Attachment A Construction Inspection Log (Required for initial certification of stormwater treatment facilities)

Similar documents
CONSTRUCTION CERTIFICATION PACKAGE

MSD STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY

STORM M ANHOLE FOR 42" PIPE AND SM ALLER JOB NO. SHEET NO. DATE MARCH 2015 OF MIN OF 3 CRSES MAX OF 5 CRSES 30"MAX 3 OR 3.5 PRECAST ECCENTIC CONC

VISUAL INSPECTION CHECKLIST FOR GENERAL NPDES PERMIT FOR STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITIES (PAG-02)

B17. Sewer Site Plans BULLETIN

APPENDIX K DEPARTMENT OF PLANNING AND CODE ENFORCEMENT SUBDIVISION APPLICATION CENTER SUBMITTAL CHECKLIST

Zoning District: R-1, R-2, and R-4 Applicant: Exeter Rose Farm, LLC, 953 Islington Street #23D Portsmouth, NH 03801

CHAPTER 11. Plan Standards

STANDARD BID ITEM NUMBERS

CITY OF DANA POINT DEVELOPMENT REVIEW

1.1 GENERAL RECORD DRAWING REQUIREMENTS

Porter County Plan Commission

11/06/2014 Pay Items - 1

VICINITY MAP LOCATION MAP GRAPHIC SCALES

PO Box 1089 Apex NC

NWP of 9 Enclosure

VARIANCE APPLICATION (NO SITE PLAN OR SUBDIVISION)

I. GENERAL: The Bidding and Contract Documents for Riverside North Parking Lot are modified as described in this Addendum.

StormTrap Guide Specification. StormTrap SingleTrap on Pad Foundation Groundwater BELOW Invert Revised 11/21/18

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS

2014 Bentley Systems, Incorporated. Industry Futures Dean Bowman, PE Bentley Fellow Bentley Systems

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS

B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422

Application for Site Plan Review

CITY OF MUSKEGO DRAFTING STANDARDS

SUBDIVISION APPLICATION FOR DRT SUBMITTAL PUBLIC WORKS DEPARTMENT

MADISON METROPOLITAN SEWERAGE DISTRICT MADISON, WISCONSIN PUMPING STATION 15 REHABILITATION CITY OF MADISON PLANNING COMMISION SUBMITTAL

StormTrap Guide Specification. StormTrap 2 SingleTrap on Aggregate Foundation Groundwater BELOW Invert Revised 11/30/17

MINOR SUBDIVISION. [ ] [ ] [ ] [ ] B. Dimensions, bearings and curve data for all property lines and easements.

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST

PREPARATION GUIDELINES FOR UDFCD MAINTENANCE SITE PLAN

ROUTES: 65 SECTIONS: miles in length. THE FOLLOWING ITEMS AND APPROXIMATE QUANTITIES ARE INVOLVED:

MAJOR GRADING PLAN CHECKLIST

VILLAGE OF VILLA PARK CENTRAL BOULEVARD IMPROVEMENTS LOCATION MAP (NOT TO SCALE) CORTESI AVE. MYRTLE AVE. CENTRAL BLVD.

Integrated Life Cycle Management for Design, Modeling, and Operation of Stormwater Drainage Systems

Advantages of Implementing StormCAD for OpenRoads (SUDA)

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION

Authorized Agent: City of Manassas Check List Attached: Contact: Address: Phone Number: Fax Number: Developer s Name: Phone Number:

Grading, Erosion and Sediment Control (GESC) Checklist

Section 1. Introduction

PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1

City of Regina Standard Construction Specification SECTION 2999 LISTING OF ROADWAY STANDARD DRAWINGS

City of Massillon Site Plan Checklist

TUSCAN VILLAGE - MASTERPLAN Salem, New Hampshire PRELLWITZ CHILINSKI ASSOCIATES 221 Hampshire Street Cambridge MA 02139

CITY OF SAN MARCOS ENGINEERING DIVISION

SECTION 9.00 AS-BUILT DRAWING REQUIREMENTS SUB-INDEX

Council Policy Engineering Drawing Submission Requirements

Phone Number: Address:

INDEX OF SHEETS FLAMING GORGE RANGER DISTRICT OFFICE ADDITION REGION 4 INTERMOUNTAIN REGION ASHLEY NATIONAL FOREST DRAWING SHEET INDEX

1. Denver Water is not the provider. [C1 Cover] Baseline Response: Revised to show Thornton Water Department as the provider.

ATTACHMENT H TACOMA HYDROELECTRIC PROJECT DESCRIPTION OF PROJECT FEATURES

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST

UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1

MAY J. Collins Engineering Associates, LLC San Jose Blvd. Jacksonville, Florida 32223

SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT

erosion control HasTec KGW 400 advantages: usage: For surface protection and greening of slopes in landscaping and traffic route engineering.

Miscellaneous. Demolition

PRECISE GRADING PLAN CHECKLIST

HEXAGONAL DOUBBLE TWISTED GABION & ROCK FALL MATRESSES

SECTION 6A ROADWAY PLAN PREPARATION

SECTION DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

STANDARD CATCH BASIN GUTTER LINE CB INLET FRAME & GRATE, GROUTED TO GRADE RINGS AS REQ'D CONCRETE CURB FINISHED GRADE ASPHALT MAX 50 MIN

SECTION DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS

APPLICATION FOR SITE PREPARATION PERMIT

"A" "A" SECTION "A-A" X-SECTION VERTICAL CURB (TYPE B) Village STREET & PAVEMENT STR-05. Engineering Department

Transcontinental Gas Pipe Line Company, LLC. Response to Technical Deficiency Pennsylvania Department of Environmental Protection

ARTICLE 3: WATERSHED MANAGEMENT PERMIT REQUIREMENTS AND SUBMITTALS

Tooker Family Residence

Oakdale Primary School, Peterborough Civil Engineering NBS Specification

Free Raised Garden Bed Plans

Consultant s As Constructed Survey Certification Check List

Discretionary Project Submittal Requirements

SECTION MANHOLES

Artificial Grass. Fitting Guide

A. Dewatering observation wells are part of dewatering allowance.

GCG ASSOCIATES, INC. February 8, Mr. Nathaniel Strosberg, Town Planner 101 Main Street Town of Ashland Ashland, MA 01721

CCWA As-Built CAD Standards Effective Date: June 1, 2002 Latest Revision: March 2016

SCHEDULE 10 ENGINEERING DRAWING SUBMISSION

City of Regina Standard Construction Specifications SECTION LIST OF SEWER STANDARD DRAWINGS

CITY OF MORTON RESERVOIR NO. 1 REPLACEMENT - REBID

CONSTRUCTION SPECIFICATION FOR MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION

This addendum forms a part of the Contract Documents dated: August 10, 2012.

1 MUNICIPAL INFRASTRUCTURE

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST

CITY OF NEW WESTMINSTER SECTION Westminster Pier Park ADDENDUM NO. 1 Landscape Contract

2. Remove from the Standard Plate manual: Standard Plate Index, Sheets 1-4 of 4, Numerical Index of Standard Plates (August 31, 2012)

Manhole or Catch Basin Type A & B Cone Sections Precast - Design F Manhole or Catch Basin Cover (Reducer Cone Section Precast) Design D

CITY OF WAPATO NORTH WAPATO LIFT STATION REPLACEMENT CITY OFFICIALS. JUAN OROZCO Mayor. ROBERTO REYNA Mayor Pro Tem

Guide to the Single Family Site Development Process

Minor Site Plan Application and Checklist Land Disturbing Activities

50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges

RIICCM203D Read and Interpret Plans and Specifications

TEMECULA, CA SITE PLAN PROJECT SUMMARY UNIT MIX 2 CAR GARAGE (20' X 20") PARKING SUMMARY OPEN SPACE SUMMARY REQUIRED: REQUIRED: PROVIDED: PROVIDED:

2.5 Design of Channels

TABLE OF CONTENTS. SI No Contents Page No.

Project Name: County File No.: Checked by: For: Date:

Type A. BWSC CAD Standards for Site Plans (Design and As-Built) Format. Scale. Fonts, Linetypes, Shapes

APPENDIX D: DRAWING SUBMISSION STANDARDS

Housing Authority of Utah County

Part 1 - Common Comments on Erosion and Sediment Control Plans (Walter Hamilton, SDID)

Transcription:

Rain Garden Soil Amendments meet requirements (if amendments required) Final grades/location/volume conform with construction plans Overflow installed at location/elevation shown on plans Type and thickness of mulch provided as shown on plans verifying that unacceptable items have been corrected. Page 1 of 12

Infiltration Basin Stilling basin installed per plan Principal spillway conforms with size, materials, elevations, and locations shown on plans Principal spillway outlet energy dissipation installed per plan Underdrain pipe conforms with size, material, elevation and location shown on plans Emergency spillway conforms with dimensions, locations, elevations shown on plans Embankment conforms with dimensions and elevations shown on plans Infiltration media installed per plan Facility drains completely within 72 hours after rain event verifying that unacceptable items have been corrected. Page 2 of 12

Final grades/location/volume conform with construction plans Geotextile fabric meets specifications and installed at locations shown on plans Aggregate materials meet plan gradation requirements Water level monitoring well installed at location/depth shown on plans Infiltration Trench Locking cap installed on monitoring well Grass filter pretreatment strip installed per plan Page 3 of 12

Final grades/location/volume conform with construction plans Filter fabric meets plan specifications and installed at locations shown on plan Underdrain gravel filter bed meets gradation requirements and installed at locations shown on plan Cleanout locations installed per plan Engineered soil matrix meets material specifications and thoroughly mixed prior to installation Bioretention Organic or mulch layer material meets specification and installed to thickness shown on plans Pretreatment device installed per plan. Overflow device size, location, and elevation conforms with construction plans Embankment conforms with dimensions and elevations shown on plans Emergency spillway conforms with dimensions, locations, elevations shown on plans Page 4 of 12

Porous Pavement Geotextile fabric meets specifications and installed at locations shown on plan Aggregate materials meet plan gradation requirements Underdrain piping conforms with locations/sizes/opening sizes/materials shown on plans Pavement surface meets design specifications Page 5 of 12

Extended Detention Wetland Final grades/location/volume conform with construction plans Micropool volume and area conform with plans Low Marsh volume and area conform with plans High Marsh volume and area conform with plans Inlet works erosion protection conforms with plans Water quality outlet structure conforms with size, location, elevation shown on plans Trash racks provided in conformance with plans Emergency spillway conforms with dimensions, locations, elevations shown on plans Embankment conforms with dimensions and elevations shown on plans Page 6 of 12

Wetland Swale Cross section conforms with plan Location/length conforms with plan Check dams installed at locations/elevations shown on plan Page 7 of 12

Cross section conforms with plan Location/length conforms with plan Check dams installed at locations/elevations shown on plan Bioswale Engineered soil matrix meets material specifications and is thoroughly mixed prior to installation Underdrain gravel filter bed meets gradation requirements and installed at locations/depths shown on plan Filter fabric meets plan specifications and installed at locations shown on plan Underdrain piping conforms with locations/sizes/opening sizes/materials shown on plans Page 8 of 12

Extended Wet Detention Final grades/location/volume conform with construction plans Littoral bench constructed at location/dimensions shown on plan Inlet works erosion protection conforms with plans Water quality outlet structure conforms with size, location, elevation shown on plans Trash racks provided in conformance with plans Emergency spillway conforms with dimensions, locations, elevations shown on plans Embankment conforms with dimensions and elevations shown on plans Page 9 of 12

Native Vegetation Swale Cross section conforms with plan Location/length conforms with plan Check dams installed at locations/elevations shown on plan Page 10 of 12

Extended Dry Detention Final grades/location/volume conform with construction plans Inlet works erosion protection conforms with plans Water quality outlet structure conforms with size, location, elevation shown on plans Trash racks provided in conformance with plans Emergency spillway conforms with dimensions, locations, elevations shown on plans Embankment conforms with dimensions and elevations shown on plans Page 11 of 12

Turf Grass Swale Cross section conforms with plan Location/length conforms with plan Final Stabilization met - i.e. at least 70% coverage over 100% of area with approved turf grass Page 12 of 12