Public Safety Radio Communications System Update. Presented by Steve Streiffert Assistant Director, IT Solutions May 10, 2011

Similar documents
Radio System Replacement Project

City of Fort Worth Information Technology Solutions Department

Radio Technology Overview. January 2011

PALMETTO 800 History Project Cost

Butler County Department of Emergency Services. Butler County Radio Project Briefing

Radio Communications Essentials. Module 9: Narrowbanding Pete Peterson

Nevada Shared Radio System Update. WCRCS 800 MHz Joint Operating Committee Meeting, July 28, 2017 Agenda Item 11

Public Safety Radio System. August 6, 2018

Steven W. Jennings, CIO Harris County ITC

UPGRADES TO 800 MHZ TRUNK RADIO SYSTEM TECHNOLOGY

2-800 MHz CCCS Sys Extension

9-800 MHz Countywide Coordinated Communications System (CCCS) Upgrade

Sept 28, Mukhtar mook-tar Thakur

Public Safety Radio System Update September 9, 2013

Missouri FY 10 Interoperable Grant Guideline Definition and Examples of Eligible Procurement

Minnesota Department of Public Safety ARMER. A resource public safety officials need to do their job

SARASOTA COUNTY GOVERNMENT

Public Safety Communications Commission

REPORT TO MAYOR AND COUNCIL

Statewide 800 MHz Communications System

Wyoming s Statewide Public-Safety Interoperable Radio Communications System WyoLink Frequently Asked Questions (FAQ)

INTERNAL AUDIT DIVISION CLERK OF THE CIRCUIT COURT

Joint System Owners Customer Information Meeting Thursday, December 7, 2017 Environmental Service Building

MOTOBRIDGE IP Interoperable Solution

Tri-County Area APPLICATION FORM

Federal Partnership for Interoperable Communications

The Public Safety Committee will be briefed on the Modernization of Dallas' Radio Network on Monday, November 1, 2010.

Orange County Sheriff s Department. Jo Ann Galisky Assistant Sheriff

Communications Interoperability- Current Status

Appointments are available the first two weeks of June 2001 (06/04/01 06/15/01) from 9:00 a.m. to 4:00 p.m.

Eaton County Public Safety Radio System Recommendation

Resolution Authorizing Expenditure Appropriations to Purchase Radio Equipment and Facilitate Infrastructure R56 Grounding Work

Narrowbanding and Public Safety Communications

SERS primary mission was to design, purchase, build and operate a county-wide 800 MHz radio system along with supporting infrastructure and

800MHz Advisory Board August 24, 2017

INTEROPERABILITY PLANNING FOR PUBLIC SAFETY

Pennsylvania STARNet NASCIO Awards Information Communications Technology Innovation Commonwealth of Pennsylvania

EMERGENCY COMMUNICATIONS

Interoperable Communication Sustainment

Differences Between Level 4 and Level 6 Interoperability

P25 and Interoperability. RadioResource. User Benefits, Cautions and Case Studies. October 2013 MCCmag.com TM

DESCRIPTION OF INTENDED SINGLE SOURCE PURCHASE (PUR 7776)

Statewide 800 MHz trunked radio system available for all emergency responders (local, State, Federal)

3 4 1: 2: SAFECOM : 4: 5: 6: 7: IP

Columbia Communications District Request for Information New Radio Communications System

Project 25 with LTE: Mission Critical PTT Interworking Standards in Development

Motorola WAVE Licensing

Public Safety Interoperable Communications (PSIC)

Current Systems. 1 of 6

Radio Communications. Recommendation. Executive summary. Strategic context

TOPAZ Regional Wireless Cooperative (TRWC) Board of Directors

Guide for Short Term Interoperability

EMERGENCY COMMUNICATIONS DEPARTMENT. FY08 Budget Information Session April 26, 2007

IFERN / IFERN 2 Radio Base Stations for all Wisconsin MABAS Divisions/Counties

Wicomico County. RFP for new 700/800 hybrid P25 Phase II radio system

Ernie B. McNeely, Township Manager Michael J. McGrath, Superintendent of Police Lower Merion Township Radio System Replacement DATE: June 25, 2014

Guide for Short Term Interoperability Revised June 24, 2009

SUBJECT: MARIN EMERGENCY RADIO AUTHORITY (MERA) NEXT GENERATION

PUBLIC SAFETY WIRELESS BROADBAND NETWORKS WHAT S HAPPENING IN CITIES, COUNTIES, REGIONS AND STATES?

City Council Agenda Report

SOUTH EAST TEXAS REGIONAL RADIO SYSTEM Report August 8, 2011

Tactical Interoperable Communications Plan Greater Dallas/Fort Worth/Arlington Urban Area Security Initiative

INTERNAL AUDIT DIVISION

JOB ANNOUNCEMENT. Whitman County Communications Systems Manager

FINAL REPORT SUBMITTED JUNE 2017 TO: SHENANDOAH COUNTY, VIRGINIA

ENSURING FORCE PROTECTION & SECURITY WITH MISSION-CRITICAL COMMUNICATIONS

PRESENT: Directors Bill Paskle, Chair; Tony Ray; Ali Zolfaghari; Manuel Rodriguez; Tony Rouhotas; Brett VanWey; Stephen Rea.

State Law Enforcement Radio System (SLERS) Business Case Study For Department of Management Services. January 28, 2015

NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP July 28, 2017

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, DC ) ) ) ) ) ) COMMENTS OF THE TELECOMMUNICATIONS INDUSTRY ASSOCIATION

WASHINGTON COUNTY-WIDE Digital Trunked P25 Phase 2 Interoperable EMERGENCY RADIO, PAGING & SYSTEM for sheriff, police, fire

ALMR FREQUENTLY ASKED QUESTIONS

Federal Partnership for Interoperable Communications

Justice and Public Safety Subcommittee Thursday, January 23, a.m. 9 a.m. CCI Large Conference Room, 800 Grant Street, Suite 500, Denver AGENDA

UPGRADE YOUR MPT NETWORK THE SMART WAY. harris.com #harriscorp

Narrow-banding What It Means to Public Safety Webinar

Table of Contents. Phase 2. Planning

The Benefits of Project 25

FREQUENTLY ASKED QUESTIONS ABOUT ALLOWABLE USES OF 911 FEES Updated January, 2018

Project 25 Mission Critical PTT

MERA NEXT GENERATION SYSTEM SUMMARY PROJECT DESCRIPTION IN ADVANCE OF CEQA SUBSEQUENT ENVIRONMENTAL IMPACT REPORT (SEIR)

Consultation Paper on Public Safety Radio Interoperability Guidelines

Statewide Law Enforcement Radio System

N E T W O R K UPGRADE SOLUTIONS UPGRADE YOUR MPT NETWORK YOUR WAY

Cover photo: Smoke from a nearby wildfire is visible from the Lime Hill radio site in Baker County. A crew from Summit Solutions Group was on site

Cross-Border Interoperability Report Overview CANUS CIWG Meeting

Datacasting for Public Safety Access to Enhanced Technology via Public Television

DANE COUNTY BOARD OF SUPERVISORS MINUTES OF THE PUBLIC SAFETY COMMUNICATIONS TECHNICAL COMMITTEE Meeting of July 16, 2010

POLK COUNTY, FLORIDA EVERYDAY INTEROPERABILITY AND DISASTER RESPONSE

Before the Federal Communications Commission Washington, DC ) ) ) ) ) ) ) ) REPLY COMMENTS OF THE TELECOMMUNICATIONS INDUSTRY ASSOCIATION

Canada Voice Communications Plan (The Way Forward)

Regional Interoperable Communications System

Radio Communications Interoperability 2017 Assessment Report

Silicon Valley Regional Interoperability Authority (SVRIA) Overview. Presented By: William J. McCammon Interim Executive Director

The Professional Consulting Services Communications Consultant E-911. Design Alternatives

National Incident Management System

Saluda County 911 Center Upgrades Console System and Improves Operations

MOTOROLA SOLUTIONS 2017 K-12 EDUCATION INDUSTRY SURVEY REPORT SURVEY REPORT 2017 SCHOOL COMMUNICATIONS

ROUTT COUNTY, COLORADO

Lowell Porter Executive Director S. 35 th St., Suite D Tacoma, Washington

Transcription:

Public Safety Radio Communications System Update Presented by Steve Streiffert Assistant Director, IT Solutions May 10, 2011

Purpose Review state of the current radio system Council to consider M&C P11234 Recommend next steps 2

Radio System Overview Operational in 1992 Primary Communications CFW: 6500 Radios Police, Fire, Water, TPW, etc. Others: 2600 Radios Tarrant County, The T, Haltom City North Richland Hills, MedStar, Kennedale, Richland Hills, TCC, etc. 3

The Challenges Equipment Manufacturer Support Parts Availability System Performance Not Standards Compliant Operational Service Interruptions Capacity Coverage Interoperability Law enforcement agencies struggle to communicate despite technological advances 08:13 AM CDT on Friday, July 3, 2009 By ED TIMMS and TANYA EISERER / The Dallas Morning News Despite unprecedented advances in technology, law enforcement agencies still struggle to communicate with each other during high-speed chases that streak through several different cities or counties 4

Project 25 (P25) Set of radio communication standards Produced through joint efforts Association of Public Safety Communications Officials International National Association of State Telecommunications Directors Federal Agencies and the National Communications System Ensures organizations can easily communicate in both routine and emergency circumstances Allows communication between vendors and products Improves radio spectrum efficiency to ensure enough capacity to handle calls and allow room for growth 5

P25 & State of Texas Texas Statewide Communications Interoperability Plan Vision P25 Goal: By the end of 2015, provide all public safety and critical infrastructure responders the highest level of real-time direct interoperable voice and data radio communications utilizing Standards- Based Systems (i.e P25) No federal funds will be made available for procuring radio equipment unless the technology is P25 compliant Texas House Bill 442: relating to the establishment of an emergency radio infrastructure account. 6

What s happening System Assessment - Jan 2009 Obsolete key components, insufficient capacity & new sites needed Recommendation: Begin upgrade Master Plans Jan 2011 City of Fort Worth & Regional Countywide Plans Contract negotiated for system upgrade 7

What s happening.. Rolling Hills Tower Replacement (Mar 2011) 8

What s happening.. Rolling Hills Tower Replacement (Mar 2011) Initial P25 Infrastructure (Jun 2011) Radio Site & Master Switch w/connectivity to Dallas & NCTCOG 9

What s happening.. Rolling Hills Tower Replacement (Mar 2011) Initial P25 Infrastructure (Jun 2011) Radio Site & Master Switch w/connectivity to Dallas & NCTCOG Microwave System Upgrade (Dec 2011) 10

What s happening.. Rolling Hills Tower Replacement (Mar 2011) Initial P25 Infrastructure (Jun 2011) Radio Site & Master Switch w/connectivity to Dallas & NCTCOG Microwave System Upgrade (Dec 2011) Far West Tower Site (Mar 2012) 11

What s happening New jurisdictions interested in participating in Fort Worth Radio System TCC, Burleson, Cleburne, Johnson County, Watauga, Westover Hills Other Projects: Rebanding Regional Initiatives North Texas Interoperable Communications Coalition Tarrant County 911 District 12

What s Next Upgrade Fort Worth System Expand Regional Interoperability 13

Upgrade Fort Worth System Summary Replace all tower receiver/transmitter equipment w/p25 Standard Upgrade and/or replace all radios Equipment discounts available to all system users Install two additional tower sites 14

Upgrade Fort Worth System Benefits Addresses all challenges Equipment & Operational Additional Benefits: Encryption, Over the Air Updates, etc Builds on existing investments Provides foundation for P25 Standard Regional System Provides Walsh Ranch Coverage Motorola maintains existing system 15

Upgrade Fort Worth System Timeline P25 Upgrade Contract Signed Jun 2011 P25 Equipment Arrives Mar 2012 P25 Installation Complete Jun 2013 Acceptance Testing Complete Sep 2013 Transition Begins Mar 2014 Project Complete Mar 2015 16

Upgrade Fort Worth System Financial Summary Additional Project Cost Radio System* (M&C P11234) $ 52,216,800 Infrastructure $ 6,907,700 Engineering/Consulting $ 3,850,000 Total $ 62,974,500 Potential Funding IT Solutions Excess Fund Balance $ 2,650,000 CCPD** Excess Fund Balance $ 5,000,000 UASI Grant $ 650,000 2011 Debt Sales $ 4,200,000 Total $12,500,000 Balance to be Funded Lease Purchase $50,474,500 (General Fund, CCPD, Grants, etc.) * 12 Year Useful Life avg cost: $5.2million/year ** Upon CCPD Board Approval 17

Upgrade Fort Worth System Funding Scenario Motorola Lease/Purchase & Cash Project Costs BGA Associates Proposed Funding First Southwest Infrastructure, Engin Spt, PM Lease Pymt Total Outflow Debt Proceeds Fund Bal Contribution Grant Future Year Funding Required FY11 (340,000) (340,000) 340,000 - - - FY12 (4,790,000) (4,790,000) 3,860,000 930,000 - - FY13 (2,400,000) (4,351,400) (6,751,400) - 6,720,000 31,400 - FY14 (2,400,000) (4,351,400) (6,751,400) - - 618,600 (6,132,800) FY15 (827,700) (4,351,400) (5,179,100) - - - (5,179,100) FY16-FY24/year - (4,351,400) (4,351,400) - - - (4,351,400) per year Total (10,757,700) (52,216,800) (62,974,500) 4,200,000 7,650,000 650,000 (50,474,500) Debt Proceeds: Part of 2007 Critical Capital CO Sale planned for 2011 Fund Balance Contribution: Combined CCPD ($5,000,000) & ITS ($2,650,000) Grant: UASI Grant 18

Regional System Benefits Improve safety and response capabilities of Public Safety Personnel Interoperability Coverage Capacity Potential Cost Savings Leverage assets such as tower sites, frequencies, etc. Consistent with State & Federal direction Statewide interoperability by 2015 Funding opportunities 19

Goal Regional System Summary Establish regional radio system Leverage existing assets & work Fort Worth: Regional Master Plan, Contract, Master Switch Tarrant County 911 District Include options for: Johnson, Wise, Denton Counties Existing joint organization in the region Potential funding source Compatible with existing mission 20

Regional System Timeline & Cost Tarrant County 911 District Board Established Interim Radio Advisory Committee Approved Feasibility Study Assess the operational impact to the District organization Staffing, facilities, budget, processes and procedures Using Fort Worth Contract Timeline: April August 2011 Cost: $176,100 Next steps after Feasibility Study 21

Regional System Challenges Scope Area of Responsibility Current or future systems Infrastructure and/or subscriber units Governance Representation Membership/Voting Operations Funding Maintenance & support System refresh Transition Timing Resources 22

Next Steps Upgrade Fort Worth System Execute Lease to Purchase Contract M&C P11234 for City Council Consideration May 17, 2011 Actively Support Regional Radio System Tarrant County 9-1-1 District City Council Update October 2011 23

Pubic Safety Radio Communications System Update Questions