MIX OFFICE BUILDING (N2-32) PREPARATION OF DESIGN AND EIA PROJECT BRIEF 1. INTRODUCTION The Mix Office building plot N2-32, is the first low carbon, energy efficient building to be developed in hulhumale located in the heart of Hulhumale phase 1, near the Central Park. The building is to become an iconic institutional development. 2. PROJECT DETAILS 2.1 Plot Area: 940 sqm (10,118 sqft) 2.2 Foot print: 737 sqm (7,933 sqft) 2.3 Gross Floor Area: 7,683 sqm (82,699) 2.4 Height: 37m (10 stories) 3. SCOPE OF WORK The project is designing as an energy efficient, contemporary office building with green sustainable strategies. The designer is expected to obtain the necessary consultancy from the relevant parties during the course of design stage to incorporate green sustainable strategies into the design. Following are the features that the Employer requires the Designer to explore within the course of the design, however the Designer will have the flexibility to decide and recommend the most relevant and cost effective features to this building; 3.1 Green strategies 3.1.1 Rainwater harvesting system 3.1.2 Solar/PV cells sufficient to power common areas 3.1.3 Vertical roof gardens at the different levels (with specially engineered Mix-Office Building Design and EIA Project Brief Planning & Development Department, Housing Development Corporation Ltd, Tel: 3353535, Fax: 3358892, Email:planning@hdc.com.mv 1
slabs) 3.1.4 Central AC system (OR) Water chill system 3.1.5 Energy efficient cladding (E.g. Low E, tinted glass) 3.1.6 Sun screen louvre system of exterior walls (Where required) 3.1.7 Natural light and ventilation The employer will propose a basic concept design. The designer shall not deviate his detail from this concept by the employer, however can propose methods in detail design to improve the project. (Please find attached concept drawings for further details). Employer will provide the support to give clarification to any queries which the designer would require at any stage. The designer is required to submit a work schedule indicating the important milestones of Design Stage considering the review period (Feedback period) within two days of signining the contract. Please find below the Required documents. With the submission of Required documents, the Employer would provide the necessary feedback. In giving feedbacks we would check whether if it fits the design guidelines, function, aesthetics, materials, façade etc. and a two way dialogue attain satisfactory level of work. The designer shall complete the Required documents in the order given 3.1 Required documents. The time of completion for the project shall be maximum 90 calendar days from which within the first 15 days designer has to submit documents 3.2.1 to 3.2.4 under 3.1 Required documents Please note that these documents should be designed and presented in a way which. Designer has to submit the documents 3.2.4 to 3.2.14 within the next 55 days. For the remaining 20 days the designer can submit the remaining document 3.2.15, 3.2.16. The project is only deemed to be completed when the Employer has issued the approval for all Required Documents. Designer should accommodate for the review period after submission and attend to any corrections or supplementary documents if required by the Employer. However please note that this will not change the time of completion of project. Mix-Office Building Design and EIA Project Brief Planning & Development Department, Housing Development Corporation Ltd, Tel: 3353535, Fax: 3358892, Email:planning@hdc.com.mv 2
3.2 Required Documents 3.2.1 Basic Architectural Drawings (Floor plans, Sections, Elevations, Exterior and interior material finishes) 3.2.2 2D rendered floor plans for each floor highlighting unit type and area 3.2.3 4 exterior 3D renders 3.2.4 4 interior 3D renders 3.2.5 Detailed Architectural Drawings & Structural drawings 3.2.6 Material schedule(in MS Word & PDF Format) 3.2.7 Design Specifications (In MS Word & PDF Format) 3.2.8 Services drawings 3.2.8.1 Plumbing drawings (referring to the latest MWSC guidelines) 3.2.8.2 Electical drawings (referring to the latest STELCO guidelines) 3.2.8.3 Fire (approved as per the latest MNDF fire guidelines) 3.2.9 Landscaping Details design 3.2.10 Environmental Impact Assessment Report 3.2.11 Structural calculations 3.2.12 protection method 3.2.13 inspection report 3.2.14 Bill of quantities both priced and unpriced (In MS Excel & PDF format) 3.2.15 Final exterior and interior render as per the final detail drawings 3.2.16 3D walkthrough animation/video Please note that the designer can start preparation of Environment impact assessment and (E.I.A) send for approval to the relevant authorities for approval once the documents 3.1.1 to 3.1.4 has been approved by the employer. For any further information, please refer to the attached guideline/concept drawings for further details Mix-Office Building Design and EIA Project Brief Planning & Development Department, Housing Development Corporation Ltd, Tel: 3353535, Fax: 3358892, Email:planning@hdc.com.mv 3
HDC Building Mini Mall Mix Office Building N2 Mosque PROJECT:N2-32 MIX OFFICE BUILDING DRAWING:LOCATION PLAN PLANNING AND DEVELOPMENT DEPARTMENT
PROJECT:N2-32 MIX OFFICE BUILDING DRAWING: SITE PLAN PLANNING AND DEVELOPMENT DEPARTME
PROJECT:N2-32 MIX OFFICE BUILDING DRAWING: GROUND FLOOR PLANNING AND DEVELOPMENT DEPARTMENT
PROJECT:N2-32 MIX OFFICE BUILDING DRAWING: FIRST FLOOR PLANNING AND DEVELOPMENT DEPARTME
PROJECT:N2-32 MIX OFFICE BUILDING DRAWING: SECOND FLOOR PLANNING AND DEVELOPMENT DEPARTME
OPTION 1 OPTION 2 PROJECT:N2-32 MIX OFFICE BUILDING DRAWING: THIRD FLOOR PLANNING AND DEVELOPMENT DEPARTMENT
PROJECT:N2-32 MIX OFFICE BUILDING DRAWING: FOURTH TO NINTH FLOOR PLANNING AND DEVELOPMENT DEPARTMENT
PROJECT:N2-32 MIX OFFICE BUILDING DRAWING: TENTH FLOOR PLAN PLANNING AND DEVELOPMENT DEPARTMENT
PROJECT:N2-32 MIX OFFICE BUILDING DRAWING:ROOF PLAN PLANNING AND DEVELOPMENT DEPARTME