Construction Measurement III SBQ3314. Electrical Installations : Single & Three Phase. Dr. Sarajul Fikri Mohamed

Similar documents

Busbar and Modular Wiring Systems

2/15/2015. Current will always try to return to its source. In order for there to be current, there must be a complete circuit

Licensed Electricians Practical Assessment (LEP)

CONTINUING EDUC ATION

Licensed Electricians Practical Assessment (LEP)

SECTION WIREWAYS FOR RADIOLOGY EQUIPMENT

E S T I M A T E Name of Work : Estimate of Electric & Air Conditioned Work for Union Bank of India, Saral Branch, Dist. Rajkot.

SECTION LOW-VOLTAGE ELECT. DIST. DESIGN AND CONSTRUCTION STANDARDS _ February 2015 PART I: GENERAL

ET 40 - Electrician Theory Examination Marking Schedule

ER 87 Electrician Regulations Answer Schedule. Question 1 Marks Reference Marking notes. (1 mark) ESR 27(2) (2 marks) ESR 74A(1AA)

American Electrical Institute

Wisconsin Contractors Institute Continuing Education

International Tube & Conduit Company Ltd. BRITISH STANDARD STEEL CONDUITS & FITTINGS

Risk Assessment & Safe Working Practice

Chapter 6. WIRING SYSTEMS Safe Electrical Design

Piper GI Conduits. Heavy Gauge Welded GI Conduit, threaded

Article 250 Grounding & Bonding

FINAL - ER 70 Electrician Regulations Answer Schedule. Question 1 Marks Reference Marking notes

Cablelink Plus Flush Technical

Our Marketing. Our Group. Our Mission. Our Quality Achievements

Page Electric Utility Service Specifications

Installation Instructions Student 101 Fume Cupboard

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/8/10 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

METRIC LIGHTNING PROTECTION PRODUCTS

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-II) OVERHEAD NETWORK GROUNDING. Rev. 01

Control Cable installation: Best Practice

NATIONAL RULES FOR ELECTRICAL INSTALLATIONS. Fourth Edition. Extracts from Amendment No.1: June 2011

Cable Management Solutions with DLP TM

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-I) UNDERGROUND NETWORK GROUNDING. Rev. 01

CABLE TRAYS & STRUTS CATALOUGE

ELECTRIC GROUNDING AND WIRING REQUIREMENTS BOOTHS-METAL

SECTION ELECTRICAL IDENTIFICATION

OptiLine 45 Floor boxes

SECTION 5 TRANSFORMERS

CHAPTER 15 GROUNDING REQUIREMENTS FOR ELECTRICAL EQUIPMENT

ZUCCHINI MS - LOW TO MEDIUM POWER BUSBAR

1. All electrical switches and outlets used shall be equal to Hubbell heavy duty, specification grade or equivalent quality.

Grounding and Bonding

NATIONAL CERTIFICATE (VOCATIONAL) ELECTRICAL PRINCIPLES AND PRACTICE NQF LEVEL 4 NOVEMBER 2009

Index Pipe Hangers and Straps

6419X Conduit Cable. Dungannon Electrical Wholesale Tel: Page 1 of 10

Status Date Prepared Reviewed Endorsed Approved

Copper Tubing Hangers Clevis Hangers. Copper Tubing Hangers

TRANSMISSION ENGINEERING STANDARD TES-P , Rev. 0 TABLE OF CONTENTS 1.0 SCOPE 2.0 BONDING METHODS

ELECTRICIAN S THEORY EXAMINATION 20 November 2010 QUESTION AND ANSWER BOOKLET

Agenda. Earthing of Telecom Installations using Single Point Earthing. Reference Documents. How many earths? Earthing Issue...

Test Joints / Fixed Earthing Terminals

7_Floor_Trunking_Layout 1 18/01/ :50 Page 53 FLOOR TRUNKING

Utility Structures. Utility vaults, trenches, transformer pads Electrical Pole Bases and switching cubicles

Ford Water Meter Couplings & Accessories

03/7/12 Issuance UTD Section Page 1 of 5 Electrical General

1. TRACER WIRE. I. Application. Material Specification. Page 1 of 16

Customer Connection Guide Updates Effective May 2017

Earth Clamp / Ground Clamp Earth rod Clamp / Earthing rod Clamp Ground Clamp / Grounding Clamp

5/2 Introduction. Unequipped Distribution Boards 5/4 Modular distribution boards 5/5 Add-on parts

Wanco Electric & Machinery Pte Ltd. Cable Management Systems. Cable Trunking

Article 225: Outside Branch Circuits And Feeders

Engineering and Construction Services Division Construction Drawings for Sewers and Watermains. T No. Revision T No. Revision Remarks All T drawings

Chapter 1. Applied Grounding and Bonding. Applied Grounding and Bonding 9/18/2011. Introduction. Introduction. Paul Dobrowsky Member NEC Panel 5

GROUNDED ELECTRICAL POWER DISTRIBUTION. Excerpt from Inverter Charger Series Manual BY: VIJAY SHARMA ENGINEER

Flush Floor system LIMOGES Cedex. Phone : Fax :

INDUSTRIAL ELECTRICAL LAB-434 SEMESTER 4

1 Exam Prep NFPA 70: National Electric Code 2011 Tabs and Highlights

S.NO Description Quantity Rate Amount

Module Title: Electrical Installation II Laboratory Sheet:

Neighborhood Police Post Centre Scotts 28 Condominium Bank of China Ngee Soon Medical Centre. Hill View Garden Condominium.

4.3 Section CONDUIT INSTALLATION ACCESSORIES. Thinking of the environment. Fixing accessories Coupling accessories

GE Monogram. Installation. Instructions. 36" Vent Hood. Model ZV750. Call anywhere in the US and Canada -

St. Monica Food Pantry

Wiring of the Main Distribution Panelboard

DIVISION 26 ELECTRICAL SECTION ELECTRICAL

SOUTH DUBLIN COUNTY COUNCIL Traffic Management Centre Roads (Traffic and Transportation) Department

Sample Scheme of Work

POWER DELEGATOR SERIES 7200A POWER DISTRIBUTION UNIT WITH POWER CONDITIONING GENERAL SPECIFICATIONS

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 2/9/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

HBK INTERNATIONAL AN ISO 9001 : 2015 CERTIFIED COMPANY

INTRODUCTION NUHAS OMAN QUALITY & RELIABILITY.

17TH EDITION BS TH EDITION BS7671 HOW THIS AFFECTS YOU. A BITESIZE LOOK at RCDs and parts of the 18th edition DPC. wylexreasons.co.

HOUSE PARTS PACKED IN HOUSE BOX PARTS IN PLASTIC BAG (HARDWARE) PARTS IN SMALL PLASTIC BAG (FLOOR CLIPS) PARTS PACKED IN BUNDLE

Outdoor Installation 2: Lightning Protection and Grounding

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design

CURRENT FUTURE REGULATIONS PROPOSALS

ET 61 - Electrician Theory Examination Marking Schedule

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible.

Field Instruction. Induced voltages can occur in overhead lines, underground cables, or in switchyards.

Technical guide. The technical guide provides all the additional information you need on our cable management products.

ELECTRICAL PANEL SYSTEM

Lightning Strikes. Presented to the Greater Norwalk Amateur Radio Corporation Inc. February 8, 2017 Steven M. Simons W1SMS

BRADICICH CONSULTING ENGINEERS PTY LTD

PIPE/CONDUIT SUPPORTS

Safety Issues Caused by High Earth Resistance and Identifying Them Using Instruments

MV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer

Sizing conductors and selecting protection devices

METER - INSTALLATION Pad Mount Transformer

SECTION CABLE TRAYS

Michigan State University Construction Standards SWITCHBOARDS, PANELBOARDS, AND CONTROL CENTERS PAGE

A. Product Data: For each electrical identification product indicated.

SECTION INTERCOMMUNICATIONS SYSTEMS. A. Section Includes: Manually switched intercommunications systems with the following components:

SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

Transcription:

Construction Measurement III SBQ3314 Electrical Installations : Single & Three Phase Dr. Sarajul Fikri Mohamed

Table of contents 1. Electrical installations: main components 2. SMM2 measurement rules for electrical installations: three phase 3. Taking off list for electrical installations: three phase 4. Heading and description.

Electrical installation and components

Electrical Distribution Power transmission and distributions

Single and Three Phase Single Phase For domestic uses, three phase voltage are very high and dangerous to the home owner Therefore, low voltage electrical supply normally used for domestic use such residential Standard voltage for single phase is 240 v. Normally one live wire will be used with one neutral wire. The code are as follows: RN YN BN Three Phase Carrying voltage is 415 v and can exceed 880 v for industrial user. The industries that use heavy machineries such as steel factory and cement factory need to have three phase electrical system. Three phase systems may have three live wire and neutral wire Live wires identified based on colour coded and the code are as follows: LI or R (red): Single Phase L2 or Y (yellow): Second Phase L3 or B (blue) : Three Phase

Main Components INCOMING SERVICES MAIN INSTALLATION POWER INSTALLATION LIGHTING INSTALLATION ELECTRICAL APPLIANCES CONDUIT AND FITTING CABLES LIGHTNING PROTECTION SYSTEM TESTING

Electrical Distribution INCOMING SERVICES TESTING POWER INSTALLATION ELECTRICAL APPLIANCES LIGHTNING PROTECTION FINAL SUB-CIRCUIT MAIN INSTALLATION LIGHTING INSTALLATION CABLE CONDUIT

Main Components POWER INSTALLATION LIGHTING INSTALLATION ELECTRICAL APPLIANCES 3 pin switch socket Fluorescent light Wall light EXIT sign High bay light EL light Exhaust fan Sweep ceiling fan CONDUIT & FITTING Chased into brickwall Ceiling level CABLES 2x1c/2.5mm PVC cable 2x1c/1.5mm PVC cable TESTING On completion of the electrical installation test all switches, switch socket, wiring etc and make good all defects an leave everything perfect working order to the satisfaction of the S.O and TNB

SMM2 measurement rules

Measurement Rules

Related SMM2 Clauses Clause R4-R5 R6-R8 R9-R13 R14-R17 R18 R19 R20-R21 R22 R23-R24 Description Equipments and Control Gear Fittings and Accessories Conduits, trunking and cable tray Cabling Final Sub-circuits Earthing Ancillaries Sundries Builder s Work

Incoming Services

Cadangan Membina Dan Menyiapkan Sebuah Makmal Komputer Di Sekolah Kebangsaan Sri Selangor, Petaling Jaya, Selangor. ELEMENT: ELECTRICAL SERVICES BIL KETERANGAN UNIT KUANTITI HARGA (RM) ubb/n/01 JUMLAH (RM) A Preamble All quantities in this bill are provisional quantities subject to remeasurement upon construction of the said item. The tenderer must allow for testing the electrical installation and handling over of test certificate to S.O. B Incoming Services-Externally (All Provisional) INCOMING SERVICES - EXTERNALLY 100mm UPVC class 'D' pipe complete with long bend extended beyond drain for entry of TNB, incoming cable to MSB inclusive of excavation and backfilling. 4 x 25mm² pilestas (AC) cable in UPVC class 'D' pipe (m/s) buried underground to TNB panel. M 3.05 M 3.05 C Incoming Services-Internally (All Provisional) 75mm x 38mm electrical trunking from meter to DB/M3B. 25mm x 25mm Telekom PVC trunking from lighting arrestors run at high level and drops to computer server. M 1.00 M 1.00 INCOMING SERVICES - INTERNALLY To Collection

Measurement Rules : Classification of Work R.2 CLASIFICATION OF WORK a. Incoming services b. Standby equipment c. Mains installation-switch gears, sub-main cables. d. Power installation e. Lighting installation f. Heating installation g. Electrical appliances h. Electrical work k. Clock installation I. Sound distribution m. Alarm system n. Earthing system installation p. Lightning protection installation q. Special services r. Any other installation s. Trunking, ducting and cable trays

Measurement Rules : Location of Works LOCATION OF ELECTRICAL WORKS R3 - Location of work a. Internally b. Externally

Cl R.2.1(d) Classification of work Cl R.3.1(a) Location of Work ITEM DESCRIPTION UNIT A POWER INSTALLATION (INTERNALLY) Cable 2 x 1C-2.5mm2 PVC insulated colour coded cable as specified drawn into conduit. Cl R.14.2 Generally M Cl R.15.2(a) Cables

Main Installations (Equipments)

Measurement Rules : Equipment EQUIPMENT AND CONTROL GEAR (NO) R4 Equipment (generator, motors) Control gear (isolator, switch fuses) Packaged item described with a manufacturer s detail. Limiting dimension on size shall be given. Connecting cable ends or cable tails shall be deemed to be included with the item. Platework and supporting steelwork Section P.

TPN DB P SPN DB L MCCB SUB SWITCH BOARD 100A TPN MCCB EARTHING SYSTEM

Cadangan Membina Dan Menyiapkan Sebuah Makmal Komputer Di Sekolah Kebangsaan Sri Selangor, Petaling Jaya, Selangor. ELEMENT: ELECTRICAL SERVICES BIL KETERANGAN UNIT KUANTITI HARGA (RM) ubb/n/02 JUMLAH (RM) D Mains Installation-Internally (All Provisional) Metal clad main switch board of wall mounted floor standing type model no. 3b and including 60A/100A TPN cut-off fuse C/W neutral link, 75A TPN MCCB WALL MOUNTED SUB SWITCH BOARD and surge protector and all associated accessories. Wall mounted metal clad distribution board inclusive 30A SPN MCB, 30A SPN current-operated 100mA ELCB comprising of 13 nos 6A MCB and all associated accessories. Wall mounted metal clad distribution board inclusive 60A TPN MCCB, 60A TPN current-operated 300mA ELCB comprising 17 nos of 30A MCB, 5 nos of 20A MCB, 6 nos aircond point and all associated accessories. NO 1 NO 1 NO 1 E Power Installation-Internally (All Provisional) 3 nos 13A 3pin switch socket outlets mounted 300mm from first floor level complete with 2 x 2.5mm²/1C PVC in concealed UPVC trunking. NO 2 4 nos 13A 3pin switch socket outlets mounted 300mm from first floor level complete with 2 x MAIN SWITCH C/W INDICATOR LIGHTS 2.5mm²/1C PVC in concealed UPVC trunking. 4 nos 13A 3pin switch socket outlets mounted under of table complete with 2 x 2.5mm²/1C PVC in concealed UPVC trunking. To Collection NO 2 NO 4

METERING BOARD To monitor and record the total amount of electrical energy that is being consumed for the purpose of charging consumers through the issuance of electricity bills. Property of TNB 2 types of meter Analog Digital TNB CUT OUT FUSE Consumer s back up protection 2 purposes: As a measure of back up protection to the fuse in the Distribution Board and also ELCB As mean of cutting of electrical supply to the consumers when required Cutout fuse is connected to live wire and it is use to control current supply. Both belong to TNB.

Cadangan Membina Dan Menyiapkan Sebuah Makmal Komputer Di Sekolah Kebangsaan Sri Selangor, Petaling Jaya, Selangor. ELEMENT: ELECTRICAL SERVICES BIL KETERANGAN UNIT KUANTITI HARGA (RM) ubb/n/02 JUMLAH (RM) D Mains Installation-Internally (All Provisional) Metal clad main switch board of wall mounted floor standing type model no. 3b and including 60A/100A TPN cut-off fuse C/W neutral link, 75A TPN MCCB and surge protector and all associated accessories. Wall mounted metal clad distribution board inclusive 30A SPN MCB, 30A SPN current-operated 100mA ELCB comprising of 13 nos 6A MCB and all associated accessories. NO 1 NO 1 Wall mounted metal clad distribution board inclusive 60A TPN MCCB, 60A TPN current-operated 300mA ELCB comprising 17 nos of 30A MCB, 5 nos of 20A MCB, 6 nos aircond point and all associated accessories. NO 1 E Power Installation-Internally (All Provisional) 3 nos 13A 3pin switch socket outlets mounted 300mm from first floor level complete with 2 x 2.5mm²/1C PVC in concealed UPVC trunking. NO 2 4 nos 13A 3pin switch socket outlets mounted 300mm from first floor level complete with 2 x 2.5mm²/1C PVC in concealed UPVC trunking. NO 2 DISTRIBUTION BOARD 4 nos 13A 3pin switch socket outlets mounted under of table complete with 2 x 2.5mm²/1C PVC in concealed UPVC trunking. To Collection NO 4

Excess Current Protection : MINIATURE CIRCUIT BREAKERS (MCB) MCB An electromechanical or electro thermal devices which break the circuit in the case of excess current It will cut off any faulty circuit immediately Sensitive to lightning 2 types of excess current protection: Earth Leakage Circuit Breaker: ELCB Miniature Circuit Breaker: MCB

RESIDUAL CURRENT CIRCUIT BREAKER (RCCB) To ensure freedom from risk of shock it is important that the earth connection linking the metalwork of electrical equipment has a very low resistance. RCBO INSIDE A DISTRIBUTION BOARD RCCB provide a possible solution. The current-operated type compare the current flowing in the line and neutral of a circuit. In the case of fault the current flow will no longer be equal and the device will disconnect the supply. RCCB INSIDE A DISTRIBUTION BOARD

Main Switch : ELECTRICAL INSTALLATIONS Main switch Locate at the main incoming supply of the consumer s Distribution Board The purpose is to cut all of the power supply to the consumer in the event that any maintenance work needs to be carried out. Connect, cut off and control the current if their any excess current. A two terminal one way switch that contains fuse.

Circuit Breaker : ELCB : ELECTRICAL INSTALLATIONS ELCB A mechanical device to connect and cutout circuit It will cut off any faulty circuit immediately Sensitive to lightning 2 types: Earth Leakage Circuit Breaker: ELCB Miniature Circuit Breaker: MCB

Distribution Board : ELECTRICAL INSTALLATIONS This is where distribution of electrical energy to various connected load take place inside the consumer premises. It also distributes the path for the earthing and neutral wire, and acts as means of flowing leakage and return current respectively.

Miniature circuit breaker : MCB MCB & FUSE

Distribution Board : ELECTRICAL INSTALLATIONS Usually for houses and small loaded. Situated inside building. Including equipment such as circuit breaker and fuse SMM2 Refer to clause R.4.1(NO.)

Measurement Rules : ELECTRICAL INSTALLATIONS EQUIPMENT SUPPORTS : R5 Equipment supports enumerated and described (NO) Method of fixing given in the description with clauses R.1.5-6.

Measurement Rules : ELECTRICAL INSTALLATIONS FITTING AND ACCESSORIES (N0) R6 Fittings (clock, alarm bells) Accessories (socket outlets) R7 R8 Pendant fittings NO length stages 300mm Accessories - NO (in gang) a) rated capacity b) type c) no. accessories in each gang

Power Installations

Measurement Rules : ELECTRICAL INSTALLATIONS Switch socket outlet & socket point. Different Types for different capacity. SMM2 Refer to clause R.18.2 (No.)

Power Installation : ELECTRICAL INSTALLATIONS SOCKET

Power Installation : ELECTRICAL INSTALLATIONS 13A 2 gang s/s/o Bell push switch 13A 2 gang s/s/o with neon Telephone socket

Lighting Installation : ELECTRICAL INSTALLATIONS Fluorescents Lights and emergency light. Specification refer to manufacturer. SMM2 Refer to clause R.4.1(NO.)

Electrical Appliances

Electrical Appliance : ELECTRICAL INSTALLATIONS Fan, MATV point and telephone point. SMM2 Refer to clause R.6, R.22.1 (NO.)

Conduit, Trunking & Cable Tray

Measurement Rules : ELECTRICAL INSTALLATIONS CONDUIT, TRUNKING AND CABLE TRAYS R9.1 Conduit and fittings. (m) a) type b) size c) specification d) saddles & crampets pattern e) nature of background Except for final sub-circuit (measured overall conduit fittings) e.g tees, elbows, bend, cover plates, bushes, locknuts, nipples, stopping-lugs and reducing bushes), short running lengths and branches).

Measurement Rules : ELECTRICAL INSTALLATIONS CONDUIT, TRUNKING AND CABLE TRAYS Classification : a) conduits fixed to surfaces b) conduits fixed in chases c) conduits embedded in floor screeds d) conduits embedded in concrete

Conduit inside the suspended ceiling

Conduits fixed in chases brickwall

Measurement Rules : ELECTRICAL INSTALLATIONS CONDUIT, TRUNKING AND CABLE TRAYS R9.2 Special boxes, adaptable box, floor trap boxes, purposes made boxes, rectangular junction boxes required for drawing in cables, flameproof boxes & expansion joint ( N0 EXTRA OVER)

Measurement Rules : ELECTRICAL INSTALLATIONS CONDUIT, TRUNKING AND CABLE TRAYS R9.3 Flexible conduits & extensible conduit (NO) i) size ii) overall length iii) type iv) size & type termination glands R9.4 Components & special boxes (N0) ( for making connection of conduit in trunking )

Trunking

Measurement Rules : ELECTRICAL INSTALLATIONS CONDUIT, TRUNKING AND CABLE TRAYS R10.1 Trunking (m) i) type ii) size iii) no & size compartment iv) method of connecting R10.2 Fitting (NO) and EXTRA OVER R10.3 Connection between trunking & item of equipment & control gear use flanges and or the forming of apertures (N0)

Measurement Rules : TRUNKING A rectangular metal made system that either horizontally or vertically fixed to wall. A good mechanical protection. Made from 18 gauge steel sheet. Available size: 50mm x 50mm 70mm x 100mm 150mm x 75mm 150mm x 150mm Equipped with bend, tee, and junction.

Cadangan Membina Dan Menyiapkan Sebuah Makmal Komputer Di Sekolah Kebangsaan Sri Selangor, Petaling Jaya, Selangor. ELEMENT: ELECTRICAL SERVICES BIL KETERANGAN UNIT KUANTITI HARGA (RM) ubb/n/05 JUMLAH (RM) I Electrical Appliances In Concrete Buildings Internally (All Provisional) ACSU starter panel. NO 1 Aircond point. NO 6 J Cables In Concrete Buildings Internally (All Provisional) Fixed to wall using bracket 2 x 6mm²/1C in concealed UPVC conduits. 4 x 6mm²/1C in concealed UPVC conduits. 2 x 1.5mm²/1C in concealed UPVC conduits. 2 x 2.5mm²/1C in concealed UPVC conduits. M 11.53 M 30.53 M 186.41 M 112.06 K Conduits And Fittings In Concrete Buildings Internally (All Provisional) 20mmø Galvanised Iron class 'B' conduits with screw joints and run at underfloor level. M 132.00 20mmø Galvanised Iron class 'B' conduits with screw joints and chased into brickwall. 50mm x 25mm underfloor trunking for power point. 75mm x 25mm underfloor trunking for computer services. M 16.78 M 56.03 M 56.03 Run at ceiling level To Collection

Measurement Rules : ELECTRICAL INSTALLATIONS CONDUIT, TRUNKING AND CABLE TRAYS R10.4 Pin racks (NO) i) type; and ii) size R11.1 Busbar Trunking (m) Clauses R.10.1 a) type; b) width; c) rated capacity; and d) method of capacity R11.2 Tap-off units, feeder units, fire barries & the like (NO)

Cable Tray

Measurement Rules : ELECTRICAL INSTALLATIONS CONDUIT, TRUNKING AND CABLE TRAYS R12.1 Trays (m) i) type; ii) width; and iii) method of jointing R12.2 Stools (NO) i) type; and ii) size R12.3 Fitting (NO and EXTRA OVER )

Cable

Measurement Rules : ELECTRICAL INSTALLATIONS CABLES R15.1 Cables (m) measured as the net length of the conduit, trunking or tray. other cable measured as fix (without any allowance for sag) between boxes, equipment control gear, fittings, accessories etc. except for final sub-circuits.

Measurement Rules : ELECTRICAL INSTALLATIONS Cables R15.2 Cables (m) i) type ii) size iii) classification CLASSIFICATION a) drawn into conduits or ducts b) laid or drawn into trunking c) laid or drawn into trunking and laced into ciucuit d) fixed to surfaces e) wrapped around pipework f) laid in trenches g) fixed to insulators in overhead lines h) suspended from catenary cables R15.4 Cable joints (NO) R15.5 Line taps (NO) i) size ii) type of cable iii) shrouds (type)

Measurement Rules : CABLE CLASSIFICATIONS Underground cable Fixed to wall Fixed in ceiling

Measurement Rules : ELECTRICAL INSTALLATIONS CABLE R15.6 Cable termination glands (NO) i) type & size of cable ii) type of gland R15.7 Conduit: boxes, adaptable boxes & the like used with cable termination glands (NO - separately) i) type ii) size of cable iii) joint-boxes, sealing boxes (type) R16.1 Components for supporting cable given in the description of the cable stating type and spacing. Alternatively, components of combination system (NO)

Measurement Rules : ELECTRICAL INSTALLATIONS CABLE R17 Connections to public mains, making good public highway and other work which may only carried out by Public Undertaking or Local Authority PROVISIONAL SUM

Measurement Rules : FINAL SUB CIRCUIT Cable (m) Final subcircuit (nos) Stating the ampere rating based on classification of point.

Measurement Rules : FINAL SUB CIRCUIT FINAL SUB-CIRCUITS R18.1 Distribution sheets and drawing showing layout shall be given. R18.2 Points (NO) i) cable & conduit installations ii) ampere rating iii) classification CLASSIFICATION a) Lighting points: one way or two way b) Socket or switch socket points c) Immersion heater points, cooker outlet points etc.

Lightning Protection System

Measurement Rules : ELECTRICAL INSTALLATIONS EARTHING R19.1 Tapes for earthing (m) i) size; ii) type; and iii) type & spacing of saddles, cleats, clip holdfasts & the like R19.2 Conductor connections & junctions (NO) i) type; and ii) size R19.4 Test clamps (NO) i) type ii) size; and iii) method of connecting

Measurement Rules : LIGHTNING PROTECTION SYSTEM Air Terminal Cooper Tape

Cadangan Membina Dan Menyiapkan Sebuah Makmal Komputer Di Sekolah Kebangsaan Sri Selangor, Petaling Jaya, Selangor. ELEMENT: ELECTRICAL SERVICES BIL KETERANGAN UNIT KUANTITI Lighting Installation-Internally (All Provisional) (Cont'd) HARGA (RM) ubb/n/04 JUMLAH (RM) 3 x 36W recessed mounted fluorescent light fitting with low loss ballast C/W acrylic diffuser 2 x 1.5mm²/1C PVC in concealed UPVC conduits with 5A switch. NO 16 3 x 36W recessed surface fluorescent light fitting with low loss ballast C/W acrylic diffuser 2 x 1.5mm²/1C PVC in concealed UPVC conduits with COOPER TAPE H 5A switch. Lightning Protection-Externally (All Provisional) NO 16 25mm x 3mm copper tape at roof including propose made copper or brass clips at 1000mm internals and connecting to roof tapes. M 29.00 Brass test clamp complete with screws. NO 2 500mm High Solid Copper air termination with formed thread complete with bronze nut and appropriate thickness copper air terminal base. NO 2 300mm x 300mm x 300mm deep concrete Earth Electrode Chamber complete with concrete cover from ground level, lightweight screed to prevent ingres of water, 16mmø solid drawn copper Earth Electrode, copper tape and 50mmø UPVC pipe. NO 2 ELECTRODE CHAMBER To Collection

Earth electrode pit Cooper strip

Measurement Rules : LIGHTNING PROTECTION SYSTEM EARTHING R19.5 Earth electrodes (NO) i) type ii) size; and iii) driving electrode into ground R19.6 Air termination points (NO) i) type ii) size; and iii) method of connecting

Measurement Rules : LIGHTNING PROTECTION SYSTEM ANCILLARIES R20 Loose keys, tools, spares and the like (NO separately) i) type; and ii) quantity Rack for holding tools (NO)

Measurement Rules : LIGHTNING PROTECTION SYSTEM SUNDRIES R22.1 Marking the position of holes, mortice, chases & the like (ITEM) R22.2 General earth bonding & earthing (ITEM) R22.3 Disconnecting, setting aside & refixing equipment (ITEM) R22.4 Temporary operating each installation (ITEM) R22.5 Testing each installation (ITEM) R22.6 Preparing plans or diagrams of the installations (ITEM)

Testing

Cadangan Membina Dan Menyiapkan Sebuah Makmal Komputer Di Sekolah Kebangsaan Sri Selangor, Petaling Jaya, Selangor. ELEMENT: ELECTRICAL SERVICES BIL KETERANGAN UNIT KUANTITI HARGA (RM) ubb/n/06 JUMLAH (RM) L Sundries Test the lighting and fitting installation described in specification. ITEM M Testing On completion of the electrical installalion test all switches switch sockets, wiring etc. and make good all defects an leave everything perfect working order to the satisfication of the S.O and TNB. ITEM To Collection

Taking Off List

TAKING OFF LISTS DOMESTIC HOUSING SINGLE PHASE 1.Main Installation - meter panel no - distribution board no - cables m - conduits no - sundries = mark holes item = general bonding item = testing item

TAKING OFF LISTS DOMESTIC HOUSING SINGLE PHASE 2. Power Installation - fitting & accessories = socket no - cables m - conduits m - sundries = mark holes item = general bonding item = testing item

TAKING OFF LISTS DOMESTIC HOUSING SINGLE PHASE 3. Lighting Installation - fittings & accessories = switch no - cables m - conduits m - final sub circuit no - sundries = mark holes item = general bonding item = testing item

TAKING OFF LISTS DOMESTIC HOUSING SINGLE PHASE 4. Electrical Appliances - fitting & accessories = switch no - cables m - conduits m - final sub circuit no - sundries = mark holes item = general bonding item = testing item

TAKING OFF LISTS DOMESTIC HOUSING SINGLE PHASE 5. Earthing System Installation - cables m - copper tape no - test clamps no - conductor connection no - earth electrodes no - air termination no - sundries = mark holes item = testing item

Heading & Description

ITEM DESCRIPTION UNIT QUANTITY MAIN INSTALLATION(EXTERNALLY) A Metering board to shop TNB kwh meter single phase complete with cut out fuse, neutral link, interconnecting cables and all necessary accessories to TNB's requirement NO 1 B 150mm diameter corrogated pipe as specified including all short running length extended beyond drain. M 12 C 100mm diameter PVC pipe complete with long bend extended beyond drain for entry of TNB incoming cable to distribution board. M 21

ITEM DESCRIPTION UNIT QUANTITY POWER INSTALLATION (INTERNALLY) A B Galvanised steel conduit with screw joint including all short running lengths, bends, tees, saddles, crampets, locknut and circular conduit box 20mm Diameter conduit chased in brickwall. 20mm Diameter conduit fixed to ceiling. M 36 M 21 C 20mm Diameter conduit embedded in floor screed. M 20

ITEM DESCRIPTION UNIT QUANTITY LIGHTING INSTALLATION (INTERNALLY) Cable A 2 x 1C-2.5mm2 PVC insulated colour coded cable as specified drawn into conduit. M 127 B Fittings and Accessories 6 Ampere 1 gang 1 way wall mounted flush type switch for light complete with PVC face plate mount to brickwall at 1200mm from finished floor level. NO 2 C Final sub-circuit of galvanised steel conduit installation of 2 x 1.5mm 2 PVC insulated cable drawn into galvanised steel conduit (m/s) in circuit comprising of 1 lighting point. NO 16

ITEM DESCRIPTION UNIT QUANTITY LIGHTNING PROTECTION INSTALLATION (EXTERNALLY) A Lightning air terminal with approved hold fasts including 25mm x 3mm copper tape and roof conductor with and including gun conductor with earth electrode. NO 1 B 25mm x 3mm bare copper tape fixed with and including cast brass saddles at one metre centres including bends, sets and saddles fix at roof. M 13 C Test clamp, size 20mm x 40mm connected to conductor, screwed to brickwall vertically. NO 2