Removing the Z-Axis lead screw

Similar documents
Referencing 0,0 position

CNC Router Parts. Standard Rack & Pinion Drive Assembly Instructions

PRS Retro Z-Axis Installation

Removing outter components

Shapeoko XXL Assembly Guide

This manual will aid in the assembly of the FireBall V90 and FireBall X90. The assembly of both machines will be identical, unless specified.

Legacy Woodworking Machinery a division of Phantom Engineering. The Legacy CNC. Assembly Manual

ABM International, Inc. Navigator Assembly Manual

Heavy Duty Ceiling Tilt Mount Installation Manual

C a r r i a g e A s s e m b l y R e p l a c e m e n t

ABM International, Inc.

This procedure will cover the steps to properly pack up the ARES for shipment.

C a r r i a g e A s s e m b l y R e p l a c e m e n t

C4 Fabrication Rock Slider Installation 14+ 5th Gen 4Runner w/o KDSS

AX1001. Smith/Functional training Combo-free weight ASSEMBLY INSTRUCTIONS

Arc Trainer Main Frame Assembly

63824 Ford Combination Vacuum Pump/Alternator Mount

installation guide 1 GUIDE#: pwb-assault-001

Z Axis Check & Adjustment (MVX Class Machines)

User Instructions Multiline Otter Scoreboard Caddy Assembly

RBP-1215B-RX DODGE RAM QUAD CAB RX3

Removing and Replacing the Y-truck

Page 1. SureMotion Quick-Start Guide: LACPACC_QS 1st Edition - Revision A 03/15/16

Replacing the build plate clamps

Z-Axis Assembly Replacement / Adjustment

MOTORIZED STANDARD SHADE WITH CABLES Installation Instructions

Mounting Instructions For 3-Piece Namur Style Mounting Bracket To 2-Way 60 Series Valves

INSTALLATION INSTRUCTIONS

Installation Manual for the Rockmeister Roof Ladder

Gared Pro-S Portable Backstop

Part 7 Assembling the X axis

INSTALLATION INSTRUCTIONS

DUAL ADJUSTABLE PULLEY IP-D9302 INSTALLATION INSTRUCTIONS

RTI TECHNOLOGIES, INC.

Installation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 60" Plasma Screens

Installing the Partridge RA Extension on Losmandy G11

M2 Assembly. M2 Sub-Assemblies mm Belt Sub-Assembly mm Belt Sub-Assembly Spider Sub-Assembly... 4

re3d Assembling Gigabot: "Flatpack"

CNC Router Parts PRO Machine Kit Cable Track Installation Instructions

Bed Extension Kit 16 Instructions

Fresenius Medical Care North America Service Bulletin

Pickup Box Utility Rack Package Installation (Instruction ID: )

MODEL H " BYRD SHELIX CUTTERHEAD INSTRUCTIONS

INSTALLATION INSTRUCTIONS FOR FRONT CASTING DECK RAIL Ranger

HONDA RIDGELINE (KIT #601) Installation Instructions (to be used in addition to owners manual)

TOYOTA TUNDRA CARGO DIVIDER Preparation. Part Number: PT

INSTALLATION MANUAL CHEVROLET BIG BLOCK V4120 / V4220

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS

installation guide 1 GUIDE#: pwb-assault-004

INSTALLATION MANUAL FRONT. See pages 2 and 3 of this manual for configuration options. Level of Difficulty. Product Photo (center section only)

TABLE OF CONTENTS REQUIRED TOOLS

INSTRUCTIONS AND PARTS LIST POWER HAMMER

Flat Panel Stand FPZ-655. for 32" to 55" Flat Panel Screens FEATURES. Reinforced universal adapter plate for a strong hold

4. Z-axis assembly. 4. Z-axis assembly. Written By: Josef Prusa manual.prusa3d.com Page 1 of 18

Repair Instructions. Replacing a La Z Time Mechanism Side Subassembly. Remove the Back(s): Remove the Mechanism Assembly: CAUTION.

Medium HoneyBadger Chase Rack Installation Instructions

1. VERIFY ALL COMPONENTS

Shelf Converter Drawer System

Nancy s Knit Knacks LLC 4 Yard Option Upgrade Kit Assembly Instructions and User Manual

BIGBOT ASSEMBLY INSTRUCTIONS. 1/18/2017 V0.5

BX1956 Installation Instructions Chrysler PT Cruiser (Include Turbo)

Metroboard Pulley Replacement Procedure

Electric Skein Winder

UNIVERSAL RETROFIT KIT

VARIABLE SPEED WOOD LATHE. Model DB900 INSTRUCTION MANUAL

Big Block Installation Manual For Systems without A/C

Technical Procedure. HIITMill (X) Push/Pull Brake Cable Install

Assembly procedure for KA_S series January, 04, 2010

Assembly Instructions. Table of Contents

Please read BOTH these Installation Instructions and the General Instructions prior to installing or operating this equipment.

GlideRite Retractable Cover System For Hot Spot Spas (SE & SLX only)

Ender-3 3D Printer. Instructions for assembly

FlexFrame - Storage Components and Skins

TorqueMaster Replacement Spring

EllisSaw.com. EllisSaw.com P.O. Box Verona, WI

installation guide 1 GUIDE#: pwb-wwtowv1-pol-003

Installation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 60" Plasma Screens

Elimination of Elevator Bounce

SINCE 1922 P UBLICATION N O

OPERATIONAL MANUAL V1.0. Removing/Replacing Blades

(2) 25mm x 20mm x 5mm Adhesive Backed Foam Pads. 100mm x 50mm x 1.0mm Adhesive Backed Foam. (2) Spacer Plates. Passenger/Right Side Frame Mounting

Installation Instructions for Vista Air Vertically Folding Walls

CTTR Tire Rack Required tools

2015 Current Ford F150/Raptor Adaptive Cruise Control Module Relocation Bracket Installation Instructions

DO35 MAINTENANCE INSTRUCTIONS

Therma-Tru Door Gallery Setup Instructions Swing Unit with Hardware Kit - Hardware Part # MADGSWU15 (Swing Unit) Part # MADGHKSU10 (Hardware Kit)

ESA-200 Fixed Sidelite

GlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas)

Submersible Turbine Assembly Manual

Ford FE Installation Manual For Systems with A/C #14700 / #14720

SatNOGS. SatNOGS Rotator v3 Mechanical Assembly. This is the assembly guide for the third version of the SatNOGS Rotator.

Inventory (Figure 2)

SAM. Model: STV-C65 LCD Mobile Visualized Stand Instruction Manual. Weight Capacity: 1251bs / 56.7kg Suits LCD Flat Panel Display: 42"-55" Page 20

ESA-300 Full Breakout

Segmented Transfer Plate Installation Instructions

Deck Mount Installation with Bench

SERIES I MILLING MACHINES

3. X-axis assembly. 3. X-axis assembly. Written By: Jakub Dolezal manual.prusa3d.com/ Page 1 of 13

Installation instructions for FC9 & FC18 Forward Controls for Yamaha V-Max

Heavy-Duty Bypass Track System

Transcription:

Page 1 of 8 TITLE: Sabre Z-Axis Lead Screw Replacement Procedure Gerber FastFact #: 5048 Supplied by: Gerber Hardware Support Last Modified: June 14, 2007 Summary: Tools used: The following procedure explains how to replace the Z-Axis lead screw in a Sabre 404 or 408 Router. Metric Allen Wrench set Long-L type Metric Allen Wrench set T handle type Torque Wrench INCH POUND Socket for Torque Wrench 15mm for Lead screw bolts, ¼ for Chapman bits Metric Chapman Drive set Light duty thread locking compound. LocTite 222 or equivalent and LocTite 245 or equivalent Medium duty thread locking compound. LocTite 242 or equivalent Isopropyl alcohol for clean-up Removing the Z-Axis lead screw To Remove the Z-Axis lead screw 1 Using the keypad, move the carriage to the center of the beam and move the beam to approximately 18 from the front edge of the router. 2 Turn off and unplug the router. 3 To remove the vacuum shroud remove the four screws (5mm) on the carriage assembly (2 screws on each side). 4 Remove the springs from the spring brackets on each side of the motor (this will require 2 people to complete.) 5 Remove the spindle motor by removing all the screws attaching the motor to the carriage except the upper-left one. Have someone hold the motor up while the last one is removed, as the motor is very heavy.

Page 2 of 8 6 Use an Allen wrench (5mm) to remove the spring brackets (two on each side a short one and a long one). 7 Remove the four screws (5mm) from the two lower bearing blocks. Upper Center Lower 8 Remove the two screws (5mm) from the center nut block. 9 Remove the four screws (5mm) from the two upper bearing blocks. Note: Be careful when removing the blocks, the top blocks will fall out. 10 Remove the Z motor plate. 11 Remove the four screws (2.5mm) that holds the cover on top of the carriage. 12 Remove the spring on the motor plate. 4 1 5 2 3 13 Remove the five screws and washers (5mm) on the motor plate.

Page 3 of 8 14 Carefully remove the Z motor out of the carriage housing. 15 Remove the pulley, clamp and belt from the top of the lead screw. Upper Bearing 16 Carefully lift the upper bearing out of the top of the carriage housing. 17 Remove the six cap screws (5mm) from the top of the carriage housing.

Page 4 of 8 18 Remove the two screws (5mm) from the bottom of the bearing block assembly. Top Bearing 19 Carefully lift the top of the carriage housing and remove the Z lead screws, sliding it forward and down. 20 Remove the bearing from the top of the lead screw assembly and install on the new lead screw assembly. Installing the Z-Axis Lead Screw To Install the Z-Axis lead screw 1 Carefully slide lead screw up and in, while lowering the top of the carriage housing. 2 Reinstall two screws (5mm) into lower bearing block assembly. 3 Align bearing block assembly to front of carriage assembly (snug screws to finger tight, screws will be torqued later).

Page 5 of 8 4 Carefully replace the upper bearing on top of the carriage housing. Upper Bearing 5 Install six mounting screws (5mm) to the top of the carriage assembly (snug screws to finger tight, screws will be torqued later). 6 Carefully slide the Z motor back in carriage housing. 7 Reinstall the five mounting screws (5mm) with the washers on the motor plate. Leave the screws loose. 8 Reinstall the pulley, belt and clamp on the top of the lead screw. Use a 3mm Allen wrench to tighten the pulley clamp. 9 Using pliers reinstall the spring on the Z motor to re-tension the belt. 10 Fully tighten the five mounting screws (5mm) to secure the Z motor plate. 11 Install the four screws (5mm) to the upper bearing blocks (snug screws finger tight, screws will be torqued later). 12 Carefully lift the Z plate and install the two screws (5mm) for the center nut block (snug screws finger tight, screws will be torqued later).

Page 6 of 8 13 While holding the top of the Z-Axis lead screw, carefully rotate to align the holes. Install the four screws (5mm) to the lower bearing block (snug screws finger tight, screws will be torqued later). 14 Plug in and turn on the router. Orient the machine. 15 Using the Sabre keypad, slew the Z-Axis up and down to full length of travel. Repeat several times. 16 With the Z-Axis in full upright position, torque the six cap screws (5mm) from the top of the carriage housing to 88 inch pound. 17 With the Z-Axis in full low position, torque the two screws (5mm) that holds the lower bearing block, to 88 inch pound. 18 With the Z-Axis in the mid position, torque to 88 inch pound the remaining 10 screws (5mm) that hold the bearing block and the nut block assembly. Verifying the encoder pulse position 1 Put a piece of paper (masking) tape vertically on the Z-Axis Plate and on the Z-Axis housing 2 to 3 from the top of it s travel. 2 Plug in and turn on the router. 3 Push the A key on the keypad to orient the router.

Page 7 of 8 4 Hold a pen horizontally and firmly against the bottom of the lower spring bracket. When the Z-Axis pauses for the first time while orienting, mark both pieces of tape with an accurate line. 5 Once the Z-Axis finishes orienting make a second mark on the tape. 6 Measure the distance between the two marks on the tape. The distance should measure between 0.16 to 0.20. 7 If the measurement is correct, you are finished. Reinstall the cover on the top of the carriage, the spindle motor, the springs, and the vacuum shroud. If it is not, continue this procedure. 8 Mark a third line on the tape at.18 from the first line. 9 Loosen the Z-Axis motor pulley clamp (3mm). 10 Rotate the motor pulley to move the Carriage to line up with the third mark. 11 Re-tighten the motor pulley clamp (3mm) and return to Step 1 to verify the adjustment. 12 Using the four screws (2.5mm) reinstall the carriage cover. 13 Reinstall the upper and lower spring brackets.

Page 8 of 8 14 Reinstall the spindle motor. Run a test job to check performance before resuming production