Safety Code for Floating Production, Storage and Offloading Systems (FPSO)

Similar documents
Standard Drawing of Foundation Bolt (Anchor Bolt)

中华人民共和国国家计量技术规范 定量包装商品净含量计量检验规则

National Standard of the People's Republic of China 中华人民共和国国家标准

GB/T National Standard of the People s Republic of China 钢板制对焊管件. Steel Plate Butt-welding Pipe Fittings

Steel Butt-Welding Seamless Pipe Fittings

Cigars in Hong Kong, China

Floating Systems. Capability & Experience

Stars Snub Twilight Premiere 明星怠慢 暮光之城 首映式

2018 Tulane Engineering Forum

电池柜 B32 Battery Cabinet B32. 安装说明 Installation Instruction

Offshore Development Concepts: Capabilities and Limitations. Kenneth E. (Ken) Arnold Sigma Explorations Holdings LTD April, 2013

WARNING. Disconnect the inverter from all the external power sources before service!

Long-Awaited Film 期待已久的影片

FPSO Operation and Maintenance

2 THE PROPOSED WHITE ROSE OILFIELD DEVELOPMENT 2.1 PROJECT DESCRIPTION

Summary of Changes and Current Document Status

The audience has given us a lot of positive feedback, some typical ones are listed below:

Dagang Zhang China-America Frontiers of Engineering Symposium San Diego, USA

8 English P.20 한국의 P.21 中 文 P.22

General Welder Skilled Trade Test Mock Practical Test Paper

Yueh Hai Ching Temple Photo Contest Organised by Ngee Ann Cultural Centre of The Ngee Ann Kongsi 粤海清庙摄影比赛義安公司辖下義安文化中心主办

GB/T Translated English of Chinese Standard: GB/T NATIONAL STANDARD OF THE

SUMMARY REPORT AND RECOMMENDATIONS ON THE PREVENTION OF MARINE OIL POLLUTION IN THE ARCTIC.

SWS Ultra deepwater drillship

Offshore Drilling Rigs

FPSO Engineering. From Concept to Commissioning. Iv-Oil & Gas

Leveller Skilled Trade Test Mock Practical Test Paper

FPS Spending: $20 Billion a Year and Growing By Bruce Crager

GSM/GPRS. By Mendy Ouzillou Silicon Laboratories Inc. Austin, TX GSM 3GPP (GSM) burst current) GSM900 DCS V

Route Planning & Cable Route Surveys

Offshore Wind Risks - Issues and Mitigations

Floating Production Installations

Opportunities and Challenges in Deepwater West Africa Projects

3DD13005ED 主要参数 MAIN CHARACTERISTICS

Media Kit GLOBAL PERSPECTIVE local opportunities

Journey to the West 西游记

King Arthur 亚瑟王. A Legendary King 一个具有传奇色彩的国王. Read the text below and do the activity that follows. 阅读下面的短文, 然后完成练习

Floating LNG facilities

Air pollution control in a new oil and gas developments using best available techniques

Concretor Skilled Trade Test Mock Practical Test Paper

Pantomimes 圣诞节上演的话剧. Look Behind You! 就在你身后!

p. 1 p. 29 p. 39 p. 67 p. 79 p. 87 p. 95

1. Things you need to know 基本词汇 1. Yes, it s great to begin with a word of agreement: Yes 好的 hǎo de (= yes, agree) 是的 shì de (= yes, confirm) 2.

SPECIFICATION FOR APPROVAL

Compoundtek Your Dedicated Silicon Photonics Partner Compoundtek 您的专属硅光子合作伙伴

High frequency ratio antenna for RFID tags

Keeping Your House in order?

Dry trees for cost effective solution with the Wellhead Barge: WHB

Workshop on Offshore Wind Energy Standards and Guidelines: Metocean Sensitive Aspects of Design and Operations in the United States July 17, 2014

Through Cost Effective Procurement Strategy. Gu Hong, COOEC April, 2011

Development of Floating Exploration & Production Solutions for Remote and Arctic Environments

EMF Safety and Actions in China Telecom

Discipline. Technology TECHNOLOGY DEVELOPMENT. Technology WITHIN SBM OFFSHORE

ISO INTERNATIONAL STANDARD. Petroleum and natural gas industries Offshore production installations Basic surface process safety systems

WHITE ROSE OILFIELD COMPREHENSIVE STUDY REPORT SUBMITTED BY:

A marginal field (re-)development using several alternative methodologies 1

3DD4243D. 封装 Package IPAK

Introduction of 26th FLACS User Group (FLUG) Meeting Shanghai, China November 3-5, 2015 Bin Xie Gexcon China

Totally Integrated Power (TIP) for the Oil and Gas Industry

Address: South Elgin, IL Phone: ( ) - Fax: ( ) - Cell: ( ) - Contractor Type: Phone: ( ) - Fax: ( ) - Cell: ( ) - Contact Type:

Class Update on Latest Ship to Ship Transfer Plan

Strategic performance in the toughest environments

Internal Compact Dual-Band Printed Loop Antenna for Mobile Phone Application

A SMALL PASSIVE UHF RFID TAG FOR METALLIC ITEM IDENTIFICATION. Mun Leng Ng, Kin Seong Leong, and Peter H. Cole

5th International Workshop on Neuroinformation, dedicated to neuroimaging, and focus in EEG, MEG and MRI

HETERO JUNCTION FIELD EFFECT TRANSISTOR NE4210M01

Oil&Gas Subsea Production

Low Voltage Alternators - 4 pole

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

RHT03-SPI Temperature & Humidity Sensor

M030 and M040. Operating Manual Genelec M030 and M040 Active Monitoring Loudspeakers 操作手册

Module No. # 01 Lecture No. # 3 Safety in design and operations. (Refer Slide Time: 00:10)

US SEALED SERIES. Structure. Features 特点. Connector M Connector F

FDTD Modeling of Noise in Computer Packages

RESOLUTION MSC.21(59) (adopted on 22 May 1991)

V GG -V TO. rout = Saturation Region I OUT. Vout V SAT V GS V OUT. Sheet 1 of 10. Cascode Current Mirror

Ansoft HFSS Antenna Design Kit Design Parameters

Appendix 6-3: HFSS 3D Excitations

FRAMEWORK ACT ON MARINE FISHERY DEVELOPMENT. [Enforcement Date: Nov. 28, 2009] [Act No. 9717, May 27, 2009, Other Laws and Regulations Amended]

MOORING SOLUTIONS IN ASIA PACIFIC A SINGLE, LOCAL SOURCE OF MOORING, POSITIONING AND RIG MOVING SERVICES

Precision Lead-free Reflow Oven. Model: AT-R1825 SHENZHEN ATTEN ELECTRONICS CO., LTD

US SERIES CONNECTOR FOR AUTOMOBILES

Solid State Relays Industrial, 1Phase Peak Switching Type RM1C

FPSOs IN THE GULF OF MEXICO: A REVIEW OF REGULATORY OBSTACLES

Version:2.0 M1+/M2/M3

Advanced Design System. Release 2005A New Features

Sinking of the Deepwater Horizon. 11 perish and 115 survive

Technology. F. Tabatabai, Member, IEEE, H.S. Al-Raweshidy, Senior Member, IEEE. filter, normally do not possess high quality factor at the

向 JGCD 投稿的成功之路. Journal of Guidance, Control, and Dynamics. 陆平 Editor-in-Chief June 9, 2014

Introduction to Subsea Production Systems. What is Subsea? 02 What is Subsea? DNV GL DNV GL 2013 September 2014

Dr RV Ahilan 20 th March 2018

RULES FOR THE CONSTRUCTION AND CLASSIFICATION OF MOBILE OFFSHORE DRILLING UNITS TITLE MOBILE OFFSHORE DRILLING UNITS NAUTIC AND ELECTRONICS CHAPTERS

R. Dehdasht-Heydari, H. R. Hassani, and A. R. Mallahzadeh

For personal use only

For personal use only

Notes can be considered as simplified letters in specific situations. Notes can be classified into many types according to different purposes such as

Offshore Access to America s Oil and Natural Gas Resources

Offshore. Christian Tribout Senior Vice President, Offshore. Investor Presentation Paris, October 17, New York, October 19, 2007

SITRANS F flowmeters SITRANS F US. SITRANS FUS880 (retrofit kit) 4/218 Siemens FI

Petrosync Distinguished Instructor Sandy Fyfe Principal Naval Architect and Director PAFA Consulting Engineers

Transcription:

Safety Code for Floating Production, Storage and Offloading Systems (FPSO) June, 2010 1

Chapter 1 General 1.1 Purposes This Safety Code for Floating Production, Storage and Offloading Systems (hereinafter referred to as "the Code") is formulated to ensure personnel health and life safety on an offshore floating production, storage and offloading systems (hereinafter referred to as floating systems or FPSO), and to prevent property damage and environment pollution in accordance with the Provision of Safe Operations or Offshore Petroleum Industry, Rules of Management of Offshore Oil Safety, and the Provisions for Inspection of Offshore Petroleum and Natural Gas Production Facilities. 1.2. Scope of application 1.2.1 The Code applies to the floating systems within the inland waters, territorial sea, contiguous zone, exclusive economic zone, and continental shelf in the People's Republic of China and within the other sea areas governed by the People's Republic of China. 1.2.2 Upon the Code takes effect, the newly built FPSO shall meet the requirements herein. The major maintenance, renovation, or conversion for existing FPSO shall meet the requirements herein to a reasonable extent, that is, the existing FPSO shall continue to be in compliance with the requirements the applicable laws and regulations, and codes of existing design and build. 1.2.3 The special requirements for structure, stability, sub-division, and freeboard of deep draft spar platform and tension leg platform (TLP) shall be formulated separately 1.2.4 The requirements for FPSO pollution prevention shall respect national relevant laws and regulations, and Standards for offshore pollution prevention. 1.2.5 For the floating drilling production, storage and offloading (FDPSO) systems and the similar offshore petroleum production facilities designed with the other functions, the production and oil storage functions shall be designed and built by reference to the Code accordingly. 1.3 Basic principles 1.3.1 Basic principles of design During design, the difference between an FPSO and a fixed platform, adverse influences of floating conditions on personnel, oil-gas separator, rotating mechanical equipment, and take-off and landing of helicopter etc, the difference between an FPSO and a navigational ship, and influence of mooring on buoy shall be considered. 1.3.2 Risk analysis principles 2

1.3.2.1 The FPSO design institute, builder, responsible party, and certification and inspection body shall follow the risk analysis principles, using mature and effective method to fully and systematically analyze the possible risks during design, building, installation, production, and abandonment of FPSO to reduce the risks to a reasonable and practical level. 1.3.2.2 On the basis of advanced safety theories, methods, and new technologies, based on safety rules of international offshore petroleum facilities, it is allowed that the responsible party should adopt safety countermeasures different from the Code, but the safety degree of them shall reach or be higher than the level herein. 1.3.2.3 When the responsible party intends to adopt the safety countermeasures different from the Code, the reliability, reached degree of safety of countermeasures shall be systematically analyzed in advance. After the safety analysis documents are approved by the certificate inspection body, they shall be submitted to the Offshore Petroleum Operation Safety Office (hereinafter referred to as OPOSO) of the State Administration of Quality and Technical Supervision for file and the safety analysis documents shall be attached. 1.4 Explanation The OPOSO shall be in charge of explanation of the Code. 1.5 Terms and definitions (1) FPSO is offshore petroleum production facilities which are floating and mooring at sea, with main functions for handling, storage, and loading/unloading of petroleum and natural gas, or designed with partial theses functions. (2) Ship-shaped FPSO is FPSO which is designed with structural type of hull form. (3) Semi-submersible (column-stabilized type) FPSO is FPSO that the main deck is connected to the underwater shell or spud can via column or buoy. (4) Other FPSO is FPSO which is designed with the other characteristics, for example, cylindrical FPSO, deep draft spar platform, and tension leg platform etc. (5) The responsible party is all persons, operators or workers involved in design, building, commissioning, and production of FPSO. (6) The certification and inspection body is an intermediary agency which engages in certification and inspection of offshore petroleum production facilities and of which qualification is granted by OPOSO. (7) Applicable codes and standards are the codes and standards which are adopted by the responsible party and the certification and inspection body in design, building, installation, production, and implementing certification and inspection of FPSO in accordance with the Provisions for Inspection of Offshore Petroleum and Natural Gas Production Facilities. 3

(8) SOLAS Convention is the International Convention for Safety of Life at Sea in 1974 and its sequent protocols and amendments. (9) MODU Code is the Code for the Construction and Equipment Self-propelled Mobile Offshore Drilling Units in 2009 and its sequent protocols and amendments. Chapter 2 General arrangement 2.1 Principles of general arrangement 2.1.1 The danger areas shall be kept away from the areas and modules with the igniting sources of fire and explosion as far as possible in order to prevent fire and explosion from occurring and fire from spreading. If it is impossible to be kept far away from them, the hermetically tight guard wall or fire wall shall be employed for isolation. 2.1.2 For general arrangement of FPSO, wind direction shall be so considered to (1) minimize the possibility that the combustible gas escaped from the hazardous area flows into the area with sources of explosion; (2) make the exhaust gas generated from combustion of flare and the combustible gas from venting keep away from the FPSO; (3) minimize the possibility that the smoke generated from fire and explosion flows into accommodation space, temporary refuge and shelter, and evacuation location. 2.2 Arrangement of areas and modules 2.2.1 Machinery spaces under the bulkhead deck 2.2.1.1 The machinery spaces under the bulkhead deck may be provided on the bow or astern, but not on the middle, of the FPSO. 2.2.1.2 The machinery spaces under the bulkhead deck shall be isolated from the crude oil tank, slop tank, and production water tank with cofferdam, ballast tank, fuel oil tank, or crude oil pump rooms. The pipelines of this machinery space shall pass through neither the crude oil tanks, slop tanks, and production water tanks, nor the spaces immediately next to the crude oil tanks, slop tanks, and production water tanks. 2.2.2 Crude oil pump rooms 2.2.2.1 If the crude oil pump rooms is adjacent to the machinery spaces under the bulkhead deck, it is allowed that the lower portion of the pump room may be properly concave into the machinery spaces for the purpose of pump installation, but the top plate height of the concave portion shall not exceed the 1/3 moulded depth above the keel in general. 4

2.2.2.2 The ballast pump for the ballast tank adjacent to the crude oil tank or slop tank shall be provided in the crude oil pump tank or in similar spaces without any source of explosion within the crude oil area. 2.2.3 Crude oil tanks, slop tanks, and production water tanks The wing tank protection of the crude oil tanks, slop tanks, and production water tanks shall be in accordance with Sub-clause 3.5.3 in the Code. 2.2.4 Fuel oil tanks 2.2.4.1 A fuel oil tank should not take the side portion which is prone to be collided as the boundary. 2.2.4.2 The double bottom within the crude oil area shall not be filled with fuel oil. 2.2.4.3 The FPT shall not be filled with fuel oil. When the crude oil is transferred to the oil tanker and it is necessary that the oil tanker is moored on the astern or side, the APT shall not be filled with fuel oil either. 2.2.5 Accommodation module and control room 2.2.5.1 The accommodation module shall be located above the non-hazardous area and should be up wind. 2.2.5.2 The access, air inlet, and the other openings on the accommodation module shall not toward the crude oil area. It shall be located end bulkhead, the side of the superstructure deck or deck house and at least 3 m from the end wall toward the crude oil area. 2.2.5.3 The central control room should be provided within the accommodation module; the other control rooms (stations) shall be provided within the accommodation module or within the non-hazardous area near the accommodation module. 2.2.6 Temporary refuge 2.2.6.1 An FPSO should be equipped with temporary refuge which shall be located within in safe area and closed to the evacuation location. 2.2.6.2 The temporary refuge shall be provided with measures for fire protection, heat insulation and to prevent smoke and harmful gases from entering into it. Inside the refuge, functions for monitoring and control of accident expansion, for example, communication, switch on/off the fire-fighting system. 2.2.7 Helicopter deck module 2.2.7.1 The helicopter deck module shall be located above the accommodation module or the other non-hazardous areas and have at least 1.8 m gap from the lower supporting 5

北京文心雕语翻译有限公司 Beijing Lancarver Translation Inc. 完整版本请在线下单 或咨询 : TEL: 400-678-1309 QQ: 19315219 Email:info@lancarver.com http://www.lancarver.com 对公账户 : 单位名称 : 北京文心雕语翻译有限公司开户行 : 中国工商银行北京清河镇支行账号 :0200 1486 0900 0006 131 支付宝账户 :info@lancarver.com 注 : 付款成功后, 请预留电邮, 完整版本将在一个工作日内通过电子 PDF 或 Word 形式发送至您的预留邮箱, 如需索取发票, 下单成功后的三个工作日内安 排开具并寄出, 预祝合作愉快!