MPD Application Process

Similar documents
ECDM System. November, Security Classification: Restricted - Status: Draft

Macondo Blowout Lessons Learned for Prevention and Mitigation

August 6, Re: Blowout Preventer Systems and Well Control Revisions, 1014 AA39. Via electronic submission to:

Well Control Considerations of MPD on Deepwater Rigs

Design and Concept Integration- MPD Technology in Deepwater Rigs. Julmar Shaun S. Toralde, Global Deepwater Managed Pressure Drilling Champion

Industry Response - Post Macondo

pipeline FSHR and tether for fatigue, stress, and any other abnormal condition (e.g., corrosion) that may negatively impact the riser or tether; and

Well Integrity During Drilling Operations

@balance Deepwater. MPD services

UNITED STATES DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT SERVICE GULF OF MEXICO OCS REGION

NTL No N05 Increased Safety Measures for Energy Development on the OCS Effective June 8, 2010

NTL No N06 Information Requirements for EPs, DPPs and DOCDs on the OCS Effective June 18, 2010

MPD ACTIVE PRESSURE MANAGEMENT Next-generation MPD technology, built by manufacturing specialists

GOMR OCS Subsea Pipelines Regulatory Perspectives. Pipeline Section, Regional Field Operations Gulf of Mexico Region Chief, Angie D.

OCS leasing program draft PEIS comments Attachment A

BSEE BAST Determination Process

EC-Drill MPD Dual Gradient Drilling

Effects of Water Depth on Offshore Equipment and Operations Topic #3: Well Drilling & Completion Design and Barriers

Industry & Govt Changes Post Macondo. Charlie Williams Chief Scientist Shell Executive Director - Center for Offshore Safety

NOIA ANNUAL MEETING CONCERNS/INITIATIVES. BSEE Update. Joe Levine BSEE Washington DC April 11, 2014

International Well Control Forum IWCF. Well Control Training Syllabus. Drilling Level 2. 1 st January 2014 Version 3.0

Subsea Pump System - Optimized for Rapid Deployment & Operation within the Primary Barrier. Brian Piccolo, Technology Development Mgr.

Final Rule AADE Lunch and Learn

BSEE s Innovation Culture: Using Innovation to Balance the Historically Prescriptive Climate of Regulations

Chapter 02. Casing and Tubing

SubSea MudLift Drilling: from JIP to the Classroom

SUBSEA WELL CONTAINMENT. Global Basis. Deepwater & Emerging Technologies Group (DETG) AADE Houston Chapter 25 January 2012

PressurePro CONTROL SYSTEM

New Developments in Regulation of U.S. Offshore Oil and Gas Operations

Managed Pressure Drilling New Convention in Deepwater Wells. Brian Grayson, Bhavin Patel, Alice Gomez Weatherford International

DRILLING ENGINEERING SERVICES LOOK-AHEAD AWARENESS

February 23, Re: EO & Well Control and Blowout Preventer Rule. Via Electronic Transmittal. Dear Mr. Whiteman:

BSEE Oil Spill Preparedness Division Response Research Branch

Offshore Regulatory Oversight on the U.S. Arctic Outer Continental Shelf

An informal discussion of drilling contractors was held prior to the Well Control Committee meeting. Key topics discussed included the following:

On the Development of the Blowout Preventer PRA Model

Spill Prevention and Spill Response. Canada-Newfoundland and Labrador Offshore Petroleum Board

DEA Quarterly Meeting 18 November Bill Pike NISC, an IBM Company

Well Control Contingency Plan Guidance Note (version 2) 02 December 2015

Siem WIS. Siem WIS AS. Closed Loop Drilling CLD. August Siem WIS AS.

Industry & Govt Changes Post Macondo

Overview and Update of API Standards

This figure shows the difference in real time resolution of azimuthal resistivity data

Bureau of Safety and Environmental Enforcement. [Docket ID: BSEE ; 15XE1700DX EEEE EX1SF0000.DAQ000]

I. Executive Summary. In addition to CRE s incorporated ICR comments, CRE makes the following comments.

4 Briefing. Responsible investor

Recommendations for Improvements to Wellbore Surveying and Ranging Regulations

july aug HPHT operations pose escalating challenges for operators, suppliers all drilling, all completions, all the time

Moduels in PetroTrainer. PetroTrainer. How PetroTrainer is used

Experience, Role, and Limitations of Relief Wells

Sinking of the Deepwater Horizon. 11 perish and 115 survive

IWCF Well Control Level 5. Celle Drilling Conference 2017

White Paper. Deepwater Exploration and Production Minimizing Risk, Increasing Recovery

Syllabus CH EN 6181 Drilling and Completions Fall 2015

API RP 53 Recommend Practices for Blowout Prevention Equipment Systems for Drilling Wells vs. Standard 53 4 th Edition 2011

SPE A Systematic Approach to Well Integrity Management Alex Annandale, Marathon Oil UK; Simon Copping, Expro

Marathon Drilling Indonesia

Drilling Courses

Integrity Monitoring? New thinking in the approach to Subsea IMMR. Dr Karl Woods, Snr Subsea Reliability Engineer 22/2/2017

Lloyd s BOP Register energy Risk servicesmodel Project Development. Scotty Roper Project Manager Moduspec USA, Inc.

Micronized barite fluid helps Brazilian well walk narrow drilling window

Oil and Gas UK Well Integrity Guidelines

EXPERIENCES FROM A VIRTUAL SIMULATOR ENVIRONMENT. Stavanger, October 20 th 2011

AADE Houston Chapter. Group. 26 January 2011

Riserless Subsea P&A. Deepwater Decommissioning Workshop 2016 W I L D W E L L C O N T R O L S U B S E A I N T E R V E N T I O N

April 10, 2013 Washington DC. Joe Levine, BSEE John Cushing, BSEE

HPHT operations pose escalating challenges for operators, suppliers

Drilling Courses Overview Pressure control and drilling equipment course offering

Expro Perforation Services

EUOAG Workshop. Workshop on decommissioning of offshore installations Challenges, options and lessons learned PP&A

An Introduction to Oil & Gas Drilling and Well Operations

TOP HOLE DRILLING WITH DUAL GRADIENT TECHNOLOGY TO CONTROL SHALLOW HAZARDS

Cementing: Taking in lessons learned. Industry engaged in all-out effort to strengthen standards, testing, placement for better wellbore integrity

Welltec Pareto Offshore Conference September 4, 2013

Pumps and Subsea Processing Systems. Increasing efficiencies of subsea developments

SAFER, SMARTER, GREENER

Baker Hughes Offshore Opportunities

INVESTIGATION REPORT VOLUME 2

7 Briefing. Responsible investor

ANADARKO PETROLEUM CORPORATION

Intervention/Decommissioning

Comprehensive Plug and Abandonment Systems

Cost Effective Alternative to Cased Hole Bond Logging: Full Waveform Capture using Open Hole Sonic Tool

International Well Control Forum Well Intervention Pressure Control Subsea Syllabus

Identifying Ways to Reduce Drilling Budgets in the Low Oil Price Environment

Integrity Management of Offshore Assets

Designing Subsea Wells for Abandonment & Suspension

C o n t a c t U s f o r S p e c i a l C o r p o r a t e R a t e N o w!

GWF-1 Development DrillWell

False Sense of Safety

UNDERBALANCED DRILLING (UBD) - A CASE STUDY IN INDIAN OFFSHORE

DE120 Successful Well Completion and Workover Practices:

June 16, Via Electronic Transmission. Lamar McKay Chairman and President BP America, Inc 501 Westlake Park Boulevard Houston, TX 77079

Defining the New Normal for Offshore Drilling Copenhagen 16 June Alan Spackman Vice President, Offshore Regulatory & Technical Affairs

2016 North America DPE UGM WellPlan Software Product Update. Gabriela Morales Sr. Product Specialist

Seeing through software

Deepwater well design, construction & drilling operations

REVIEW AND APPROVAL OF NOVEL CONCEPTS

Grade 3 Geometry Rectangle Dimensions

WELLVANTAGE REMOTE OPERATIONS DEEPWATER

Transcription:

MPD Application Process Fred Brink Chief, District Operations Support (DOS) September 19, 2017 To promote safety, protect the environment and conserve resources offshore through vigorous regulatory oversight and enforcement.

BSEE Mission Statement To promote safety, protect the environment and conserve resources offshore through vigorous regulatory oversight and enforcement. 2

What is New Technology 3 As defined in CFR 250.200: New or unusual technology means equipment or procedures that: (1) Have not been used previously or extensively in a BSEE OCS Region; (2) Have not been used previously under the anticipated operating conditions; or (3) Have operating characteristics that are outside the performance parameters established by this part. Consideration of a new technology must begin long before it may be employed on a specific project. Certain new technologies may trigger environmental or other additional reviews. The leaseholder considering an unproven technology can mitigate approval uncertainties by engaging in discussion with the DOS early in the design process.

What a typical application should include The new technology submittal should be tailored to the specific application. 4 1. A thorough description of the technology and specific conditions of use, including the following if applicable: a. Demonstration of shut-in philosophy and procedures b. Demonstration of dual mechanical barriers to prevent hydrocarbon flow during abnormal conditions c. Discussion of inspection and testing capabilities 2. Risk assessment and/or failure mode assessment. (detail should be proportional to the level of risk involved) 3. Operating procedures 4. History of development and testing 5. Detailed schematics 6. Justification for use 7. Additional information necessary for the review process 8. For technically complex new technology evaluations, where a high degree of specialized knowledge is required, BSEE will generally mandate the operator to provide an independent third party analysis.

Approval of New Technology All new technology approvals will be based on the following principles: Protection of people and the environment. Redundant mechanical barriers. Barriers must be verified by testing. Failure mode assessment/risk assessment. These assessments must address what can go wrong or fail. Additionally, the mitigations for such failures must be well developed and understood. The new technology must be based on verified engineering principles. 5

Regulations 250.414 (c) (c) Planned safe drilling margin that is between the estimated pore pressure and the lesser of estimated fracture gradients or casing shoe pressure integrity test and that is based on a risk assessment consistent with expected well conditions and operations. (1) Your safe drilling margin must also include use of equivalent downhole mud weight that is: (i) Greater than the estimated pore pressure; and (ii) Except as provided in paragraph (c)(2) of this section, a minimum of 0.5 pound per gallon below the lower of the casing shoe pressure integrity test or the lowest estimated fracture gradient. (2) In lieu of meeting the criteria in paragraph (c)(1)(ii) of this section, you may use an equivalent downhole mud weight as specified in your APD, provided that you submit adequate documentation (such as risk modeling data, off-set well data, analog data, seismic data) to justify the alternative equivalent downhole mud weight. (3) When determining the pore pressure and lowest estimated fracture gradient for a specific interval, you must consider related off-set well behavior observations. 6

Regulations 250.738 (m) A third party approval is needed 30CFR250 does not capture MPD equipment or MPD drilling practices However 250.408 does allow for the District Manager to approve the use of alternative procedures or equipment during drilling operations 7 NTL 2008-G07 Managed Pressure Drilling Projects Provide guidance for MPD operations based upon regulatory allowance in 250.408.

NTL 2008-G07 8 1. MPD process employs a collection of tools and techniques which may mitigate the risks and costs associated with drilling wells that have narrow downhole environmental limits, by proactively managing the annular hydraulic pressure profile. 2. MPD may include control of back pressure, fluid density, fluid rheology, annular fluid level, circulating friction, and hole geometry, or combinations thereof. 3. MPD may allow faster corrective action to deal with observed pressure variations. The ability to control annular pressures dynamically facilitates drilling of what might otherwise be economically unattainable prospects.

NTL 2008-G07 MPD is intended to avoid continuous influx of formation fluids to the surface. Any flow incidental to the operation will be safely contained using an appropriate process. Translation => MPD is not to be used in a continuous underbalanced situation. 9

NTL 2008-G07 Operations Matrix 10

NTL 2008-G07 Defined Limits HC Zones, Flow limitations, Influx Rate, Influx Time, Influx Volume, Surface Pressure Indicators 11

Industry Guidance API Spec 16RCD - Specification for Drill Through Equipment-Rotating Control Devices (2005). API RP-92M - Managed Pressure Drilling Operations with Surface Back-pressure is currently being developed to provide guidance for MPD operations. 12

Conditions of Approval 13 District Contact Required for: PWD failure Failure of Flowmeter (primary and backup) MPD pump failure Well control event Reduction of MW Contingencies: Flowmeter Failure Stop drilling, circulate, isolate manifold, change to backup flowmeter RCD element Change Re-Test of failed component following component repair. MPD Software Failure Stop drilling, circulate, repair software or drill ahead conventionally.

Enforcement While MPD as a drilling practice is approved for use in the GOM, each operation should be thoroughly reviewed and onsite inspection performed. HAZOPs/HAZIDs should be attended by BSEE personnel especially for Subsea operations. MPD training of rig personnel must be verified 14

Restrictions At no time should the bottom hole pressure be reduced below PP (no underbalanced drilling). MPD NTL does allow for the combination of statically underbalanced as long as casing backpressure is trapped to ensure overbalance to the formation. 15

When is it considered non-new Technology? The first approval letter does not grant blanket approvals Each project must be verified separately to determine if it can be applied to the specific application Requests must be made until either a NTL or regulation is written, or it is deemed non-new technology by the DOS Section. 16

BSEE Website: www.bsee.gov @BSEEgov BSEEgov Bureau of Safety and Environmental Enforcement To promote safety, protect the environment and conserve resources offshore through vigorous regulatory oversight and enforcement.