:

TOOLS REQUIRED: HARDWARE INCLUDED: 13MM FLAT WRENCH FOR LEVELING THE STRUCTURE RATCHET WITH 5MM HEX BIT FOR CORNER SCREWS ON TOP TRAVERSE BEAMS

INSTALATIONGUIDE 1 Door / Offset Quadrant

Topo Freestanding Applications - Private Office

NEW equinox INSTALLATION GUIDE Issue

FABA. Installation Instructions. Conductor Bar System. Publication #FABA-03 3/1/04 Part Number: Copyright 2004 Electromotive Systems

Installation Instructions

Transcription:

GV Standard Sliding Over Roof Installation Instruction Manual Technical experts in the design, manufacture and supply of precision engineered, architectural rooflights for residential and commercial buildings.

GV Standard Sliding Over Roof Installation Instruction Manual. SOR-INST v1.0-10.02.14 Page 2 of 7 Important checks before proceeding with installation Check that the kerb is built to Glazing Vision s sales drawings. In particular: Kerb structure is dimensionally correct to customer order and kerb drawings. Top surface of kerb is flat (although it will be pitched at least 3 degrees) without undulations greater than +/-2mm. Cable exit hole has been included in the kerb. Kerb has been weathered as per drawings 602-ASS-402 and 602-ASS-403. Note: if using any metallic waterproofing material, this cannot be applied across the top surface of the kerb as this will cause a thermal bridge which can lead to internal condensation and invalidate the rooflight warranty. Extension rail supports are constructed and weathered to drawing 602-ASS-403. Installation procedure 1. Remove all packaging from rooflight including polyfoam glass protection and low tack tape. 2. Remove clip on covers around lower perimeter of rooflight. This is done by first pulling the bottom to release as shown in (Figure 1). Take care not to deform the section or scratch any powder coat. Base frame work Cover clip Figure 1 Removing clip-on cover 3. Referring to Figure 2 and 3, attach spreader plates to sliding frame using M4 supplied (2 per plate). Depending on the span and width dimensions the positions of brackets will vary, the longer side will include holes for 2 spreader plates and lifting brackets, the shorter side will include holes for a spreader plate only. 4. Mount lifting bracket to tapping plate in the base frame using M6 high tensile supplied (3 per bracket). Adjust rubber feet to make light contact with top of glass (do not tighten). Repeat for the 3 other corners. 5. Assemble lifting frame (refer to Glazing Vision drawing MA0065) to position lifting eyes with lifting brackets. Secure joints using clevis pins and R-clips (2 per lifting bracket and

Page 3 of 7 joining brackets). Finer adjustment of position is achieved with the on the lifting bracket. Once in position, ensure nuts are tightened appropriately for lift. Lifting eye R-clips and clevis pins Adjustment Rubber feet Lifting bracket Spreader plate Spreader plate Packing plate High tensile base Tapping plate Figure 2 Section showing bracket and framework Lifting eye R-clips and clevis pins Adjustment Rubber feet Bracket Spreader plate Base Packing plate Figure 3 View of bracket and framework 6. Attach shackles to lifting eyes (Figure 2 and 3). Attach chains/strops to shackles. These must be a minimum of 3 metres in length.

Page 4 of 7 7. Carefully lift rooflight to the roof. 8. Apply two continuous runs of silicone (supplied in installation kit) to top of kerb. Position runs approximately 25mm and 100mm from outside edge of kerb (Figure 4). Silicone Fully weathered kerb Figure 4 Applying silicone to kerb 9. Carefully lift rooflight over to kerb. 10. Feed power and control cables from base framework into hole in kerb (Figure 5). If BMS integration option was purchased there will be a third cable. Sliding framework Base framework Power & control cables fed into hole in kerb 11. Gently lower rooflight to kerb ensuring cables are not kinked or snagged under framework. 12. With base framework in contact with kerb top and majority of rooflight weight still supported, adjust position of rooflight on kerb ensuring internal framework is equally spaced and aligned with internal finishes. Fixing cover strip located here Figure 5 Cable installation 13. Gently release weight of rooflight. Remove crane before doing any further work.

Page 5 of 7 14. Drill pilot holes in kerb using holes in drip leg on base framework. Use a suitable size drill to suit supplied. Secure base frame to kerb using supplied and packers. The packers must fill the gap between kerb and rooflight base frame for each woodscrew (Figure 6) to prevent distortion of framework. Kerb Fixing holes in drip leg Packers 15. Locate extension rails using brackets, slide track capping on to base frame track extrusion (Figure 7). Slide into position until extension rails butt up to base frame. Figure 6 Fixing detail Track capping Base frame track extrusion Brackets Extension rails Figure 7 Locating extension rails 16. Ensure extension track is aligned and straight with track on base frame. Using a spirit level, check that extension rails are not sloping towards or away from kerb. They must be horizontal for reliable and smooth operation. 17. Use flat packers (supplied in installation kit) to fill gap between extension tracks and kerb extension supports at each fixing hole location on both sides (packers will sit flush with extension rail once installed). Secure extension rails to kerb extension supports with countersunk provided (Figure 8). Apply clear silicone to each fixing hole before inserting fixing to ensure a seal.

Page 6 of 7 Countersunk Track capping grub screw Flat packers Capped supports Figure 8 Extension rail 18. Loosen grub screws securing track capping to extension track (Figure 8). Remove this piece of track capping. Remove cap head securing extension track to extension rails and remove extension track to gain access to additional fixing holes (Figure 9). Additional fixing holes Button head Flat packers Extension rail 19. Secure extension rail to capped supports with button head supplied. 20. Reposition extension track (without ) on extension rails to check alignment with base track. Re-check rail with spirit level to ensure track is horizontal (adjust packing and accordingly if required). 21. Insert cap head to secure extension track to extension rails. Slide track capping back on to extension track and tighten grub screws to secure in position. 22. Secure all flashings to sliding frame using M4 cap head supplied. 23. Secure rear flashing to base frame with 9 provided (Figure 10). Kerb extension support Figure 9 - Extension rail

Page 7 of 7 Rear flashing Fixing Figure 10 Flashing 24. Connect power and switch cables inside the building as per standard wiring detail. Open and close the rooflight to check for smooth operation at this stage. The control board settings are configured during manufacturing assembly (if adjustment is required any new settings must be logged and returned to Glazing Vision for our records). 25. Complete site QC documents.