PACIFIC LASER SYSTEMS. HVL100 Procedures

Similar documents
45 CUTTING HEAD TILE SAW-BLADE ALIGNMENT PROCEDURE

Mounting a BalanceBox 400 to a brick wall

7902 Dado Jig. Owners Manual Please Read Carefully! Hardware List: 7902 Parts List:

7878 K940. Checkpoint Antenna. Kit Instructions. Issue B

ABM International, Inc.

Z-Truck Up-and-Down Motion. Y-Truck Side-to-Side Motion. Head. Squaring Plate. Sliding Plate FIGURE 1: THE CARVEWRIGHT MACHINE

Video Wall Installation Instructions 2W X 3H, 3W X 3H

LOFT DOOR HANGER BARN DOORS & HARDWARE. Hardware Installation Instructions. Page

User Instructions Multiline Otter Scoreboard Caddy Assembly

Installation Manual ZGuard Mounting Options

ESA-200 Fixed Sidelite

ICU TRACKLESS SLIDING DOOR

Series 4 HV Single Monitor Lift Assembly Instructions

Heavy-Duty Bypass Track System

Installation Manual MODEL E-42

ESA-300 Full Breakout

TABLE OF CONTENTS REQUIRED TOOLS

Plug-n-Show Stake Down Pixel Tree Kit 16 strips of 25 pixels Assembly Instructions

For additional assistance call

SAM. Model: STV-C65 LCD Mobile Visualized Stand Instruction Manual. Weight Capacity: 1251bs / 56.7kg Suits LCD Flat Panel Display: 42"-55" Page 20

ICU TRACK SLIDING DOOR

Installing flat panels on the MPL15 wall mount

Heavy Duty I-Beam Trolley

TOYOTA TUNDRA CARGO DIVIDER Preparation. Part Number: PT

TRUE TECHNICAL SERVICE MANUAL - ALL MODELS. DOORS/DRAWERS/LIDS

PLEASE CHECK ALL BOXES FOR HARDWARE BEFORE DISCARDING WARRANTY AND USER INFORMATION CAN BE FOUND AT THE END OF THESE INSTRUCTIONS

1 Removing The Screen Track, Screen and Screen Rollers Note: The screen remains in the track while the track is removed and/or installed.

Mount to the Wall INSTALLATION MANUAL

Assembly Instructions for model: VMPR1

AutoThrow for A&D by Adam MacDonald

PULL-THRU USER S MANUAL

Safety glasses Measuring tape Level Pencil Power drill Center punch Phillips screw driver Saw horse

INSTALLATION INSTRUCTIONS Small Flat Panel Height-Adjustable, Extended Pitch Swing Arm Wall Mount Model KWE-110

Installation Manual MODEL AE-46

Congratulations! You are now on your way to enriching your life with!

* * 98/9950WDC. Fire-Rated Devices include these. additional components. 1-Point Latch (LBL)

Repair Instructions. Replacing a La Z Time Mechanism Side Subassembly. Remove the Back(s): Remove the Mechanism Assembly: CAUTION.


Eraser Conveyor Belt Cleaning System IWARNING Always obey all applicable safety rules. Be sure all power to the conveyor has been disconnected and con

Band-Master ATS Nano Pneumatic Banding Tool Operating Instructions

GlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas)

6 Foot/ 1800mm Aisle Width Net-Contain Aisle Containment for N-Type and S-Type Cabinets

Panosaurus Rex. May Please Visit To view the setup video for the Panosaurus Rex.

MM340 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

MK52 Series ULTRA-LOW FREQUENCY VIBRATION ISOLATION WORKSTATION ASSEMBLY AND OPERATION INSTRUCTIONS

Small Flat Panel Height-Adjustable Dual Swing Arm Wall Mount With Universal Slat Wall Mount (MSP-JS-KWG-110)

Inventory (Figure 2)

SmartView Mounting Frame 3 Wide x 3 Deep Video Wall Display Installation Guide

mila-wall (Series100) General Operating Instructions page 1 of 15

AUDI A8 D3 REPLACING THE OUTSIDE DRIVER DOOR HANDLE

Installation Instructions

INS T A L L A TIO N INS T R U C TIO N S HORSESHOE W/ BAR HANGER

Removing and Replacing the Y-truck

Installation Instructions

STEINBERGER TRANSTREM (TYPE 2) TECHNICAL DOCUMENT

INSTALLATION TORSION SPRING FRONT OR REAR MOUNT LOW HEADROOM. 1 Cutting Vertical Track. 2 Fully Adjustable Jamb Brackets

Rim-Lock Door Set Installation Instructions

MM750 Installation Instructions

Installation Instructions for Converting Hinging on Roll-In Refrigerators

Electric Skein Winder

MM540 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

Laser LA-4P. Operating instructions

3-way Transfer Valve Trim

BY ALIEN TECHNOLOGIES CORP

Adjusting Ibanez SR405QM Truss Rod

LCD MONITOR/TV WALL MOUNT

Inventory (Figure 2)

INSTALLATION INSTRUCTIONS INS T A L L A TIO N INS T R U C TIO N S THE MAVERICK HANGER R H

001-Component-build. Build the following Contraptor components before assembly:

INSTALLATION INSTRUCTIONS Small Flat Panel Mounts Model: F-Series

Installation and Assembly: Flat Video Wall Mount For 40" to 65" Flat Panel Displays

MPA-9000 Universal Ceiling Projector Mount Kit

Thermostatic Valve Trim

LIGHT BEAM ANTENNA MaxRange Antenna Series Assembly Instructions MaxRange Plus Digital / High Definition Television Antennas

Multi Use Telescoping Pole Instructions Model

media:scape HDVC Wall Mount

GlideRite Retractable Cover System For Hot Spot Spas (SE & SLX only)

Installing Brackets to Minimize Distortion in Your SMART Board 685ix Interactive Whiteboard System s Projected Image

MantelMount. TM1A Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

Door Hardware Installation Instructions. Version A No Interior on an Un-prepped Door Step 1 Select the Position of the Handleset

Operation Manual Panel Mounting Gas Pressure Regulators

INSPECTION AND CORRECTION OF BELLHOUSING TO CRANKSHAFT ALIGNMENT

Installation Instructions

INSTALLING INVISIRAIL GLASS PANELS POST INFORMATION... 2 PRE-INSTALLATION... 2

C70 Window Roller Repair Taken from: Heres the problem:

Chapter 23. Garage Construction

RPMSP Series Installation Guide

ABM International, Inc. Navigator Assembly Manual

6000 Horizontal Router Table Owners Manual Please Read Carefully!

3 wide x 3 deep Video Wall Display Installation Guide

Diptych Bath Screen Installation Guide

MyStudio VS53 Versa Sweep Setup Instructions

American Morse Equipment

MODEL T TON HYDRAULIC PRESS INSTRUCTIONS (For Machines Mfd. Since 10/17)

NEPAL Installation procedure

QUAD 1000 OWNERS MANUAL OPERATION GUIDE

Laser LAX 300. Operating instructions

CarvLock HDLM6 Manual Machinable Jaw Vise

TorqueMaster Replacement Spring

DiGiT Numbering System

Transcription:

PACIFIC LASER SYSTEMS HVL100 Procedures A. Setting Up for Level Calibration of Horizontal Lines, Plumb and Down pg. 2 B. Setting Up for Vertical Line Calibration pg. 4 C. Setting Up for Square Calibration pg. 5 D. Checking Level Line Calibration pg. 6 E. Checking Plumb Up Beam Calibration pg. 8 F. Checking Plumb Down Beam Calibration pg. 9 G. Checking Vertical Line Calibration pg. 10 H. Checking Square Calibration pg. 11 I. Removing Housing from Core pg. 12 J. Adjusting Vertical Line Back to Calibration pg. 13 K. Adjusting Horizontal Line Back to Calibration pg. 14 L. Adjusting Down Beam Back to Calibration pg. 15 M. Adjusting Plumb Beam Back to Calibration pg. 16 N. Adjusting Square Back to Calibration pg. 16 O. Placing Housing Back to Core pg. 17 1/18

A. Setting Up for Calibration of Horizontal Lines, Plumb, and Down Beam 1. Use targets with 1/8 scale to check level. 2. Place target at 60ft away (far field target). If space is limited, place target closer to the tool. The target needs to be scaled according to the distance from the tool. 3. Place a 2nd target approx. 3ft (1m) away from the tool (near field target). (Fig. A- 1) 1st 2nd 60ft Tool Fig. A-1 3ft 4. Use a level platform to set the tool on. (Fig. A-2) Fig. A-2 5. Place a 6 diameter adjustable mirror above the tool for plumb up calibration check. (Fig. A-3) 6 Dia. Fig. A-3 2/18

6. Place an adjustable mirror below the tool for plumb down calibration check. (Fig. A-4) Fig. A-4 7. Place a target twice the scale of the main beam target for plumb up beam at 60 ft away from tool. (Fig. A-5) 1/8 in Plumb Target Fig. A-5 1/4 in 8. Place a target with 0.08 scale for down beam at 4.5ft away from tool. (Fig. A-6).08.04 Fig. A-6 3/18

B. Setting Up for Vertical Line Calibration 1. On a 20ft high wall, place 1 st target 20ft away from tool. Place 2 nd target 10ft above the 1 st target. Place 3 rd target 20ft above the 1 st target. (Fig. B-1, B-2) 3rd 2nd 20ft 10ft Tool 20ft Fig. B-1 1 st Fig. B-2 2. Align three targets using a plumb bob hanging in front of the targets. (Fig. B-3) Fig. B-3 3. The scale on 3 rd target is 0.058 inches (1.5mm) to be in calibration. 4. The scale on 2 nd target is 0.047 inches (1.2mm) to be in calibration. 5. The vertical line is always place at the center of bottom target. 4/18

6. Place a camera in each target and connect to a monitor to easily view the line on the target. (Fig. B-4, B-5) Fig. B-4 Fig. B-5 C. Setting Up for Square Calibration 1. Use a theodolite mounted to an adjustable height tripod to check the square left and right beams. (Fig. C-1) Fig. C-1 2. To setup targets, mark the down reference point of theodolite, mark the level reference point at zero position, and mark another level reference point at 90 degree from zero position. (Fig. C-2) Target 1 90 Target 2 Theodolite Fig. C-2 5/18

D. Checking Level Line Calibration 1. Set tool on the level platform. Center down beam on stage. (Fig. D-1) Fig. D-1 2. Point one of the horizontal lines to center of the near field target. (Fig. D-2) Near Field Target Fig. D-2 3. Adjust height of stage until the line is on center of target. (Fig. D-3) Fig. D-3 4. Rotate and point tool to the far field target. (Fig. D-4) 6/18

Far Field Target Fig. D-4 5. Verify if center of beam is 1/8 within the target (± 40 asec). (Fig. D-5) 40 40 Fig. D-5 6. Rotate tool until ends of line appear on target. Verify if beams are 1/8 within the target. Intermittently cover one end of line and verify if the lines are overlapping within 40 asec. Fig. D-6 and Fig. D-7 Fig. D-6 Fig. D-7 7. Repeat until all horizontal lines have been checked. 7/18

E. Checking Plumb Up (Intersection of Lines) Calibration 1. Center down beam on stage. (Fig. E-1) Fig. E-1 2. Adjust mirror until up beam is on center of plumb target. (Fig. E-2) Plumb Up Mirror Tool Plumb Down Fig. E-2 3. Rotate tool 180 degrees from initial position while maintaining down beam on reference target. (Fig. E-3) Plumb Up Mirror Fig. E-3 Tool Plumb Beam 4. Verify if up beam is within the ¼ radius of target. Fig. E-4 shows a plumb beam 1/8 inches off from center of target. Since the mirror is adjusted to point the 8/18

beam to the center of target, rotating the tool 180 degrees from initial position will place the beam ¼ away from center of target. 0 1/4 in Tool Fig. E-4 F. Checking Plumb Down Beam Calibration 1. Set tool on a level platform (Fig. F-1). Adjust mirror until down beam is on center of target. (Fig. F-2) Fig. F-1 Fig. F-2 2. Rotate tool 180 degrees from initial position while maintaining up beam on reference target. (Fig. F-3) Up Beam Tool Down Beam Mirror Fig. F-3 9/18

3. Verify if down beam is within the 0.08 radius of target at 4.5ft away. (Fig. F-4) Fig. F-4 G. Checking Vertical Line Calibration 1. Center down beam on stage. (Fig. G-1) Fig. G-1 2. Rotate tool until the vertical line is lined up with Bottom targets (use as reference). (Fig. G-2) CENTER BOTTOM TOP Fig. G-2 3. Verify if vertical line straightness is 1/8 within the target. Repeat until all vertical lines are checked. 10/18

H. Checking Square Calibration 1. Place tool on a level stage. (Fig. H-1) Fig. H-1 2. Place the down beam on the down reference mark. (Fig. H-2) Fig. H-2 3. Rotate tool until center of the vertical line is aligned to reference 0 on target 1. (Fig. H-3) Target 1 Fig. H-3 11/18

4. Check the second vertical line if it is within +/- 1/8 from center of the square target. (Fig. H-4) Target 2 Fig. H-4 5. Repeat step 1 thru 4 until all squares are checked. I. Removing Housing from Core 1. Using a T10 Torx screwdriver to remove the three screws that secure the housing. (Fig. I-1) Fig. I-1 2. Carefully lift the housing up. (Fig. I-2) Fig. I-2 12/18

3. Turn on the power with horizontal and two vertical lines on. Carefully disconnect the wire connector from the control board and set the housing aside. (Fig. I-3) (Fig. I-3) J. Adjusting Vertical Line (Straightness) Back to Calibration 1. Set core on a level stage. Use 1.5mm Hex screwdriver for adjustment. 2. If the vertical line is toward the right side. (Fig. J-1) Adjust the top screw clockwise (tighten) in order to move the line to the left. Note: turn screw slightly since adjustment is very sensitive. Fig. J-1 3. If the screw is too tight, you will have to slightly loosen (counter clockwise) the screw that is on the opposite side. Fig. I-2 13/18

4. Adjust until the line is 1/8 within the target. Repeat the above steps until the remaining vertical lines are within specification. 5. Calibration of square needs to be verified after adjusting vertical line straightness. K. Adjusting Horizontal Line (Level) Back to Calibration 1. Set core on a level stage. Use 1.5mm Hex screwdriver for adjustment. 2. If left side of horizontal line is higher, adjust the center screw clockwise (tighten) to lower the line and vice versa. If the screw is too tight, you will have to slightly loosen (counter clockwise) the screw on the opposite side. (Fig. K-1) Note: turn screw slightly since adjustment is very sensitive. Fig. K-1 3. If center portion of the horizontal line is higher in the far field target, slightly loosen the 2 top screws and tighten the 2 bottom screws Fig. K-2. 14/18

4. If center portion of the horizontal line is lower in the far field target, slightly loosen the 2 bottom screws and tighten the 2 tops screws Fig. K-3. L. Adjusting Down Beam Back to Calibration 1. Set core on a level stage. Use a 1.2mm Hex screwdriver for adjustment. 2. Observe the location of down beam. When down beam is at the lower position (Fig. L-1), rotate tool back to initial position and turn screw in clockwise direction to bring the beam downward (Fig. L-2). Readjust mirror until beam is at center of target. Rotate tool 180 degree and recheck beam position. Make more adjustment until beam is within specification. Note: turn screw slightly since adjustment is very sensitive. Fig. L-1 Fig. L-2 15/18

M. Adjusting Plumb Beam Back to Calibration 1. Set core on a level stage. Use 1.5mm Hex screwdriver for adjustment. 2. Plumb adjustment is similar to vertical adjustment. Only make small adjustment at a time on both vertical lines from opposite ends (ex. V1 and V3 or V2 and V4) (Fig. M-1). Misalignment of the line from two opposite ends will create double line (Fig. M-2). Note: turn screw slightly since adjustment is very sensitive. V1 Double Line V4 V2 V3 Fig. M-1 Fig. M-2 N. Adjusting Square Back to Calibration 1. Use 1.5mm Hex screwdriver for adjustment. 2. Vertical line toward the right side angle between LD1 and LD 2 is acute (< 90 ) & angle between LD 2 & LD3 is obtuse (>90 ). (Fig. N-1) LD 1 < 90 LD 2 >90 Fig. N-1 LD 3 3. Loosen (counter clockwise) LD2 screw and tighten the opposite side of the screw in order to steer the line back to the left side. (Fig. N-2) Note: turn screw slightly since adjustment is very sensitive. 16/18

LD1 LD2 LD2 LD3 Fig. N-2 O. Placing Housing Back in Core 1. Install wire connector back on control board. (Fig. O-1) Fig. O-1 2. Carefully put housing back on the core. (Fig. O-2) Make sure that wires are not pinched. Fig. O-2 17/18

3. Align the screw holes and install the three screws back onto the housing with a T5 Torx screwdriver. (Fig. O-3) Fig. O-3 18/18