Segmental Bridge Construction. Segmental Bridges It s a Construction Technique with Design Implications. Plans Review Group

Similar documents
Segmental Bridge Technology Established and Evolving. W. Jay Rohleder, Jr, P.E., S.E. Senior Vice President / Project Development FIGG

FIGG. Accelerated With Bridge Construction. Concrete Segmental. Bridges. William R. (Randy) Cox, P.E. American Segmental Bridge Institute

BRIDGE TYPE CONCEPT EVALUATION

The $13.2 billion Central Artery/Tunnel Project (CA/

PRECAST CONCRETE BRIDGE SUBSTRUCTURE COMPONENTS. Presented by: Matthew Youngblood, PE, SE Scott Noyer, PE Janssen & Spaans Engineering

Name: Kimio SAITO. 1. General Information (10min.) 2. History and Applications in U.S. (15min.) 3. Recent Applications in Japan (10min.

Accelerated Bridge Construction (ABC) and the Utah Experience

Dauphin Island Bridge

In Denver, a recently completed flyover

ABC and Innovative Bridge Construction for Minnesota Local Roads

An Overview of PCL s. Transportation Infrastructure Group CONSTRUCTION LEADERS

THE TRANSPORTATION ISSUE

Precast Bridge. in only Eight Days. profile. Minimizing construction-related traffic delays and improving workzone

6/19/2014. Milton Madison Bridge Slide. Project Partners. The Challenge. Aaron L. Stover, PE, SE Michael Baker Jr., Inc.

SUMMARY SHEETS OF BAR COUPLER CONNECTIONS

11/15/2010. Construction. Accelerated Bridge Construction (ABC) Definition. Systems (PBES) Definition

TECHNICAL NOTE SEGMENTAL BRIDGE WIZARD. Introduction. Segmental Bridge Span Assembly

State of the Art Precast, Prestressed Concrete Bridges and Industry Innovations

How to Estimate the Cost of a. Precast Concrete Parking Structure

Construction Tolerances - The following tolerances apply to cast-in-place structures:

PCI Update on Transportation Activities and elearning Modules for AASHTO Technical Committee T-4 AASHTO SCOBS --- Spokane Washington

shawprecastsolutions.com BEBO Arch Systems PRODUCT GUIDE & TECHNICAL REFERENCE MANUAL Providing the right solutions.

James Luebke, PE Structural Development Engineer WisDOT Bureau of Structures

California Department of Transportation

Amajor transportation infrastructure undertaking, billed

adopted in Hong Kong

Proven precast solutions for every application

Overview of Precast ABC Projects in the Pacific Northwest. Chuck Prussack, P.E., Oldcastle Precast, Inc - Spokane

Demolition of Ramp C (SN ): Westbound Ontario Street to Eastbound I-90/94) over I-90/94 (JF Kennedy Expressway)

OpenBridge Modeler: What is it and how can I use it today?

Jointed Precast Concrete Pavement

Total precast solution for large stadium projects meet tight schedule

Value Engineering Design Build MODULAR INFRASTRUCTURE

APPENDIX C: MAIN RIVER BRIDGE PLANS. The graphics in this appendix depict the Practical Alternatives.

FDOT PRECAST BENT CAP DEVELOPMENT AND IMPLEMENTATION

No limitations to precast

State-of-the-art Report On FULL-DEPTH PRECAST CONCRETE BRIDGE DECK PANELS (SOA )

Wood Roof Framing Common Design and Construction Defects Concurrent Session #5.3, Friday April 28, 2017, 9:45 AM-10:30 AM

Deep Creek Canyon US Highway 12

Double Storey HC Precast System Drawing - 3D

Welcome. Hong Kong Zhuhai Macao Bridge Design & Construction of Marine Viaducts for HKLR

PANEL CRIB PIERS AND TOWERS

Phase 2 Silver Line Update

Unit 8 Precast Concrete

TARGET FIELD: REMOVING THE VARIABLES THROUGH BIM

PRACTICE NOTE NO: 13 Version 1 Amended March 2001 Page 1 of 6 PRECAST CONCRETE ELEMENT DESIGN RESPONSIBILITIES AND CONTRACTUAL ARRANGEMENTS

PRECAST CONCRETE DESIGN AND ENGINEERING KNOW HOW ALL UNDER ONE ROOF

Application of Advanced Materials and New Detailing for ABC Column Connections

White Paper on: Recommended Practices for Specifying and Delegating Responsibilities for Precast Concrete Building Structures in Colorado

Precast Concrete Pavement Background Concepts. Project 1517 FHWA, CTR & TxDOT Gary Graham November 15, 2001

Edgerail Aluminum Bridge Railing System Specification & Installation Instructions

Fat vs. Thin. MPE Engineering 2018 Irrigation Technical Conference

Stellenbosch University South Africa CONSTRUCTION ENGINEERING & MANAGEMENT CHAIR. Jan Wium

Precast / Prestressed Concrete Trade Coordination Case Study Jason P. Lien, PE, FPCI EnCon United, Denver, Colorado

CHAPTER 10 MICHIGAN DESIGN MANUAL BRIDGE DESIGN (SI) SHOP DRAWING REVIEW TYPES OF SHOP DRAWINGS Structural Steel

WHERE TO GO FROM HERE?

PRECAST CONCRETE STRUCTURES

WELCOME Visit To IBS Factory IBS Superstructure In Malaysia 3 in 1

Post-Tensioning Components

Module 10 : Improvement of rock mass responses. Content

Section 808. FENCING

SUBSTATION SECURITY WALL INSTALLATION MANUAL

Precast Concrete Pavement

Project Reference Catalogue

SECTION 1050 STEEL BRIDGE SUPERSTRUCTURE

HOLLOW CORE PRODUCTS GROUNDED IN STRENGTH

Historic Bridge Foundation Facebook Archives

MTJ Outdoor Baggage Claim

Bridge Scour Detection of the Feather River Bridge in Yuba City, CA through the use of Finite Element Modeling and Infrasound

Sun Sculpture. By Scott L. Melnick

THE CONSTRUCTION OF SCIENCE AND TECHNOLOGY CULTURE ON THE DEVELOPMENT OF SURAMADU BRIDGE

Item 550 Chain Link Fence

Non-Destructive Bridge Deck Assessment using Image Processing and Infrared Thermography. Masato Matsumoto 1

1.1 RELATED DOCUMENTS

Concrete Connections. MeadowBurke

For. Precast Concrete Segmental Bridges America s Beautiful and Affordable Icons HISTORICAL-TECHNICAL SERIES

Suggested Reinforcement Detailing Practices Based on comments from R&D and ES ESS Committees

Arch Bridge in Nijmegen - new 3D Approach to Workshop Plans

JVI Vector Connector

Manhole or Catch Basin Type A & B Cone Sections Precast - Design F Manhole or Catch Basin Cover (Reducer Cone Section Precast) Design D

STANDARD MSGDET4AC: NOTES TO DESIGNER

INDEX. Initial SOL Approval. 1. Evergreen Retaining Wall System (Deleted) 3. Sound Barrier Walls (Deleted) Standard Details

Architectural Precasters Design Assist Role

50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges

Composite Sections. Introduction BETON PRATEGANG TKS Session 10: 2015/4/27

PROJECT ASCENT, SPRING 2006

This specification describes the minimum requirements for structural steel drawings.

FINAL REPORT. On Project Supplemental Guidance on the Application of FHWA s Traffic Noise Model (TNM)

Projector Test Screen. Slides Ready

Double Truss Shelter Model# SST W9.14xL14.2xH4.88m Assembly Instructions

INSTALLATION GUIDE PermaTrak. Patented Product: U.S. Patent #5,906,084 #8,302,362 #8,522,505 #8,839,588 #9,096,975

moment and shear tables 8 inch High strength precast & prestressed concrete lintels

IJSRD - International Journal for Scientific Research & Development Vol. 4, Issue 04, 2016 ISSN (online):

METHOD STATEMENT FOR THE CONSTRUCTION OF LIGHTWEIGHT HALLS

3 DATE ISSUE R# Forefront Dermatology. CONFLUENCE DESIGN GROUP #2 Daniel Drive O'Fallon, MO ph: St. Peters, Missouri 63376

THE MARINE PARTNER OF CHOICE

MANuFACturers industry QuALity statement.

AASHTO TIG Promoting the use of Precast Concrete Pavement Systems. Highways for Life PCPS Showcase NJDOT, Mt. Arlington NJ Timothy J.

Designing for Seismic Success with Precast Concrete

A. Extent of structural precast concrete work is shown on drawings and in schedules.

Transcription:

Structures g Design Plans Review Group Segmental Bridge Construction Segmental Bridges It s a Construction Technique with Design Implications 2010 FDOT/FTBA Construction Conference February 23-24 Orlando, Florida

Structures Design Plans Review Group Presentation Speakers Brian Blanchard, P.E. PE Florida Department of Transportation Enrique Espino, P.E. PE Condotte America, Inc. Jim Schneiderman, P.E. PCL Civil Constructors, Inc. R. Craig Finley, Jr., P.E. Finley Engineering ggroup, Inc.

Structures Design February 23, 2010 FDOT/FTBA Construction Conference Agenda Plans Review Group Florida Department of Transportation s Perspective, Brian Blanchard,P.E., Florida Department of Transportation Contractor s Perspective Enrique Espino, P.E., Condotte America, Inc. Jim Schneiderman, P.E., PCL Civil Constructors Design and Construction Engineers Perspective R.Craig Finley, Jr., P.E., Finley Engineering Group, Inc. Future Perspective, Enrique Espino, P.E., Condotte America, Inc. Round Table Q & A

Structures FDOT Perspective Design Plans Review Group Segmental Bridge Construction Perspective Roosevelt Bridge Segmental Bridges It s a Construction Technique with Design Implications February 23, 2010 FDOT/FTBA Construction Conference Brian Blanchard P.E. Chief Engineer Florida Department of Transportation From the Florida Department of Transportation s Perspective

Structures FDOT Perspective Design Plans Review Group Segmental Bridge Construction Perspective Skyway Bridge February 23, 2010 FDOT/FTBA Construction Conference Brian Blanchard P.E. Chief Engineer Florida Department of Transportation From the Florida Department of Transportation s Perspective History of Segmental Bridges in Florida FDOT Policies and Procedures Experience and Future Treads

Structures FDOT Perspective Design Plans Review Group Segmental Bridge Construction Perspective Royal Park Bridge History of Segmental Bridges in Florida February 23, 2010 FDOT/FTBA Construction Conference Brian Blanchard P.E. Chief Engineer Florida Department of Transportation

Structures FDOT Perspective Design Plans Review Group Segmental Bridge Construction Perspective History of Segmental Bridges in Florida The Early Years Long Key Bridge Channe el 5 Seven Mile Niles Ch hannel 1981 1982 1983 1984 Span-by-span Balanced Cantilever All dates given are completion dates Ram mp I Over I-75

Structures FDOT Perspective Design Plans Review Group Segmental Bridge Construction Perspective History of Segmental Bridges in Florida The Early Years Niles Channel Long Key Bridge Channel 5 Seven Mile

Structures FDOT Design Plans Review Group Segmental Bridge Construction Perspective - The Early Years (cont.) Skyway Approaches Span-by-span Balanced Cantilever All dates given are completion o dates 1985 1986 1987 1988 I-75/SR 826 (5 Bridges) I-595/I-75 (5 Bridges) Ft. Lauderdale Airport (4 Bridges) I-595/I-75 (6 Bridges) I-595/US 441 (2 Bridges)

Structures FDOT Perspective Design Plans Review Group Segmental Bridge Construction Perspective Long Key Bridge First application of Precast Span-byspan Bridge Construction in the U.S. 1981

Structures FDOT Perspective Design Plans Review Group Segmental Bridge Construction Perspective Seven-Mile Bridge First Application of an Overhead Gantry in Florida 1982

Structures FDOT Perspective Design Plans Review Group Segmental Bridge Construction Perspective Ramp I Bridge First application of Precast Balanced Cantilever Construction in Florida 1984

Structures FDOT Perspective Design Plans Review Group Segmental Bridge Construction Perspective - Other Firsts First Demolition of Existing Segmental Bridge in the North America. Fort Lauderdale-Hollywood International Airport expansion required the removal of three precast segmental concrete bridges. How did we demolish segmental concrete bridges built by the balancedcantilever method? By reversing the way the segments were installed. 2002

Structures FDOT Perspective Design Plans Review Group Segmental Bridge Construction Perspective - Other Firsts I-75/ SR 826 Ramp A -First Segmental Bridge Widening in U.S. Mainland 2004

Structures FDOT Perspective Design Plans Review Group Segmental Bridge Construction Perspective 12 10 FDOT Segmental Bridges Constructed by Year 8 6 4 2 0 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 Current Number of Segmental Bridges 68 (3 have been removed at Ft. Lauderdale Airport)

Structures FDOT Perspective Design Plans Review Group Segmental Bridge Construction Perspective Acosta Bridge FDOT Policies and Procedures February 23, 2010 FDOT/FTBA Construction Conference Brian Blanchard P.E. Chief Engineer Florida Department of Transportation

Structures FDOT Perspective Design Plans Review Group Segmental Bridge Construction Perspective FDOT Policies In Response to PT Corrosion Issues February 23, 2010 FDOT/FTBA Construction Conference Brian Blanchard P.E. Chief Engineer Florida Department of Transportation Advanced Corrosion of Strands within Niles Channel Anchorage

Structures FDOT Perspective Design Plans Review Group Segmental Bridge Construction Perspective FDOT Bridges w/ Grout Problems Niles Channel Bridge 6 Bridges at I 75 & I 595 (Voids in Tendons) 1996 Inspection February 23, 2010 FDOT/FTBA Construction Conference Niles Channel (Failed Tendon) 1999 Inspection Brian Blanchard P.E. Chief Engineer Florida Department of Transportation

Structures FDOT Perspective Design Plans Review Group Segmental Bridge Construction Perspective Skyway Bridge FDOT Bridges w/ Grout Problems (cont.) Mid bay (Spans 28 and 57 2 Failed Tendons) 2000 Inspection February 23, 2010 FDOT/FTBA Construction Conference Brian Blanchard P.E. Chief Engineer Florida Department of Transportation Skyway Approach (Failed TendonPier 133 N) 2000 Inspection

Structures FDOT Perspective Design Plans Review Group Segmental Bridge Construction Perspective New Directions for Florida Post-Tensioned Bridges Corven Engineering, g, Inc. February 15, 2002 February 23, 2010 FDOT/FTBA Construction Conference Brian Blanchard P.E. Chief Engineer Florida Department of Transportation

Structures FDOT Perspective Design Plans Review Group Segmental Bridge Construction Perspective Seabreeze Bridge February 23, 2010 FDOT/FTBA Construction Conference Brian Blanchard P.E. Chief Engineer Florida Department of Transportation 2Policy y Revisions Specify Minimum Layers of Protection Develop Anchorage Protection Standard Details and QPL Pour-back Materials Develop P.T. Redundancy Requirements Rfi Refine Grouting Procedures Pre-approved P.T. Systems Qualified Grouting Personnel/ Inspectors Specify Low-Point-Up Grouting Specify Non-bleed QPL Bagged Grouts Specify Inspection Access Points

Structures FDOT Perspective Design Plans Review Group Segmental Bridge Construction Perspective Dodge Island Bridge Experience and Future Trends February 23, 2010 FDOT/FTBA Construction Conference Brian Blanchard P.E. Chief Engineer Florida Department of Transportation

Structures FDOT Perspective Design Plans Review Group Segmental Bridge Construction Perspective Hathaway Bridge February 23, 2010 FDOT/FTBA Construction Conference Experience and Future Trends Segmental top-down construction techniques are cost effective on large waterway projects where insurance and labor rates are governed by time working from barges. Larger projects generally make segmental construction more cost effective due to the casting yard setup cost being spread over more segmental units and when the amount of work is sufficient to overcome learning- curve inefficiencies. Brian Blanchard P.E. Chief Engineer Florida Department of Transportation

Structures FDOT Perspective Design Plans Review Group Segmental Bridge Construction Perspective Experience and Future Trends (cont.) Segmental alternatives have been Royal Park Bridge competitive against steel box options where February 23, 2010 FDOT/FTBA Construction Conference Brian Blanchard P.E. Chief Engineer Florida Department of Transportation the number of segmental units is sufficient (greater than 600-700 units). Segmental options have not been competitive on small projects when bid against simple span prestressed beam options.

Structures FDOT Perspective Design Plans Review Group Segmental Bridge Construction Perspective Future Trends Customized Overhead Gantries Allowing Cantilever Construction on Curved Ramps Roosevelt Bridge Greatly Reducing Traffic Disruptions Example: Palmetto Section 5 February 23, 2010 FDOT/FTBA Construction Conference Brian Blanchard P.E. Chief Engineer Florida Department of Transportation Transverse Deck Beam

Structures FDOT Perspective Design Plans Review Group Segmental Bridge Construction Perspective Future Trends Greater Use of Combined Steel and Concrete to Reduce Weight? Core Segment External Strut + Rib Precast Panel Example: Yamakiri Viaduct (Japan)

Structures FDOT Perspective Design Plans Review Group Segmental Bridge Construction Perspective Future Trends National Post-Tensioning Specification PTI is currently developing a nationwide post- tensioning specification based largely on FDOT specifications, research and past experiences.

Structures FDOT Perspective Design Plans Review Group Segmental Bridge Construction Perspective February 23, 2010 FDOT/FTBA Construction Conference Brian Blanchard P.E. Chief Engineer Florida Department of Transportation S.E. 17 th Street Bridge

Structures Contractor s Design Perspective Perspective Segmental Plans Segmental Review Bridge Bridge Group Construction Enrique I. Espino, P.E. President Condotte America, Inc. Segmental Bridges It s a Construction Technique with Design Jim Schneiderman, P.E. Construction Manager PCL Civil Constructors, Inc. February 23, 2010 FDOT/FTBA Construction Conference Implications The Contractor s Perspective

Structures Contractor s Design Perspective Perspective Segmental Plans Segmental Review Bridge Bridge Group Construction Enrique I. Espino, P.E. President Condotte America, Inc. Jim Schneiderman, P.E. Construction Manager PCL Civil Constructors, Inc. February 23, 2010 FDOT/FTBA Construction Conference Types of Segmental Bridges and Characteristics PrecastingSegments t Superstructures & Substructures Erecting Precast Segments Superstructures & Substructures Cast in Place with Form Travelers

Structures Contractor s Design Perspective Perspective Segmental Plans Segmental Review Bridge Bridge Group Construction Types of Segmental Bridges and Characteristics Jim Schneiderman, P.E. Construction Manager PCL Civil Constructors, Inc. February 23, 2010 FDOT/FTBA Construction Conference JimSchneiderman Schneiderman, P.E. PCL Civil Constructors, Inc.

Structures Design Segmental Plans Review Bridge Group Construction Types of Segmental Bridge Structures Precast Span by Span Precast Balanced Cantilever Precast Progressive Placement Cast in Place Balanced Bl dcantilever Cast in Place Incremental Launching Cast in Place & Precast Cable Cbl Stayed

Structures Design Segmental Plans Review Bridge Group Construction Precast Span by Span Ernest F. Lyons Bridge Stuart, FL (Photo courtesy of PCL Civil Constructors, Inc.)

Structures Design Segmental Plans Review Bridge Group Construction Precast Balanced Cantilever J h Ri li C S t FL John Ringling Causeway Sarasota, FL (Photo courtesy of PCL Civil Constructors, Inc.)

Structures Design Segmental Plans Review Bridge Group Construction Precast Progressive Placement Temp. Support Linn Cove Viaduct Blue Ridge Parkway, NC (Photo courtesy of Figg Engineering Group)

Structures Design Segmental Plans Review Bridge Group Construction Precast Progressive Placement (cont.) Temp. Support

Structures Design Segmental Plans Review Bridge Group Construction Cast in PlaceBalanced Cantilever Form Traveler Foothills Parkway Bridges Smokey Mountains, Tennessee (Photo Courtesy of PCL Civil Constructors, Inc.)

Structures Design Segmental Plans Review Bridge Group Construction Cast in Place PlaceBalanced Cantilever (Cont.)

Structures Design Segmental Plans Review Bridge Group Construction Cast in PlaceIncremental Launching Launching Direction Casting Bed Launching Nose

Structures Design Segmental Plans Review Bridge Group Construction Precast & CIP Segmental Cable Stayed Sunshine Skyway Bridge Tampa, FL (Photo courtesy of Figg Engineering Group)

Structures Design Segmental Plans Review Bridge Group Construction Precast and Cast in Place Cable Stayed (cont.) Stay Cable Pylon Deck

Structures Contractor s Design Perspective Perspective Plans Segmental Review Bridge Group Construction Enrique I. Espino, P.E. President Condotte America, Inc. February 23, 2010 FDOT/FTBA Construction Conference Precasting Segments Superstructures & Substructures Enrique Espino, P.E. Condotte America, Inc.

Structures Contractor s Design Perspective Perspective Segmental Plans Segmental Review Bridge Bridge Group Construction Erecting Precast Segments Superstructures & Substructures Jim Schneiderman, P.E. Construction Manager PCL Civil Constructors, Inc. February 23, 2010 FDOT/FTBA Construction Conference JimSchneiderman Schneiderman, P.E. PCL Civil Constructors, Inc.

Structures Design Segmental Plans Review Bridge Group Construction Precast Segmental Bridge Erection Techniques Span by Span Erection Methods Balanced Cantilever Erection Methods Erection of Segmental Substructures

Structures Design Segmental Plans Review Bridge Group Construction Span by Span Erection Methods Top Down erection using under slung truss and segment lifter Segment Lifter Underslung Truss Truss Supports Ernest F. Lyons Bridge Stuart, FL (Photo Courtesy of PCL Civil Constructors, Inc.)

Structures Design Segmental Plans Review Bridge Group Construction Span by Span Erection Methods Overhead Erection Truss Seattle Sound Transit Light Rail Project Seattle, WA (Photo courtesy of PCL Civil Constructors, Inc.)

Structures Design Segmental Plans Review Bridge Group Construction Span by Span Erection Methods Overhead Erection Truss Overhead Erection Truss C&D Canal Bridge Delaware (Photo courtesy of Figg Engineering Group)

Structures Design Segmental Plans Review Bridge Group Construction Span by Span Erection Methods Erected on Falsework using conventional cranes Falsework (Photo courtesy of Flatiron Constructors, Inc.)

Structures Design Segmental Plans Review Bridge Group Construction Span by Span Erection Methods Lifting of Entire Span at once Jamestown Bridge Rhode Island (Photo Courtesy of Figg Engineering Group)

Structures Design Segmental Plans Review Bridge Group Construction Typical Balanced Cantilever Erection Methods

Structures Design Segmental Plans Review Bridge Group Construction Balanced Cantilever Erection Methods Crane Erection from Ground Crane Erection from Bridge Deck

Structures Design Segmental Plans Review Bridge Group Construction Balanced Cantilever Erection Methods Erection using a beam and winch Oakland Bay Bridge Oakland, CA (Photo courtesy of Flatiron Constructors, Inc.)

Structures Design Segmental Plans Review Bridge Group Construction Balanced Cantilever Erection Methods Erection using overhead Erection Truss Otay River Bridge San Diego, CA (Photo courtesy of International Bridge Technologies)

Structures Design Segmental Plans Review Bridge Group Construction Segmental Substructures Sequence of Erection: Place and Grout Segment to footing Keway Erect remaining segments to a predetermined elevation (usually based on stability). Perform intermediate P.T. to maintain pier stability After all segments have been erected, permanent PT is performed (usually loop tendons through footing) Tendons are then grouted. Typical Precast Column Segment Keyway Splash Zone Requirements: Many states do not allow precast substructure elements to be used within the splash zone. Above the Splash Zone, precast erection can begin. Keyway in Footing to Align / Stress first Segment

Structures Design Segmental Plans Review Bridge Group Construction Segmental Substructures C&D Canal Bridge Hoover Dam Bypass

Structures Design Segmental Plans Review Bridge Group Construction Segmental Substructures Stressing Vertical Column Tendon

Structures Design Segmental Plans Review Bridge Group Construction When does Precast Segmental Substructure make sense? When you have a large volume production of typical pier shapes When high quality concrete and geometry control of the piers is extremely important Whenthere is a long lead time for foundations that allows fabrication of pier segments concurrently with foundation work * The major advantage of precasting substructure segments is the * The major advantage of precasting substructure segments is the speed of erection, which surpasses any other conventional method of pier construction.

Structures Design Segmental Plans Review Bridge Group Construction Scheduled Seminars : February 17 18 Denver, Colorado June 22 23 Orlando, Florida For More Information, Please Go To: http://www.asbi assoc.org assoc org

Structures Contractor s Design Perspective Perspective Plans Segmental Review Bridge Group Construction Cast in Place with Form Travelers Enrique Espino, P.E. Condotte America, Inc. Enrique I. Espino, P.E. President Condotte America, Inc. February 23, 2010 FDOT/FTBA Construction Conference

Structures Contractor s Design Perspective Perspective Plans Segmental Review Bridge Group Construction Enrique I. Espino, P.E. President Condotte America, Inc. Segmental Bridges It s a Construction Technique with Design Implications Jim Schneiderman, P.E. Construction Manager PCL Civil Constructors, Inc. February 23, 2010 FDOT/FTBA Construction Conference

Structures Design Plans Review Group Design and Construction Engineer s Perspective R. Craig Finley, Jr., P.E. Managing Principal FINLEY Engineering Group, Inc. February 23, 2010 FDOT/FTBA Construction Conference R. Craig Finley, Jr., P.E. Finley Engineering Group, Inc.

Design and Plans Construction Review Engineer s Group Perspective Structures Design Presentation Outline Key Points to Understanding Segmental My Background & Perspective Importance of Project Procurement Engineering Roles & Responsibilities Special Considerations

Design and Plans Construction Review Engineer s Group Perspective Structures Design Key Points to Understanding Segmental Segmental bridges are based on a construction technique that has design implications. Know how to build it before starting to design it.

Design and Plans Construction Review Engineer s Group Perspective Structures Design Background A bridge engineer, a Florida PE and FTBA member Involved with segmental bridges continuously since 1979 Working in the USA and internationally Started in Florida on the Keys and now doing SR 826/836 Interchange

Design and Plans Construction Review Engineer s Group Perspective Structures Design Perspective As a designer and construction engineer Preference for contractor driven and design/build projects Typically involved with the bid The best approach is not always the same for every one or every project.

Design and Plans Construction Review Engineer s Group Perspective Structures Design Importance of Project Procurement Three ways to do it: Design Bid Build Design Build After the fact Value Engineering or Construction Modification Different approaches to incorporate construction methods

Design and Plans Construction Review Engineer s Group Perspective Structures Design Design Bid - Build Generic design many assumptions Code based not construction methods or schedule Will be reworked by construction engineer before it can be built Multiple steps/approvals Procurement

Design and Plans Construction Review Engineer s Group Perspective Structures Design Design - Build Specific design known construction method Better initial optimization and faster process More efficient best results Responsibility is where it needs to be Procurement

Design and Plans Construction Review Engineer s Group Perspective Structures Design Value Engineering / Construction Modification Combination approach Used for an advantage Has been very successful More common in tough times Procurement

Design and Plans Construction Review Engineer s Group Perspective Structures Design Engineering Roles & Responsibilities Design Engineer Owner Client Construction Engineer Contractor Client Value Engineering / Design Build

Design and Plans Construction Review Engineer s Group Perspective Structures Design Design Engineer Works for the owner Typical scope Design Drawings Specifications Cost estimates Based on an assumed schedule and means & methods Roles & Responsibilities

Design and Plans Construction Review Engineer s Group Perspective Structures Design The Design Engineer provides post-design services. Reviews and approves construction ti engineering Based on actual construction engineering Takes time Inefficient Personalities involved Roles & Responsibilities

Design and Plans Construction Review Engineer s Group Perspective Structures Design Construction Engineer Works for contractor Typical scope Integrated shop drawings Construction analysis and camber Temporary works / special equipment Geometry control Post tensioning support Roles & Responsibilities

Design and Plans Construction Review Engineer s Group Perspective Structures Design The Construction Engineer does the detailed design. Performs time dependent, step by step analysis Incorporates schedule and sequence Analyzes means and methods Uses sophisticated softwareandand is very detailed Roles & Responsibilities

Design and Plans Construction Review Engineer s Group Perspective Structures Design Value Engineering and Design - Build In VE projects, there is overlap between the design and construction engineers. With Design Build, ild the design and construction engineer are the same. Roles & Responsibilities

Design and Plans Construction Review Engineer s Group Perspective Structures Design Special Considerations The Construction Method Dictates Design Takes more engineering to Bid & Build Requires high level of planning and coordination Calls for a factory/assembly line mentality Is optimum in design/build

Design and Plans Construction Review Engineer s Group Perspective Structures Design Managing Principal

Structures Design Plans Review Group Design and Construction Engineer s Perspective R. Craig Finley, Jr., P.E. Managing Principal FINLEY Engineering Group, Inc. February 23, 2010 FDOT/FTBA Construction Conference R. Craig Finley, Jr., P.E. Finley Engineering Group, Inc.

Structures Design Segmental Bridge Construction Plans Review Group Future Perspective February 23, 2010 FDOT/FTBA Construction Conference More design build & experienced Contractors. Standardization of precast segments Supply like pre stressed girders. Higher strength and composite materials. National specifications for materials and training.

Structures Design Segmental Bridge Construction Plans Review Group Future Perspective More sophisticated erection equipment. Rehab marketwill develop. 100+ year service life durability. February 23, 2010 FDOT/FTBA Construction Conference

Structures Design Segmental Bridge Construction Plans Review Group Round Table Q & A Florida Department of Transportation s s Perspective, Brian Blanchard, P.E., Florida Department of Transportation Contractor s Perspective Enrique Espino, P.E., Condotte America, Inc. Jim Schneiderman, P.E., PCL Civil Constructors, Inc. February 23, 2010 FDOT/FTBA Construction Conference Design and Construction Engineers Perspective R. Craig Finley, Jr., P.E., Finley Engineering ggroup