A1000 ALPHA and A1200 ALPHA Meter Installation Instructions. General. Installation. For A1000 ALPHA Type R, A1000 ALPHA Type C, and A1200 ALPHA Meters

Similar documents
A1800 ALPHA meter special installation instructions DANGER

ALPHA meter. General. Installation instructions IL S

4S, 5S, 5A, 6S, 6A, 8S, 9S, 10S, 10A, 26S, 29S, 35S, 35A, 36S,

Planning and Installing the EnergyAxis System Starter Kit. Introduction. Related Documents

INSTRUCTION LEAFLET IL17537B F FRAME IQ ENERGY SENTINEL TM INSTALLATION INSTRUCTIONS FOR F FRAME IQ ENERGY SENTINEL TM

Series NRX with PXR - Instructions for Neutral Current Sensor Type NF

INSTRUCTION LEAFLET IL17553B IQ UNIVERSAL POWER SENTINEL TM INSTALLATION INSTRUCTIONS FOR THE IQ UNIVERSAL POWER SENTINEL TM INTERNAL CT

Grid Radar Installation Manual

COOPER POWER SERIES. External application of a motor start capacitor on a single-phase voltage regulator. Voltage Regulators MN225063EN

Magnum low voltage drawout circuit breaker IEC horizontal stab cassette shutter kit (double wide A cassettes)

TAG5000 WIRELESS PHASER. Instruction Manual HD ELECTRIC COMPANY 1475 LAKESIDE DRIVE WAUKEGAN, ILLINOIS U.S.A.

COOPER POWER SERIES. Upgrade instructions for CL-6 series control firmware. Voltage Regulators MN225071EN

Copyright 2014 by Minarik Drives

G7K. Latching Relay. Compact Mechanical Lock Latching Relays with Manual Buttons. Model Number Structure. Ordering Information

Energy Meters for DIN Rail Mounting Electric energy meter WS0101, WS0102,WS1102 WS0301, WS0302,WS1302

An American Control Electronics Brand PCM4 SERIES USER MANUAL PCM4.

99 Washington Street Melrose, MA Fax TestEquipmentDepot.com # # AAC Clamp Meter. Instruction Manual

Mini Receiver. Off Peak System Control. Operation & Installation Guide for Power Line Carrier WARRANTY. (Applicable to Software Version

User Guide. Digital AC/DC Clamp Meter Model 38394

Ordering Information. Stepping Relay Unit G9B. Model Number Legend

User s Guide. Digital AC/DC Clamp Meter Model 38394

User Guide. AC/DC Mini Clamp Meter. Model Introduction. Large 3 3/4 digit LCD display with 40 segment bargraph

Pen Multimeter. Model

Oberebenestrasse Bremgarten Switzerland Tel Fax

Addendum to Instructions for Installation, Operation and Maintenance of Digitrip 3000 Protective Relays

X80 Activator. User's Manual. Version 1.1.

User s Guide. Model MA A AC Mini Clamp-on Meter

A1800 ALPHA Meter Family. Product Bulletin PB A

PHASE ROTATION METER. Operating and Instruction Manual. a n d A C C E S S O R I E S

CSM_G7S-_-E_DS_E_7_1

BC145 SIGNAL ISOLATOR BOARD

User s Guide. MultiView Series Digital MultiMeters Models: MV110 MV120 MV130

SIR, RADAN and UtilityScan are registered trademarks of Geophysical Survey Systems, Inc..

DIGITAL SOUND LEVEL DSM8930 METER USER S MANUAL. Please read this manual carefully and thoroughly before using this product.

WSA 8 BOX RELE Installation Manual

34134A AC/DC DMM Current Probe. User s Guide. Publication number April 2009

M2/M2A AC-DC Power Supply Operator s Manual

200Amp AC Clamp Meter + NCV Model MA250

STAFF User Manual. Manual Part #

Video Door Phone Door Station and Indoor Station. User Manual UD03871B

G70R-SOC08 CSM_G70R-SOC08_DS_E_2_1

Ordering Information. Ratchet Relay G4Q. Plug-in Models. Model Number Legend

LX Series Part-Sensing Light Screen

Installation and Operation Manual MSI. Multi-Sensor Interface Hub. Interface Module for all Sensors Network and Wireless CAUTION

Earth Fault Indicator EFI-BLZ-50 User Manual

PM-311x Quick Start Ver PM-311x introduction 1.1. Caution & Warning 1.2. Product Warranty & Customer Support

PREMIER INSTALLATION AND OPERATING INSTRUCTIONS

Pen Multimeter. Model

INTELLIMETER REGISTER

Introduction DIN rail mounted electricity meters

Model 9302 Amplifier-Discriminator Operating and Service Manual

Glass Electrode Meter

E3X-DRT21/SRT21/CIF11

Radio Remote Controls Manual K Series

COOPER POWER SERIES. Slip-On bushing current transformer kits KA712L1S, KA712L2S, KA712L3S, and KA712L5S installation instructions and technical data

Effective November 2017 Supersedes May 2017

Delta Meter. ABB Cewe

Single Flex and Double Flex Couplings (i)

Arc Sensor User Manual

80i-600A AC Current Probe

Model DB Disc Caliper Brake AIR CHAMP PRODUCTS. User Manual. (i) MTY (81)

CM605. User Manual AC/DC LOW CURRENT CLAMP-ON METER ENGLISH

User s Manual. MiniTec TM Series. Model MN26 (Model MN26T includes temperature probe) Mini Autoranging MultiMeter

Model 935A Current Source Operation Manual

HHMA2 DC / TRUE RMS AC NON-CONTACT MILLIAMMETER

Model 9305 Fast Preamplifier Operating and Service Manual

WARNING: Do not work around outlets while the power is on. Do not stick fingers or tools into an electrical box while the power is on.

00108/00110 INSTRUCTION MANUAL

3 Shielded Compact Ribbon (SCR) Wiremount Plug, XX, and Shell Kit, F200-XXX

Independent Technology Service Inc Independence Ave. Chatsworth, California Toll Free:

INSTRUCTION MANUAL LKG 601 Electrical Safety Analyzer

TRMS LEAKAGE CURRENT CLAMP-ON METER 565

Rev /13 SSRMAN-1B SERIES USERS MANUAL SSR INTELLIGENT BURST FIRING CONTROL COPYRIGHT 2013 NUWAVE TECHNOLOGIES, INC.

User's Manual. Clamp-on Power Datalogger. Model

USER S MANUAL PROCESS CONTROL MODULE PCM3

Installation Instructions

Pre-wired Photomicrosensor with Amplifier and Cable EE-SPW321/421 Compact, Thin-profile Photomicrosensor with special amplifier.

Broadband Current Probe Series Operation Manual

True RMS AC / DC Power Clamp Meter Model

SAFE USE &OPERATIONS MANUAL

OPERATING INSTRUCTION

IC800SSD Hardware Manual Pub 348R5. for models. A publication of

MODEL 3810/2 Line Impedance Stabilization Network

Model Number Structure

Digital Panel Meter K3TE. Model Number Structure. Model Number Legend. Easy-to-use, Low-cost Digital Panel Meter that Accepts DC Input K3TE

AC/DC True RMS Power Clamp Meter ELECTRONIC TEST INSTRUMENTS MODEL 325

INSTRUCTION MANUAL LKG

Single-phase Current Relay

INSTRUCTION BOOK FOR. IDEA Screen & Panoramic for Nureva Span

PRODUCT SAFETY SOLUTIONS MODEL HWI-01. Model HWI-01 Serial Number:

DL102 Counter Loop Amplifier

Radio Remote(s) (Installation Manual)

WEL-200 O P E R A T I N G I N S T R U C T I O N S W I R E L E S S E D G E L I N K

LUDLUM MODEL 182 RADON FLASK COUNTER. June 2011 Serial Number PR and Succeeding Serial Numbers

DM-46 Instruction Manual

Nashville Etagere/Bookcase

WORLD-BEAM QS18AFF200 Sensors with Foreground Suppression

MY-GS CSM_MY-GS_DS_E_2_1

Installation & Operation Manual SAGA1-K Series Industrial Radio Remote Control

CDT. Service and Installation Manual. Manual Revision Oct 2014

Transcription:

January 003 IL4-401B A1000 ALPHA and A100 ALPHA Meter Installation Instructions For A1000 ALPHA Type R, A1000 ALPHA Type C, and A100 ALPHA Meters General This leaflet contains general installation instructions for 4 wire and 3 wire applications of the A1000 ALPHA and A100 ALPHA polyphase meters. All meters are factory calibrated and tested before shipment. For proper installation, accuracy, and maximum life of the meters, use the following installation procedures. For more information about the operation of the meter, see the appropriate technical manual: A1000 ALPHA Meter Technical Manual (TM4-390D or later) A100 ALPHA Meter Technical Manual (TM4-398A or later) Installation Dangerous voltages with high current capabilities are present Use authorized utility procedures to install and service metering equipment. Equipment damage, personal injury, or death can result if safety procedures are not followed. Make sure the meter being installed matches the service type, system voltages, and maximum load current. Installing a mismatched meter can result in severe damage to the meter or the service installation. A1000 ALPHA and A100 ALPHA meters are not intended for use with phase shifting transformers. The meter voltage inputs have a common internal to the meter, which can result in equipment damage if used with phase shifting transformers. To ensure proper operation of the meter, consider the following items before installation: 1 Plan the meter installation. Make sure the service type, voltage, and load current are compatible with the meter ratings before installing the meter. The meter is mounted to a vertical surface using three mounting screws. Use sufficiently large screws so that the meter will be securely mounted. When mounting, consider the force that will be exerted by the service connecting wires. Š One screw engages the meter hanger (1 or in Figure 1) at the top of the meter. Š The two bottom supporting screws are positioned on both sides of the meter terminal block (7 in Figure 1). 3 Set the mounting height of the meter so that the LCD ( in Figure 1) is at (or slightly above) average eye level. This is the optimal viewing position for the LCD.

IL4 401B January 003 To install the meter 1 Make sure that the meter hanger ( in Figure 1) is in the desired position. Sliding the hanger down to the hidden position ( in Figure 1) will hide the top supporting screw. Use at least an M6 screw for the top supporting position and hang the meter on it, making sure that the meter is vertical. Moisture resistance and LCD visibility are best when the meter is vertical. 3 Use at least an M6 screw in each of the bottom supporting screw positions ( in Figure 1) to secure the A100 ALPHA meter; the bottom supporting screw slots are 6.0mm wide. Before wiring the meter into the power circuit, use authorized utility procedures to install proper ground connections on all appropriate VT and CT secondary circuits. Also, be certain that CTs on energized lines are securely short circuited either with Elster Electricity circuit closing test switches or with properly installed conductors. Dangerous voltages can be present. Equipment damage, personal injury, or death can result from improperly grounded metering transformer circuits. 4 Install the system ground connections. 5 Make sure that primary or system voltages are either disconnected or that utility safety practices for handling live circuits are strictly followed. 6 Make sure that any current transformers are de energized with no high voltage primary voltage connected to their primaries and no primary current circulating through them. If primary current and voltage are present in the current transformers, it is extremely important to verify that safety shorting connections are in place on all secondary winding connections before handling CT connections to the meter. CT connected A100 ALPHA meters are designed for use with copper wiring only. Direct connected A1000 ALPHA and A100 ALPHA meters may be used with copper or aluminum wiring. When using aluminum wiring, it is extremely important to use proper aluminum wiring practices. Aluminum wiring compound or paste (grease) should be used when attaching the bottom connected terminals. Tighten the connections, allow them to relax for a few minutes, and then tighten them again. This will minimize the cold flow effects of aluminum cable. Failure to observe correct practices for installing aluminum wiring could lead to overheating of the terminals, equipment failures, or damaging fires. Where possible, it is recommended to use special wiring adapters which are designed to make the conversion from copper compatible meter terminals and aluminum wire. Such adapters also can provide for use of larger aluminum conductors that can otherwise be used in the terminals of the A100 ALPHA meter. 7 Wire the meter using labeled or color coded wire that complies with local electrical codes or applicable specifications. Examples of wiring diagrams are shown either on the nameplate, under the terminal cover, or in the meter s technical manual. Maximum wire size and required clamp screw torque are shown in the following table: Meter Maximum wire size Screw torque Direct connected AWG #1 or 35 mm 1.7 -m or 41 oz inches CT connected AWG #5 or 16 mm 1. -m or 170 oz inches

January 003 IL4 401B Sustained operation at currents near the meter s rated current causes some heating in the main terminal connections. Much of this heat is dissipated through the meter service wiring. The wire connected to the main terminals must be properly rated for the service current and voltage. Conductor size and insulation ratings (voltage and temperature) must be considered. Direct connected A100 ALPHA meters include voltage disconnect and voltage test terminals. On CT connected A100 ALPHA meters, the voltage disconnect terminals are not used. Also, on CT connected A100 ALPHA meters, the voltage test terminals are used for internal meter wiring and are not available for testing. Do not loosen or disturb the voltage test terminals on CT connected meters. Failure to observe this caution can result in equipment malfunction. 8 On direct connected meters, check that the three voltage disconnect links ( in Figure ) are closed. The meter is shipped from the factory with the voltage disconnect links closed and the screws tightened to 0.18 to 0.4 -m (5 to 34 ozinches) torque. The links are closed when the link screws are positioned to the left (when facing the meter as shown in Figure ). 9 Install and seal the wiring cover ( in Figure 1). Seal at least one of the wiring cover screws ( in Figure 1). 10 Apply power to the meter and load. Verify that the meter is installed correctly by following the Initial Setup on page 6. 3

IL4 401B January 003 1 3 1 4 Id.! 11 A1 0 0 Serial #: 0000 01300 3 10V/08V 40V/415V - 3 5(100) A, 50 Hz, Cl. 1 I T : 5 0 0 0 I mp /kw h ( kv A Rh ) ( L E D T M) I K : 5 0 I mp /kw h( kvarh ) (S0) L1 L L3 T1 T T3 T4 TM +Q -P +P -Q Cf g BOI Dl Ov 1000 Imp/kWh 1000 Imp/kVArh 5 5 10 7 8 6 7 8 9 Figure 1. A100 ALPHA meter (A1000 ALPHA meter is similar) Callout Description 1 Meter hanger (shown extended) Meter hanger (hidden) 3 Liquid crystal display (LCD) 4 Push button (A1000 ALPHA Type C and A100 ALPHA meters only) 5 Meter cover screw (can be sealed) 6 Test light emitting diode (LED) 7 Bottom supporting screws (under wiring cover) 8 Wiring cover screws (can be sealed) 9 Wiring cover (long wiring cover shown) 10 External DC power source connector (optional) 11 ameplate 1 Optical port 4

January 003 IL4 401B 1 8 5 7 3 6 9 4 Figure. A1000 ALPHA Type C and A100 ALPHA direct connected meter base assembly Caption Description 1 L1 L3 voltage disconnect links (shown closed) Tariff input terminals 3 S0 output terminals 4 eutral terminals (3 element meters only) 5 Voltage connections for meter testing 6 L1 L3 main terminals 7 Location of auxiliary terminal block cover (not shown). Tariff Inputs The A100 ALPHA meter can perform tariff control using its internal real time clock. However, if using the real time clock is not desired, the A100 ALPHA meter can receive tariff control information from an external clock or signaling device. A1000 ALPHA meters receive tariff control information only from an external clock or signaling device. Using external signaling, the A1000 ALPHA and A100 ALPHA meters implement up to 4 tariffs, depending on the meter type and configuration. The operating tariff is selected based on the electrical inputs to the meter tariff inputs. An external timer or communication device controls tariff selection by applying AC control voltages to the optically isolated tariff inputs. Each input can be separately activated or deactivated. The voltage specification is 100 to 40 VAC ±0%. Single tariff meters do not respond to the tariff inputs. Energy is registered to the total registers. The tariff registers are not used. Two tariff meters use input terminal 13. Three tariff and four tariff meters use input terminal 13 and input terminal 33. Terminal 15 is the common terminal for both tariff inputs. Terminal numbers for tariff inputs are shown on the meter wiring diagram and on the auxiliary terminal block cover. 5

IL4 401B January 003 S0 Relay Outputs The A1000 ALPHA and A100 ALPHA meters include one or two solid state S0 relay outputs, depending on the meter type and configuration. The S0 relay outputs can be used in the following ways: energy quantity pulse outputs indication of the beginning of demand internal (BOI) indication of the overload condition As a pulse output, each relay can be separately assigned to one of the meter s configured energy quantities. The energy quantity assignment, and pulse rate for each output, are configurable using meter support software. The pulse rate should be selected as appropriate for the size of the metered load and capability of the pulse receiver. When configured as a BOI indicator, the relay remains closed for the first 1% of the interval time. The S0 relay outputs are each optically isolated SPST solid state relay contacts. The contact ratings are 7 VDC and 7 ma maximum per IEC 6053-31. The common terminal (40) must be connected to the negative side of the external DC control source. The numbering of the S0 output terminals is listed in the following table: Output relay function Terminal number Overload condition indication 36 BOI indicator 37 +P, P 41 -P 4 +Q, Q 43 -Q 44 Common connection for terminals 36 to 44 40 Battery Installation or Replacement Multi tariff A100 ALPHA meters are typically shipped with the battery installed and connected. If the battery was requested to be shipped disconnected, separately, or as a replacement, see the A100 ALPHA Meter Technical Manual for procedures on installing and removing the battery. Serial Communication Port A100 ALPHA meters may be equipped for remote communication using RS-3 or RS-485. See the A100 ALPHA meter technical manual for information on how the RS-3 or RS-485 port is configured. The connector wiring is shown on the meter nameplate. Initial Setup After installing and powering the A1000 ALPHA or A100 `ALPHA meter, verify the following items: All phase indicators are present. Three element meters should display L1, L, and L3. Two element meters should display L1 and L3. The appropriate tariff indicator matches the state of the external tariff control device. The test LED on the front of the meter pulses. This depends on the magnitude of the load and the energy quantity assigned to the LED. The energy direction indicators indicate the correct direction of energy flow. Typically, the Æ (+P) arrow will be on. 6

January 003 IL4 401B Check the LCD for any indication of an error. Š If the error indicator remains on (not flashing), the meter installation should be checked for wiring errors. Depending on the meter program, the installation test may be performed when the meter is powered up or when alternate mode is entered (or both). Š If the error indicator is flashing, there is a meter error. A meter with a flashing error indicator must be removed from service and returned to Elster Electricity for repair or replacement. Required meter seals are installed. If the tariff control is by real time clock, check the date and time. If the meter is CT connected, check or set the transformer factor (using meter support software) if this item is included in the display list. Record as necessary such information as the meter s identification number, location, and initial readings. Display Quantity Identifier Error Indicator Power/Energy Unit Identifier Phase Indicators Tariff Indicators Id.! L1 L L3 T1 T T3 T4 Cursor Indentifiers +Q -P +P -Q Display Quantity Energy Direction Indicators Figure 3. Liquid crystal display 7

IL4 401B January 003 Wiring Diagrams Direct Connected The A1000 ALPHA and A100 ALPHA meters can be ordered for direct connected service. Figure 4 shows an example of a direct connected 3 element wiring diagram. Figure 5 shows an example of a direct connected element diagram. Refer to the wiring diagram on the nameplate of each meter for specific terminal assignments. All connections are equipped with combination head screws that accept either a slotted or Phillips screwdriver. L3 L1 T1/ T3/4 +A +R L L or L3 L1 1 3 5 8 4 6 7 9 10 11 1 13 15 33 41 40 43 Com + - + L1 L L3 Figure 4. Example of Three Element, Four Wire Wye or Four Wire Delta L1 L L3 T1/ T3/4 +A +R L3 or L1 1 3 5 4 6 7 8 9 13 15 33 41 40 43 Com + - + L1 L or L3 Figure 5. Example of Two Element, Three Wire Delta or Three Wire etwork CT Connected The following wiring diagrams only apply to the current transformer connected A100 ALPHA meter. Figure 6 shows an example of a delta transformer connected two element wiring diagram. Figure 7 shows an example of wye transformer connected (sequential) three element wiring diagram. Figure 8 shows an example of wye transformer connected (symmetrical) three element wiring diagram. Refer to the wiring diagram on the nameplate of each meter for specific terminal assignments. All connections are equipped with combination head screws that accept either a slotted or Phillips screwdriver. 8

January 003 IL4 401B T1/ T3/4 +A +R 1 3 1 3 5 7 8 9 13 15 33 41 40 43 Com + - + L I E 1 3 L O A D Figure 6. Example of Two Element, Three Wire Delta Transformer Connected T1/ T3/4 +A +R 1 3 1 3 4 5 6 7 8 9 11 13 15 33 41 40 43 Com + - + 1 L I 3 E L O A D Figure 7. Example of Three Element, Four Wire Instrument Transformer, Sequential Connection 9

IL4 401B January 003 T1/ T3/4 +A +R 1 3 1 3 4 5 6 7 8 9 11 13 15 33 41 40 43 Com + - + L I E 1 3 L O A D Figure 8. Example of Three Element, Four Wire Instrument Transformer, Symmetrical Connection 10

1000 I mp/kwh 1000 I mp/kvarh January 003 IL4 401B Mounting Dimensions The A1000 ALPHA Type R meter, A1000 ALPHA Type C meter, and A100 ALPHA meter have the same mounting dimensions. 66 3 Id.! L1 L L3 T1 T T3 T4 +Q -P +P -Q TM Cfg BOI Dl Ov A100 Serial #: 000 3 10V/08V - 3 40/415V 5(100) A, 50 Hz, Cl. 1 I T : 5000 Imp/kWh (kvarh) (LED TM) I K : 50 Imp/kWh (kvarh) (S0) 198 76 6 150 170 80 Figure 9. Mounting dimensions (in mm.) 11

IL4 401B January 003 otes DISCLAIMER OF WARRATIES AD LIMITATIOS OF LIABILITY There are no understandings, agreements, representations, or warranties either express or implied, including warranties of merchantability or fitness for a particular purpose, other than those specifically set out by any existing contract between the parties. Any such contract states the entire obligation of the seller. The contents of this document shall not become part of or modify any prior existing agreement, commitment, or relationship. The information, recommendations, descriptions, and safety notices in this document are based on Elster Electricity, LLC experience and judgment with respect to operation and maintenance of the described product. This information should not be considered as all-inclusive or covering all contingencies. If further information is required, Elster Electricity, LLC should be consulted. o warranties, either expressed or implied, including warranties of fitness for a particular purpose or merchantability, or warranties arising from the course of dealing or usage of trade, are made regarding the information, recommendations, descriptions, warnings, and cautions contained herein. In no event will Elster Electricity, LLC be responsible to the user in contract, in tort (including negligence), strict liability or otherwise for any special, indirect, incidental, or consequential damage or loss whatsoever, including but not limited to: damage or loss of use of equipment, cost of capital, loss of profits or revenues, or claims against the user by its customers resulting from the use of the information, recommendations, descriptions, and safety notices contained herein. Elster Electricity, LLC Raleigh, orth Carolina USA +1 800 338 551 (US toll free) +1 919 1 4800 support@us.elster.com www.elsterelectricity.com *IL4-401B* 003 by Elster Electricity, LLC All rights reserved. Printed in the United States.