TREX SIGNATURE (Formerly Reveal) PANELS Installation Instructions

Similar documents
TREX REVEAL RAILING Installation Instructions

TREX SIGNATURE (FORMERLY REVEAL) RAILING Installation Instructions

TREX REVEAL RAILING Installation Instructions

HOW TO INSTALL HORIZONTAL ROD RAILING TREX SIGNATURE STANDARD

HOW TO INSTALL HORIZONTAL ROD RAILING TREX SIGNATURE STANDARD

RAILING R A IL ING 51

TREX ENHANCE RAILING (Also Applies to Trex Select Railing) Installation Instructions

TREX TRANSCEND RAILING

TREX SELECT RAILING Installation Instructions

TREX SELECT RAILING. Installation Instructions PARTS

Level Railing. Installation Guide. v2.5 W W W. S O L U T I O N S A L U M I N U M. C O M

Classic Vinyl Stair Railing. Installation Guide

TREX POST MOUNT DECKING AND CONCRETE

2x Bottom Bracket. 1x Rail Support STEP 1 STEP 2

T r e x Art i s a n Se r i e s Railing

INSTALLATION INSTRUCTIONS PRAVOL DURA-SHIELD COMPOSITE DECK RAILINGS

IMPORTANT: Read all sections before you start

CXT PRO RAILING INSTALLATION INSTRUCTIONS For Installations Using Aluminum and Glass Balusters Sold Separately

AFCO-Rail Post INSTALLATION INSTRUCTIONS AFCO-RAIL POST

Horizontal Cable Systems

DekPro Prestige Aluminum Rail System Level Railing Installation Instructions

**MOUNTING YOUR MONITOR

Ready-To-Assemble VersaRail INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS GUIDE

RAILING. Installation Guide

Installing the Nantucket (100 Series), Manhattan (200 Series), and Charleston (300 Series) Code-Approved Rail Systems

INSTALLATION INSTRUCTIONS. Level Rail With Cap: Page 2 Level Rail Without Cap: Page 8 Stair Rail: Page 12

Installation of Balustrade Systems

PVC Composite Railing & Stair Kit

YUKON PATIO COVER INSTALLATION INSTRUCTIONS

FLAT PANEL CART WITH OR WITHOUT A PULL OUT SHELF

General Guidelines:

RAILING R A IL IN G 57

ATLANTIS RAIL Contact Information

INSTALLATION MANUAL VERANDA REGENCY RAILING WITH METAL BALUSTERS. Model # SEC17 RW U8 W/MTL KD SEC17 RWS U8 W/MT KD

ALUMINUM RAILING INSTALLATION INSTRUCTIONS. 1) Check Contents Of Packages: Verify that all parts have arrived and that they match the packing list.

Frameless Inline Door QCI5288

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

Installation Instructions

Installing AZEK Evolutions Rail

Fortress Al Posts must always be secured to the deck framing. Fortress Al Posts should never be attached to only the deck boards.

PORCH RAIL INSTALLATION INSTRUCTIONS. Level Rail... 2 Stair Rail... 8 Care & Maintenance, Finishing... 15

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

Oxford Stalls Installation Instructions

Post & Rail Crossbuck

W1209 1/2 10 X 12 SOLARIUM ASSEMBLY INSTRUCTIONS

tile redi redi DOOR Redi Swing SERIES: CONFIGURATION: MOUNTING PACKAGE:

Leveling Foot RB210. Leg Extender RLT66

MODERN PERGOLA INSTALLATION GUIDE. When only the best will do.

3. Use base plate as template (see FIG. 4-1) to mark location for fasteners.

ALUMINUM RAILING INSTALLATION INSTRUCTIONS. 1) Check Contents Of Packages: Verify that all parts have arrived and that they match the packing list.

INSTALLATION MANUAL VERANDA ENCLAVE RAILING. Model # SEC17 EW R15 PRE W/H SEC17 EW R15 KD W/HW SEC17 EWS R13 KD W/H

RUN-IN SHED INSTRUCTIONS

Walk-in Configurations

X 12 SOLARIUM ASSEMBLY INSTRUCTIONS Two or more adults required for assembly

Fireball Fab Welded Baluster Insert Panel System Installation Instructions

W1610 1/2 10 X 16 SOLARIUM ASSEMBLY INSTRUCTIONS Assembly by more than one person is suggested.

POST INSTALL INSTRUCTIONS

Installation Guide. Capped Cellular PVC Fencing. Table of Contents. Storage and Handling Tools Needed Fence Layout and Locating Posts

ASSEMBLY INSTRUCTIONS 10 X14 HIGGINS HARDTOP GAZEBO ITEM# L-GZ212PST-4

Horizontal Cable Systems

CAUTION: Before opening the crate place it flat on its side (not up right as show in the photo) Hardware included for assembling your gazebo:

PARTS INCLUDED IN FIXED STAIR CABLE RAIL KIT:

Fortress Al HOME posts must always be secured to the deck framing. Fortress Al HOME posts should never be attached to only the deck boards.

Figure 1. RAILING INSTALLATION The following instructions describe the installation of three types of railing sections: Line, Stair, and Angled

Vinyl Gazebo Instructions

Tape Measure Carpenter s Square Touch-up Paint Chalk Line. Blue 242. Template

v1.0 ASSEMBLY GUIDE Mia Wide Bookcase

W X 12 SOLARIUM ASSEMBLY INSTRUCTIONS Two or more adults required for assembly

Figure 1.2 Figure 1.3

Assembly Instructions 10 X 10 Aluminum Roof Support

Aluminum Railing Gate Kit

installation care & maintenance instructions lifecycledecking.com 25-year limited residential warranty 20-year limited commercial warranty

rmoire Materials Hardware

Post & Rail. Includes: Crossbuck, 2-Rail, 3-Rail and 4-Rail POST SUPPORT OPTIONS

Installation and Assembly: 32" - 60" Flat Panel TV Cart

W1610 1/ X 16 SOLARIUM ASSEMBLY INSTRUCTIONS Two or more adults required for assembly

Sliding Pocket Door Systems

Installation Guidelines

Installation Instructions for. Before You Begin TOOLS REQUIRED

Stair Parts Installation. Tricks

SHADOWBOX INSTALLATION FOR: Standard 6 H x 8 W Shadowbox Fence 5 x 5 Routed Posts Dog Ear or Straight-Edge Pickets 1.75 x 3.5 Rail

Gambrel Barn with Overhang Manual

COACT MEDIA UNIT ASSEMBLY WITH X9 OPEN SHELF STORAGE OPTION PART # INSTALLATION INSTRUCTIONS

PORCH COMPANY PVC PANEL AND DECKORATOR RAILING

x16 GAZEBO ASSEMBLY INSTRUCTIONS

Dorian Triple and Quad Instructions Installation Instructions

Installation Instructions for. Handrail Component System

Tools Required. Bench Hardware. Bench Parts. Planter Hardware. Planter Parts. BENCH/PLANTER INSTALLATION GUIDELINES for

Regency Railing. Rail Installation Instructions

Please read BOTH these Installation Instructions and the General Towing Instructions before attempting to install or operate this equipment.

Shetland Stalls Installation Instructions

The following instructions will guide you through the installation of your new vinyl railing stair kit.

x12 GAZEBO ASSEMBLY INSTRUCTIONS

Please read BOTH these Installation Instructions and the General Towing Instructions before attempting to install or operate this equipment.

RadianceRail Installation Guide

12 X 15 SOLARIUM ASSEMBLY INSTRUCTIONS

PRIVACY INSTALLATION FOR: Standard 6 H x 8 W Privacy Fence 4 x 4 Post Sleeve & Brackets Dog Ear or Straight-Edge Pickets 1.75 x 3.

COMPOSITE RAILING INSTALLATION

Installation Instructions for Fortress Pure View Railing Panels with Universal (UB) Brackets and Iron Posts

Transcription:

(Formerly Reveal) PANELS NOTES:» SIGNATURE RAILINGS ARE DESIGNED TO BE ATTACHED WITH POSTS INSTALLED AT A CLEAR SPAN OF 6' (.8 M) OR 8' (.44 M).» IF INSTALLING AT EXACT SPAN LENGTHS OF 6' (.8 M) OR 8' (.44 M), AND USING POST-TO-POST CONFIGURATION, THE BOTTOM RAIL WILL NOT NEED TO BE CUT, BUT THE TOP RAIL WILL NEED TO BE MEASURED AND CUT.» IF INSTALLING AT EXACT SPAN LENGTHS OF 6' (.8 M) OR 8' (.44 M), AND USING CROSSOVER POST CONFIGURATION (SPANS FROM ONE CROSSOVER POST TO ANOTHER CROSSOVER POST), BOTH THE BOTTOM RAIL AND TOP RAIL WILL NOT NEED TO BE CUT.» IN ADDITION, AT ALL FINAL END POST CONFIGURATIONS, TOP RAIL WILL NEED TO BE MEASURED AND CUT.» SEE INFORMATION WITHIN DETAILED INSTRUCTIONS FOR MORE INFORMATION. PARTS H TOOLS NEEDED H A I C B J G G N D K L E F F M NOTES:» Trex Assembled Signature Panels DO NOT come with foot blocks. You must purchase foot blocks separately. SKU BKALFTBLK (one per panel required on spans greater than 6', see note below***).» Trex Assembled Signature Panels DO NOT come with brackets and screws. You must purchase the horizontal rail hardware separately. SKU BKFHBKTAL (one per panel). A. Signature upper rail cover* - 6' (actual length 7-/" [867 mm]) - 8' (actual length 97-/" [477 mm]) B. Signature Panel (includes top and bottom railings and square balusters) C. Crossover bracket cover (supplied with crossover post) D. Signature crossover post** - 6" (actual length 4-/" [876 mm]) - 4" (actual length 40-/" [09 mm]) E. Signature foot block*** F. Signature post skirt or post sleeve skirt** G. Signature post** -/" - 6" (actual length 7" [940 mm]) - 4" (actual length 4" [09 mm]) or Trex 4x4 post sleeve** - 6" (actual length 9" [99 mm]) - 4" (actual length 45" [4 mm]) H. Signature post cap or post sleeve cap** I. Signature upper rail bracket and cover J. Signature lower rail bracket and cover K. Trex decking L. Code-approved wood joist " x 8" (5 mm x 0 mm) or larger M. Trex Fascia N. Code-approved wood rim joist " x 8" (5 mm x 0 mm) or larger * Covers are slightly longer to accommodate crossover post applications. ** Item not included in Signature Panel kits. Both 4" x 4" (0 mm x 0 mm) and 6" x 6" (5 mm x 5 mm) post sleeves are designed to fit over 4" x 4" pressure-treated post. *** Required ONLY for all clear span applications over 6' (.8 m) when fixed baluster is centered or unsupported spans greater than 5' (.5 m). For example, if an 8' (.44 m) panel is cut into a 5-/' (.68 m) section, it would require a footblock due to the off-center placement of the fixed baluster. NOTE: If installing 4" (067 mm) railing, and using pressure-treated posts with Trex post sleeves, ensure that a longer pressure-treated post is used along with longer post sleeve, both cut to a height of 46" (68 mm) from decking surface. 800 BUY TREX TSP-6

(Formerly Reveal) PANELS BRACKET HARDWARE HORIZONTAL APPLICATIONS (INCLUDING HORIZONTAL SWIVEL BRACKETS) HORIZONTAL RAILING HARDWARE AA. Lower rail bracket BB. Lower rail bracket cover CC. Upper rail bracket cover DD. Upper rail bracket AA BB CC DD FOOT BLOCK COMPONENTS EE. Foot block base FF. Foot block support FF EE HORIZONTAL SWIVEL HARDWARE GG. Swivel base HH. Horizontal swivel bracket top rail II. Horizontal swivel bracket top rail cover JJ. Horizontal swivel bracket bottom rail cover KK. Horizontal swivel bracket bottom rail LL. Swivel base cover II HH GG NOTE: For measurements and detailed horizontal swivel hardware installation instructions, please see Trex.com or the complete installation guide. JJ LL KK 800 BUY TREX TSP-6

HOW TO INSTALL PANELS Attach Brackets Using Signature Posts TIP: Use a clamp to help hold brackets in place while fastening with screws. a -/" (8 mm) " Post (5 mm) b -/8" (5 mm) -/" Post (64 mm) Attach Brackets Using Pressure-Treated Posts and Post Sleeves TIP: Use a clamp to help hold brackets in place while fastening with screws. 5-7/8" (48 mm) 6 a. When using " (5 mm) post, for both post-topost and post-to-crossover post configurations, measure -/" (8 mm) up from top of post base plate (or -7/8" [48 mm] from decking surface). Mark with light line. b. When using -/" (64 mm) post, measure -/8" (5 mm) from top of post base plate or -7/8" (48 mm) from decking surface. Mark with light line. -5/8" (89 mm) or 8-5/8" (98 mm) 5. Measure -7/8" (48 mm) up from deck surface to bottom of bracket. Slide skirt up to allow for proper measurement, then push skirt back down onto surface of decking BEFORE ATTACHING BRACKET. Mark with light line. 6. Center lower bracket on post above the marked line and attach using two " (5 mm) wood screws (provided). 7-5/8" (89 mm) or 8-5/8" (98 mm) 8. Center lower bracket on post above the marked line and attach using two self-tapping screws (provided).. Measure up -5/8" (89 mm) for 6" (94 mm) tall railing or 8-5/8" (98 mm) for 4" (067 mm) tall railing from top of lower rail bracket. Mark with a light line. 4. Center upper bracket 4 on post below marked line and attach using () self-tapping screws (provided). 7. Measure up -5/8" (89 mm) for 6" (94 mm) tall railing or 8-5/8" (98 mm) for 4" (067 mm) tall railing from top of lower rail bracket. Mark with a light line. 8. Center upper bracket on post below marked line and attach using three " (5 mm) wood screws (provided). NOTE: Upper bracket is not required on crossover post configuration. 800 BUY TREX TSP-6

(Formerly Reveal) PANELS HOW TO INSTALL PANELS/CONTINUED How to Measure and Cut Bottom and Top Railings of Signature Panel (When REQUIRED) Cutting Top Rail Option : For Post-to-Post Configuration a KEY KEY Mark Cut Top rail Standard post Standard post /4" /4". Position panel between posts and align with bottom bracket. Align center baluster with middle of span between posts (this will allow for equal spacing between end balusters and each post). Mark bottom and top rail at each end. NOTE: If the end balusters fall too close to the brackets, the center point can be adjusted one baluster to the left or right to allow more room. Cutting Bottom Rail KEY KEY Mark Cut a. Using a saw equipped with a non-ferrous metal blade, cut each end of top rail /4" shorter than mark to allow for fit into top rail brackets. Cutting Top Rail Option : For Post-to-Crossover Post Configuration b KEY KEY Mark Cut Top rail Crossover post Standard post Bottom rail (9 mm) /4" /4" /4". Using a saw equipped with a non-ferrous metal blade, cut each end of bottom rail and bottom rail insert /4" shorter than mark on each end to allow for fit into bottom rail brackets. b. Top rail must be cut differently on each side of the rail. Railing side that attaches to standard post should be cut /4" shorter than the mark to allow for fit into top rail bracket. Railing side that attaches to the crossover post should be cut (9 mm) LONGER than the mark to allow for fit into the crossover post bracket. 4 800 BUY TREX TSP-6

HOW TO INSTALL PANELS/CONTINUED Cutting Top Rail Option : For Crossover Post-to-Crossover Post Configuration c KEY KEY Mark Cut Top rail Crossover post Crossover post Install Signature Panel 6 7 (9 mm) (9 mm) 6. Break or cut the bottom tab off the bottom brackets. 7. Put a dab of silicone in the basket of the bottom bracket to prevent rattle. c. Cut each end of top rail (9 mm) LONGER than the mark to allow for fit into the crossover post bracket on each side. 8 4 Top rail (9 mm) (9 mm) 8. Place panel in bottom and top brackets. 9 0 4. Using razor knife or other cutting tool, cut rail insert (9 mm) FROM EACH SIDE. 5. Mark and cut top rail cover same length as 5 top rail for all top rail configurations. 7/64" (.8 mm) 7/64" (.8 mm) 9. For post-to-post configuration, fasten upper rail to each bracket by installing screws diagonally through upper rail into bracket using two self-tapping screws each side (provided with bracket kit). 0. For crossover post configuration, fasten upper rail to crossover post by installing screws diagonally through upper rail into post using two self-tapping screws each side (provided with bracket kit). NOTE: Pre-drilling is recommended (7/64" [.8 mm] drill bit) for attachment of railing to bracket. 5 800 BUY TREX TSP-6

(Formerly Reveal) PANELS HOW TO INSTALL PANELS/CONTINUED 4 Signature post 5 Post sleeve. Attach upper rail cover to upper rail by aligning cover on one side of rail. Then starting from one end of rail, snap cover onto opposing slot working down length of rail. A rubber mallet may facilitate the fastening, using GENTLE tapping. 4. Attach post caps to Signature posts (use of rubber mallet may be required for secure attachment). 5. Attach post caps to post sleeves using external grade PVC construction adhesive. 6. For crossover post configuration, attach 6 crossover post cap to crossover post. Attachment of Bracket Covers, Skirts, and Caps Signature post. Attach corresponding bracket covers over opening in upper and bottom rails.. Attach provided post skirt to bottom of posts when using Signature posts. 6 800 BUY TREX TSP-6

HOW TO INSTALL FOOT BLOCKS PANELS Attachment of Foot Block (Required ONLY for All Clear Span Applications Over 6' [.8 m] ) NOTE: Pre-drilling is recommended (/8" [ mm] drill bit) for attachment of base.. After attached, use a rubber mallet along with scrap piece of wood to tap foot block until it locks into place.. To ensure correct location, place foot block under center of bottom rail. Mark to provide placement location of base.. Place base (smaller side facing down) on decking surface. Attach base of foot block using one screw at an angle through base and into decking. 800 BUY TREX 7 TSP-6

(Formerly Reveal) PANELS NOTES 8 800 BUY TREX TRP-06