TR21042 Geotechnical BIM: Applying BIM principles to the subsurface

Similar documents
Implementing BIM for infrastructure: a guide to the essential steps

The role of geotechnical data in Building Information Modelling

The Geotechnical Data Journey How the Way We View Data is Being Transformed

BIM FOR INFRASTRUCTURE THE IMPACT OF TODAY S TECHNOLOGY ON BIM

Recent Advances in BIM in Geotechnics

BIM & Emerging Technologies. Disrupting Design process & Construction

Moving to Model-Based Design

Developments in BIM Infrastructure Design. Barry Blake 3 rd June 2014

Session 3 _ Part A Effective Coordination with Revit Models

AVEVA PDMS. Business Benefits. Accurate and clash-free 3D plant design

Accuracy, Precision, Tolerance We understand the issues in this digital age?

How Digital Engineering Will Change The Way We Work Together To Design And Deliver Projects Adam Walmsley, BG&E, Australia.

Piping Workflow for MEP AutoCAD Piping Phil Nower Hazen and Sawyer

GEOTECHNICAL SERVICES

MP BIM at the Heart of the MEP Subcontractor Business

UNIT-III LIFE-CYCLE PHASES

ActionCAD. ActionCAD provides a professional service to the Construction Industry

MEP Coordination. Ir. Dr. Sam C. M. Hui Faculty of Science and Technology

Practice ideas in getting digital information across the design-construction interface

BIM Workflow for Roads and Highways Using the Autodesk Portfolio

Autodesk for the Transportation Industry. Experience It Before It s Real

BIM Introduction. Building Information Management Definitions, Applications and general information. Betty Bezos

Tidal Energy. Transmission & Distribution Network. Wind Energy. Offshore Substation. Onshore Substation. Tidal Stream Energy.

Autodesk Navisworks: Using Autodesk Navisworks in a BIM Workflow

Make 50 Years of Experience Count

What is BIM and why should construction lawyers care about it? Dr. Carrie Sturts Dossick, P.E. Bita Astaneh Asl

BIG IDEAS. Personal design interests require the evaluation and refinement of skills. Learning Standards

THE USE OF A SAFETY CASE APPROACH TO SUPPORT DECISION MAKING IN DESIGN

AVEVA PDMS 12.0 The 3D plant design application for accurate and clash-free plant design

Evolving the JET Virtual Reality System for Delivering the JET EP2 Shutdown Remote Handling Task

Why Moving from AutoCAD to AutoCAD MEP Just Makes Sense!

MESSAGES. International Society for Soil Mechanics and Geotechnical Engineering

LINKING PROCESS MAPPING AND TECHNOLOGY: A CASE STUDY OF TEAMWORK 2001

Factors influencing the adoption of building information modeling in the AEC Industry

Discovering the source of smart:

NOW and NEXT BIM THE CONSTRUCTION PUZZLE- HOW TO MAKE EVERYONE WORK COLLABORATIVELY?

Plant Design work flow Using Autodesk Plant Design Suite Ultimate. Carlos Caminos CAD Manager - Venture Engineering & Construction, Inc.

BIM Technology Certificate Program

Using machine learning to identify remaining hydrocarbon potential

An ecosystem to accelerate the uptake of innovation in materials technology

UT D Substation Design A Brownfield Approach

Bridgeway has always been an equal opportunities employer, as we believe that values, behaviours, and competence are the key attributes of any

EXPERIENCES OF IMPLEMENTING BIM IN SKANSKA FACILITIES MANAGEMENT 1

Designing with BIM for Infrastructure on Large Transportation Projects

Agenda 1 Introduction 2 Navisworks Overview

Utilization of Revit Applications as Preliminary Shop Drawings to Improve Construction processes

AGENDA: BIM Introduction. Large-Scale Value. Value for Architects. Conceptual BIM / Small BIM. All-Out BIM. BIM Introduction

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin

Final Report of the Subcommittee on the Identification of Modeling and Simulation Capabilities by Acquisition Life Cycle Phase (IMSCALCP)

FUTURE NOW Securing Digital Success

Using BIM to follow up milestones in a project plan during the design phase

BIG IDEAS. Personal design interests require the evaluation and refinement of skills. Learning Standards

Services Overview. Northeast Blueprint

BIM. e Submission Guideline Structural. Annex 1a. Recommended Process Revit 2010

Put Your Designs in Motion with Event-Based Simulation

AS How to Use Dynamo to Visibly Show Navisworks Clashes into Revit

Emerging Subsea Networks

Optimizing wind farms

IS 525 Chapter 2. Methodology Dr. Nesrine Zemirli

What s New in Bentley Civil SELECTseries 3

OpenBridge Modeler: What is it and how can I use it today?

Technology Readiness Assessment of Department of Energy Waste Processing Facilities: When is a Technology Ready for Insertion?

Effective engineering solutions

BIM and Urban Infrastructure

PDMS INFORMATION BOOKLET. Date: 15/08/2013 SEPC

Autodesk Inventor LT. Easy as 1, 2, 3D.

September 2017 PGM:TSX-V

Railway Training Simulators run on ESRI ArcGIS generated Track Splines

Integrating Survey, CAD and GIS into a Single Solution

Improved Methods for the Generation of Full-Ship Simulation/Analysis Models NSRP ASE Subcontract Agreement

CONSTRUCTION MACHINES IN THE DIGITAL AGE CONSTRUCTION EQUIPMENT MAKERS NEED TO FIND THEIR PLACE IN SMART BUILDING SITES. Romed Kelp and David Kaufmann

Drawing Module, Import-Export

BIM-MEP AUS ROAD MAP Parliamentary Launch

White paper The Quality of Design Documents in Denmark

D8.1 PROJECT PRESENTATION

1st ANNUAL BIM REPORT Foreword

The Collaborative Digital Process Methodology achieved the half lead-time of new car development

BIM/VDC on TAA Projects:

Design of Roundabouts using Corridor Models (Part 1 of 2)

LD20558-L Parking Lots with AutoCAD Civil 3D Corridors

2013 A Giant Leap Forward for openbim

Engineered Resilient Systems DoD Science and Technology Priority

DFI Europe Chapter Digitalisation Working Group

ThinkPlace case for IBM/MIT Lecture Series

Company Profile. Introduction. Contents. Orbitcad.com since 2009 Providing AutoCAD & Revit Support to Clients Globally

Early-stage BIM for CERN s Future Circular Collider studies

Notes from a seminar on "Tackling Public Sector Fraud" presented jointly by the UK NAO and H M Treasury in London, England in February 1998.

COMOS Walkinside 10.2

Building Information Modeling: An Academic Perspective

We ll Get You There. Petroxin Petroleum Solutions 2016

DOCTORAL THESIS (Summary)

Imagine your future lab. Designed using Virtual Reality and Computer Simulation

Information Flow and Simulation Support in the Product Development Process - A Case Study

Role of BIM. in Plumbing System -K Chandrakanth and M Vinay Kumar. Abstract. 3 Dimension. Introduction: Collaborative Design:

Integrating Design using BIM and IFC

Wind Energy Technology Roadmap

A Study on the Impacts of Computer Aided Design on the Architectural Design Process

Transmission Innovation Strategy

LINKING CONSTRUCTION INFORMATION THROUGH VR USING AN OBJECT ORIENTED ENVIRONMENT

National Biodiversity Information System. Brenda Daly South African National Biodiversity Institute

Transcription:

TR21042 Geotechnical BIM: Applying BIM principles to the subsurface Gary Morin Keynetix Learning Objectives How the general principles of BIM can be applied to the subsurface. The use of tools such as HoleBASE SI to efficiently collate and manage geotechnical data How AutoCAD Civil 3D can be used to model and visualize subsurface data Techniques for sharing geotechnical data with the wider construction team Description While the use of BIM has grown massively in recent years, too frequently it appears to start from the ground up, with the geology and subsurface being ignored. This is a significant omission as the whole premise of BIM is to reduce costs by reducing risk at the early design stage and throughout the lifetime of the project. This class will look at how the core BIM principles, of data sharing, collaboration and process can be used and applied to the geotechnical process, illustrated with the case study; Silvertown Road Tunnel. It will highlight the use of tools, like AutoCAD Civil 3D and Navisworks together with HoleBASE SI, for combining information from previous projects together with a wide range of other data sources, maps drawings and models. This leads to a better understanding of the site and improved processes to model and visualize geology and subsurface data with the wider team, which will ultimately help to reduce risk and save money. Your AU Expert(s) Gary Morin originally trained as a civil engineer and has over 30 years of experience working in the production and support of a range of geographic information and CAD software systems. He is now the Technical Director of Keynetix, which he co-founded in 2000 to specialize in geotechnical data management software. He heads up the geotechnical Building Information Modeling (BIM) development, and is responsible for the design and support services for a range of products designed to manage geotechnical data in the BIM process, including the HoleBASE SI Extension, the Geotechnical Module from Autodesk, Inc., and the advance HoleBASE SI Extension for AutoCAD Civil 3D software. In recent years Morin has been at the forefront of geotechnical BIM and how it can Page 1

change working practices to enable a better understanding and integration of geotechnical data into the wider construction process Gary.morin@keynetix.com LinkedIn: uk.linkedin.com/in/garymorin63 Page 2

Introduction One of the biggest areas of risk and uncertainty in any construction project is the unseen subsurface ground conditions, in fact it has been reported that over a third of construction projects that overrun cite unforeseen ground conditions as a major contributor to the overrun. This class looks at how BIM principles can be applied to geotechnics to help reduce uncertainty and produce a better site investigation which is fit for the project and ultimately will help to reduce risk and cost Traditional Process Many geotechnical professionals work within a process that has been developed over time. Even though they think and visualize in 3D, information is passed through traditional means via reports containing 2D site plans and log sheets. The next person in the design process has to decipher the information and again try to understand it and visualize it in 3D. If we take a look at the development of CAD through to the current BIM working practices, we will see how the technology has evolved from the initial replacement of the drawing board through to more automated drawing and eventually through into full 3D BIM. We can compare this to the evolution of software within the geotechnical industry. Originally borehole logs were drawn by hand, then graphic software was developed to aid the drawing of the logs, and in time, software added data management to allow borehole logs to be printed at a touch of a button. This is where it ends for many the production of a Log. The Log is an important document as it contains the important information, but ultimately it is either a piece of paper or a PDF file and the data within it cannot easily be reused or analyzed. TRADITIONAL GEOTECHNICAL SOFTWARE For the geotechnical information to be used again in the design process, information has to be relearnt and often re-entered from the reports and logs, this is a slow, time-consuming process prone to error. BIM principles (Process, Collaboration and Whole Life) together with the enabler, 3D Digital Data, can be applied to geotechnical engineering. The process is illustrated by highlighting the benefits experienced by the proposed Silvertown Tunnel project team DEFINITION OF BIM The manufacturing world claims the origin for BIM. Years before an item went into production, numerous prototypes would be designed and tested. Electrical and mechanical designers would come together to see how they could work more collectively to improve the prototype over a number of iterations before the first version would go into production. The manufacturer would Page 3

keep the item's data and model to feed into any improvements required through the whole life of the component. This process cannot be fully replicated in construction as a tunnel, road, building or other infrastructure cannot be built, refined, demolished and rebuilt. However, in the virtual world, using the right processes and methodologies, a virtual prototype can be built using components from different Civil Engineering disciplines. This virtual version of the project can then be used to refine the design and construction process and kept to assist with the lifetime maintenance of the structure. BIM can be broken down into three main principles and a digital data enabler when applying it to Geotechnical Engineering: Process BIM PRINCIPLES BIM requires agreed repeatable procedures, methods and workflows, to allow data and information to be quickly captured, processed and shared. Collaboration Many of the benefits of BIM are obtained by visualizing and analyzing data in context with information from other disciplines, thus ensuring engineers see the big picture and can make decisions that are more informed. Whole Life Refers to retaining and building on data and knowledge collected over the life of the project so that it can be reused and refined. In a non-bim environment information is often lost and has to be relearnt at each stage of the project. By managing data and knowledge, it can be used throughout the life of the structure and possibly in future projects. Digital Data (3D) Digital data is the core and enabler that allows the benefits of BIM to be achieved. For BIM to succeed, common agreed formats need to be used. For geotechnical data the UK and various parts of the world are blessed with having mature agreed standards, AGS (Association of Geotechnical and Geo-environmental Specialists, www.ags.org.uk/data-format ), in the United States the DIGGS (Data Interchange for Geotechnical and Geoenvironmental Specialists, www.diggsml.org ) format is starting to emerge as the preferred format. Both formats enable the transfer of geotechnical and geo-environmental data within and between organizations. When Page 4

utilizing data interchange standards, compiling geotechnical data requires importing the data from the data interchange file into the chosen geotechnical data management system. One of the main benefits of BIM is the cost savings generated by using the virtual prototype model to highlight and remove potential problems before the construction stage, in essence helping to visualize problems which before may have been unseen. Better understanding and subsequent refining of the project from the collaboration of design data helps to minimize problems later in construction. Problems identified and resolved at an earlier stage cost considerably less than rectifying them later in the construction process. This is highlighted in the MacLeamy Curve which illustrates the ability to reduce a project s costs if informed decisions can be made earlier in the design stage. MACLEAMY CURVE One of the standard usages for BIM is highlighting where objects from different disciplines might intercept and cause problems during construction (often called Clash Detection), for instance in a building the ventilation ducting may clash with a structural beam. This problem is heightened by ongoing changes in the design with different disciplines working, unknowingly, with out-ofdate data. The same process can be applied to Geotechnical Engineering, for example, a road cutting being realigned into different, or difficult, ground conditions that has a significant impact on the construction process. The Silvertown Tunnel Project Transport for London (TfL), the statutory authority responsible for most aspects of Greater London s transport system, is planning a new road tunnel under the River Thames in East London. The proposed Silvertown Tunnel between Silvertown and North Greenwich will ease the strain on the nearby Blackwall Tunnel and other existing crossings. Engineering and design consultancy Atkins developed the project s reference design. There are many challenging problems in the area; the south portal of the tunnel route is the site of a demolished gas works. The soil in that area is contaminated and there are still remnants of the underground foundations of the plant. On the south and north banks, the proposed tunnel location comes close to the pylon foundations of the Emirates Air Line cable car. Additionally, the north bank tunnel portal is in the area of the now-filled western entrance to the Royal Page 5

TUNNEL ALIGNMENT CHALLENGES Victoria Dock and some demolished warehouses. Like the gas works on the south bank, there are still underground remnants of these features. The route of the tunnel will need to thread through heavily industrialized areas of London; areas which contain many different ground conditions, roads, foundations and other subsurface structures. Atkins realized that to reduce the overall project costs and risk they needed a better way to visualize and understand the ground conditions in context with existing built conditions and wider site challenges. One example was to have a better way of estimating the quantities of contaminated ground that will be impacted by construction. The costs of treating contaminated materials makes accurate volume calculations vital for assessing cost implications. The BIM Approach Atkins, the geotechnical engineers, knew they had a lot of existing information available for the site, from historic maps to more recent digital data from recent projects. They realized that by using this information it would be a sizeable aid in understanding the site conditions and allow them to design a refined site investigation building upon the existing knowledge. Atkins decided to take a two-pronged approach to the project, collating the existing geotechnical knowledge in a geotechnical data management system, and at the same time developing a 3D ground model of the site and ground conditions. The two were then integrated to generate a 3D geotechnical model with the intention of constantly refining the geotechnical data and model throughout the whole process from preliminary investigation, full site investigation, design and onwards. Geotechnical Data Page 6

For many years Atkins have embraced geotechnical data management, using standard methods and processes for managing their various geotechnical jobs. The use of standardization enabled them to collate geotechnical data from various projects in the area, coupled with AGS format digital data supplied by the client. Historic Maps Various historic maps and plans were available including old plans for the demolished gas works, warehouses, and piers and foundations of the old dock entrance. 3D Models The project team also had access to, or created, a number of 3D models, including the proposed tunnel alignment together with other proposed structures relating to the tunnel. POSSIBLE OBSTRUCTIONS Due to the client's approach to whole life BIM on previous projects, the team were also able to obtain the as-built data for the cable car foundations. Geotechnical Data Management Atkins collated and imported geotechnical data from the previous projects into the new project within their already established geotechnical data management system, HoleBASE SI developed by Keynetix. The process was relatively straightforward as the data was available in the common AGS format allowing them to take advantages of a standard method for sharing that digital data offers. Atkins had to ensure that a common datum was used across all imported projects together with standard geology classifications. The DIGGS format will fulfill this function in the USA in the near future; however, in the meantime agreed process and workflows must be agreed by each project team. Page 7

HOLEBASE SI SHOWING EXISTING AND NEW BOREHOLE LOCATIONS Historic maps from Ordnance Survey and geological maps from the British Geological Survey were also combined into the geotechnical data management system, building up a mosaic of known information around the site. By having easy access to past data in conjunction with seeing it in context with the environmental and geotechnical data allowed them to design a refined site investigation, building upon the existing knowledge. In parallel, Atkins used AutoCAD Civil 3D to create an existing conditions model of the project area (both above and below the surface) based on a variety of data sources such as TfL s asbuilt data for the cable car foundations, and historical data for the demolished gas works foundations, warehouses, and piers and foundations of the old dock entrance. The proposed tunnel alignment was added and other proposed structures relating to the tunnel. One of the advantages of using a common drawing format like DWG, much of the data was already in the format, for the data that was not it was relatively easy to convert to it. Before combining all of the datasets into one ground model, Atkins also had to ensure that they all used the same coordinate system and datum. As the information was created it was also combined together within Navisworks to allow the collaborating teams to see how the model combined. Combined Geotechnical Model As Atkins had used HoleBASE SI it allowed for the geotechnical data in the system and to be easily integrated with AutoCAD Civil 3D. It also enabled the geotechnical data from the management system to be visualized within the 3D ground model and gave them the ability to quickly combine, organize, and manage geotechnical data in the context of the existing and proposed above and below ground structures, again helping to improve and refine their knowledge of the site. Page 8

3D BOREHOLES AND POSSIBLE OBSTRUCTIONS The software used allowed subsurface models representing the geology strata to be created inside AutoCAD Civil 3D directly from the geotechnical data stored in HoleBASE SI. The initial model, automatically created, needed manipulating and cleaning up. This process was carried out by the team using all available contextual information together with functionality within the chosen software. The big advantage was that it helped the team to visually understand and evaluate the design alignment, pinpoint potential construction obstructions, and determine what new site investigations were needed. By analyzing the historical and available data within the model environment they reduced the number of exploratory holes required for the site investigation, which translated into reduced project time and cost for the client. THE COMBINED GEOTECHNICAL MODEL As the project progressed into the site investigation stage, the new site investigation data was added to the project in the geotechnical data management system, and used to further refine the 3D geotechnical model to enable better understanding of the ground conditions. Page 9

The dynamic link between the HoleBASE SI geotechnical database and the AutoCAD Civil 3D model, which allowed them to have a rapid workflow and enabled updated geotechnical data to be quickly viewed in context with the wider model. The savings in the time required for recreating or manually synchronizing the geotechnical data and 3D model gave them more time to further refine and improve the project design. Moreover, it also helped to automatically generate earthworks and contamination quantities for project costing and risk assessment. Advantages of collaborative BIM Once a federated model had been created within Navisworks it was clear how the geotechnical BIM approach would benefit the wider construction team. It became clear to the structural team that once the approach ramps slab was incorporated with the geotechnical model the groundwater conditions would cause problems with their current design. The federated model including the geotechnical material has also been used to generate the necessary sections for the acoustic analytical software. The project is still in the design stage, however when it reaches construction there will be a number of distinct advantages that the BIM approach has facilitated. The 3D geotechnical model can be passed on to the construction team allowing them to quickly build on existing data and reduce the time and cost of increasing their own knowledge. The 3D geotechnical model will provide a distinct baseline for the construction team to compare their findings. If differences are seen during construction it will be possible to incorporate them into the model and any potential consequences can be better predicted and managed. Conclusion Atkins have found the use of a fully integrated, multidisciplinary model, including subsurface geology, to be of significant value for both the Geotechnical Engineers and the wider design teams. By visualizing ground conditions in a design context, they have potentially reduced project risk and costs during construction. The client did mandate the use of BIM as an overall concept for the project, although it was the team s decision to apply BIM principles to the geotechnical process in particular and generate the 3D geological model and in doing so they have found many benefits from it: The visual model allowed a better understanding of the site and enabled them to pinpoint potential construction obstacles The model allowed them to improve their estimates on earthwork and contamination quantities The use of existing client knowledge and BIM data led to a significant reduction in the number of new exploratory holes required. Streamlined workflows saved time and effort in updating and integrating data The project team are finding more uses for the geotechnical model across the wider project, which should ultimately lead to cost savings for the client and protection of geotechnical knowledge. The use of a fully integrated, multidisciplinary Civil 3D model, including subsurface geology, has been a real eye-opener for the team. By visualizing ground conditions in a design context, we can reduce project risk and project costs during construction. Simon Miles, Principal Geotechnical Engineer, Atkins Page 10