Kinyun Australia KP : Procedure for Control of Engineering Drawings PROCEDURE FOR CONTROL OF ENGINEERING DRAWINGS

Similar documents
Status Date Prepared Reviewed Endorsed Approved

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

SECTION SUBMITTAL PROCEDURES

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

ENGINEERING DRAWINGS MANAGEMENT POLICY (IFC/AS BUILTS)

EU- T y p e E x a m i n a t i o n C e r t i f i c a t e

EU- T y p e E x a m i n a t i o n C e r t i f i c a t e

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES

NOTIFIED BODY EU-TYPE EXAMINATION CERTIFICATE

NOTIFIED BODY EU-TYPE EXAMINATION CERTIFICATE

Status Date Prepared Reviewed Endorsed Approved

East Central College

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

LA Solutions. JobTracker. Projects, Clients, and Drawings. Issue Sheets. MicroStation Software and Consultancy

NOTIFIED BODY EU-TYPE EXAMINATION CERTIFICATE

NUMBERING OF DRAWINGS, SPECIFICATIONS AND SIMILAR DOCUMENTS. L. D'Addario,

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

BE PREPARED FOR SIGFOX READY TM CERTIFICATION

Drawing Management Standard

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS

Overview of Textron Systems Supplier First Article Inspection (FAI) expectations

Answer: Qualification statement should be provided with the bid.

11.0 INSTRUMENTATION LOOP DIAGRAMS

Record As-Built Drawings for Capital Projects

Drawing Standard for Plans Showing Horizontal Alignment

Privacy Policy SOP-031

Title Substation Auxiliary Transformer from Rectifier Transformer Secondary. Reference Number PDS 01 (RIC Standard: EP SP)

MESP TECHNICAL SPECIFICATION FOR AN ESSENTIAL SERVICES SUPPLY STEP UP TRANSFORMER

SPECIFICATIONS FOR NEW UNDERGROUND RESIDENTIAL DISTRIBUTION SYSTEMS

EMC & Radio requirements within EU

Reference Number PDS 07 (RIC Standard: EP SP)

Title Lightning/ Surge Protection - Power Inductors. Reference Number SPS 37 - (RIC Standard: SC SP)

DNVGL-CP-0338 Edition October 2015

A Department of the Recorder s Division, Cuyahoga County Fiscal Office

00-General Drawings. Doc. no.: NA-00-STS002

TAB B-9 RECORD DRAWINGS

Certificate of Conformity

BAE Systems Combat Vehicles Supplier Quality Assurance AS9102 Requirement

Electrical Overcurrent Studies

Measurement of Signalling Distances

SECTION ADMINISTRATIVE REQUIREMENTS

A. Section includes administrative and procedural requirements for project record documents, including the following:

Schedule - 20 LED LAMPS

Certificate of Conformity

Earthing Requirements for HV Transmission Structures

Certification of EXPLOSION PROTECTED ELECTRICAL EQUIPMENT

This specification describes the general requirements for Engineering Services provided to Vale.

American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM

PPAP REQUIREMENTS. Revision: March Methode Electronics, Inc. G-MB of 12 Printed copies are not controlled.

Robot e.do. Certifications, Service, Warranty. Rel Versions: 4 axes and 6 axes

Specification For. Asset Information Pr8701

Air Monitoring Directive Chapter 9: Reporting

P.L. 1999, CHAPTER 258, approved October 15, 1999 Assembly, No (First Reprint)

36kV VOLTAGE TRANSFORMERS (OUTDOOR TYPE)

SECTION A. RFI: Request from Contractor seeking interpretation, information, or clarification of the Contract Documents.

ELECTRICAL NETWORKS SPECIFICATION TECHNICAL SPECIFICATION FOR A 230V/110V AND 400V/110V TRANSFORMER

TYPE APPROVAL PROCEDURE

Part 1: General requirements

BIM. e Submission Guideline Structural. Annex 1a. Recommended Process Revit 2010

Signalling Documentation and Drawings

Gippsland Water Drafting Specifications

EECAD s MUST List. Requests for drawing numbers MUST be submitted via the EECAD job request form at

Term Design Project Details

015 : 1993 CEB STANDARD

DNVGL-CP-0212 Edition March 2016

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS

Artwork Lifecycle Process Management. Vilva Natarajan CEO, Karomi

STANDARD SPECIFICATION FOR CONTRACTOR'S DRAWING AND DATA TRANSMITTAL CONTRACTOR S DRAWING AND DATA TRANSMITTAL STANDARD SPECIFICATION FOR

Miami University. Physical Facilities Department. CAD Standards. April 2004

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014)

Alfa Laval Material Standard T

DIGITAL DATA SUBMISSION STANDARDS Procedures and Guidelines

ELECTRONIC DRAFTING GUIDELINES

Distribution transformers Part 2 Ground mounted transformers not closecoupled

CRICUT ACCESS TERMS OF USE

Application for Assessment of a full quality assurance system regarding Measuring Instruments in accordance with MID

Reference Number PCP 02 (RIC Standard: EP SP)

New Title Block Editor

Cutting tool data representation and exchange. Part 72:

It is expected that this standard will evolve over time; however the use of this standard should remain consistent within individual projects.

ARCHITECTURAL DESIGN (542)

INTERNATIONAL STANDARD

ACB, Inc. Notified Body Number Whittier Avenue, Suite C110 McLean, VA 22101, USA

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018

AWS J1.1M/J1.1:2013 An American National Standard. Specification for Resistance Welding Controls

QUALITY CONTROL INSTRUCTIONS

ETSI EN V1.2.1 ( ) Harmonized European Standard (Telecommunications series)

Release: 1. MEM30031A Operate computer-aided design (CAD) system to produce basic drawing elements

SPECIFICATION FOR SAFETY POLE SIGNS & ACCESSORIES

DESIGN PRACTICE NOTE DESIGN/REVIEW REQUIREMENTS FOR TRACTION BONDING PLAN

EUROPEAN ETS TELECOMMUNICATION August 1993 STANDARD

Certificate of Appropriateness (CoA) Checklist

Transcription:

PROCEDURE FOR CONTROL OF ENGINEERING DRAWINGS 1 General Kinyun has established, documented, implemented and maintains this Quality Procedure for the control of engineering drawings. This procedure defines how Kinyun controls all engineering drawings that are required by our Quality Management System. 2 Purpose To ensure that the right persons have the current version of the engineering drawings they need, while unauthorized persons are prevented from use. 3 Scope Engineering drawings include, but are not limited to, Electronics designs: Schematic, printed circuit board (PCB) and bill of materials (BOM). A BOM is not a drawing, but is considered to be a drawing because of its nature. Mechanical designs: CAD files or image. Graphic design: Drawings for packages, labels and plates, test setup, system diagrams and concept map. All schedule drawings listed in all Ex certificates. All engineering drawings are controlled but the level of control is appropriate to the importance and impact of the document. 4 Responsibility All employees. 5 Terms and Definitions Schedule drawing: Drawing listed in the Ex certificate and/or test report. Related drawing: Drawing or document not listed in the Ex certificate but linked to the schedule drawing and used, for example, for detailed manufacture of component parts. Revision Date: April 1, 2012 Page 1 (of 5)

6 System The current revision of an engineering drawing shall have both softcopy, which is a file in a computer, and hardcopy. The master copies are original editable files and published softcopies created from the editable file. The published softcopies shall not be in any editable format. Kinyun uses PDF format whenever possible. The master copies shall be saved in the computer accessible to top management only, including the R&D Manager, to protect documents from unintended and unauthorised use and/or change. The master copies shall be backed up in another computer accessible to top management only. The archive storage for published softcopy can be a server, an Intranet, an Internet place, a shared drive or other equipment, which is safe, easy to access and controlled. Protect documents from unintended and unauthorised use and/or change. There are two stamps for hardcopy control managed by the Quality Manager Obsolete and Current. Information contained within engineering drawings is compatible with documentation that enables the conformity of the product with the requirements of the standard(s) to be assessed. Kinyun shall not initially approve or subsequently amend related drawings unless they are in compliance with the schedule drawings. Where any engineering drawing is passed to a third party, it shall be provided in a way that is not misleading. No factor (type, characteristic, position etc.) defined within the Ex certificate and technical documentation (e.g. schedule drawings) is modified. A document called Engineering Drawing List records details of all engineering drawings and their distributions. All employees shall follow the instructions below to ensure our documents and engineering drawings are controlled. Revision Date: April 1, 2012 Page 2 (of 5)

7 Control Procedures D ra w in g R e v ie w & A p p ro v e - A p p ro v a l re c o rd - G e t a c o p y R e v is e A rc h iv e Illustration of Control of Engineering Drawing Process Make a new drawing You may or may not need to get a template depending on what kind of drawing. Give it a title. Make your drawing. Complete the Title Block except Reviewed by. The Title Block shall at lease include the following information: - Description - Revision - Designer by - Reviewed by - Issued date - Drawing number - Sheet number and total sheets, e.g., 4 of 9. An electronic drawing must comply with Australian standards or international standards. Make changes Get the editable copy from the R&D Manager with his or her consent Make changes. Update the Title Block. Record changes on the Engineering Change Request form. For any schedule drawing, check all associated Ex certificates and report to the R&D Manager. Revision Date: April 1, 2012 Page 3 (of 5)

The R&D Manager shall take corresponding actions for all associated Ex certificates. Hand written changes are not allowed Sign off Get the approval from the R&D Manager. The R&D Manager completes the Reviewed by to approve the new drawing. For drawing changes, the R&D Manager also needs to sign the Engineering Change Request form to approve the changes. The R&D Manager may authorize another person for review and approval. The R&D Manager makes the last revision obsolete and archives the new revision. Archive For the first revision, record it in the Engineering Drawing List. Print out a hardcopy. Save editable version in the master copy computer and the back-up computer. Stamp the Current stamp on the new revision of the hardcopy, then put it in the hardcopy archive storage. Make sure the drawing accessible to intended users. If you want to keep a hardcopy of the last revision, cross-out the Current then stamp the Obsolete on the last revision. All obsolete engineering drawings shall be archived for at least 2 years in a softcopy for any possible reference. Only the R&D Manager can destroy an obsolete engineering drawing after 2 years. The above requirements on identification and distribution also apply to engineering drawings that originate outside of Kinyun. If you modify any such engineering drawing (thus making them your own), all of the above requirements apply. Revision Date: April 1, 2012 Page 4 (of 5)

Revision History Revision Date List of Changes Author (Name & Date) 1/4/2012 First version Henry Gong 1/4/2012 Approval (Name & Date) Hanson Chen 1/4/2012 Revision Date: April 1, 2012 Page 5 (of 5)