Modification of the der processing WING 50 A with stepped edge glazing and 3M tape

Similar documents
Vertical Slider Section Detail

Aluminium Window Scheme to BS4873 & PAS24:2016

Updates Interior compensation of varying infill thicknesses. THERM + V curtain walls

ASS 70 FD folding/sliding door installation guide

For Installer. Duration Windows. Assembly Guide Durafold 1000

Curtain Wall Installation Guide

ASS 70 FD folding / sliding door. Installation Guide

Block Frame Inovo Patio Door/Transom/Sidelite Field Mulling Instructions. simonton.com/installation. If mulling sidelites, skip to Step 5.

INSTALLATION INSTRUCTIONS

*** All chrome surfaces should be cleaned using a clean damp cloth. *** No abrasive cleaning agents or materials should be used.

INSTALLATION GUIDE SLIMLINE ROOF LANTERN 4 PANE CONFIGURATION

C-Series & S-Series Classic Frame with Transom (Single or Pair)

3-LITE PATIO DOOR INSTALLATION INSTRUCTIONS

FIXED FLAT ROOFLIGHT: INSTALLATION INSTRUCTIONS (Double & triple glazed)

PRODUCT MANUAL. November A product of crealco WISPECO. Aluminium. creative aluminium

4. Partially open the operating panel and tilt the top toward the interior of the door (Figure 4). Lift the panel off the sill and set it aside.

. crealco V I S TA F O L D B O T T O M R O L L E R F O L D I N G D O O R Index Legal Disclaimer 4 Profile Identification 5-7 Hardware Identification 8

173.1 INTRODUCTION SERIES 453 RESIDENTIAL DOUBLE-HUNG WINDOW INTO FRAMING. Australian Registered Design. Design Features :

Side Light Frame Pack Assembly Instructions

Sliding Door Enclosure. Telephone Cleaning. Please retain this manual after installation for future reference and maintenance.

Hawko LED Flex & Accessories Installation Instructions

Kestrel Aluminium Systems Limited. Product Manual Section 11 Thermal Framing System - Fabrication. Manual Version

THE PLACEMENT OF ALUMINIUM PROFILES IN THE FRAME VIEW FROM THE FRONT SIDE 2

SMART SYSTEMS VISOGLIDE+ INSTALLTION GUIDE

Side Light Frame Pack Assembly Instructions

FITTING INSTRUCTIONS

9/16" (14mm) 1/2" (12mm)

Exploded View PAGE 2 OF 9

Extrusions GB-3-IN01. Updated: Scale: REV: - This Drawing is Protected by Copyright Altus NZ Ltd.

ALLORA SWING PANEL INSTALLATION INSTRUCTIONS

Curium 19H Installation Instructions & Parts List

Series 8 Bifold door/shower wall

Piazzola Pergola Awning Manufacturing and installation guide

SIG Awning / Casement / Fixed Lite 100

Allora ALCOVE ENCLOSURE INSTALLATION BEFORE INSTALLATION CHECK THAT YOUR ALLORA SHOWER ENCLOSURE SYSTEM IS UNDAMAGED

Fold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE

INOVO 2-LITE SLIDING PATIO DOOR

Installing the Profile Privacy Panel. Assemble top mounting bracket. Prerequisites. Tools

Metal & Vinyl, Flush Mount and Recessed Fin Windows Recommended Installation Instructions

Liniar Window. installation guide

Installation Instructions for Vista Air Vertically Folding Walls

Kestrel Aluminium Systems Limited. Product Manual Section 22 TB Commercial Door. Manual Version

THERMO-FIT REPLACEMENT WINDOW INSTALLATION INSTRUCTIONS (BRICKMOULD / NO NAILING FLANGE)

Contemporary 3 Panel Classic 5 Panel French Panel

western series 9500 f loor load The Volume Program window systems westernwindowsystems.com bi fold installation instructions

INSTALLATION INSTRUCTIONS

14000 Series. Fabrication and Installation Instructions

Installation Instructions

1200 SERIES 2 PANEL DOOR rev.1 DETAILED INSTALLATION INTRUCTIONS

46, 66, Page /01/17

40mm Thermoclick. Type II Class 1 Clear Satin Anodize - 201R1 (Mid Grade Commercial)

Installation Instructions

UNIDOOR-X TUB DOOR TUB DOOR INSTALLATION NSTRUCTIONS. MODEL #s D58580-##

B A T H R O O M G L A S S

6400, 8400 and 9400 Series Sliding Patio Door

VINYL REPLACEMENT WINDOW INSTALLATION STANDARDS

IMPORTANT INSTALLATION GUIDE VALENCIA ANGLE CORNER SHOWER READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION

14000 Series. Fabrication and Installation Instructions

GENERAL INSTALLATION GUIDELINES

Traditional Undermount: S Method (Undermount):

1Woodwright Insert Windows

Xenon 05 Installation Instructions & Parts List

GENERAL INSTALLATION GUIDELINES

aluminium profile system

Storefront Installation Guide

Integrity Polygon and Round Top Installation and Finishing Instructions

Heavy Wall Applied Stop Tube Frame and Door Installation

Double Frameless Swing Door QCI5247

Installation Guide. Evolve bi-fold. 8. Door restrictor- optional p9. 1. Before you start p2. 9. Adjustment. 2. Measuring and surveying p2

patio door installation guide

2300 BI-FOLD INSTALLATION GUIDE

series 9500 top load bi4fold installation instructions

4-lite Patio Door. Installation Instructions

Fireball Fab Welded Baluster Insert Panel System Installation Instructions

Curium 19.4H Installation Instructions & Parts List

Installation Instructions

(Non Handed Kits) Slotted Hand Screwdriver. Power Driver & Bits. Work Gloves

Chapter 12 - Windows and Doors

SECTION 19: Endwood Fusion Welded Gate Installation Guide

Frameless Heavy Glass Door with Wall Mount Hinges

RV Entry Door OEM INSTALLATION MANUAL

Installation Guide 1

Hardware Fitting Accessories Door Seals

Platinum Swing Panel Installation Instructions

400 Series Woodwright Insert Windows (2005 to Present)

Air-supply elements. Air-supply elements MGE Flanged plate (p. 5-3) M12-1/4" (p. 5-4) Longitudinal end connector (p.


Portofino Installation Guide

NORMAN SHUTTERS INSTALLATION INSTRUCTIONS. 4 Sided Z Frame. (Inside Mount - 2 panel) Getting Started

Manufacturing and installation instruction. Solidare Verso. Pergola awning (bottom mounted)

Alessi Installation Guide - vjun16

Side and rear window, assembly overview

Sliding Glass Door Assembly and Installation Guide

Chevy Tahoe Utility Vehicle

Installation Instructions

Titan - Double Skin Steel Partitioning. Installation Pack

WALL SHELVING SYSTEM 250/750

Connector Technology, Shelf Supports Connection Fittings

Frameless Door QCI5284

Before installation, check your local and state requirements for this type of install.

Transcription:

WING 50 SK / 50 A insertion windows Modification of the der processing WING 50 A with stepped edge glazing and 3M tape At the version WING 50 A with stepped edge glazing and 3M tape the processing of the fixation of the hinges was revised or rather the external hinges were extended with the insertion no. 224569. Due to this the current drilling jig no. 228478 was replaced by the new one, no. 228479, because the installation depth of the external hinges was shifted from the corner to the inside for 7 mm (the insertion would have been collided with the corner connector). The processing of the version WING 50A with stepped edge glazing and sealant adhesion stays as ever, but the drawing was splittet. The processing has been completed with the drawing V50A - 1056. Moreovere the processing drawings of the assembly angles (V50A - 9010, V50SK - 9000 and V50SK - 9010) have been completed with an assembly information. Please find all important information on the following pages which will be considered in the next revision of the documents as well as in LogiKal. Article Material Surface No. PU Drilling jig - - 228479 1 pce(s) for turn hinges in the sash profile no. 204112. Article Material Surface No. PU Insertion sash aluminium mill finished 224569 2 pce(s) for WING 50 A-S with 3M- adhesion in the sash 204112. for hinge intenfification for sash profile no. 204112.

Profile processing Processing of sash- and outer frame profiles for hinge WING 50 A-S Two-part sash / fixation screwing glazing beads D, K, KL for sash profile 204110 Pan head tapping screw DIN 7985 M5x8 Tx25 (not included in the set) Profile recess for fitting; must take place prior to assembly of the sash frame. 7985 M5x8, drive Tx25 FAM = External sash dimension For side-hung window models (see detail Z ), the sash must be secured against sagging in the hinge after calculation by the installation of a pan head tapping screw DIN 7985 M5x8 (not included in the set). Cutting and screwing of glazing beads after glueing of the pane! The load transfer takes place via the glazing shims 227080 to 227090 (see also shimming instruction V50A-4100). These must be glued in prior to screwing in the glazing beads. 3 screws each have to be inserted in the areas of the glass load transfer! (see detail Y ). Cutout on the outer frame order of work steps: cutting of profiles (together) 1. cutout of the elongated holes in the outer frame 2. cutout length 56 mm in PA-profile 3. cutout length 96 mm in PA-profile Distribute the hinges symmetrically sash for hinge 7982-ST4.8x19 drive Tx25 sash for glass carrier profil 230075 T3.9x13 drive PH2 Contact edge for drilling jig 228467 Drill in front of the sash frame screw fastener! For top-hung and side-hung windows, seal the cutouts with adhesive tape (e.g. 3M TM 341 aluminium adhesive tape) corner angle assembled condition V50A-1052

Profile processing Processing of sash- and outer frame profiles for hinge WING 50 A-S Two-part sash / fixation screwing glazing beads D, K, KL for sash profile 204112 Pan head tapping screw DIN 7985 M5x8 Tx25 (not included in the set) Cutout on the outer frame order of work steps: cutting of profiles (together) 1. cutout of the elongated holes in the outer frame 2. cutout length 56 mm in PA-profile 3. cutout length 96 mm in PA-profile Profile recess for fitting; must take place prior to assembly of the sash frame. Distribute the hinges symmetrically 7985 M5x8, drive Tx25 FAM = External sash dimension For side-hung window models (see detail Z ), the sash must be secured against sagging in the hinge after calculation by the installation of a pan head tapping screw DIN 7985 M5x8 (not included in the set). Cutting and screwing of glazing beads after glueing of the pane! The load transfer takes place via the glazing shims 227080 to 227090 (see also shimming instruction V50A-4100). These must be glued in prior to screwing in the glazing beads. 3 screws each have to be inserted in the areas of the glass load transfer! (see detail Y ). Assemble the insertion no. 224569 only at the external hinges, for execution as side-hung or bottom-hung windows. sash for hinge 7982-ST4.8x19 drive Tx25 sash for glass carrier profil 230075 T3.9x13 drive PH2 sash for the security of the insertion Contact edge for drilling jig 228479 Drill in front of the sash frame screw fastener! For top-hung and side-hung windows, seal the cutouts with adhesive tape (e.g. 3M TM 341 aluminium adhesive tape) corner angle assembled condition V50A-1056

Assembly List of mounting angles Outer frame 205100 façade grid = External outer frame dimension Taking the façade construction into account, the setting blocks must be positioned as far as possible in the corner and adapted to the drainage system! Assembly instructions 1. Install the window and centre the height positioning by shimming on the façade waling - symmetrical shadow gap. (Please note that in the case of wide and heavy elements, the lower outer frame can sag. The component must then be centred in the corners.) 2. Fix the window to the façade mullion by the lateral fixing brackets. 3. Align the lower outer frame using setting blocks and fixing brackets. 4. Align the upper outer frame using the fixing brackets (can be done only after glazing the upper field). 5. If there is deformation/sagging of the upper façade waling, the sag affects the width of the shadow gap between the outer frame and the sash frame. If necessary the window must be installed raised. 6. When dimensioning the window, both the glass load and the load of the insertion element must be taken into account from a distance between centre lines of 1,500 mm. view from inside mounting angle UK outer frame glass carrier Quantity of mounting angles Quantity 600 mm 1 angle central 1200 mm 2 angles > 1200 mm additional angles a 600 mm see table dimenion variabel L angle profi le L angle profi le L angle profi le L angle profi le L angle profi le L angle profi le V50A-9010

Assembly List of mounting angles Outer frame 205000 façade grid = External outer frame dimension Taking the façade construction into account, the setting blocks must be positioned as far as possible in the corner and adapted to the drainage system! Assembly instructions 1. Install the window and centre the height positioning by shimming on the façade waling - symmetrical shadow gap. (Please note that in the case of wide and heavy elements, the lower outer frame can sag. The component must then be centred in the corners.) 2. Fix the window to the façade mullion by the lateral fixing brackets. 3. Align the lower outer frame using setting blocks and fixing brackets. 4. Align the upper outer frame using the fixing brackets (can be done only after glazing the upper field). 5. If there is deformation/sagging of the upper façade waling, the sag affects the width of the shadow gap between the outer frame and the sash frame. If necessary the window must be installed raised. 6. When dimensioning the window, both the glass load and the load of the insertion element must be taken into account from a distance between centre lines of 1,500 mm. view from inside mounting angle UK outer frame glass carrier Quantity of mounting angles Quantity 600 mm 1 angle central 1200 mm 2 angles > 1200 mm additional angles a 600 mm PVC compensation block PVC compensation block screw length for for screw length for for for for Mounting angle: 224540 for RAICO THERM + 50 mm 224545 for RAICO THERM + 56 mm 224550 for RAICO THERM + 56 mm Screwing in with pan head tapping screw ST5.5 DIN 7981; for combination with 013300/013310 with countersunk screw ST5.5 DIN 7982. Length of screw see table PVC-compensation block (self-fabrication): see table V50SK-9000

Assembly List of mounting angles Outer frame 205100 façade grid = External outer frame dimension Taking the façade construction into account, the setting blocks must be positioned as far as possible in the corner and adapted to the drainage system! Assembly instructions 1. Install the window and centre the height positioning by shimming on the façade waling - symmetrical shadow gap. (Please note that in the case of wide and heavy elements, the lower outer frame can sag. The component must then be centred in the corners.) 2. Fix the window to the façade mullion by the lateral fixing brackets. 3. Align the lower outer frame using setting blocks and fixing brackets. 4. Align the upper outer frame using the fixing brackets (can be done only after glazing the upper field). 5. If there is deformation/sagging of the upper façade waling, the sag affects the width of the shadow gap between the outer frame and the sash frame. If necessary the window must be installed raised. 6. When dimensioning the window, both the glass load and the load of the insertion element must be taken into account from a distance between centre lines of 1,500 mm. view from inside UK outer frame mounting angle glass carrier Quantity of mounting angles Quantity 600 mm 1 angle central 1200 mm 2 angles > 1200 mm additional angles a 600 mm see table dimenion variabel L angle profi le L angle profi lel angle profi le L angle profi le L angle profi lel angle profi le V50SK-9010