AG-TUF Corrugated PVC Liner Panels

Similar documents
AG-TUF & AG-TUF 9 Corrugated PVC Liner Panels. Installation Guide

INSTALLATION GUIDE AG-TUF. Corrugated PVC Liner Panels.

SUNTUF Plus. Corrugated Polycarbonate Sheet with Anti-Condensation. Greenhouse Installation Guide

SUNLITE Plus. Installation Instructions for Greenhouses. Multiwall Polycarbonate Sheet with Built-in Condensation Control

Figure 1: Various Pro-Sky Skylight and Side Light Arrangements

PolyCarb has good resistance to many chemicals. Some chemicals may harm the PolyCarb sheets. Contact us when in doubt about any chemical.

SUNSKY Premium Corrugated Polycarbonate Panels

Corrugated Installation and Technical Guide

SUNTUF Corrugated Polycarbonate Panels

SUNSKY. Installation Guide. Corrugated Polycarbonate Skylight & Side Light Panels for Commercial Applications.

HOLLOW CORRUGATED SHEETS

PALDECK. Style for Life

Five Star Panel Installation Instructions

Multi-wall Polycarbonate Installation Instructions

Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement

Installation Tips. Bayer MaterialScience Makrolon multi UV multiwall sheets. multi UV

FOLDING DOOR - FOR FACTORY ASSEMBLED JAMBS WITH APPLIED SILL

extend your outdoor lifestyle

GIRTS ON BACK OF BUILDING

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS

Wave Profile Installation Guide

Corrugated Sheet. Installation Instructions

Steel Reinforced Joining Thank you for choosing Andersen. Please leave this guide with building owner.

Sheet Steel Facts. Most common head design for self-drilling, self-tapping screws.

SUNLITE Multiwall Polycarbonate Sheet

SUNLITE Technical Guide

SUNLITE. Technical Guide. Multiwall Polycarbonate Sheet.

Panel Installation Instructions

SecuAnch Roof Anchor System

GLOSSARY OF TERMS SECTION 8

KEITH PANEL SYSTEMS FUNDERMAX- MAX EXTERIOR EXPOSED FASTENER PRESSURE EQUALIZED WALL SYSTEM

Rigid and Flex Tubular Skylights Installation Instructions

40mm Thermoclick. Type II Class 1 Clear Satin Anodize - 201R1 (Mid Grade Commercial)

Installation Instructions

Chapter 16: Roof Steel

Panel Assembly and Installation

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows without Exterior Trim or Nailing Fin (JII025) ImpOrTaNT INFOrmaTION & GlOssary.

Series Sloped glazed Curtain wall. Installation Instructions

WINDOW REPLACEMENT INSTRUCTIONS FOR CASEMENT, DOUBLE-HUNG AND CLAD FRAME WINDOWS USING FRAME SCREWS

LIFE TIME. polycarbonate sheeting

Integrity Polygon and Round Top Installation and Finishing Instructions

Tuff-Rib Install Guide

Metal Roof Installation Manual. Chapter 14: Fasteners

COMPOSITE SIDING INSTALLATION GUIDE

window installation Guide wood FRaMinG New Construction

INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS

DW HORIZONTAL INSTALLATION

for Andersen 400 Series Woodwright Transom over 400 Series Woodwright Double-Hung or 400 Series Woodwright Picture Window

Non-Reinforced Joining Guide (2-Way Horizontal and Vertical Joining) for Andersen 200 Series Tilt-Wash Double-Hung and Transom Windows

Installation Instructions

lindab we simplify construction LindabSandwichPanels Installation instructions PIR Panels

SUNGLAZE. Solid Polycarbonate Standing Seam Architectural System

Installation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit.

Panel Installation Instructions

Non-Reinforced Joining Guide (1-Way Vertical or Horizontal) for Andersen 200 Series Tilt-Wash Double-Hung Windows and Complementary Products

900 SERIES WALL PANELS

INSTALLATION INSTRUCTIONS LS X 12-2 X 7 1/2 FRAME LOAFING SHED

3/ /

Table of Contents. Notes to Designer/User Map of Typical Roof Conditions Fastener Placement Fastener Selection...

Sun Windows General Information New Construction Hinged Door Installation Instructions

Installation Guide for Andersen 400 Series Tilt-Wash Transom and 200 Series Narroline Transom Windows

SUNPAL. Multiwall Polycarbonate Standing Seam Architectural System

2 ½ Corrugated Panel Installation Specifications

Pocket Door Installation Instructions

Installation Guidelines For ALUMINUM M-SERIES 3 PANEL SLIDING DOOR

Steel Reinforced Joining Guide (Horizontal / Vertical)

Inclined Roof System Trimoterm SNV

Block Frame Inovo Patio Door/Transom/Sidelite Field Mulling Instructions. simonton.com/installation. If mulling sidelites, skip to Step 5.

4. Partially open the operating panel and tilt the top toward the interior of the door (Figure 4). Lift the panel off the sill and set it aside.

Aluminum Base & Cap System Installation Guide See - Print large details specific to your installation

Sliding Glass Door Assembly and Installation Guide

INSTALLATION INSTRUCTIONS LS X 12-2 X 7 1/2 FRAME LOAFING SHED


400 SERIES VERTICAL INSTALLATION

STACKING MULTI-SLIDE DOOR SYSTEM

DYNEX SOFFIT SYSTEM. Product. Scope. Building Regulations. Appraisal No. 908 [2016] Appraisal No. 908 (2016) BRANZ Appraisals

INSTALLATION INSTRUCTIONS LS X 12-2 X 7 1/2 FRAME LOAFING SHED

PATIO INSTALLATION MANUAL

LUX INSTALLATION GUIDE. LUX Panel V Groove Installation. Installation Guide. February

Installation Guide. for E-Series/Eagle Clad Hinged Inswing French Door

Sun Windows General Information New Construction Sliding Door Installation Instructions H F

How To Install Windows: Nail-Fin Application

SUNPAL. Multiwall Polycarbonate Standing Seam Architectural System

VYTEX PREMIUM SLIDING GLASS DOOR. Table of Contents. Precautions and Safety 2. Tools Required...3. Inspect and Prepare Door...4

FABRICATION MANUAL CCM Copper Composite You discover why ALPOLIC Copper composite material (CCM) is the building material of the future as soon as

SUNLITE TWIN-WALL POLYCARBONATE SHEET CATALOGUE & INSTALLATION GUIDE. Overview. Main Benefits. Energy efficiency - High thermal insulation

HBS-AP ASSEMBLING INSTRUCTIONS

INSTALLATION GUIDE DUOFUSE SLAT WALL SYSTEM

WESTERN WAVE Panel. Vertical Installation and Technical Information

Installation Guide. for Ampelite Industrial Sheeting STD. Premium Industrial Sheeting. Industrial Grade Fibreglass. Industrial Grade Fibreglass

MTS-ACB. RENOGY Photovoltaic Module Adjustable Curved Bracket E Philadelphia St, Ontario, CA Version: 1.

WESTERN WAVE Panel. Horizontal Installation and Technical Information

Curium 19.4H Installation Instructions & Parts List

(773) INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GL OSSARY ROUGH OPENINGS

Cardo DOOR & RETURN SHOWER ENCLOSURE INSTALLATION PLEASE READ THESE INSTRUCTIONS CAREFULLY.

western window systems westernwindowsystems.com installation instructions non-pocket 2-1/4 panels

10 YEAR GUARANTEE. Vistalux corrugated sheeting is the ideal general purpose PVC sheet for roofing and cladding PVC SHEET WITH HIGH LIGHT TRANSMISSION

Steel Roofing & Siding INSTALLATION GUIDE

Read guide from beginning to end before starting installation. Read all warnings and cautions during unit installation.

Cambridge English Application Instructions

Transcription:

AG-TUF Corrugated PVC Liner Panels Installation Guide

A Profile Dimensions: Table 1 Distance between Corrugations Rib Depth Panel Width Number of Corrugations Coverage Overlap Overlap mm mm mm mm Corrugations % 76 18 1115 15 1064 1 6.8 Figure 1 B Distance Between Supports (ceiling purlins & wall girts): Table 2 Panel Thickness Theoretical Weight Ceiling Supports Distance Wall Supports Distance mm g / m 2 mm mm 1.2 2000 1200 1200 * Installations with purlin spacing greater than 1,200mm may result in increased deflection (sagging). 1. The dimensions depicted in Table 2 above do not supersede any requirements of local construction codes. Before installation, check local building codes for relevant specifications and recommendations. Follow local codes at all times. The support distances depicted are based on the typical structural properties with sheet deflection by dead load and thermal expansion factors taken into consideration, according to customary construction practice for internal lining materials. 2. The maximum recommended panel length is up to 7 m. Longer panels could be supplied on special demand. 3. Instead of longer panels, consider lapping panels to achieve desired length. (Figure: 4a Page:3). C Positioning the Panels: 1. The panels may be installed on ceilings with the corrugations parallel or perpendicular to the direction of the main supporting structure, providing the purlins are prepared as depicted in table 2, perpendicular to the corrugations. 2. When the ceiling is sloped, Palram recommends installing panels with the corrugation in the direction of the slope. 3. Never try to adapt the AG-TUF panel to a wider or narrower dimension by stretching & forcing the corrugations in or out during installation. Such an action distorts the panel, inducing undue internal stresses leading to crazing and eventual failure. 4. To minimize the possibility of warp and deformation, Palram recommends installing the panels after they have been acclimated. The panels should be stored inside the interior space in which they have to be installed until their temperature is equalized to the ambient temperature inside the structure. This way there will be no warp through drastic changes of thermal expansion/contraction. 5. When installing AG-TUF panels vertically on walls or horizontally sloped on ceilings, start installation at the bottom and work up toward the wall eave or ceiling top. Be sure to maintain the correct fastening sequence (Figure: 4d, 4e Page:3). Commence at bottom edge, at right or left side & proceed to the left (or right) and up. It is possible to start in the middle and work both ways 1

toward the ends. Never fasten both edges first and then work towards the middle; this will result in undue slack and wavy appearance. 6. Recommended method and installation steps of AG-TUF on ceilings: a. An installation crew of 5 or 6, two teams (A & B) on mobile scaffoldings, 2 workers on each, with a ground team C to prepare and hand out the lining panel for installation. The panel will be lifted by ropes either at with clamps holding the edge, or rolled into a tube. (Figure: 2) b. A plumb line P will be put up, to mark the precise starting position P and direction. (Figure: 2) c. B1 of team B will hold one end of the panel against the 1ST bottom purlin, while B2 along with team A aligns the panel along A2 the plumb-line and holds it taut, in place. (Figure: 2) A1 d. With the panel aligned and taut, B2 will fasten the panel s edge to the purlin. Next, B2 B1 with team A stationary, holding the liner edge against the last A purlin, the ground crew will push team B s tower under the subsequent purlin, the fastening process repeated and so on. (Figure: 2) C B e. The liner should always be kept flush and taut during positioning and fastening. A slack panel during installation will result in deformation and wavy appearance. f. It is also possible to begin installation in the middle of a panel and proceed to both sides. Never commence installation from both ends towards the middle. It may result in imprecise execution and undue slack. g. When more than one-length panel is required for ridge to eave, or eave to floor cladding, follow instructions in paragraph D Overlap part 1. (Figures: 4a, 4b, 4c). h. Horizontal installation on walls should work out virtually the same (with necessary adjustments). i. Vertical wall cladding can be done with team A1-A2 on a tower and ground crew C1-C2. Installation can be begin from the bottom up or vice versa. Working from the top down is more logical and easier. However, when more than one panel is required, always begin with the bottom array and proceed upward. (Figure: 3) 7. Use only approved scaffoldings, lifting devices and equipment, for safe and efficient work. 8. For safety sake, do not leave partly installed panels unattended until all the required fasteners have been placed and properly tightened. C2 Ceiling installation Figure 2 A2 A1 C1 Wall installation Figure 3 2

D Overlap: 1. End-Lap: (at panel s short edges): Minimal recommended overlap - 100 mm. Minimum distance of 50 mm from each panel edge to the centre line of the support (line of fasteners). Maximum overlap 200 mm. Always install the lower panels array first, and lap with the upper panels, so the drip down the slope or wall does not penetrate into the ceiling or wall cavity and wet the insulation. (See Fig. 4a-4e and paragraph C. 6.i.) 2. Side-Lap: One corrugation. 3. Panel s Edge Overhang: The panel s edge should not extend more than 100 mm from the centre line of edge support on both sides. Minimal extension - 50 mm. 4. Overlap Seals: In wash areas or extremely wet conditions, Palram recommends installation of butyl-rubber sealing strip along the whole length of side lap or end lap corrugations. Length Overlap Greca style shown for illustration purposes. Slope Direction 3 Width Overlap 2 Ceiling installation & fasteners positions Figure 4a A 1 5 Ceiling array installation sequence 3-4-5 Figure 4b 4 B 3 Wall array installation sequence 1-2-3 Figure 4d 2 B A Detail B Figure 4c Detail A Figure 4e 3

E Arching Radius: When lining a curved ceiling, it is possible to set the panels against a curved (concave) structure so they will arch within their range of elasticity, without inducing undue stress. The minimal radius recommended for such an arch is 4.00 m. (Figure: 5) F Wall and Ceiling Fastener Location: 1. A fastener should be installed every third corrugation valley, screwed into the centre line of each support (Figure: 6a). At sheet edges and overlaps a fastener should be used in every 2nd corrugation valley. (Figure: 6b) 2. A pre-drilled hole, 4 mm larger in diameter than the intended fastener, is recommended at every fastener location. A special self-drilling / wood screw, equipped with additional protrusions at top of screw stem, preparing a larger entry hole during insertion, can also be used (Fig 11; Available from others; Not available from Palram; Use for AG-TUF PVC panels only; Not recommended for use with polycarbonate) 3. The fasteners should be tightened by an electric screwdriver equipped with adjustable clutch, taking care not to overtighten. 4. At the side-lap, two valley fasteners should be installed at both sides of the overlapping corrugations (Figure: 9b) Minimum radius 4.00m Figure 5 Positions of ceiling/wall fasteners in regular installation without insulation. Figure 6a -1,115mm Positions of ceiling/wall fasteners at sheet edges and overlaps. Figure 6b -1,115mm G Fasteners, Washers and Gaskets: 1. For optimal long-term maintenance-free service, Palram recommends the use of corrosion resistant #12-14 x 1 fastening screw, with 19 mm washer specified by Palram with profiled EPDM rubber gasket, to fasten the panel to the supports. In wash areas, extremely wet areas, or in highly corrosive environments like pig or cattle confinement, stainless steel fasteners are recommended. Self-tapping screw Figure 7a Self-drilling screw Figure 7b Wood screw Figure 7c 2. The screw can be hex-head or pan-head Phillips, self-drilling, selftapping or wood screw, according to the type of the supports and the method of fastener installation. Each fastener will be fitted with 19 mm washer specified by Palram. 3. The screws should be tightened moderately, without deforming the washer, squashing the gasket and distorting the panel. Careful attention should be given to assure perpendicular insertion of the fasteners. (Figure: 8a, 8b, 8c) 4. Excess tightening and oblique insertion will possibly distort the panel, induce undue internal stresses, leading to fracture and cracks, eventually ending in failure. 5. Never use an impact wrench/driver for fastening AG-TUF. Tighten by hand or by an adjustable torque power screwdriver. INCORRECT Excess overtightening Figure 8a CORRECT Figure 8b INCORRECT Non-perpendicular. Figure 8c Figure 9a Figure 9b 19mm Washer/Gasket helps prevent over-tightening; provides best seal. Figure 10 4

H Handling and Storage: 1. AG-TUF panels should be transported and stored horizontally on a flat, sturdy pallet whose dimensions are equal to or larger than the panels themselves. The panels should be secured and fastened to the pallet. It is possible to store panels of smaller dimensions on top of larger panels of the same type. (Never store long panels on top of smaller ones!) 2. In case it is necessary to store the pallet outdoors, cover it with a white opaque polyethylene sheet, cardboard, or other suitable materials that do not absorb or conduct heat. The total area of the pallet should be covered. 3. To minimize the possibility of warp and deformation, Palram recommends installing the panels after they have been acclimated. The panels should be stored inside the interior space in which they have to be installed until their temperature is equalized to the ambient temperature inside the structure. This way there will be no warp through drastic changes of thermal expansion/contraction. Storage of sheets. Figure 12 I Cutting: 1. It is possible to cut AG-TUF panels with a circular saw, using a blade intended for hardwood or a special one for plastics, rotating at a high speed. Advance the saw at a slow feed rate. Palram recommends cutting a few panels stacked together, for cleaner cuts and smaller risks of breaks and rough edges. 2. It is possible to use an electric jig saw, a handsaw or sheet-metal shears for local or limited cropping, especially for curved lines or complex cuts. 3. In any case, it is important to support the panels in the vicinity of the cut and clean away the dust and debris generated by cutting. J Drilling: Cutting the sheet. Figure 13 1. Drilling should be carried out with a drill bit intended for metal. The pre-drilled hole diameter should be 4 mm greater than the diameter of the fastening screw. Support the panel in the vicinity of the drilling. Clear away the dust generated by the drilling before the insertion of the screws. 2. Attention should be paid to drill the required holes perpendicular to the face of the panel. 90 o Drilling the sheet. Figure 14 K Chemical Resistance: (Compatibility to environmental chemicals, sealants and adhesives) 1. AG-TUF panels are resistant to a wide variety of chemicals and display limited resistance to others. A third group of chemicals may attack and damage the panel. The degree of damage will depend on he severity of attack and the duration of exposure. 5

2. In case of doubt consult the list of chemical resistance of PVC to various chemicals, depicted in Palram publications, to find out if there is any risk to the liner. 3. Materials not on the list, which have not received the Manufacturer s explicit approval, may harm the panel and void all warranties and responsibility of the manufacturer for the performance of AG-TUF panels! 4. Your local distributor can provide additional information and forward materials for evaluation of their compatibility with AG-TUF panels. L Sealing and Bonding: 1. Silicone sealants: Palram strongly recommends the use of tested and approved sealing, bonding and adhesives materials that may be required. For a list of sealants that have been tested and approved, download a list of Chemical resistance of Palram PVC products at: http://www.palram.com/ag-tuf 2. Other silicone sealants and sealing, bonding or adhesives materials should be referred to Palram or its distributor for evaluation and approval before use. 3. Obscure sealing or bonding materials should be referred to Palram or its distributor for evaluation and approval before use. Unapproved materials may chemically attack the AG-TUF, resulting in failure and voiding any and all warranties. 4. Corrugated closure strips are used to stop entry of water, wind, insects or small animals through the openings above or below the edges of the installed sheets. The closure between the sheet and edge purlins or top trim is done by an AG-TUF profile contoured closure strips. The strips are held in place by the sheet fastening screws. They are made of cross- linked expanded polyethylene (XPE). (Figure: 15a) 5. In wash areas or extremely wet conditions butyl-rubber sealing strips should be used along the side & end-laps of AG-TUF sheets, to prevent moisture penetrating the wall or ceiling cavities. (Figure: 15c) Shaped foam polyethylene (PE) sealing strip. Figure 15a Slope direction Approved Sealant Silicone sealant. Figure 15b Butyl rubber sealling strip. Figure 15c WARNING Do not use sealing or bonding materials that are not approved specifically by Palram. Expanded polyurethane is not recommended for use in AG-TUF Installation. Extensive use of this material will render the sheets fragile at the area of contact through mechanical bond effect. When in doubt, consult your Palram Distributor. 6

PALRAM H.Q. Tel: +972 4 8459900 Fax: +972 4 8444012 palram@palram.com PALRAM EUROPE LTD. Tel: +44 1302 380777 Fax: +44 1302 380788 sales.europe@palram.com PALRAM UK Tel: +44 1302 380738 Fax: +44 1302 380739 sales.uk@palram.com www.palram.com 85923-12.2017 In as much as Palram Industries has no control over the use to which others may put the material, it does not guarantee that the same results as those described herein will be obtained. Each user of the material should make his own tests to determine the material s suitability for his own particular use. Statements concerning possible or suggested uses of the materials described herein are not to be construed as constituting a license under any Palram Industries patent covering such use or as recommendations for use of such materials in the infringement of any patent. Palram Industries or its distributors cannot be held responsible for any losses incurred through incorrect installation of the material. In accordance with our company policy of continual product development you are advised to check with your local Palram Industries supplier to ensure that you have obtained the most up to date information. 1996 Palram Industries Ltd. PALRUF is a registered trademark of Palram Industries Ltd.