INSTALLATION. Installation Guide. Installing Bamboo Flooring on Top of a Wood Subfloor

Similar documents
INSTALLATION GUIDE FOR MAZAMA MULBERRYWOOD HARDWOOD FLOORING

INSTALLATION GUIDE. Preparation

INSTALLATION GUIDE. Preparation The environment

INSTALLATION GUIDE. Preparation. Subfloor Preparation. Installation of Vapour Barrier Paper (asphalt-free) Model repair and maintenance kit

INSTALLATION GUIDE SOLID HARDWOOD FLOORING

TORLYS LEATHER PLANK INSTALLATION INSTRUCTIONS

Engineered Hardwood Flooring Installation Instructions

Installation and Warranty

TONGUE & GROOVE NAIL-DOWN INSTALLATION INSTRUCTIONS

INSTALLATION. GlUElEss CliCK BamBoo installation GUidE. Introduction. Tips for a successful installation

For ANGLE-DROP Styles

Installation Instructions for Engineered Wood Flooring

Installation Instructions for Viking Hearth Engineered Wood Flooring

AquaGuard - Water Resistant Flooring Installation guidelines

SINCE 1995 HYBRID / LOFT / MANOR LINE INSTALLATION GUIDE

INSTALLATION INSTRUCTIONS of Chevron and Herringbone Engineered Hardwood Flooring

ENGINEERED WOOD INSTALLATION GUIDE: The Cardinal Collection

Installation Guide. When purchasing Aboeda flooring, add 5%-15% to actual square footage needed for cutting allowance.

SOLID STRAND BAMBOO INSTALLATION GUIDE. Tips for a successful installation

WOODLOC STAPLE DOWN INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS FOR ELKALAMINATE. IN ORDER TO OBTAIN A GOOD RESULT, WE ADVISE TO FOLLOW ALL GIVEN INSTRUCTIONS CAREFULLY.

Wood Molding Installation Guide

Engineered Strand Uniclic Floating Installation

INSTALLING YOUR UNICLIC FLOOR - Small planks / 3 sizes

Prior to installation, the installer assumes all responsibility for final inspection and quality of the product

STOP BEFORE YOU START

¾ Solid Installation Instructions

READ PRIOR TO BEGINNING INSTALLATION

DuChâteau Vinyl DeLuxe Grand Collection LuxCor Click Installation Instructions

FITTING INSTRUCTIONS FOR OFD SOLID OAK FLOORING

For best results, it is essential that you follow the installation instructions exactly.

Solid Installation Guidelines Elegance Plyquet

INSTALLATION INSTRUCTIONS

B e l l e F l o o r INSTALLATION GUIDE INSTALLER/OWNER RESPONSIBILITY

Royal Collection. Installation Guidelines

Engineered Hardwood Installation

INSTALLATION INSTRUCTIONS FOR QUICK-STEP LAMINATE WITH HYDROSEAL TECHNOLOGY.

Engineered Hardwood Installation

V3 Engineered Flooring- Installation Instructions

Installation Instructions FOR INTERLOCKING ENGINEERED HARDWOOD (P.1)

WOOD INSTALLATION GUIDE

INSTALLATION INSTRUCTIONS FOR QUICK-STEP LAMINATE.

INSTALLER / OWNER RESPONSIBILITIES

Lifestyle Laminates Uniclic Floating Floor

Landscape Collection

installation Prefinished 3/4 solid (including various widths such as 3 1/4, 3 5/8, 4 3/4, 5 ) naildown installation instructions

Columbia Laminate Installation Instructions

SolidClassic 1/6. Warranty Installation Maintenance 35-YEAR WARRANTY

Zenterra TM Installation Guide

General Installation Instructions

Pompeii Birch & Hickory Engineered Hardwood Flooring Installation Instructions

INSTALLATION. Installer / Owner Responsibility. Basic Tools and Equipment. Putty and Filler Use. Recommended Installation Methods

Nail-Down Installation Instructions Prefinished 3/4 and 5/8 solid

INSTALLATION INSTRUCTIONS FOR QUICK-STEP LAMINATE WITH HYDROSEAL TECHNOLOGY.

Engineered Strand Bamboo Flooring

IMPORTANT NOTES ABOUT YOUR FLOORING PLEASE READ BEFORE INSTALLING INSTALLATION & MAINTENANCE FOR ENGINNERED HERRINGBONE

ARTISTIC FINISHES. The Artistic Touch TM. Installation and Maintenance Guide. Copyright 1999 Artistic Finishes, Inc. All rights reserved.

¾ Solid Hardwood Flooring Installation Information

Exterra Installation Guide

Wall Installations. Chapter 16 Wall Installations 16. 1

English Professional Installation Guidelines

BOIS CHAMOIS VINTAGE HARDWOOD FLOORING

1. Read all instructions/warranty first: Get all your questions answered before you start installing the floor by calling

LATITUDES 6.5 INSTALLATION & MAINTENANCE INSTRUCTIONS HARDWOOD

INSTALLATION INSTRUCTIONS

Please read and review installation instructions completely before proceeding with the actual installation.

TRIVERSA TRIVERSA ID. Triversa Triversa ID Installation Instructions. Remove the wall base and doorway trim. Always undercut wood door casings

INSTALLATION GUIDELINES

INSTALLATION INSTRUCTIONS

ENGINEERED TONGUE & GROOVE INSTALLATION INSTRUCTIONS 3/8, 7/16, 1/2, 9/16, 5/8, 3/4 Float-In / Glue-Down / Nail Down

INSTALLATION LAMTON INSTALLATION INSTRUCTIONS. Lamton Laminate Flooring with Underlay Attached Glueless Installation. Tools and Accessories

INSTALLATION INSTRUCTIONS FOR ENGINEERED WOOD

Engineered Installation Instructions

Please Read All Instructions, Carefully, Before You Begin Installation. Improper Installation Will Void Warranty

WoodTrac Direct Mount Ceiling System

Installation Guide. Pionite Decorative Surfaces One Pionite Road, Auburn, Maine PIONITE ( )

Carmel Bay & Touch of Euro Engineered Floors - Installation Instructions

Loose Lay Luxury Vinyl Plank

Laminate Floor Installation Guide

3/9 HANDLING AND STORING LOCATION TOOLS AND MATERIAL REQUIRED ABOUT INSTALLATION

Installation Manual. Installation for Solid OAK Flooring: Before Installation

PRO CYCTM PRO CYC, INC. SYSTEM 1.5 FS

INSTALLATION INSTRUCTIONS Bamboo floors

Logs End Installation and Maintenance Information

CFS Engineered Flooring Floating Installation Instructions

Install your floor between 18 and 30 C.

INSTALLATION, STORAGE AND WALL CONSTRUCTION DETAILS

GREEN WORLD LUMBER GENUINE MAHOGANY DECKING INSTALLATION GUIDE

INSTALLATION INSTRUCTIONS ECOfusion 1/2 & 3/8 Engineered Hardwood Flooring

TOOLS AND/OR ACCESSORIES NEEDED: NAIL/STAPLE-DOWN INSTALLATION

Installation Instructions

Artisan World Imports Terre Verte 1/2 Engineered Hardwood Installation Instructions

Engineered Prefinished & Unfinished Flooring

Installation, Care, Maintenance Windsor Park

Hudson Dresser [1] Hudson Dresser Published on Ana White ( Submitted by dan-k [2] on Fri, :43 [1]

installation PreFinished 3/8, 1/2 and 9/16 engineered staple, glue-down and Floating installation instructions

Laying instructions Installation of multilayer Herringbone / Basket-weave with tongue and groove joint.

Quest ¾ and 5/8 Solid Installation Instructions

Galaxy SPC RIGID-CORE UNICLIC HYBRID PLANK. Installation Guidelines

Linear Open Style Suspended Ceiling Installation Guide

Transcription:

READ COMPLETELY BEFORE STARTING INSTALLATION. Congratulations on choosing Yanchi bamboo flooring. Please take time to read the following procedures before you begin installation. With the correct installation of this flooring, following the precautions in this guide, this natural product will give you many years of satisfaction. Yanchi bamboo flooring is manufactured to standards that permit a variance in thickness, width, and length of no more than 0.25mm (that is less than 0.01 inch). While quality control procedures at the factory ensure that very few defective boards are delivered to the consumer, the owner/installer of this bamboo flooring is responsible for the final inspection. Claims cannot be made for defective boards after they have been installed. Installing Bamboo Flooring on Top of a Wood Subfloor Important Notices - Read the Warranty carefully before installing the product. - All installed strips will be considered accepted by the installer and/or homeowner. - Before you order flooring, make sure you add at least 5% to the actual area size you are going to cover. The industry standard for allowable small defects, mismilling or misgrading is 5 %. Installation Requirements - Gypsum joints must be completed and dried. - Concrete work must have been completed at least 45 days prior to installation. - The heating system must be functional and the building must be heated up to 21 C (70 F) for a minimum of 7 days immediately prior to installation. - The relative humidity of the building must be between 40% and 45%. - Plywood humidity (subfloor) must not exceed 12%. - Subfloor thickness must be a minimum of ¾ - Particle boards or chipboards must not be used as the subfloor. Before Installing It is important to acclimate this product for at least 15 days. To properly acclimate, move the product into the rooms where they will be installed. Ensure the carton is open and raised off the ground. - Make sure the subfloor (plywood) is properly attached to the joists to avoid creaking. - Correct slight irregularities on the subfloor with a sander. - All the nails and screws of the subfloor must be driven in properly. - Remove baseboards and doorsills. - Cut 2cm (9/16 ) off the bottom of the doorframes to insert the strips underneath them. - Vacuum the subfloor regularly during installation to make sure it is always clean and dust free. - A vapor barrier or felt paper (#15) placed between the subfloor and the strips will help keep the humidity content of the flooring more stable. - 1 ¼ minimum length, 15-gage nails, or staples are recommended to fasten the floor. Page 1

Tools and Accessories Required - Measuring tape - Miter saw - Square - Sawhorse - Chalk line - Handsaw - Hammer - Vacuum cleaner - Crowbar - Drill and drill bits - Safety goggles - Nail punch - Level - Hardwood hammer (manual or pneumatic) and rubber hammer - Other tools and accessories may be necessary depending on site configuration and type of installation. - Locate the longest wall of the room where the product will be installed. This wall must be perpendicular to the joists. The flooring strips must be installed perpendicularly to the joists. - Allow for a 13mm to 19mm (1/2 to 3/4 ) expansion joint between the wall and the flooring strips. This joint will be hidden by a baseboard or quarter round. - Draw a guide line with a chalk line. The guide line must be parallel to the wall. Calculate its distance from the wall as follows: expansion joint + strip flooring width + tongue width. - Nail the first row by drilling holes on top of the strips first. The holes must be drilled 13mm (1/2 ) from the side of the strip and 25cm (10 ) from center to center. Also, drill holes on top of the tongue at a 45 degree angle. Using spiral roll shank nails, fix the first row of strips making sure you are aligned with the chalk line. Use a nail punch to hide the nails properly. - For the second row, drill holes on top of the tongue at a 45 degree angle and nail it with spiral roll shank nails. Use a nail punch to hide the nails properly. - To end a row, cut the strip at the correct length and use the remainder of the strip to start the next row. Do not forget to leave sufficient space for the expansion joint at the end of each row. - Make sure you carefully choose the strips to avoid aligning the end joints with those of adjacent rows. A minimum of 15cm (6 ) must be allowed to avoid aligning the end joints. - Install subsequent rows using the hardwood hammer while respecting the rules for alignment joints and expansion joints. Nail the strips every 6 to 8. - When installing the last 4 or 5 rows, use of a hardwood hammer will not be possible because of the proximity of the adjacent wall. Proceed in the same way as you did for the second row at the beginning of installation. - You may have to cut the last row lengthwise. Fix it in the same way you did for the first row, that is, from the top. - Once installation of the strips is completed, use a touch-up pen to fill nail holes and correct other imperfections. Page 2

- Install baseboards and doorsills. - Vacuum once again. Spray some flooring cleaner on a mop and clean your floor. Installation is now complete. Practical Tips - Installation of a factory-finished, hardwood floor requires more care than a conventional floor to prevent damaging the floor s finish during installation. Frequent use of a vacuum cleaner during installation is highly recommended to eliminate sawdust and wood chips. - Place your tools on the plywood or on a piece of cardboard rather than directly on the hardwood floor. - Verify frequently that the hardwood hammer works properly and make sure its base is clean. If the base is damaged or rough, place tape underneath it to protect your floor s finish. - To better hide the expansion joint around the room, cut the gypsum so that the wood can use that space as an expansion joint. - Make sure the hardwood hammer is resting properly against the side of the strip before nailing. Inadequate positioning may damage the strips. - If a nail is not driven in completely, use a nail punch and a conventional hammer. - Save remaining strips after installation and store them in a proper place for future repairs. Maintenance - Use non-wax flooring cleaner to keep your floor in good condition. Use of conventional, domestic cleaners may permanently damage your floor s finish. - Never clean your hardwood floor with a wet mop or cloth. Water and wood are natural enemies. - Do not wax your hardwood floor. - Vacuum your floor frequently to eliminate the presence of solid particles (such as sand) which may damage and/or scratch your floor. - Place protective felt underneath your furniture to protect your floor. Clean the felt regularly and replace it when necessary. - When moving heavy furniture (fridge, piano, etc.), place a thick rug underneath furniture legs before moving Installing Bamboo Floors on Top of a Concrete Subfloor Important Notices - Read the Warranty carefully before installing the product. - All installed strips will be considered accepted by the installer and/or homeowner. - Before you order flooring, make sure you add at least 5% to the actual area size you are going to cover. The industry standard for allowable small defects, mismilling or misgrading is 5 %. - The adhesive has to be a 100% Urethane-based product. - The adhesive manufacturer s installation instructions are to be followed. Installation Requirements - Gypsum joints must be completed and dried. - Concrete work must have been completed at least 45 days prior to installation. - The heating system must be functional and the building must be heated up to 21 C (70 F) for a minimum of 7 days immediately prior to installation. - The relative humidity of the building must be between 40% and 45% - Refer to the adhesive s installation instructions to find the allowable moisture level of the concrete. Page 3

- Maximum acceptable floor variation is 1/8 in 10 feet. Before Installing It is important to acclimate this product for at least 15 days. To properly acclimate, move the product into the rooms where they will be installed. Ensure the carton is open and raised off the ground. - Correct slight irregularities on the subfloor. - Remove baseboards and doorsills. - Cut 9/16 off the bottom of the doorframes to insert the strips underneath them. - Vacuum the subfloor regularly during installation to make sure it is always clean and dust free. Tools and Accessories Required - Measuring tape - Miter saw - Square - Sawhorse - Chalk line - Handsaw - Vacuum cleaner - Crowbar - Safety goggles - Level - Trowel - Other tools and accessories may be necessary depending on site configuration and type of installation. - Locate the longest wall of the room where the product will be installed. - Allow for a 9/16 expansion joint between the wall and the flooring strips. This joint will be hidden by a baseboard or quarter round. - Draw a guide line with a chalk line. The guide line must be parallel to the wall. Calculate its distance from the wall as follows: expansion joint + strip flooring width + tongue width. - To end a row, cut the strip at the correct length and use the remainder of the strip to start the next row. Do not forget to leave sufficient space for the expansion joint at the end of each row. - Make sure you carefully choose the strips to avoid aligning the end joints with those of adjacent rows. A minimum of 15cm (6 ) must be allowed to avoid aligning the end joints. - You may have to cut the last row lengthwise. Fix it in the same way you did for the first row, that is, from the top. - Install baseboards and doorsills. - Vacuum once again. Spray some flooring cleaner on a mop and clean your floor. Installation is now complete. Page 4

Practical Tips - Installation of a factory-finished hardwood floor requires more care than a conventional floor to prevent damaging the floor s finish during installation. Frequent use of a vacuum cleaner during installation is highly recommended to eliminate saw dust and wood chips. - Place your tools on the plywood or on a piece of cardboard rather than directly on the hardwood floor. - To better hide the expansion joint around the room, cut the gypsum so that the wood can use that space as an expansion joint. - If a strip presents too much color variation or a minor defect, put it aside and use it in a less visible area such as a closet. You can also cut a defective strip and use it to start or end a row. - Save remaining strips after installation and store them in a proper place for future repairs. - Remove adhesive from surface of the floor as soon as possible. Maintenance - Use non-wax flooring cleaner to keep your floor in good condition. Use of conventional, domestic cleaners may permanently damage your floor s finish. - Never clean your hardwood floor with a wet mop or cloth. Water and wood are natural enemies. - Do not wax your hardwood floor. - Vacuum your floor frequently to eliminate the presence of solid particles (such as sand) which may damage and/or scratch your floor. - Place protective felt underneath your furniture to protect your floor. Clean the felt regularly and replace it when necessary. - When moving heavy furniture (fridge, piano, etc.), place a thick rug underneath furniture legs before moving Page 5