UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND DETAILS SEVERE WEATHER

Similar documents
UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND DETAILS STANDARD

NEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS FIBRE CEMENT CLADDING

RECOMMENDED INSTALLATION PROCEDURE LEVEL 3

Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications.

INSTALLATION SHOP DRAWINGS FOR MINNEAPOLIS, MN

900 SERIES WALL PANELS

Butyl Flash. Installation Instructions. Prep & General Conditions

CFDTT-01. Control Joint Study (General)

DW HORIZONTAL INSTALLATION

WindowSeal. Installation Instructions. Prep & General Conditions

SERIES 300 SINGLE HUNG WITH FIN WINDOW INSTALLATION

Read guide from beginning to end before starting installation. Read all warnings and cautions during unit installation.

DW VERTICAL INSTALLATION

Before installation, check your local and state requirements for this type of install.

Fold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GLOSSARY ROUGH OPENINGS

400 SERIES VERTICAL INSTALLATION

eco-shake INSTALLATION INSTRUCTION

SERIES 300 SINGLE HUNG WINDOW INSTALLATION

RECOMMENDED INSTALLATION PROCEDURE LEVEL 3

RECOMMENDED INSTALLATION PROCEDURE LEVEL 3

A REFERENCE GUIDE OF TYPICAL RAINSCREEN WALL AND WINDOW DETAILS

KS SERIES - VERTICAL INSTALLATION

How To Install Windows: Nail-Fin Application

DOOR INSTALLATION GUIDE WOOD FRAMING New Construction

Installation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit.

(773) INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GL OSSARY ROUGH OPENINGS

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows without Exterior Trim or Nailing Fin (JII025) ImpOrTaNT INFOrmaTION & GlOssary.

Eagle clad double-hung window installation instructions

Sun Windows General Information New Construction Hinged Door Installation Instructions

All Window Installation Instruction

MULTISLIDE DOORS INSTALLATION GUIDE & SITE PREPARATION

Installation Guide. for E-Series/Eagle Clad Hinged Inswing French Door

Installation Guidelines For ALUMINUM M-SERIES 3 PANEL SLIDING DOOR

SECTION SHEET METAL FLASHING AND TRIM

Installation Guidelines. Next Dimension. Single Hung / Single Hung Fixed / Double Hung / Sliding Window / Fixed Window

Curtain Wall Installation Guide

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001)

SERIES 4070-T GENERAL ASSEMBLY AND INSTALLATION INSTRUCTIONS

Providing 3 Layers of Protection

INSTALLATION INSTRUCTIONS for Vinyl Projecting Windows with Integral Nailing Fin (JII023)

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows with Exterior Trim or Nail Fin (JII024)

WEB BASED CORE APPLICATION SPECIFIC INSTALLATION INFORMATION AND METHODS

INSTALLATION INSTRUCTIONS for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII032)

FOLDING DOOR - FOR FACTORY ASSEMBLED JAMBS WITH APPLIED SILL

KS42 MF SERIES - HORIZONTAL INSTALLATION

Tools required by installer: Materials required by installer:

window installation Guide wood FRaMinG New Construction

GENERAL INSTALLATION GUIDELINES

GENERAL INSTALLATION GUIDELINES

ULTRA WINDOW & DOOR EXPANDERS AND RECEIVERS INSTALLATION INSTRUCTIONS

Integrity Polygon and Round Top Installation and Finishing Instructions

DHS-500 IMPACT SYSTEM INSTALLATION MANUAL

ForceField Air & Water Barrier System. installation instructions

Dear Contractor, I am glad that you are interested in our window rebate program.

Installation Guide for E-Series/Eagle Clad Mechanically Fastened Windows

POCKETING MULTI-SLIDE DOOR SYSTEM

STACKING MULTI-SLIDE DOOR SYSTEM

3M Air and Vapour Barrier 3015 Technical guide

Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement

Storefront Installation Guide

PIVOT DOOR 3400P INSTALLATION INSTRUCTIONS

TYPAR WEATHER PROTECTION SYSTEM TABLE OF CONTENTS. SPECIAL INSTALLATION CONSIDERATIONS Stucco** Brick** Stone Veneer** Wood Siding**

INSTALLATION INSTRUCTIONS for Wood Patio Doors without Exterior Trim or Nailing Fin (JII027)

THESE DETAILS ARE PROVIDED AS A GUIDELINE FOR PROPER PANEL AND ASSOCIATED COMPONENT INSTALLATION, AND ARE BASED ON INDUSTRY ACCEPTED PRACTICES.

DuPont Flashing Systems Commercial Installation Guidelines

Fibre Cement G C. Batten Fixing Setout ST-01. Jan 2014 A4 PROFILE DATE SCALE DETAIL DETAIL NO. Plank joint. 600mm stud crs.

INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS

Sun Windows General Information New Construction Sliding Door Installation Instructions H F

HydroGap Drainable Housewrap: Installation Instructions

Windows Installed into Walls with Polyiso and Wood Framing. Installation Instructions Picture Frame Method Revised 10/24/2016

Sliding Glass Door Assembly and Installation Guide

A. Provide a comprehensive guide to the products that are used when flashing, what they are used for, and the proper way to use them.

Windows Installed into Walls with Polyiso and Wood Framing. Installation Instructions Standard Method Revised 10/24/2016

Installation Instructions

Vinyl Windows Manufactured by VPI Quality Windows

Vinyl Windows and Doors Manufactured by VPI Quality Windows

INSTALLATION INSTRUCTIONS for Vinyl Projecting Windows with Integral Nailing Fin (JII023) IMPORTANT INFORMATION AND GLOSSARY ROUGH OPENINGS

Show them you're an InstallationMaster, and watch your business grow. InstallationMasters Training Manual Addendum Level RLC-1

CONTENTS. Transitions Board and Batten Vertical Installation... 10,11

Pebbletex Adhered Mat Design. Typical Details

INSTALLATION, STORAGE AND WALL CONSTRUCTION DETAILS

SERIES 3600-T GENERAL ASSEMBLY AND INSTALLATION INSTRUCTIONS

UNIT 5: EXTERIOR DOORS AND WINDOWS

4500 Series. Fabrication and Installation Instructions

Installation Recommendations for Finless Frame Doors

INSTALLATION INSTRUCTIONS for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII032) IMPORTANT INFORMATION AND GLOSSARY ROUGH OPENINGS

Inspire Aledora Slate Application Guidelines

INSTALLATION INSTRUCTIONS for Wood Patio Doors with Exterior Trim or Nailing Fin (JII026)

Installation Instructions for Wood/Clad Wood Windows with Exterior Trim or Nail Fin (JII024)

Norwood Windows Permaglass Fiberglass Products Installation Instruction

INSTALLATION GUIDE WOOD PIVOTING CIRCLE/ OVAL

INSTALLATION GUIDE. StreamLine Linear Drain. Supply Drainage Support.

FG-5100T STORMMAX INSTALLATION AND GLAZING MANUAL NOTE:

Installation Instructions for Vinyl Windows with Integral Nailing Fin (JII001)

Building Wrap and Flashing

In the 30-plus years that I ve been a remodeling contractor, I ve

With Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e Download 12,000 More Shed Plans

Metal & Vinyl, Flush Mount and Recessed Fin Windows Recommended Installation Instructions

Transcription:

CAMPUS STANDARDS APPENDIX I UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND DETAILS SEVERE WEATHER February 21, 2014

WINDOW INSTALLATION SEQUENCING GUIDE Issued By: Pyatok Architects and Allana Buick & Bers Inc. Issue Date: 02/21/14 These documents must be printed in COLOR Notes: 1. Details and photos show the windows at Kresge only. Sequencing is identical for the Stevenson windows, but refer to ASI 016 (01/03/14) and ASI 016-R1 (01/17/14) for details of the Stevenson windows. 2. Any conditions that do not allow the installation to be performed as outlined in this guide require immediate notification of the Architect. 3. Where elements on details and instructions are noted to be soldered. Elements are to be soldered water-tight, not just spot or tack soldered. Page 1 of 13

Window Sill Detail (Detail 1/AK9.01A) The rough opening is prepared by applying the Air & Water Barrier min. 3 inches into the rough opening. Apply primer in raw wood surfaces in rough opening to receive SAF. Page 2 of 13

ALL SAF installed to roll flat with J-Roller. SAF corner pieces installed at bottom corners 4 up jambs. Page 3 of 13

GSM angle along sill butted up to tapered shim and secured with S.S. Pan-Head screws or hot-dip galvanized ring-shanks nails to sill. SAF butterfly patches installed at sill GSM angle to jamb intersections. Page 4 of 13

12 wide SAF installed min. 4 over sheathing face, onto the GSM angle to interior edge of sill R.O. SAF butterflies installed at outside framing corners of sill. Page 5 of 13

Window Jamb Detail (Detail 2/AK9.01A) 12 wide SAF installed along jamb over sheathing face 4 and extending 4 beyond rough opening @ top & bottom. Page 6 of 13

SAF butterfly patches installed at jamb to head framing outside corners. Window Head Detail (Detail 3/AK9.01A) Page 7 of 13

9 wide SAF installed over window head and extended to outside edge of jamb SAF. Apply continuous bead of Silicone sealant at window head and jamb sides. Do not apply sealant along sill. Page 8 of 13

Window installed into rough opening into continuous bead of sealant along head and jambs. Fasten with S.S. Pan-Head Screws. Note: Install window shims as necessary. Use 1/16 inch drain mesh shims. Horseshoe Shims or 1/16 inch plastic drainage shims installed along sill flange are acceptable. Note: If drainage shims used do not extend past window frame width. IMPORTANT: STOP HERE AND WAIT FOR SEALANT TO CURE BEFORE PROCEEDING!!! Page 9 of 13

9 wide SAF installed over window flange jambs, extended 6 beyond sill & head rough openings 9 wide SAF installed over window head, extended to outside edge of jamb SAF. Page 10 of 13

GSM head flashing installed over window head. Fasten using S.S. Pan-Head Screws or hot-dip galvanized ring-shank nails. 9 wide SAF installed over GSM head flashing. Page 11 of 13

Dress top edge of head flashing with continuous bead of silicone sealant. Provide backer rod in void between window frame and R.O. @ jambs and head (Interior Side). Use appropriate size backer rod. Do not braid multiple rods together to fill wider gap. Page 12 of 13

Install GSM angles along jambs, set in a full-bed of sealant. (Interior Side) Provide sealant joint between window assembly and angle along sill, jambs, and header. (Interior Side) Page 13 of 13

DOOR INSTALLATION SEQUENCING GUIDE Issued By: Pyatok Architects and Allana Buick & Bers Inc. Issue Date: 02/21/14 These documents must be printed in COLOR Notes: 1. Details and photos show an out-swinging door. Sequencing is identical for inswinging doors. 2. Any conditions that do not allow the installation to be performed as outlined in this guide require immediate notification of the Architect. 3. Where elements on details and instructions are noted to be soldered. Elements are to be soldered water-tight, not just spot or tack soldered. Page 1 of 11

Door Threshold @ Landing (Detail 3/AS9.10) Sealant applied along door sill and wall flanges. Page 2 of 11

Fully soldered GSM sill pan set in full bed of sealant under sill and wall flanges. Sill pan to be set in recessed nailer, see detail (not shown in mockup photo) Apply hot-dip galvanized ringshank nail fasteners along vertical surfaces only. Confirm podium waterproofing installed onto door sill pan and up jambs prior to door frame installation. Page 3 of 11

Remove flange from bottom corners of door frame jambs prior to setting into rough opening. ALL SAF installed to roll flat with J-Roller. Page 4 of 11

Exterior Door Jamb (Detail 2/AK9.10A) Install SAF along door jambs and 3 onto header rough opening. Note: If Air and Water Barrier is applied onto full face of Jamb R.O. SAF can be omitted. Page 5 of 11

Exterior Door Head (Detail 1/AK9.10A) 12 wide SAF installed into full length of rough opening extending out over sheathing 4 Page 6 of 11

Door frame set into rough opening and secured to structure with pan-head screws or hot-dip galvanized ringshank nails. 24 GA GSM L-Metal installed, with minimum 1/4 contact between L-Metal and Door Frame, set in sealant. Page 7 of 11

6 wide SAF installed over L-Metal and under plaster stop. NOTE: GSM Drip to be installed prior to installation of SAF over L-metal. GSM head flashing installed, head flashing to overhang over door frame. Page 8 of 11

Plaster stop/j-mold installed, butted up to GSM head flashing. Note: Plaster stop inline with head flashing end dams. Page 9 of 11

6 wide SAF installed over plaster stop flange and extended over head flashing flange along jambs. 9 wide SAF installed over window head flashing. Page 10 of 11

Dress top edge of horizontal seam with continuous bead of silicone sealant. Page 11 of 11

PODIUM/LANDING INSTALLATION SEQUENCING GUIDE Issued By: Pyatok Architects and Allana Buick & Bers Inc. Issue Date: 02/21/14 These documents must be printed in COLOR Notes: 1. In the field, the landings are a concrete slab, not the wood frame shown in the mockup photos. Proper prepping and verifying slab slope away from the building will be required on site. 2. Any conditions that do not allow the installation to be performed as outlined in this guide require immediate notification of the Architect. 3. Where elements on details and instructions are noted to be soldered. Elements are to be soldered water-tight, not just spot or tack soldered. Page 1 of 11

Podium WP Typical Wall @ Landing (Detail 2/AK8.21) Prior to installation of podium WP confirm preceding installations complete (i.e. sheet metal saddles, door sill pans, continuous wall flashing, etc). Page 2 of 11

Clean the substrate(s) to receive podium waterproofing before proceeding with application of podium WP system. PRIMER is to be applied onto ALL substrates receiving the podium WP membrane. Page 3 of 11

Tape podium waterproofing edge line. Waterproofing to extend up to edge of Air & Water Barrier. 1 st Coat of podium waterproofing applied (approx. 90 mils). Page 4 of 11

Podium WP @ Door Threshold Following the application of 1 st coat of the WP membrane install the uncured neoprene onto the door sill pan. Note: Do not apply neoprene @ face of jamb R.O. & feather WP membrane to minimize build-up Podium WP @ Typ. Base Flashing Condition Uncured neoprene applied following application of the 1 st coat of WP membrane. Page 5 of 11

Podium WP @ Deck Edge at Landing (Detail 1/AK8.21) Apply 1 st coat of WP onto deck edge and place ½ the width of the uncured neoprene onto horizontal surface of edge and allowing min 3 of neoprene onto vertical surface. Page 6 of 11

Apply a bonding adhesive (sealant) onto the vertical surface of the deck edge to receive the uncured neoprene Pig Ear the corners of the overhanging neoprene. Do not slice neoprene at outside corners. Page 7 of 11

Apply WP membrane over uncured neoprene over deck edge. Set 24 GA S.S. Edge Metal into WP membrane and fasten as required. Note: Apply PRIMER onto S.S. edge metal on surfaces to come in contact with WP membrane (top and bottom of horizontal leg of edge metal). Page 8 of 11

Clean surface edge metal to receive podium WP prior to application. Field Application of Podium WP Following completion of WP detailing (i.e. base flashings, deck edges, saddles, etc.) Apply 1 st coat of podium WP (min. 90 mils) Page 9 of 11

2 nd Coat of podium waterproofing applied (approx. 125 mils) onto reinforcing fabric. Note: Feather podium WP at door jambs and sheathing face area for door frame to prevent build-up. Apply protection course over 2 nd Coat of podium WP. Note: For critical build-up areas only provide 1-layer of protection coarse (i.e. door jambs, lath accessories, etc) IMPORTANT: Perform Manufacturer s required testing prior to installations of drain mat & concrete overburden Page 10 of 11

Install UV metal counter flashing with hemmed edge on bottom of leg and fasten with stainless steel panhead screws or hot-dip galvanized ring-shank nails. Page 11 of 11

LATH & PLASTER/WALL PENETRATION INSTALLATION SEQUENCING GUIDE Issued By: Pyatok Architects and Allana Buick & Bers Inc. Issue Date: 02/21/14 These documents must be printed in COLOR Notes: 1. This document describes the installation for the plaster accessories, waterproofing for the electrical boxe penetrations, pipe penetrations, wall cap vents, louver vents, and scaffold tie-backs. 2. In the field, the landings are a concrete slab, not the wood frame shown in the mockup photos. Proper prepping and verifying slab slope away from the building will be required on site. 3. Any conditions that do not allow the installation to be performed as outlined in this guide require immediate notification of the Architect. 4. Where elements on details and instructions are noted to be soldered. Elements are to be soldered water-tight, not just spot or tack soldered. Page 1 of 26

Base of Wall (Detail 3/AK8.01A) Install GSM Drip Edge at Base of Wall onto substrate coated with Air & Water barrier with S.S. Pan-Head screws or hot-dip galvanized ring-shank nails. Note: Mitered joints to be set in a full bed of sealant 2 wide filling back of profile. Page 2 of 26

ALL SAF installed to roll flat with J-Roller. Install 9 wide SAF lapped over top leg of GSM Drip Edge. Page 3 of 26

Dress top edge of SAF with continuous bead of silicone sealant. Install 9 wide SAF onto substrate at locations where lath accessories are to be installed (i.e. control joints, corner aids, inside corners, etc.) Page 4 of 26

Scaffolding Bolt WP (Detail 10/AK8.01) Apply SAF sill at bolt onto sheathing with Air & Water Barrier (Step 2) Page 5 of 26

Apply second piece of SAF head at bolt, staggered vertically 3 (Step 3) Apply sealant along top edge of SAF and all around bolt (Step 4) Page 6 of 26

Electrical Wall Penetration (Detail 2/AK8.02) Install S.S. flashing around electrical box, and fasten with S.S. Pan-Head screws or hot-dip galvanized nails as required. Note: Plaster stop around electrical box flashing to be continuous. Page 7 of 26

Install 9 wide SAF alongside flanges of electrical box flashing. Apply SAF along top flange of electrical box flashing. Page 8 of 26

Dress top edge of SAF with continuous bead of sealant to seal horizontal seam. Fabricated Penetration Flashing (Detail 12/AK8.01) Page 9 of 26

Install 1-piece or 2- piece (for 2-piece flashing, provide sealant at lap seams) and fasten to substrate as required. Note: Provide sufficient gap between flange and pipe to allow for backer rod and sealant or nonexpanding foam. Step 1: Install 9 wide SAF along side flanges Step 2: Install 9 wide SAF along top flange Step 3: Dress top edge of SAF with continuous bead of sealant to seal horizontal seam. Page 10 of 26

Make-Up Air Wall Cap Termination (Detail 2/AK8.61) Install fully-soldered wall cap with insect screen into R.O. coated with Air & Water Barrier 3 into opening and fasten with S.S. Pan-Head screws or hot-dip galvanized ring-shank nails. Note: Plaster stop around wall cap flashing to be continuous. Page 11 of 26

Install 9 wide SAF along jambs of wall cap flanges Install 9 wide SAF along top flange of wall cap Page 12 of 26

Dress top edge of SAF with continuous bead of sealant to seal horizontal seam Louver Flashing Sequence Diagram (Detail 4/AK9.02) Page 13 of 26

Louver Sill Detail (Detail 1/AK9.02) The rough opening is prepared by applying the Air & Water Barrier min. 3 inches into the R.O. Apply primer on raw wood surfaces in R.O. to receive SAF. Page 14 of 26

No Photo (Similar to window installation, but without sloping shim) SAF corner pieces installed at bottom corners 4 up jambs. Install GSM angle along sill. Set in sealant and fasten with S.S. pan-head Screws or hot-dip galvanized nails placed approximately within 3/8 from interior face of louver. Page 15 of 26

SAF butterfly patches installed at sill GSM angle to jamb intersections. (Photo from window installation, but can be applied to louver installation) Install 12 wide SAF min. 4 over sheathing face, onto the GSM angle to interior edge of sill R.O. (Photo from window installation, but can be applied to louver installation) Page 16 of 26

SAF butterflies installed at outside framing corners of sill. (Photo from window installation, but can be applied to louver installation) Louver Jamb Detail (Detail 2/AK9.02) Page 17 of 26

Install 6 wide SAF installed along full face of jamb and head rough opening if Air & Water Barrier has not been applied over full depth of rough opening. Install fully-soldered GSM collar flashing around opening. Fasten with S.S. pan-head screws or hot-dip galvanized nails. Page 18 of 26

6 wide SAF at jams, over collar flashing extended 6 beyond sill & head rough openings. Louver Head Detail (Detail 2/AK9.02) Page 19 of 26

6 wide SAF installed over window head, extended to outside edge of jamb SAF. GSM head flashing installed over the louver head, fasten with S.S. pan-head screws or hot-dip galvanized nails. Page 20 of 26

9 wide SAF installed over GSM head flashing No Photo Dress top edge of head flashing with continuous bead of silicone sealant. Page 21 of 26

Install louver into rough opening and set in sealant along sill angle. Install GSM angle along jambs & header into louver, set in a bed of sealant, fastened with S.S. pan-head screws. Note: Where opening is not accessible from the interior, install angles before louver Page 22 of 26

Fasten louver to angle, from front or back as required by manufacturer. Provide sealant joint between louver assembly and angle along jambs and header (interior side). Apply backer rod and sealant between louver and collar flashing around sill and jam. Apply sealant between louver and head flashing Page 23 of 26

Base of Wall (Detail 3/AK8.01A) Installation of drain mat fastened to substrate with staples and nails where necessary IMPORTANT: Fasten ALL accessories to sheathing PRIOR to lath. Page 24 of 26

Drainage layer geotextile fabric to be lapped over seams. Stucco stop with no weep holes fastened over drainage layer at base of wall. Page 25 of 26

Control joint accessories fastened prior to installation of lath Lath fastened a minimum of 6 o.c. with grip-rite fastener, and minimum 3 minimum lap at edges. Page 26 of 26

Architect s Supplemental Instructions No. 035 Mockup Manual Installation Guides_DETAILS PROJECT: UC, Santa Cruz Infill Apartment Repairs Santa Cruz, CA 95064 Project No. 1652 OWNER: UC, Santa Cruz Physical Planning & Construction 1156 High Street, Barn G Santa Cruz, CA 95064 FROM ARCHITECT: Pyatok Architects, Inc. 1611 Telegraph Ave., #200 Oakland, CA 94612 TO CONTRACTOR: Blach Construction Company 469 El Camino Real, Suite 100 Santa Clara, CA 95050 ARCHITECT S SUPPLEMENTAL INSTRUCTION NO: 035 Mockup Manual Installation Guides_DETAILS DATE OF ISSUANCE: 02/21/14 CONTRACT FOR: Phase 1 CONTRACT DATE: Amendment 2: 9/3/13 ARCHITECT S PROJECT NUMBER: 1308 OWNER: ARCHITECT: CONSULTANT: CONTRACTOR: FIELD: Via e-mail The Work shall be carried out in accordance with the following supplemental instructions issued in accordance with the Contract Documents without change in the Contract Sum or Contract Time. Proceeding with the Work in accordance with these instructions indicates your acknowledgement that there will be no change in Contract Sum or Contract Time. DESCRIPTION: Attached are the revised and new details associated with the Mockup Manual Installation Guides that were never issued through an official ASI. Please use these details to replace any preexisting details. Below is a list of the details attached, the details that were revised through a separate ASI (reference ASI noted), and the details that did not require revisions. Revisions bubbled in red on detail sheets. ATTACHMENTS (REVISED DETAILS): 1. ASK 2.06R1 Kresge Window Sill Detail (1/AK9.01A) 2. ASK 2.07R2 Kresge Window Jam Detail (2/AK9.01A) 3. ASK 2.08R2 Kresge Window Head Detail (3/AK9.01A) 4. ASK 2.09R1 Stevenson Window Sill Detail (1/AS9.01A) 5. ASK 2.10R1 Stevenson Window Jam Detail (2/AS9.01A) 6. ASK 2.11R1 Stevenson Window Head Detail (3/AS9.01A) 7. ASK 2.13R1 Louver Sill Detail (1/AK9.02, 1/AS9.02) 8. ASK 2.14R1 Louver Jamb Detail (2/AK9.02, 2/AS9.02) 9. ASK 2.15R1 Louver Head Detail (3/AK9.02, 3/AS9.02) 10. ASK 2.16R1 Exterior Door Head (1/AK9.10A, 1/AS9.10A) 11. ASK 2.17R1 Exterior Door Jamb (2/AK9.10A, 2/AS9.10A) 12. ASK 2.18R1 Exterior Door Threshold at Landing (3/AK9.10A, 3/AS9.10A) 1611 Telegraph Avenue Suite 200 Oakland, CA 94612 p:510-465-7010 f:510-465-8575 www.pyatok.com

13. ASK 2.20R1 Scaffolding Bolt Waterproofing Diagram (10/AS8.01, 10/AS8.01) 14. ASK 2.21 GSM Door Pan Flashing (4/AS9.10, 4/AK9.10) 15. ASK 2.22 Enlarged Wall at Landing (10/AS8.21, 10/AK8.21) 16. ASK 2.23 Enlarged Deck Edge Detail (9/AS8.21, 9/AK8.21) (NOT REVISED, BUT INCLUDED AS PART OF MOCKUP MANUAL) 17. ASK 2.24 Fabricated Penetration Flashing (12/AK8.01, 12/AS8.01) REVISED DETAILS ISSUED THROUGH SEPARATE ASI S: 1. ASI 018 a. ASK 5.01 b. ASK 5.02 c. ASK 5.02 2. ASI 028 a. ASK 2.03R1 - DETAILS THAT DID NOT REQUIRE REVISION: 1. ASI 016 a. ASK 2.01 b. ASK 2.12 Louver Flashing & Sequence Diagram ISSUED BY THE ARCHITECT: (Signature) Curtis M. Caton Jr., AIA, Principal (Printed Name and Title) 1611 Telegraph Avenue Suite 200 Oakland, CA 94612 p:510-465-7010 f:510-465-8575 www.pyatok.com

SHADE 1/2" WD. WINDOW APRON 3/4" THICK WD. WINDOW SILL, BACK PRIME CONT. SEALANT BEAD 1/8" GAP FROM WINDOW TO ANGLE. (MAX. 3/16") ALUMINUM WINDOW, SEE SPECIFICATIONS SEALANT 1/16" HORSESHOE SHIM AT +/- 12" O.C. 1/2" GYP. BD. PATCH AS REQ'D. CONT. SLOPED SHIM 3/4" VERT. LEG x 1" 24 GA GSM ANGLE SAF, WRAPPED UP ONTO ANGLE AND FULL DEPTH OF R.O. DRAINAGE LAYER (EXISTING STRUCTURE) AIR AND WATER BARRIER, CONT. ONTO SHIM 1611 Telegraph Avenue, Suite 200 Oakland, California 94612 510.465.7010 p 510.465.8575 f www.pyatok.com TITLE: KRESGE - WINDOW SILL DETAIL U.C. SANTA CRUZ INFILL APARTMENTS REPAIRS DATE: SCALE: ATTACHED TO: REF. DWG: 01/17/14 6" = 1'-0" 1/AK9.01A DWG. NO: ASK 2.06-R1 2/21/2014 5:58:06 PM

CEMENT PLASTER AIR AND WATER BARRIER, CONT. MIN. 3" INTO ROUGH OPENING 12" SAF, LAP O/ WINDOW FIN DRAINAGE LAYER SAF, CONT. INTO FULL DEPTH OF ROUGH OPENING SET HEAD AND JAMB FLANGES IN SEALANT BACKER ROD ALUMINUM WINDOW, SEE SPECIFICATIONS +/- 1/4" WIDE JOINT W/ SEALANT L-METAL MIN. SPACE REQ'D FROM G.S.M. ANGLE TO F.O. GYP. BD. 1/4" (EXISTING STRUCTURE) 1"X1", 24 GA GSM ANGLE W/ HEMMED EDGE. SET IN A FULL BED OF SEALANT O/ SAF AND FASTEN @ 12" O.C., MIN. GYP. BD. WINDOW WRAP 5/8" SHIM SHADE 5/8" 2" SHADE OVERLAP PAST JAMB, TYP. ~ 1 3/16" 1611 Telegraph Avenue, Suite 200 Oakland, California 94612 510.465.7010 p 510.465.8575 f www.pyatok.com TITLE: KRESGE - WINDOW JAMB DETAIL U.C. SANTA CRUZ INFILL APARTMENTS REPAIRS DATE: SCALE: ATTACHED TO: REF. DWG: 02/13/14 6" = 1'-0" 2/AK9.01A DWG. NO: ASK 2.07-R2 2/21/2014 6:00:12 PM

DRESS EDGE W/ SEALANT TO SEAL HORIZ. SEAM ABOVE (NOT SHOWN) CEMENT PLASTER DRAINAGE LAYER AIR AND WATER BARRIER, CONT. MIN. 3" INTO ROUGH OPENING 12" SAF, EXTEND O/ HEAD FLASHINGS ~ 3 9/16" 1-1/8" X 3-1/2" CONTINUOUS PAINTED BLOCKING BLACKOUT WINDOW SHADE UNIT 9" SAF, LAP O/ WINDOW FIN 12" SAF, RUN CONT. INTO FULL DEPTH OF ROUGH OPENING (EXISTING STRUCTURE) BACKER ROD GSM HEAD FLASHING (PAINT) W/ END CLOSURE AND END DAMS. EXTEND UP WALL 4" MIN. SEALANT FILLET SET HEAD AND JAMB FLANGES IN SEALANT ALUMINUM WINDOW, SEE SPECIFICATIONS +/- 1/4" JOINT W/ SEALANT 1 1/8" L-METAL, TYP. SHADE GYP. BD. WINDOW WRAP 1611 Telegraph Avenue, Suite 200 Oakland, California 94612 510.465.7010 p 510.465.8575 f www.pyatok.com TITLE: KRESGE - WINDOW HEAD DETAIL U.C. SANTA CRUZ INFILL APARTMENTS REPAIRS DATE: SCALE: ATTACHED TO: REF. DWG: 02/13/14 6" = 1'-0" 3/AK9.01A DWG. NO: ASK 2.08-R2 2/21/2014 6:02:09 PM

SHADE 1/2" WD. WINDOW APRON 3/4" WD. WINDOW SILL ALUMINUM WINDOW, SEE SPECIFICATIONS 1/8" GAP FROM WINDOW TO ANGLE. (MAX. 3/16") SEALANT CONT. SEALANT BEAD 1/16" HORSESHOE SHIM AT +/- 12" O.C. 1/2" GYP. BD. PATCH AS REQ'D. CONTINUOUS SLOPED SHIM 3/4" VERT. LEG x 1" 24 GA GSM ANGLE SAF, WRAPPED UP ONTO ANGLE AND FULL DEPTH OF R.O. DRAINAGE LAYER (EXISTING STRUCTURE) ~ 2 11/16" AIR AND WATER BARRIER, CONT. ONTO SHIM 1611 Telegraph Avenue, Suite 200 Oakland, California 94612 510.465.7010 p 510.465.8575 f www.pyatok.com TITLE: STEVENSON - WINDOW SILL DETAIL U.C. SANTA CRUZ INFILL APARTMENTS REPAIRS DATE: SCALE: ATTACHED TO: REF. DWG: 02/21/14 6" = 1'-0" 1/AS9.01A DWG. NO: ASK 2.09-R1 2/21/2014 6:23:25 PM

CEMENT PLASTER AIR AND WATER BARRIER, CONT. MIN. 3" INTO ROUGH OPENING. 12" SAF, LAP O/ WINDOW FIN DRAINAGE LAYER SET HEAD AND JAMB FLANGES IN SEALANT SAF, CONT. INTO FULL DEPTH OF ROUGH OPENING ALUMINUM WINDOW, SEE SPECIFICATIONS +/- 1/4" WIDE JOINT W/ SEALANT (EXISTING STRUCTURE) L-METAL MIN. SPACE REQ'D FROM G.S.M. ANGLE TO F.O. GYP. BD. 1"X1", 24 GA GSM ANGLE W/ HEMMED EDGE. SET IN A FULL BED OF SEALANT O/ SAF AND FASTEN @ 12" O.C., MIN. GYP. BD. WINDOW WRAP 5/8 SHIM SHADE 1/4" 3 1/2" SHADE OVERLAP PAST JAMB, TYP. ~ 2 11/16" 1611 Telegraph Avenue, Suite 200 Oakland, California 94612 510.465.7010 p 510.465.8575 f www.pyatok.com TITLE: STEVENSON - WINDOW JAMB DETAIL U.C. SANTA CRUZ INFILL APARTMENTS REPAIRS DATE: SCALE: ATTACHED TO: REF. DWG: 02/21/14 6" = 1'-0" 2/AS9.01A DWG. NO: ASK 2.10-R1 2/21/2014 6:18:48 PM

DRESS EDGE W/ SEALANT TO SEAL HORIZ. SEAM ABOVE (NOT SHOWN) CEMENT PLASTER DRAINAGE LAYER AIR AND WATER BARRIER, CONT. MIN. 3" INTO ROUGH OPENING. 5 1/16" 2-3/8" X 3-1/2" CONTINUOUS PAINTED BLOCKING BLACKOUT WINDOW SHADE UNIT 12" SAF, EXTEND O/ HEAD FLASHINGS (EXISTING STRUCTURE) 9" SAF, LAP O/ WINDOW FIN 12" SAF, CONT. INTO FULL DEPTH OF ROUGH OPENING BACKER ROD GSM HEAD FLASHING (PAINT) W/ END CLOSURE AND END DAMS. EXTEND UP WALL 4" MIN. SEALANT FILLET SET HEAD AND JAMB FLANGES IN SEALANT ALUMINUM WINDOW, SEE SPECIFICATIONS +/- 1/4" JOINT WITH SEALANT L-METAL, TYP. GYP. BD. WINDOW WRAP 2 5/8" SHADE 1611 Telegraph Avenue, Suite 200 Oakland, California 94612 510.465.7010 p 510.465.8575 f www.pyatok.com TITLE: STEVENSON - WINDOW HEAD DETAIL U.C. SANTA CRUZ INFILL APARTMENTS REPAIRS DATE: SCALE: ATTACHED TO: REF. DWG: 02/21/14 6" = 1'-0" 3/AS9.01A DWG. NO: ASK 2.11-R1 2/21/2014 6:17:03 PM

INSTALLATION ANGLE AT JAMBS (BEYOND). SEE DETAIL CONT. 1" x 1" GSM L ANGLE. HEM VERTICAL EDGE. SET IN FULL BED OF SEALANT CONT. AROUND OPENING. REPAIR GYP. BD. FINISH WHERE OCCURS SHIM 3/8" INSECT SCREEN GSM COLLAR FLASHING BEYOND SECURE LOUVER TO ANGLE IN A FULL BED OF SEALANT 12" S.A.F., WRAP UP OVER INSTALLATION ANGLE AND INTO FULL DEPTH OF R.O. LOUVER FASTEN ANGLE TO FRAMING SEALANT AND BACKER ROD FULLY SOLDERED FOUR SIDED GSM COLLAR FLASHING, 4" FLANGE FASTENER CEMENT PLASTER W/ METAL LATH (EXISTING STRUCTURE) DRAINAGE LAYER AIR AND WATER BARRIER. CONT. MIN. 3" INTO R.O. PLYWOOD SHEATHING 1611 Telegraph Avenue, Suite 200 Oakland, California 94612 510.465.7010 p 510.465.8575 f www.pyatok.com TITLE: LOUVER SILL DETAIL U.C. SANTA CRUZ INFILL APARTMENTS REPAIRS DATE: SCALE: ATTACHED TO: REF. DWG: 01/28/14 6" = 1'-0" 1/AK9.02 & 1/AS9.02 DWG. NO: ASK 2.13R1 2/21/2014 6:15:08 PM

CEMENT PLASTER W/ METAL LATH SEALANT AND BACKER ROD LOUVER 3/8" DRAINAGE LAYER 6" SAF OVER GSM COLLAR FLASHING FULLY SOLDERED FOUR SIDED GSM COLLAR FLASHING, 4" FLANGE AIR AND WATER BARRIER. CONT. MIN. 3" INTO R.O. FASTENER GSM COLLAR FLASHING BEYOND SAF ALONG ENTIRE FACE OF R.O. FASTEN LOUVER TO ANGLE, FROM FRONT OR BACK AS REQ'D BY MANUFACTURER. SET IN SEALANT PLYWOOD SHEATHING INSECT SCREEN INSTALLATION ANGLE AT BASE (BEYOND). SEE DETAIL CONT. 1" x 1" GSM L ANGLE. SET IN FULL BED OF SEALANT CONTINUOUS AROUND OPENING. REPAIR GYP. BD. FINISH SHIM FASTEN ANGLE TO FRAMING (EXISTING STRUCTURE) PLAN 1611 Telegraph Avenue, Suite 200 Oakland, California 94612 510.465.7010 p 510.465.8575 f www.pyatok.com TITLE: LOUVER JAMB DETAIL U.C. SANTA CRUZ INFILL APARTMENTS REPAIRS DATE: SCALE: ATTACHED TO: REF. DWG: 01/28/14 6" = 1'-0" 2/AK9.02 & 2/AS9.02 DWG. NO: ASK 2.14R1 2/21/2014 6:13:17 PM

DRESS EDGE W/ SEALANT TO SEAL HORIZ. SEAM ABOVE (NOT SHOWN) PLYWOOD SHEATHING (EXISTING STRUCTURE) CEMENT PLASTER W/ METAL LATH 6" SAF OVER GSM COLLAR FLASHING FASTENER DRAINAGE LAYER SAF ALONG ENTIRE FACE OF R.O. FASTENER ANGLE TO FRAME 9" SAF OVER HEAD FLASHING 24GA GSM HEAD FLASHING, 4" FLANGE. OVER COLLAR FLASHING FULLY SOLDERED GSM COLLAR FLASHING, 4" FLANGE REPAIR GYP. BD. FINISH WHERE OCCURS CONT. INSTALLATION ANGLE. SET IN FULL BED OF SEALANT CONTINUOUS AROUND OPENING. INSECT SCREEN INSTALLATION ANGLE AT JAMBS (BEYOND). SEE DETAIL 1" SEALANT AIR AND WATER BARRIER. MIN. 3" INTO R.O. SECURE LOUVER TO ANGLE IN A FULL BED OF SEALANT - FROM FRONT OR BACK AS REQ'D BY ASSEMBLY GSM COLLAR FLASHING, BEYOND LOUVER 1611 Telegraph Avenue, Suite 200 Oakland, California 94612 510.465.7010 p 510.465.8575 f www.pyatok.com TITLE: LOUVER HEAD DETAIL U.C. SANTA CRUZ INFILL APARTMENTS REPAIRS DATE: SCALE: ATTACHED TO: REF. DWG: 01/28/14 6" = 1'-0" 3/AK9.02 & 3/AS9.02 DWG. NO: ASK 2.15R1 2/21/2014 6:10:41 PM

PLYWOOD SHEATHING AIR AND WATER BARRIER CONT. MIN. 3" INTO R.O. DRESS EDGE W/ SEALANT TO SEAL HORIZ. SEAM 9" SAF, OVER HEAD FLASHING DRAINAGE LAYER CEMENT PLASTER (E) HEADER (E) GYPSUM BOARD LAP S.A.F. INTO DOOR R.O. AND UP WALL AS SHOWN OVER AIR AND WATER BARRIER, UNDER HEAD FLASHING DOOR FRAME ANCHOR PER MANUF..GSM HEAD FLASHING (PAINT)- OVERHANG OVER DOOR FRAME 1/4" GAP AT RATED DOORS GYP. BD. MUST EXTEND INTO FRAME THROAT MIN. 1/2", REPLACE INT. WALL PANELS AS REQ'D. WEATHERSTRIPPING/ SMOKESEAL STEEL DOOR FRAME OUTSWING EXTERIOR DOOR: SEE DOOR SCHEDULE NOTE: 1/ AS9.10A SIMILAR (IN-SWING DOOR AT STEVENSON) 1611 Telegraph Avenue, Suite 200 Oakland, California 94612 510.465.7010 p 510.465.8575 f www.pyatok.com TITLE: KRESGE - EXTERIOR DOOR HEAD U.C. SANTA CRUZ INFILL APARTMENTS REPAIRS DATE: SCALE: ATTACHED TO: REF. DWG: 01/28/14 3" = 1'-0" 1/AK9.10A & 1/AS9.10A DWG. NO: ASK 2.16R1 2/21/2014 6:08:34 PM

CEMENT PLASTER GSM PLASTER STOP/ J- MOLD, TYP. BACKER ROD AND SEALANT 24 GA GSM L-METAL W/ 4" LEG. PROVIDE MIN. 1/4" CONTACT BTWN. L-METAL AND DOOR FRAME. SEAL CONTACT POINT. AT BASE OF FRAME, SEAL FRAME TO TOPPING SLAB (FOAM AND SEALANT) DRAINAGE LAYER AIR AND WATER BARRIER, CONT. MIN. 3" INTO R.O. PLYWOOD SHEATHING SAF, 9" WIDE. OVER PLASTER STOP SAF, 6" WIDE. OVER L- METAL, UNDER PLASTER STOP ALIGN OUTSWING EXTERIOR DOOR: SEE DOOR SCHEDULE WEATHERSTRIPPING/ SMOKESEAL STEEL DOOR FRAME SAF, ALONG FULL FACE OF R.O.. REQ'D. ONLY IF FULL FACE OF R.O. NOT COVERED BY AIR & WATER BARRIER DOOR FRAME ANCHOR PER MANUF. MIN. 3 PER JAMB, TYP. AT RATED DOORS GYP. BD. MUST EXTEND INTO FRAME THROAT MIN. 1/2", REPLACE INT. WALL PANELS AS REQ'D. (E) GYPSUM BOARD: 5/8" TYPE 'X' NOTE: 2/ AS9.10A SIMILAR (IN-SWING DOOR AT STEVENSON) 1611 Telegraph Avenue, Suite 200 Oakland, California 94612 510.465.7010 p 510.465.8575 f www.pyatok.com TITLE: KRESGE - EXTERIOR DOOR JAMB U.C. SANTA CRUZ INFILL APARTMENTS REPAIRS DATE: SCALE: ATTACHED TO: REF. DWG: 02/21/14 3" = 1'-0" 2/AK9.10A & 2/AS9.10A DWG. NO: ASK 2.17R1 2/21/2014 6:06:35 PM

8 3/4" STEEL DOOR FRAME WEATHERSTRIPPING/ SMOKESEAL: SEE SPECS. INSWING DOOR: SEE DOOR SCHEDULE ALUMINUM SADDLE THRESHOLD, SET IN MASTIC SEALANT @ EACH END. INSTALL W/ SCREWS SET IN SEALANT. GSM SILL PAN WITH INTEGRAL END CAPS AT JAMS, SET IN FULL BED OF SEALANT APPLIED UNDER SILL & END CAPS. MAINTAIN VERTICAL SHAPE OF END DAM (DO NOT CRIMP DOWN ONTO MEMBRANE). SEE DETAIL 4/AK9.10 2 LAYERS 1/2" CDX PLYWD DOOR SHOE (PEMKO 216_FG) SEAL DOOR FRAME TO CONCRETE SLAB (FOAM & SEALANT). - 1/8 T.O. TOPPING SLAB SEALANT & BACKER ROD 1/2" MAX. SLOPE. FLOORING 1-1/4" GYPCRETE SUB-FLOOR ACOUSTICAL MAT 0 T.O. GYPCRETE NEW CONCRETE TOPPING SLAB DRAINAGE MAT PROTECTION BOARD. DO NOT OVERLAP LAYERS TO AVOID EXCESSIVE BUILD-UP REINFORCING FABRIC (DASHED) NEOPRENE REINFORCING (THICK LINE), RUN UP ONTO SILL PAN 5 1/2" (EXISTING STRUCTURE) 1-1/2" FACTORY- PROVIDED SCREW FASTENER. SET IN SEALANT AND SEAL HEAD. HOT FLUID APPLIED WATERPROOFING MEMBRANE, TYP. (CROSS HATCH). RUN UP ONTO SILL PAN CANT NOTE: 3/ AK9.10A SIMILAR (OUT-SWING DOOR AT KRESGE) 1611 Telegraph Avenue, Suite 200 Oakland, California 94612 510.465.7010 p 510.465.8575 f www.pyatok.com TITLE: EXTERIOR DOOR THRESHOLD @ LANDING U.C. SANTA CRUZ INFILL APARTMENTS REPAIRS DATE: SCALE: ATTACHED TO: REF. DWG: 02/21/14 6" = 1'-0" ASI 035 3/AK9.10A & 3/AS9.10A DWG. NO: ASK 2.18R1 2/21/2014 5:54:14 PM

STEP 1: APPLY AIR & WATER BARRIER AROUND BOLT STEP 3: APPLY SAF "HEAD" AT BOLT STEP 2: APPLY SAF "SILL" AT BOLT STEP 4: APPLY SEALANT ALL AROUND BOLT & SAF 1611 Telegraph Avenue, Suite 200 Oakland, California 94612 510.465.7010 p 510.465.8575 f www.pyatok.com TITLE: SCAFFOLDING BOLT WATERPROOFING DIAGRAM U.C. SANTA CRUZ INFILL APARTMENTS REPAIRS DATE: SCALE: ATTACHED TO: REF. DWG: 01/27/14 3" = 1'-0" 10/AS8.01, 10/AK8.01 DWG. NO: ASK 2.20R1 2/21/2014 6:04:13 PM

4" 4" TO TOP OF STRUCTURAL SLAB. FIELD VERIFY MATCH ROUGH OPENING WIDTH SOLDER ALL JOINTS, TYP. 4" 3/4 HIGH END DAM. HEM EDGE. SEE DETAIL. NOTE: 1. TYP. EXT. DOOR FLASHING 2. FABRICATE PAN FLASHING OF 24 GAUGE GALVANIZED SHEET METAL. FOLD UP VERTICAL EDGE BELOW THRESHOLD. DO NOT NAIL AT HORIZONTAL SURFACE. 5-1/2 1611 Telegraph Avenue, Suite 200 Oakland, California 94612 510.465.7010 p 510.465.8575 f www.pyatok.com TITLE: GSM DOOR PAN FLASHING U.C. SANTA CRUZ INFILL APARTMENTS REPAIRS DATE: SCALE: ATTACHED TO: REF. DWG: 02/21/14 3" = 1'-0" 4/AS9.10, 4/AK.10 DWG. NO: ASK 2.21 2/21/2014 6:26:24 PM

STAINLESS STEEL FLASHING, EXTEND ABOVE DRIP EDGE OF WEEP SCREED 3" MIN. & 1/2" BELOW TOP OF PAVING. HEM BOTTOM @ EDGE BACKER ROD AND SEALANT OVER COMBRESSIBLE FILLER BOARD STD. WEIGHT CONC. TOPPING SLAB, MIN 1-1/2" WIRE REINFORCEMENT DRAINAGE MAT PROTECTION COURSE (GREY) REINFORCING FABRIC (DASHED) HOT FLUID APPLIED WATERPROOFING MEMBRANE, TYP. (CROSS HATCH) NEOPRENE REINFORCING, RUN UP WALL (E) CONC. SLAB ON METAL DECK HOT FLUID APPLIED MEMBRANE FILLET CONTINUOUS 24GA. GSM WALL FLASHING 1611 Telegraph Avenue, Suite 200 Oakland, California 94612 510.465.7010 p 510.465.8575 f www.pyatok.com TITLE: ENLARGED WALL AT LANDING U.C. SANTA CRUZ INFILL APARTMENTS REPAIRS DATE: SCALE: ATTACHED TO: REF. DWG: 02/21/14 6" = 1'-0" 10/AS8.21, 10/AK8.21 DWG. NO: ASK 2.22 2/21/2014 6:31:52 PM

DRAINAGE COMPOSITE PROTECTION BOARD (GREY) REINFORCING FABRIC (DASHED) HOT FLUID APPLIED WATERPROOFING MEMBRANE, TYP. (CROSS HATCH) STAINLES STEEL CON-FORM DECK EDGE METAL NEOPRENE REINFORCEMENT OVER EDGE METAL. SEE DETAIL #3. REMOVE EDGE OF (E) SLAB NEOPRENEREINFORCING WRAP, DOWN FACE OF WALL, OVER BONDING ADHESIVE 6" 1/2" 24GA STAINLESS STEEL EDGE METAL. SET IN WP MEMBRANE AND FASTEN @ 6" O.C., 2-ROWS STAGGERED 1611 Telegraph Avenue, Suite 200 Oakland, California 94612 510.465.7010 p 510.465.8575 f www.pyatok.com TITLE: ENLARGED DECK EDGE DETAIL U.C. SANTA CRUZ INFILL APARTMENTS REPAIRS DATE: SCALE: ATTACHED TO: REF. DWG: 02/21/14 6" = 1'-0" 9/AS8.21, 9/AK8.21 DWG. NO: ASK 2.23 2/21/2014 4:39:58 PM

DRESS EDGE W/ SEALANT TO SEAL HORIZ. SEAM, NOT SHOWN PLYWOOD SHEATHING CEMENT PLASTER METAL LATH SAF FASTENER FULLY SOLDERED SHEET METAL ESCUTCHEON FLASHING. TO BE 2-PIECE WHERE PENETRATION IS EXISTING..SEE NOTE 2 3/8" TYP. ALL SIDES SEALANT FILLET CONTINUOUS PENETRATION, VARIES, MAY BE ROUND OR SQUARE BACKER ROD AND SEALANT. WHERE PENETRATION MUST BE FIRE-RATED, REPLACE BACKER ROD W/ FIRE CAULKING. SEE NOTE 1 AIR AND WATER BARRIER. APPLY ONTO PENETRATION, TYP. NOTES: 1. WHERE SHEATHING GAP IS GREATER THAN 1/8", INSTALL LOW EXPANSION URETHANE FOAM IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. SHAVE CURED FOAM FLUSH WITH SHEATHING. 2. SHEATHING GAP OF 1/8" OR LESS, TYP. ALL SIDES NO FOAM REQUIRED. 1611 Telegraph Avenue, Suite 200 Oakland, California 94612 510.465.7010 p 510.465.8575 f www.pyatok.com TITLE: FABRICATED PENETRATION FLASHING U.C. SANTA CRUZ INFILL APARTMENTS REPAIRS DATE: SCALE: ATTACHED TO: REF. DWG: 02/21/14 12" = 1'-0" 12/AK8.01 & 12/AS8.01 DWG. NO: ASK 2.24 2/21/2014 6:36:20 PM