COOK INLET NAVIGATION CHANNEL

Similar documents
MAINTENANCE DREDGING, PORT OF ALASKA HYDROGRAPHIC SURVEY PRE_ _POA ANCHORAGE, ALASKA V-101 SHEET IDENTIFICATION.

MLG to MLLW Vertical Datum Conversion. Mississippi River Venice, Louisiana to the Gulf of Mexico (Vicinity of Southwest Pass) Louisiana

Corps Dredge Plan 2016 Emily Hughes Env Resources, USACE BUILDING STRONG

Instruction with Hands-on Practice: Creating a Bathymetric Database & Datum Conversion

EGYPTIAN HYDROGRAPHIC DEPARTMENT THE EGYPTIAN HYDROGRAPHIC FRAMEWORK

GLMTF November 18, 2014 Presentation

Myanmar Naval Hydrographic Centre. National Report for 13 th North Indian Ocean Hydrographic Commission Meeting

BookletChart. Chesapeake Bay Pocomoke and Tangier Sounds NOAA Chart A reduced-scale NOAA nautical chart for small boaters

Old House Channel Bathymetric and Side Scan Survey

TABLE OF CONTENTS. Executive Summary 1 Acknowledgements 3 Introduction 3 Storm Recovery and Beach Project Effectiveness 3

LT Matthew Forney, NOAA Navigation Manager Alaska Region Bering Strait MaritimeSymposium. Office of Coast Survey

Passages Between Acklins Island, Haiti and Caicos Islands NGA Chart A reduced-scale NGA nautical chart for small boaters

National Maritime Center

Baie de L Acul and Approaches (Haiti) NGA Chart A reduced-scale NGA nautical chart for small boaters

Lakes and Rivers Division, David Dale

BookletChart. Approaches to Cap-Haitien and Bahia de Monti Cristi NGA Chart A reduced-scale NGA nautical chart for small boaters

BookletChart. Sacramento River Andrus Island to Sacramento NOAA Chart A reduced-scale NOAA nautical chart for small boaters

BookletChart. Port-au-Prince (Haiti) NGA Chart A reduced-scale NGA nautical chart for small boaters

AAPSilver System Performance Validation

Booth Display Rules. Standard Inline booth. Perimeter booth. Island booth. Peninsula Booth

Lakes and Rivers Division, Mr. David Dale

BookletChart. Intracoastal Waterway Grassy Key to Bahia Honda Key NOAA Chart A reduced-scale NOAA nautical chart for small boaters

New Jersey Dept. of Environmental Protection Shore Protection Program

Around and About the San Juans Assessments:

MARINE PRIVATE MOORAGE APPLICATION REQUIREMENTS; EXAMPLE PLANS

State of New Jersey Chris Christie, Governor. Dept. of Environmental Protection Bob Martin, Commissioner

Expansion Work Has Begun The perimeter dike for Cell 7 is now visible

Western Region enavigation Sub- Committee Report

The ship RV Timba repairs are now almost complete and it is expected that come September 2014 the ship will be fully operational.

How to Conduct a Bridge to Bridge Inspection

11 th CHRIS MEETING IHB, Monaco, November Draft - - -

MONITORING RUBBLE-MOUND COASTAL STRUCTURES WITH PHOTOGRAMMETRY

Oakland County Michigan Register of Deeds Plat Engineering, GIS, & Remonumentation Dept. Ph: (248) Fax (248)

SUMMARY: The Coast Guard is declaring Sea Area A1 in certain. areas off the coast of the United States based upon the

Drawbridge Operation Regulation; Oakland Inner Harbor, ACTION: Notice of deviation from drawbridge regulation.

New Jersey Dept. of Environmental Protection Shore Protection Program

BookletChart. St. Joseph and Benton Harbor NOAA Chart A reduced-scale NOAA nautical chart for small boaters

Proposal of a New Study for the Enhancement of the Safety of Navigation in the Straits of Malacca and Singapore

MEMORANDUM NO MAY Directives Affected. Reference (a) is temporarily augmented by this policy letter.

Course Instructions. 3 Easy Steps to Complete the Course: 1.) Read the Course PDF Below.

15 November 1969: Prior to Baptiste Collette channel construction

PORT OF POOLE DEVELOPING FOR THE FUTURE

BookletChart. Cap-Haitien NGA Chart A reduced-scale NGA nautical chart for small boaters

A B C D E F G H SEE NOTE 1 EL (MIN.) 2 NEW UNCOMPACTED EL. VARIES EARTH EMBANKMENT 3 (MIN.) TYPICAL SECTION EMBANKMENT AND BORROW 6 (MIN.

Oil Spill Detection (OSD) by using X-band radar

Protection Augmentation Toughness and Alternatives of GNSS. Melaha 2016 Concord Al-Salam Hotel Cairo, April 25,2016 Refaat Rashad

FURIE OPERATING ALASKA, LLC KITCHEN LIGHTS UNIT OVEVIEW

NAVIGATION RD&T UPDATE

Planning and Installing the EnergyAxis System Starter Kit. Introduction. Related Documents

SPECIAL PUBLIC NOTICE

New Jersey Regional Sediment Management

Hartwell Lake Application for Dry Dredging

MERMAID MARINE AUSTRALIA LTD INVESTOR BRIEFING DEVELOPMENT OF DAMPIER SUPPLY BASE

Items to be measured for each team: Diagrams A, B, C, and D. 2 cereal or food boxes 1 circular lid from yogurt or other food containers

Essentials of Navigation

The Marine Well Containment System. LSU Center for Energy Studies Energy Summit 2010 October 26, 2010

Nordic Hydrographic Commission 60th Conference - Stavanger - Norway April New national ENC service for leisure craft users

World-Wide Navigational Warning Service Sub-Committee WWNWS-5 Monaco, 1-4 October S-100 Basics Background Brief

Dredging, Beach Nourishment and. Bird Conservation Workshop Atlantic Coast Region

(P.27)

National Report of Finland

The several methods for making linear measurements are quite simple and straightforward. They are described below:

Taking RSM to the Next Level

PROGRESS UPDATE AND FUTURE DIRECTIONS OF THE MARINE ELECTRONIC HIGHWAY (MEH)

SPECIFICATION FOR TOPOGRAPHIC AND HYDROGRAPHIC SURVEYS OF RECLAMATION AND DREDGING WORKS

CHAPTER 1: TITLE SHEET and GENERAL LAYOUT

United States - Canada Hydrographic Commission Halifax, Canada May 16, 2016

UDW Technology Conference Dan McLeod / John Jacobson Lockheed Martin MS2 July 27, Secure Energy for America

Kaitian - Model: Engraving & Cutting Laser System CM1309SH 1 Head One (01) KT Laser tube Watts

Irrigation District Database Analysis 1

Coos Bay BCS number: 47-8

Inland Waterways Users Board #60. Inland Navigation R&D

ECDIS ENC Accuracy. Contents. Introduction LOSS PREVENTION BRIEFING FOR NORTH MEMBER SHIPS / MAY Introduction... 1

1. Qualitative Assessment... II-101

National Report of Finland

ROUTEING OF SHIPS, SHIP REPORTING AND RELATED MATTERS. New traffic separation schemes and two-way routes in Norra Kvarken

A Report On Tide Gauges In Singapore. 1 The Republic of Singapore is an island city-state situated at the southern tip of

United States Coast Guard Office of Navigation Systems

Ingham County Request for Proposals Public Safety Radio System Project Manager and Consulting Services Packet #120-18

MR. DAVID DALE, PE, PMP, SES DIRECTOR, Programs Great Lakes & Ohio River Division. 14 May Braddock Dam

Kordil Surveying & Engineering Services

1.1 GENERAL RECORD DRAWING REQUIREMENTS

A guideline for establishing feature and symbol standard management system for national HOs

BookletChart. Sacramento River Sacramento to Fourmile Bend NOAA Chart A reduced-scale NOAA nautical chart for small boaters

PROPOSED REDEVELOPMENT OF RICHMOND ISLAND AND RICHMOND SLOUGH

Prepared by Battelle Memorial Institute

Analysis of Reference Tidal Channel Plan Form For the Montezuma Wetlands Restoration Project

The Economic Census and Its Role in Economic Statistics

670 10/26/17 SSD: 07/14/16, 09/16/17 Page 1 of 6

Vertical Control via GPS vs. Tide Gauges: A Pilot Study

Feasibility Study To Define Costs & General Conditions For Construction of Improved Entrance Structure

NATIONAL VDATUM -- THE IMPLEMENTATION OF A NATIONAL VERTICAL DATUM TRANSFORMATION DATABASE

PFA Update 22 June 2018

MEDITERRANEAN AND BLACK SEAS HYDROGRAPHIC COMMISSION

Town of Skowhegan Application For Development Review

Appendix A Lower Columbia River Chart Datum Modeling

Radiocommunication Facility Review Protocol

M-0418 REV:0

~~MICROCOPY RESOLUTION TEST CHART. A l l N NATIONAJ I PJ1 ~ S i, *-" . o IIIo. . o, r

Marine Corps Support Facility-Blount Island: Integrated Natural Resources Program Successes. E2S2 Conference May 12, 2011

Transcription:

COOK INLET NAVIGATION CHANNEL

1-5 COOK INLET NAVIGATION CHANNEL, ALASKA (CWIS NO. 10324, 10534) Condition of Improvement 30 September 2011 AUTHORIZATION: (1) Water Resources Development Act of 1996 (Public Law 104-303, 104 th Congress) authorizes the expenditure of $5,700,000 subject to the report of the Chief of Engineers. (2) The Energy and Water Development Appropriations Act, 1999 (Public Law 105-245, Oct. 7 1998) increases the project total not to exceed $12,600,000; one third of this total is to be cost shared with the local sponsor. (3) Energy and Water Appropriations Act, 2005, states that The Secretary shall modify the channel in the existing Cook Inlet Navigation Channel approach to Anchorage Harbor, Alaska, to run the entire length of Fire Island Range and Point Woronzof Range and shall modify the depth of that channel to minus 45 Feet mean lower low water. The channel shall be maintained at a depth of minus 45 feet mean lower low water." EXISTING PROJECT: LENGTH WIDTH DEPTH Original Channel......... 10,925 ft 1,017 ft -38 feet Proposed Channel Modification (full approach).. 46,150 ft 1,017 ft -45 feet PROJECT USAGE: The channel provides additional time for the passage of deep draft vessels to and from the Port of Anchorage. PROGRESS OF WORK: 1996 - The construction site and disposal area are surveyed. Pre-construction engineering and design work are initiated. 1997 - Ship tracking studies over the winter of 96-97 confirm the project dimensions. Plans and specifications are begun. 1998 - A Project Cooperation Agreement is signed with the Municipality of Anchorage in January. The construction contract is awarded in December. 1999 - Dredging operations remove 576,934 yards from the project. 2000 - The project is physically completed in September with the removal of an additional 882,609 cubic yards of material. 2001 - Three condition surveys are conducted at the beginning of June, August, and November. 2002 - The project is surveyed in May, July, and September. 2003 - Condition surveys are conducted in May, July and early October. 2004 - Condition surveys are completed in June and October with multi-beam equipment. 2005 - Survey coverage is increased along the Woronzof and Fire Island range lines in accordance with new authorization and the concern of shippers. 9,950 linear meters were surveyed at a width of 920 meters in May and September with full coverage multi-beam surveys. 2006 - One full coverage multi-beam survey was conducted in August covering 7 and ¼ miles of channel, an extension of about 1 mile from last year to cover the concerns of shippers. 2007 - A new best-fit channel alignment was created covering 8 ¾ miles along the Woronzof and Fire Island range lines. A multi-beam survey of the entire project was conducted in August. 2008 - A multi-beam condition survey was conducted in August. 2010 - A multi-beam condition survey was conducted by Terrasond in July. Until a cost shared decision document can be funded and prepared for the entire authorized project area, the maintenance dredging authority currently remains limited to stations 69+52 thru 178+77 (based on the proposed project limit stationing found in the July survey). Continues on page 1-5a 1-5

1-5a COOK INLET NAVIGATION CHANNEL, ALASKA (continued) 30 September 2011 COST TO DATE: GI PED Appropriation $307,252 GI PED Costs $307,252 CG Appropriation $8,409,492 CG Costs $8,409,492 CG Contributed Appropriation $2,498,971 CG Contributed Costs $2,498,971 O&M Appropriation $594,079 O&M Costs $590,288 RANGE OF TIDE: Mean Range Diurnal Range Extreme Range Fire Island 24.0' 26.9' 38.9' Anchorage 26.2' 29.2' 41.0' CONTROLLING DEPTH: A depth of -30 feet MLLW controls along the northern boundary between stations 111+00 and 128+00, July 2010. Note: This project is subject to the strong tidal influence found in the upper Cook Inlet. Variation in available depth may occur over time. The information above is not provided for navigation purposes. 1-5a

Cook Inlet Navigation Channel near Anchorage, Alaska CINC map on Navigation Chart and ice flow in the channel 2005.

Cook Inlet Navigation Channel near Anchorage, Alaska Northern Lights over Cook Inlet Navigation Channel near Anchorage taken in 2009.