HELICAL PIPE PILES FOR LOADS UP TO 500 TONS

Similar documents
The DFI Institute is organized to serve as a primary means through which members of the Institute may participate in improvement of the planning,

STABILITY. SECURITY. INTEGRITY.

transmit foundation loads

Helical Pier Frequently Asked Questions

1. ANSI/ASME Standard B , Square and Hex Bolts and Screws, Inch Series

With time, the evolution of anchors have led to different designs More than one anchor type may be suitable for a particular purpose Thus there are

A BIT ABOUT US. All day, every day, IDEAL has well-trained, experienced, and responsive staff available to assist you with all of your urgent needs.

SECTION HELICAL PILES AND HELICAL ANCHORS

This document downloaded from vulcanhammer.net vulcanhammer.info Chet Aero Marine

CIVIL CONSTRUCTION PRODUCT CATALOG VOL. I

Module 10 : Improvement of rock mass responses. Content

Module 5 : Design of Deep Foundations. Lecture 20 : Introduction [ Section 20.1 : Introduction ]

Module 9 Lecture 35 to 40 DRILLED-SHAFT AND CAISSON FOUNDATIONS

Foundations & Installing Tools for Transmission & Substations

COPYRIGHTED MATERIAL. Introduction

T A G PIPE ALIGNMENT CLAMPS PIPE EQUIPMENT SPECIALISTS LTD WB ALLOY WELDING PRODUCTS LTD WB ALLOY WELDING PRODUCTS LTD

1. Enumerate the most commonly used engineering materials and state some important properties and their engineering applications.

INDEX PAGE RELEASE SECTION NUMBER DATE

Synopsis. Civil Engineering Construction Chapter 3 TYPES OF FOUNDATIONS 7/22/2011. Deep Foundation. 1. Shallow foundations. 2.

Block Foundation. From the 1950s through the 80s. Hydraulically driven. piers provide bearing. for a settling foundation

SUBSTATION SECURITY WALL INSTALLATION MANUAL

Dewatering. Deep Wells Vacuum Wellpoints Eductor Wells Artesian Conditions System Design Water Treatment.

Standard 25 Wide Structure

ANCHORS SLEEVE ANCHORS BOLT DIAMETER

ATTENTION. 4. Do not over tighten the hydraulic fittings. This will cause leakage and will not be covered under warranty.

Some Innovations for Offshore and Harbor Berths Construction

1. What does it mean: to drill? 2. Why do you drill? 3. What kind of different applications are there? 4. What do you need for drilling? 5.

SHADOWBOX INSTALLATION FOR: Standard 6 H x 8 W Shadowbox Fence 5 x 5 Routed Posts Dog Ear or Straight-Edge Pickets 1.75 x 3.5 Rail

WHY YOU SHOULD USE TUFFLOOR. components

INGROUND COVER INSTALLATION GUIDE

MW&S STANDARD PROCEDURE

Magnum Piering, Inc. ISO9001:Quality Manual Section 4 Product Guides and Procedures

Installation Guide. Capped Cellular PVC Fencing. Table of Contents. Storage and Handling Tools Needed Fence Layout and Locating Posts

The Iron Skeleton of the Statue of Liberty on Bedloe s Island, New York Harbour.

PRIVACY INSTALLATION FOR: Standard 6 H x 8 W Privacy Fence 4 x 4 Post Sleeve & Brackets Dog Ear or Straight-Edge Pickets 1.75 x 3.

Technologies, Inc. Installation Instructions for Anchors & Components. Rev PAGE 1 / 11

BRACE ASSEMBLIES FOR WIRE FENCES. What They Are - How They Work - How To Construct Them

Technical Data Sheet. T E C H N I C A L D A T A S H E E T Superprop. Mass 25 Mass 50 M AT 125 Superprop. MU Bridging

CIC 200 PLASTIC SCREW ANCHOR ASSORTMENT WITH PHILLIPS BINDING HEAD METAL SCREWS. 6 x 3/4 P/N x 1 METAL SCREW P/N x 3/4 METAL SCREW

The future of offshore wind in the US

Limit Equilibrium including Shear Capacity for Launched Soil Nails. Matthew Birchmier, P.E.

Helical Pile Foundation

Anchor Kit Installation Guide

The Redi-Flange Method. How It Works. Services. Engineering & Costing Assistance

Powerful solutions. for your windmill production

NCCER Progress Blvd, Alachua, Florida Phone: (888)

MECHANICAL ASSEMBLY John Wiley & Sons, Inc. M. P. Groover, Fundamentals of Modern Manufacturing 2/e

Midwest Roadside Safety Facility

British Columbia Carpenter Apprenticeship Program

COMPONENTS INSTALLATION

DEEP FOUNDATIONS PILES

MACTECH OFFSHORE CAPABILITIES

Gable HomeshedsTM INSTALLATION BEFORE YOU START TOOLS REQUIRED GUIDE LARGE SPAN. Council Approval. Before Starting

& 1 2 ) CEMSTAND... 4 CFA-LC 4 CFA-PL (CFA 5 CFA-TC (CFA

PANEL CRIB PIERS AND TOWERS

CSS Central Mount System

Numerical simulation of screw piles under axial loads in a cohesive soil

Hours / 100 Marks Seat No.

INTERPRETATION OF SCREW PILE LOAD TEST DATA USING EXTRAPOLATION METHOD IN DENSE SAND

Offshore Pipelines. Capability & Experience

City of Regina Standard Construction Specification SECTION 2660 CHAIN LINK FENCE

of the rollers on top of each other for each press of the rollers. A self-supporting rack enables the avoidance of misalignment

Precast Bridge. in only Eight Days. profile. Minimizing construction-related traffic delays and improving workzone

SCREW FLIGHTS and Auger Blades

Deep Creek Canyon US Highway 12

Easy Step by Step Manual

3.1 General Provisions

APPENDIX C: MAIN RIVER BRIDGE PLANS. The graphics in this appendix depict the Practical Alternatives.

Centering and Clamping Devices

POWERMATIC PWBS-14 Bandsaw

European Technical Assessment ETA 15/0029 of 12/06/2017

Runcorn: A Project First for Europe

Factors Affecting Pre-Tension and Load Carrying Capacity in Rockbolts - A Review of Fastener Design

EURO DELUXE INSTALLATION INSTRUCTIONS

NEED HDD TOOLS, PARTS & ACCESSORIES?

PT-1. Pipe Tracker OPERATION MANUAL 1010 JW FISHERS MFG INC 1953 COUNTY ST. E. TAUNTON, MA USA

One Piece LSD/Vector Pads from TIE DOWN ENGINEERING Easier installation with 70% fewer parts Lower cost with competitive pricing

Cooke Precast Concrete

Free Standing Pedestal Mounting Installation Manual

FASTENERS C O M P AT I B L E W I T H F E R O T I E S Y S T E M S. Which FERO Tie Systems Require Fasteners?

Fast and flexible use Powerful results

Interaction of Soil and Seepage Barrier Cracks under Seepage Flow

Riser Installation in Deep & Ultra Deep Water

FIXED MOUNTING SHUTTERS INSTALLATION

Large Diameter Tapcon

SKT-SP Tangent Terminal

DESIGN OF MACHINE MEMBERS-I

SEA SELF DRILLING, THREADED, HOLLOW BAR / GROUT-ABLE SOIL NAILS / ANCHORS

Name two reasons why bridges are built. Name two places where you would find a bridge?

The Firestone QuickSeam Reinforced Perimeter Fastening Strip needs to be installed with appropriate fasteners at maximum centres of 300 mm.

Underwater Tool Section

Offering a full range of anchoring and tie down systems including:

ASSEMBLY INSTRUCTIONS

ABC and Innovative Bridge Construction for Minnesota Local Roads

Installing a COMROD AS1R Whip Antenna with Anchor Post

Call (770) STEP 6: Caulk bolt hole within the bracket for protection from the elements.

Installation Guide. 203 Chesterra Drive, Dahlonega, GA Toll-Free ~ Fax ~

Shoulder Wedge Maker

EXCAVATION AND BACKFILL

Installation Instructions for Solar Snow Pad (SSP-T-3)

Transcription:

HELICAL PIPE PILES FOR LOADS UP TO 500 TONS

WHILE HELICAL PILES AND THE ASSOCIATED METHODS HAVE BEEN USED FOR MANY DECADES, THE IDEAL APPROACH IS ANYTHING BUT ANTIQUATED. We believe that although it isn t broken, there s always room for improvement. We pioneered the high capacity helical pile industry and today we manufacture helical piles with shaft diameters up to 36. Leave behind any misconceptions you had about helical piles and see what IDEAL has to offer. We re going places.

BRACKET OR LOAD TRANSFER DEVICE (LTD) EXTENSION BOLTED COUPLING LEAD SECTION HELIX GET FAMILIAR The unit is called a helical pier if it resists compressive loads, which are usually downward. It is called a helical anchor if it resists tensile loads, which are usually upward or inclined. Many helical units function as both piers and anchors. A helical unit is installed by simply screwing it into the ground. The central shaft may be round or square and it may be hollow or solid. Hollow (pipe shafts) are often preferred, because they provide a greater section modulus for the same cross-sectional area of steel. Pipe shafts, as compared to solid shafts, generally provide greater resistance to installation torques and buckling under compressive loads. A typical helical unit is shown to the left. It consists of a central steel shaft, to which can be attached one or more steel helices. The central shaft can be lengthened by adding extension pieces as necessary. Pipe shafts range anywhere from 2 7/8 to 36 in diameter, and helices range anywhere from 5 to 48 in diameter and are seldom less than 3/8 thick. Experience and theory have combined to suggest that the preferred spacing between multiple helices is equal to 3 helix diameters of the preceding helix. The final component to the helical unit is the Load Transfer Device (LTD). This is used to transfer the tension or compression load from the structure to the helical unit. Simply put, the helical unit transfers tension or compression load to competent soil strata below incompetent soils. Our team is often called on to fabricate custom brackets and load transfer devices. Below are examples of brackets which are manufactured by IDEAL. Give us a call if you don t see what you re looking for and we can design the perfect bracket to meet project requirements. PIPELINE BRACKET BOARDWALK BRACKET CLEARSPAN BRACKET

APPLICATIONS A helical pier is a deep foundation. Its purpose is to transfer a structural load to deeper, stronger, and less compressible materials bypassing any weaker and more compressible materials that would be unsuitable for the support of conventional shallow foundations. As a deep foundation, a helical pier should be considered for most applications that would call for a driven pile, drilled pier, or mini pile. Helical piles and anchors are usually a great foundation solution to any of the applications below whether it s a new build or existing structure. CELLULAR TOWERS PIPE RACK SUPPORT COMMERCIAL UNDERPINNING NEW CONSTRUCTION INTERIOR NEW CONSTRUCTION RETAINING WALLS

COMMERCIAL BUILDING REMEDIATION SUBSTATIONS TIE-BACKS/ANCHORS/RETAINING WALLS SANITARY PIPELINE SUPPORT LIGHTING <50FT BULKHEADS TILT-UP WALL ANCHORS SOUND WALLS SHORING PIPELINE WORK CAMP FOUNDATIONS BRIDGES/BOARDWALKS/DOCKS GUY LINES/WIRES TOWERS QUAD BASE ROADWAY SIGNAGE TRAFFIC SIGNALS TANKS AND SILOS TOWERS MONOTUBE BILLBOARD/SIGNAGE GENERATOR BASES UNDERWATER SUPPORT UTILITY ANCHORING TIE-DOWNS/MOORINGS MACHINE BASES BRIDGE REMEDIATION MUNICIPAL BOARDWALKS RETAINING WALLS/SHORING CLEARSPAN STRUCTURES MACHINE BASES SANITARY PIPELINE SUPPORT

ADVANTAGES For many applications helical units may offer significant advantages over other systems. Some of these include: WIDE RANGE OF LOADS A wide range of allowable loads. Anywhere from 10-500 tons to be exact. VERSATILE INSTALLATION ANGLES Adaptability to a variety of installation angles to accomodate compression, tension, lateral, and overturn. LESS DEPTH = MORE MONEY Lower cost than driven or drilled piles. While the cost per foot may be higher, piles can be installed to lesser depths and reach the same required capacities. RAPID INSTALLATION Not quite lightning fast, but it s hard to beat the ease and speed of installation. MINIMAL EQUIPMENT Minimal support equipment is needed for installation. A drive head, torque indicator, and a few other components and you re up and running. Just by the way, IDEAL offers the most complete drive head packages in the industry. GREAT FOR LIMITED ACCESS Helical piles are great for low-headroom and other limited-access areas inside, underneath, and in between existing structures. SIMPLE CUTOFFS WIth a band saw or torch, on-site cut-offs are a breeze. NO CONCRETE DELAYS No concrete-related delays, and we all know time is money... INSTALL IN EXTREME WEATHER Helical piles can be installed in any weather except thunderstorms and whatnot. We play it safe, and you should too. LIMITED EARTHWORK AND NO SPOILS Little or no earthwork or spoil material is created during helical pile installation. This is a huge advantage when working at contaminated sites. MINIMAL VIBRATION AND NOISE With minimal vibration and noise, helical piles are a perfect fit for historic structures and other urban projects surrounded by fragile people and buildings. TEMPORARY INSTALLATIONS Easily removed and reused in temporary applications such as shoring and movable structures. LOW MOBILIZATION COST Very low mobilization and demobilization costs. Look at the real costs of installing alternates and you might be as surprised as we were when we did the math. VARIETY OF INSTALL ANGLES EXTREME WEATHER LIMITED ACCESS

INSTALLING A helical screw pile is rotated into the ground by using a hydraulic drive head, powered by an excavator, pile driving rig, or any other equipment with hydraulic capability. IDEAL requires installers to monitor installation torque and pile alignment during the installation process. This is required for a few reasons. First, it is important to have a qualitative assessment of the soils being penetrated at various depths. Using a graph, the recorded installation torque and depth is interpreted against the existing soil data to obtain a correlation that enables a simple verification strategy to be determined. The soil data is interpreted against the installation torque and a correlation is obtained to maintain the integrity of the helical screw pile during installation as well as mitigate damage by exceeding the allowed torsional strength to any of the pile s components. Every helical screw pile has a maximum stress level that must not be exceeded in order to avoid compromising the structural integrity of the helical screw pile unit. THE HISTORY The first helical screw pile was invented in the 1830 s by a blind Irish marine construction engineer named Alexander Mitchell. His design proved to be a major improvement over traditional straight pile designs, so Mitchell and his son promptly patented the cast iron screw pile. In 1840 the first screw piles were installed to support the Maplin Sands lighthouse at the mouth of the Thames River. This innovative design caught on and made its way across the pond quickly and before long most of the lighthouses in the Mid-Atlantic region were being built on helical pile foundations. There were more lighthouses built on helical pile foundations in Chesapeake Bay than anywhere else in the world. A total of Forty-two helical screw pile lighthouses were built on Chesapeake Bay between 1850 and 1900. The helical screw pile technology didn t stay on the east coast. Over the next few years, helical screw pile lighthouses could also be found in the Great Lakes Region and the Gulf of Mexico. The foundation of a typical screw pile lighthouse consisted of one central pile installed in the center and then flanked by another six or eight piles around the perimeter. This design increased the anchoring properties and the bearing power of the helical screw piles. These early helical screw piles were often installed by using large torque bars and the power of men, horses, or oxen. Alexander Mitchell s helical screw pile design is just as effective today as it was in the late 18th century and continues to be installed around the world. MAPLIN SANDS LIGHT EARLY HELICAL PILE

OUR MISSION To provide our clients and associates with proprietary technology, products, equipment, and support, ensuring excellence in the design and performance of deep foundation and earth anchoring projects. IDEAL Manufacturing, Inc. 80 Bluff Drive, East Rochester, NY 14445 800.789.4810 www.idl-grp.com