LuxCore Installation Instructions

Similar documents
INSTALLATION MANUAL STORAGE

Installation Instructions

Installation Guide. Pionite Decorative Surfaces One Pionite Road, Auburn, Maine PIONITE ( )

VERTICAL STILE ABOVE HORIZONTAL TRIM VERTICAL STILE BELOW COVE BASE ADHESIVE. 1" [25.4mm] BASE DETAIL

Installation Instructions Palladium 3D Hi Impact Wall System, Partial Height with Color Matched Caulk Joints

Installation Instructions

INSTALLATION GUIDE. Table saw or circular saw with fine-tooth blade, caulking gun, rule/tape, drill, file, hammer, plumb line/level, ridge/support.

General Sizes: 2 x 2 and 2 x 4 Lay-In (grid) ceilings tiles; 2 x 2 and 2 x 4 Glue-Up tiles.

Installation Instructions Palladium Wall Panels - Demountable Factory Finished Edges and Field Cut Edges

Wallgard 1,3 product

Wall Installations. Chapter 16 Wall Installations 16. 1

Installation Instructions and Details

CONTENTS OVERVIEW. For a complete set of CAD drawing details, please visit LaminatorsInc.com. 1 Essential Equipment. 1 Essential Supplies

Installation Instructions Palladium Square Edge Panels

WET AREA PANELLING. Designer Walls. Fast

Muto Premium Recessed Mount. XL150/80/120 Fixed Panel ONLY - Ceiling mount. Installation instructions

INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5233

Wet Area Panelling. Linear Series

INSTALLATION INSTRUCTIONS FOR PLASCORE F5075 FRAME WALL

Installation Manual 0318

Linear Wood Grille Ceiling Systems

WOODWORKS Walls. Installation Instructions WALL

Loose Lay Luxury Vinyl Plank

Ideal supports for dry vertical adhesion are: Ideal supports for wet applications are:

Frameless Inline Door With Return QCI5263

Installation Instructions and Details

INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS

TRIVERSA TRIVERSA ID. Triversa Triversa ID Installation Instructions. Remove the wall base and doorway trim. Always undercut wood door casings

SINKS AND LAVATORIES. Steps to completion: These items are essential for installing all sinks:

Traditional Undermount: S Method (Undermount):

Rev. 05/16 01 ACRYLIC INSTALLATION GUIDE

Resysta 6 and 4 Flat Board Siding System Assembly Installation Guidelines

PORTA-FAB Cleanroom Wall Systems

METALWORKS TARTAN PANELS General Installation Instructions

How To Install Windows: Nail-Fin Application

FIXED PANEL SLIDER QCI5241

Frameless Inline Door QCI5248

Siding Systems NOVIKSTONETM DS DRY STACK STONE INSTALLATION GUIDE

General Installation Instructions

Installation Instructions for. Before You Begin TOOLS REQUIRED

Installation Instructions

Contents. pages 20-24: Installing Edge sinks into. custom laminate countertops page 8: Installing Edge sinks into postform laminate countertops

INSTALLATION INSTRUCTIONS 960 RODA GLASS TO GLASS HINGES ANGLED FRAMELESS PANEL / DOOR / PANEL CELESTA DRESDEN TRESOR

Panel Installation Instructions

Installation Instructions for Bifold Doors (JII103)

Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement

FIXED SHOWER SCREEN For Wall Mount Hinges QCI5283

INSTALLATION INSTRUCTIONS

Installation Instructions

Series Sloped glazed Curtain wall. Installation Instructions

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows without Exterior Trim or Nailing Fin (JII025) ImpOrTaNT INFOrmaTION & GlOssary.

WoodWORKS Channeled Plank

Curium 19H Installation Instructions & Parts List

Sliding Glass Door Assembly and Installation Guide

2. Sanding the Modules Sand the entire surface of each cyc module with 60-grit sandpaper. This will provide for better paint adhesion.

INSTALLATION INSTRUCTIONS 935 RODA GLASS TO GLASS HINGES FRAMELESS DOOR / PANEL CELESTA DRESDEN GEOLUX TRESOR VONSE

Installation Guidelines

Mach Wall Installation Instructions

Please read and review installation instructions completely before proceeding with the actual installation.

Installation Guide (888)

INSTALLATION INSTRUCTIONS

INSTALLATION LAMTON INSTALLATION INSTRUCTIONS. Lamton Laminate Flooring with Underlay Attached Glueless Installation. Tools and Accessories

INSTALLATION GUIDE VERSION 11/14

Frameless Inline Door QCI5254

2. Sanding the Modules Sand the entire surface of each cyc module with 60-grit sandpaper. This will provide for better paint adhesion.

INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5232

PRO CYC PRO CYC, INC. SYSTEM SUPER 3EZ

INSTALLATION INSTRUCTIONS MILLENNIUM DECKING Before Installing Millennium Decking, please read these instructions in their entirety.

Read guide from beginning to end before starting installation. Read all warnings and cautions during unit installation.

Storing, Handling, and Cleaning dekō Markerboards Storing Markerboards. Handling. Cleaning

A-935 RODA WALL MOUNT HINGES

Frameless Fixed Panel Slider

Installation guide. MS 9 & Metal Block Profile

3 Simple Steps to a Beautiful Tile Surface. Tec Skill Set How-To Project Guide Floor Tile 1. PREPARE THE SURFACE 2. SET THE TILE. Reverso en español

Handrail H Series. Product Installation. Instructions. Installation Instructions For. Wall Mounted and Freestanding Round Handrails

Aluminum Clad Wood Window Field Mulling and Stacking Instructions

Installation Instructions

Installation Instructions Split Shake, Staggered Shake, Shingle, Perfection Shingle, and Shapes

Installation Guide (888)

PRO CYC PRO CYC, INC. SYSTEM SUPER 1.5 EZ

FRAMELESS DOOR / PANEL WITH WALL MOUNT HINGES QCI5274

INSTALLATION INSTRUCTIONS

HOW TO INSTALL ELITE PANELED WAINSCOTING Using X-Rails with Either Raised, Flat or Beaded Panels

675 Quick N Stall Neo Angle Framed Hinge Shower Enclosure

VYTEX PREMIUM SLIDING GLASS DOOR. Table of Contents. Precautions and Safety 2. Tools Required...3. Inspect and Prepare Door...4

Comfort Designs with Swan Solid Surface

INFINITE RANGE - HINGE DOOR

Installation Instructions

Curium 19.4H Installation Instructions & Parts List

Post & Rail Crossbuck

Frameless Fixed Panel Slider QCI5279

Series Advanced and alternate. Installation Instructions

FABRICATING ARBOR. koroseal.com/arbor Arbor Veneered Components

INSTALLATION INSTRUCTIONS SIDELITE ASSEMBLY SERIES 900 TERRACE DOOR AND SERIES 925 PATIO DOOR

Roll Out Vinyl Installation Guide

DECKING INSTALLATION GUIDE

Installation Instructions for easy to install Texture Plus faux wall panels

3.1 Continuous top and bottom lock 3.2 Engineered nailing hem 3.3 Temperature markings

Brick, blockwork and concrete walls are also suitable providing the surfaces are flush without excessively wide mortar joints.

KuraStone TM Installation Guide

Transcription:

LuxCore Installation Instructions ATTENTION: LuxCore PANELS MUST BE ACCLIMATIZED FOR 24 HOURS BEFORE INSTALLATION PLEASE READ ALL INSTRUCTIONS PRIOR TO INSTALLATION The guidelines provided herein have been established in good faith to help prevent installation problems. Advanced Technology Inc. believes all information contained herein to be correct. It is the responsibility of the fabricator/customer to completely test the adhesives and methods of fabrication to ensure that the results are satisfactory. Failure to comply with the following instructions, as well as the adhesive manufacturers instructions, may result in significant installation problems. ATI is not responsible for any fabrication or ancillary costs involved with using LuxCore products. INSPECTION Please inspect LuxCore panels for any imperfections prior to installing; once installed, panels may be very difficult to remove. TOOLS REQUIRED In order to cut LuxCore panels most effectively, a fine-tooth saw blade is recommended. Swivel-head shears may be utilized for small cutouts or trims. For pre-drilled fastener holes, a diamond-coated or carbide drill bit is recommended. If the installation requires adhesive, it is recommended to utilize the trowel with the notch pattern suggested by the adhesive manufacturer, since, the trowel used to apply the adhesive can have a great effect on the success or failure of the installation. PANEL TRIMMING If not using trim strips, it is recommended that the edges be properly trimmed with a router. This will mitigate showing white lines from the factory edges of the panel. A commercial high speed router using a Bosch 3/8 Laminate Trim Bit with ball bearing, carbide tip, and roller tip (when appropriate) is recommended. MATERIALS REQUIRED LuxCore Panels FRP formulated adhesive. Advanced Technology, Inc. (800) 849-1320 Page 1 of 5

PVC Moldings Silicone Sealant Soap, Water, & Damp Cloth for Panel Clean-Up Mineral Spirits to Remove Excess Adhesive or Silicone Sealant STORAGE Panels should be stored inside in a cool, well-ventilated, dry area on the original shipping pallet. Do not place panels on a concrete floor or any other surface that emits moisture. Panels should be laid flat, not on edge. Panels should be climatized in the area they will be installed for a minimum of 24-48 hours. ADHESIVE For applications requiring adhesive, suggestions include Weldwood non-flammable, water-based contact cement (applied by spray, brush, or roller), or Titebond Advanced Polymer Panel Adhesive (applied with a notched trowel). Titebond Panel Adhesive should be applied in a crosshatch pattern, enabling even distribution of substrate (See Figure to the right). For best results, Titebond panel adhesive should be stored above 50 F. Trowel Application Due to the abrasive nature of the adhesive, it is highly recommended that those working with the adhesive wear protective safety equipment which include, but are not limited to the following: safety glasses, gloves, and a filter mask. FASTENERS Nylon drive rivets, or corrosion resistant screws are appropriate fastener options. If fasteners will be used in the installation, panels should be pre-drilled using a drill bit that is 1/8-1/4 larger than the fastener. During installation, holes drilled into the substrate should also be made 1/8-1/4 larger. This is required to allow room for expansion and contraction of the panels. EXPANSION JOINTS As temperature and humidity levels fluctuate, LuxCore panels will expand and contract. Therefore, adequate space must be allowed around panel edges, holes drilled in panels, and around fixtures attached to the panel/wall. Please refer to the expansion joint chart below for spacing at ceiling, floor and between panels. Advanced Technology, Inc. (800) 849-1320 Page 2 of 5

EXPANSION JOINT CHART PANEL SIZE 4 X 8 4 X 9 4 X 10 4 X 12 Gap at ceiling 1/4" 1/4" 3/8" 3/8" Gap at floor 1/4" 1/4" 3/8" 3/8" Gap between panel and center of 1 piece molding 1/8" 1/8" 3/16" 3/16" Gap between panel and center of 2 piece molding 1/4" 1/4" 3/8" 3/8" Gap between panel without molding 1/4" 1/4" 3/8" 3/8" Gap around rivets 1/8" 1/8" 3/16" 3/16" Gap between panels and wall fixtures 1/8" 1/8" 1/4" 1/4" EXPANSION JOINT LAYOUT INSTALLATION Note: For best results, LuxCore panels should be used in conditions which result in temperatures that are less than or exceed the allowable temperature ranges in the chart below. ALLOWABLE TEMPERATURE RANGES CHART Temperature ( F) MATERIAL Length Low High FRP 48" 27 117 96" 50 94 Advanced Technology, Inc. (800) 849-1320 Page 3 of 5

STEP 1 PLANNING AND CUTTING Fit each panel in advance before fastening and/or adhering in place. Perform all cutting and drilling prior to adhesive application. o If not using trim strips, it is recommended that the edges be properly trimmed with a router. This will mitigate showing white lines from the factory edges of the panel. A commercial high speed router using a Bosch 3/8 Laminate Trim Bit with ball bearing, carbide tip, and roller tip (when appropriate) is recommended. Verify that substrate surface has no bumps or uneven areas. Pre-drill rivet holes using a bit that is 1/8-1/4 larger than rivet allowing for panel expansion according to the sizes in the chart on the previous page. Plan ahead for cove or base molding. Base molding should be installed in such a manner as not to restrict the LuxCore panel s normal movement. Cut panels 1/4 short of where the base molding will extend; poured molding should be in place prior to installation. Mark a plumb line 48-1/8 from the corner. In areas where several courses of panels are used, such as on a high wall, use vertical and horizontal lines to assure alignment. STEP 2 INSTALLING ON WALL Install one piece of corner molding and apply silicone sealant in molding groove. If using rivets, drill holes into substrate through the pre-drilled holes in panel. If using Titebond Advanced Polymer Panel Adhesive, apply adhesive to panel using adhesive manufacturer s recommended notched trowel to ensure good adhesion. If using Weldwood non-flammable, water-based contact cement, apply to both surfaces according to the manufacturer s recommendations. Set first panel true to plumb line. If using adhesive, firmly roll over the panel using a laminate roller, starting at the top corner nearest the molding rolling down and away toward the opposite edge, eliminating air pockets. Advanced Technology, Inc. (800) 849-1320 Page 4 of 5

If using fasteners, install fasteners as each panel is put into place and before the next division bar or molding strip is applied. Begin fastening at top edge and work towards the opposite end. Apply silicone sealant prior to inserting rivets or fasteners. Install fasteners one row at a time. Install on-piece division bar and caps or next molding piece by laying down a bead of silicone in molding groove and sliding completely onto the panel. Withdraw the molding or division bar 1/8 to provide proper spacing. The free edge of the molding or division bar may be tacked in place, if preferred, before installing the next panel. If using Titebond Advanced Polymer Panel Adhesive and fasteners are not used, a few nails may be placed at the top (above the ceiling grid line) to help hold panels in place while the adhesive cures. Once cured, the nails must be removed, as they do not allow for normal panel expansion and contraction. Repeat the process, working in one direction around the room. STEP 3 COMPLETING PANEL INSTALLATION Be sure to apply silicone sealant in all molding and around all panel edges, fasteners, and fixtures to prevent moisture from penetrating behind panels. Remove any residue left by adhesive as recommended by manufacturer. Clean panels thoroughly prior to leaving jobsite. Advanced Technology, Inc. (800) 849-1320 Page 5 of 5