Bio-Sand Filtration Mould Construction Guidelines

Similar documents
Bio-Sand Filtration Mould Construction Guidelines

Rorty No.2 Tube Bender.

Tool 3-1 A2 Bushing 6 Check if the bushing supports (angle iron) are properly welded with the upper part of the structure pipes. welded bushing suppor

METAL BENDER OPERATING & MAINTENANCE INSTRUCTIONS Model Nos: CCB1 & CCB2 Part Nos: & CCB2 CCB1

CARIBBEAN EXAMINATIONS SECONDARY EDUCATION CERTIFICATE EXAMINATION MECHANICAL ENGINEERING TECHNOLOGY. Paper 02 - Technical Proficiency.

1949 to 1954 Chevrolet Dual Master Cylinder Conversion

STEEL RULE. Stock TRY SQUARE

RBP-1215B-RX DODGE RAM QUAD CAB RX3

Kwik-Lock. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.

Ford Pick Up Rear leaf Spring Kit Installation Instructions

1984 to ZX (Z31) Rear Camber Modification Gary Molitor, March 1, 2009

ASAP Sr. A Strap and Pole. Magic Christmas. Single Stage. Walter Monkhouse. Alexandria, La. Version 1.2.

By C.W. Woodson From the pages of Model Craftsman magazine June, 1937

Replacing the Spindle Bearings Detailed Instructions

LocoGear. Technical Bulletin - 14 November 28, 2003 Copyright 2003 by LocoGear LIVE STEAM CASTINGS. Tech Bulletin - 14

ASSIGNMENT 4. Textbook Assignment: The point, edge, face, heel, and tang are the five parts of which of the following tools?

ASSEMBLY INSTRUCTIONS FOR MAR-K BEDSIDES AND GM FLUSH TAILGATE WITH HANDLE

UNIVERSAL BENDER MODEL: UBM-30

Installation Manual for Gate Guard

TIE-ROD AND PIPE JOINTS

CUTTING THE PIPE: BLUE DUCT Pipe can be easily cut using a Circular Saw or Reciprocal Saw. Trim all edges as necessary.

Model: 3-IN-1/1067x1.5 Model: 3-IN-1/1320x1.5

USE THE PARTS LIST BELOW TO MAKE SURE YOUR KIT IS COMPLETE BEFORE INSTALLATION. IF ANY PIECES ARE MISSING, PLEASE CONTACT:

No. 412, 414, 416 Operations Manual

DTU Low-Cost Animal Cart Programme

Assmann Corporation of America TANK INSTALLATION AND USE GUIDELINES FOR BULK STORAGE TANKS

ClearSpan PolyMax Windbreak Wall

Fairlane Front Suspension Install Sheet

Installation Instructions Kit, Base Rail Bracket Part # 31413

`48-`56 Ford Pickup Rear leaf Spring Kit Installation Instructions Tech Line:

Make a Safe. Description. Lesson Objectives. Assumptions. Terminology

frame bracket Dodge x 2 & 4 x 4 (6-1/2 & 8 Boxes Includes Mega Cab)

RACER TECH COMMANDER HD TIE ROD INSTALLATION

2 Cylinder Slidevalve Steam Engine

Classic Roll Tarp. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.

CENTER WING SECTION (CWS) WORK REPORT

INSPECTION AND CORRECTION OF BELLHOUSING TO CRANKSHAFT ALIGNMENT

FORWARD FUSELAGE SIDES & REAR TOP SKINS

Downtown Rack. Custom logo option available

ANSI ORIFICE FLANGES METAL-KOREA

HMP-200 BENDER INSTRUCTION SET

ALUMINUM PIPE GUIDERAIL 01/01/

Plans & Materials List for Handwashing Station

i sburgh COMPACT BENDER ASSEMBLY INSTRUCTIONS & PROJECT IDEAS Rev 08/00

STEEL PIPE GUIDERAIL 01/01/

Shay Drive Shafts & Universal Fabrication

LGCSE DESIGN AND TECHNOLOGY 0189 REPORT FOR TEACHERS

Fretboard Wednesday, January 16, :36 PM

PAT installation of a Sun Dome over a in-ground

Reversing Gear. Shay Reversing Gear

5/16" Flange nut. Bolt Keeper Plate (8" Sq. SYS.) (3) 1/2" x 3" Hex head connector zinc plated bolt w/ washers and nut. Anchor 3" sq. 7 Ga.

WORKSHOP EQUIPMENT. TIGER 2000S Ø200 x 40mm K 220 grinder stone 120W / 240V motor. Order Code: W859 $220 RRP JIG 60. Order Code: W8642 $38 50 RRP

MN Modelling Objects and Creating Manufacturing Strategy

Classic Roll Tarp. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.

Dehydrator Box Build Plan

Before returning this product to the store of purchase

Potter s Wheel Plans. Flywheel is poured in form made by tacking tar paper to plywood disk. Partly set concrete is broom-finished.

Copper Tubing Hangers Clevis Hangers. Copper Tubing Hangers

C70 Window Roller Repair Taken from: Heres the problem:

Sheet Metal Brake Plans for a 6' Sheet Metal Brake

A Captured Fastener, version 1.2

Important Note. Tools Required: Welder capable of fully welding 10 GA.135 steel

1964 ½ Mustang Front Suspension Installation Instructions

Installation Instructions Kit, Base Rail Bracket Part # 31413

PowerLock. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.

How to Make a Wedding Band 52 to 66 K, XL & XLH By the OSKRG vs.2

Steel Framed Miter Saw Bench

Manufacturing Process:

Eraser Conveyor Belt Cleaning System IWARNING Always obey all applicable safety rules. Be sure all power to the conveyor has been disconnected and con

6625 WEST WILSHIRE BLVD. OKLAHOMA CITY, OK (405) FAX (405)

HOME WORKSHOP HANDBOOK Rugged BENCH GRINDER. By JOEL B. LONG

Rugged Ridge Engine Transmission Skid Plate JK

How to Use the Jahn Forming System

6043 DESIGN AND TECHNOLOGY

One piece folding Bench and Picnic Table by Les Kenny

Section 6-B-6, 6-B-7, & 6-B-8 Firewall Assembly

TECHNICAL FILE FOR THE STIRLING ENGINE

INSTALLATION INSTRUCTIONS 6 OVAL BENT END SIDEBARS DODGE RAM 1500, CREW CAB PART#: /241533B

Vertical Steam Engine from barstock

Note Pad Holder. Tools:

METAL FABRICATION SECTION 8: METAL FABRICATION SCOPE MATERIAL.

ZODIAC CH 601 Series Kit Aircraft

TerraBrute CR (4-12 ) Pipe Installation Guide

Section 75-FA-5. Firewall Assembly

PLEASE READ THIS NOTICE BEFORE BEGINNING ANY PHASE OF INSTALLATION!!!!

Work Space Set-up. Slats will level the pipe during bending and help minimize twisting of the bow.

Build a Drill Press Vise

Tuf-Lite III Fans 5000K Series Hub

30DC Speed Lathe Manual

Practical Scrap Metal Small Arms Vol.10 By Professor Parabellum

How to make tailwheel shock rubber donuts and aluminum shims with formed flange

Punching 3/16" diameter round hole in up to 3/16" thick (flat strip metal).

Tool & Cutter Grinder

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

Assembly Instructions: Bencher Skylark

Operating, Servicing, and Safety Manual Model # & 72 Ultimate Box & Pan Brake

DRAFT TANZANIA STANDARD MEDC 10(5692) P3 - SPECIFICATION FOR HONEY EXTRACTOR, RADIAL TYPE

Bollard CartMagnet Standard Open Unit INSTALLATION INSTRUCTIONS

TK 422 PORTABLE BRAKE

By Professor Parabellum

Transcription:

United Kingdom The Shieling, Wreay Carlisle CA4 0RL Tel: +44 (0)1697 47 5369 Mobile: +44 (0) 7739 665 777 Email: info@biosandfilter.org Madagascar Libanona Americain PB 307 Fort Dauphin (614) Tel: +261 (0) 20 92 21405 Mobile: +261 (0) 3302 21405 Email: info@biosandfilter.org Bio-Sand Filtration Mould Construction Guidelines Adriaan Mol, BioSandFilter.org May 7, 2004

Introduction On the following pages, you will find an illustrated construction guide that takes you step-by-step through the process of building a mould that will allow you to cast your own concrete bio-sand filters. Note that a separate illustrated filter construction guide is available from www.biosandfilter.org. Much of the information in this document was collected by the author during a project that was financed and implemented by Medair in Kenya, in 2000. Check www.medair.org for more information on the humanitarian programmes implemented by this organization. Adriaan Mol BioSandFilter.org Fort Dauphin Madagascar Copyright information: This document, in part or in its entirety, may be copied, reproduced or adapted to meet local needs without permission from the authors or publishers, provided credit is given to BioSandFilter.org and the author(s). These provisions apply only provided the parts reproduced are distributed free or at cost not for profit. BioSandFilter.org would appreciate being sent a copy of any materials in which text or illustrations have been adapted. For reproduction on commercial basis, permission must be first obtained from BioSandFilter.org. Disclaimer: BioSandFiler.org and the author(s) assume no responsibility for and make no warranty with respect to the results that may be obtained from the use of information in this document. Under ideal circumstances, the bio-sand filter can produce drinking water of excellent quality which is safe to drink without further treatment. However, this can not always be guaranteed. BioSandFiler.org and the author(s) shall not be liable to anyone whatsoever for any damage resulting from reliance on any information contained in this document. This also applies to the consumption of water produced by a bio-sand filter. It should be noted that a bio-sand filter can not be relied upon to remove chemical contamination. Ideally, water should be boiled before consumption. Mould Construction Guidelines.doc 20 Page 2 of

Casting procedure Construction of a mould is not difficult. It can be made in most small metal workshops, even in developing countries. However, a good level of accuracy is required. A lathe and rolling machine (three-roll bender) are needed, besides a welding machine, drill and grinder. List of Materials The following materials are needed for the construction of 1 mould: Quantity Description Where used Manufacturing process For the Outer Shell: 1 Plate 1113mm x 950mm x 2mm Outer shell body Roll tube to 350mm diameter 1 Flat iron 50mm x 6mm 1415mm Outer shell bottom Roll to I.D. 354mm long ring 1 Flat iron 50mm x 6mm 1415mm long Outer shell top ring Roll as above, drill as per drawing 4 Flat iron 50mm x 6mm x 938mm Outer shell locking Drill as per drawing long flats 1 M12x 50 bolt & nut P.V.C pipe lock Drill shell, weld nut to shell 1 Plate 265 mm x 265mm x 2mm Nose Cut and bend as per drawing 1 Plate 110mm x 180mm x 6mm Nose plate Cut & shape as per drawing 1 Flat iron 25mm x 6mm x 40mm Nose plate lock Drill and weld M12 nut long 2 Flat iron 25mm x 3mm x 25mm long Nose plate aligners Weld to nose plate 1 M12 x 75 bolt & nut Nose plate lock Weld nut to flat 2 Bright mild steel shaft 40mm x Puller supports on 50mm long shell Drill 17mm and weld to shell For the Inner Core: 1 Plate 945mm x 253 mm x 2mm Cone A Roll to 300mm (top) and 290mm (bottom) 1 Plate 850mm x 655mm x 2 mm Cone B Roll to 270mm (top) 250mm (bottom) 1 Plate 290mm x 290mm x 2 mm Cone A bottom Cut to 286mm diameter 1 Plate 250mm x 250 mm x 2mm Cone B bottom Cut to 246 mm diameter 1 Plate 450mm x 450mm x 6mm Top plate for core Cut to 450mm diameter 1 M25 nut Core puller nut Weld to top plate 1 Plate diameter 100mm x 10mm Core puller nut Weld to top plate with nut thick 2 Square tube 50mm x 50mm x 3mm x 300mm long support Top stands Weld as per drawing For the Puller: 2 Flat iron 50mm x 6mm 50mm long Puller support plates Weld to puller bush 1 Square tube 50mm x 50mm x 3mm Puller top Drill as per drawing x 600 long 2 Angle iron 50mmx 50mm x 6mm Puller reinforcements Drill and weld to above 600 long 2 Bright mild steel shaft 16mm x Puller legs Weld to above 360mm long 1 Bright mild steel shaft 25mm x Puller bolt Thread M25 250 long Mould Construction Guidelines.doc 20 Page 3 of

300mm long 1 Bright mild steel shaft 40mm x 50mm long 2 Bright mild steel shaft 40mm x 10mm long Puller bolt head Puller legs stopper Drill 20mm and weld to bolt Drill 16mm & weld to legs 1 Pipe 1" class 'B' 900mm long Puller handle Weld to shaft 1 Bright mild steel shaft 18mm x Puller handle front 150mm long Weld to above 50mm in pipe Miscellaneous: 26 Bolts & nuts M10 x 25 Top plate, shell locks Tighten top plate & shells 2 Bolts & nuts M10 x 40 Outer shell top locks Locks shells top bolt 2 Spanners # 17 Top and outer shell Tightening & opening bolts 1 kg Welding rods welding Weld where applicable Mould Construction Guidelines.doc 20 Page 4 of

Construction Process Step-by-Step Kindly refer to the blueprints in the Annexes in order to obtain the correct specifications. Step 1 Bending Outer Shell Plate Measuring the plate as per the instructions on the blue print (see Annex). Cutting the plate for the outer shell to the right size. In a three-roll bender roll the plate for the outer shell (1113 x 950 x 2mm). Produce a cylinder of approximately 354mm diameter x 950mm length. Refer to the Annexes for exact measurements. Measuring the diameter of the outer shell after bending. Mould Construction Guidelines.doc 20 Page 5 of

Step 2 Bending Inner Core plate In the same bender, roll the cone B to major diameter of 300mm and minor diameter of 290mm. Finally, roll cone D to major diameter of 270mm and minor diameter of 250mm. Important: The plates for the cones must be cut to the exact shape as shown in the drawings in order to get a proper conical shape. Refer to the Annexes for the correct measurements. Note that you get the apex angle you connect the two short edges of the metal plate to one point that should be 7.2 degrees. The simplest way to do that is as follows: 1. Take a rope and tie 2 nails at each end. The distance between the nails should be 7500mm (7.5metres). Then draw a arc; 2. From the same centre draw another arc of 7250mm (7.25mts); 3. Draw a line from the centre to the first arc; 4. Take a standard protractor. Place it on the centre out 7.2 deg and draw a line to the first arc. The area between the two lines is your template. The other way is follow steps 1-3 them with a tape measure. Measure 942.5mm on the outer circle, follow the radius at that point connect it to the centre. The area in the centre is your template. Finally, take note that rolling pressures has to be different when rolling taper cones on a standard three roll bender. Therefore, make sure to tighten the rollers uneven. Step 3 Welding of rolled plates Tack-weld the edges and roll them again for roundness. If the bender does not allow for this process (most benders have a loose top roll where a welded job can be re rolled) then hammer it all round using a rubber mallet. Step 4 - Welding and finishing inner core Fully weld the edges on the cones inside and outside, and then grind the outer weld to a smooth finish. Next, check the surface of the cones for dents and roundness. If any dents are found make sure you remove them. This is very important, as it will be next to impossible to remove the concrete filter from the mould if dents are present. Once the above process has been completed take the flanges C & E. Machine them on a lathe to 286mm (C) & 246mm diameter (E). Machine the top plate A to 450mm diameter. Mark the centre lines for drilling holes on plate A, then draw a circle of 400mm and divide the circle into 10 equal parts. Subsequently drill 11mm holes at the divisions. In the middle of any division, drill a 13mm hole (this is the locating hole normally a odd one either a square or bigger round with a pin welded). On the opposite side draw a circle of 300mm this is the locating mark for welding the cone B to plate A. Drill a 28mm hole in the centre of plate A. Mould Construction Guidelines.doc 20 Page 6 of

Step 5 Welding Weld cone D to flange E, check for distortions and rectify them. Weld cone B to flange C, check for distortions and rectify them. Weld cone D to flange C, finish by welding the cone assembly to plate A. Grind and smoothen all welds. The inner core and the outer shell halfway through construction. Detail of the inner core. Inside, the reinforcement flanges are still visible before the top plates are welded to the cone. Important: Make sure that the cone assembly is aligned properly to Plate A. This is necessary to allow proper removal of the core from the concrete cast. Step 6 - Top and Bottom Rings for outer shell Take the flat iron (50 x 6 x 1415). In a roll bender fix the ring bending rollers and bend a ring to 450mm outside diameter x 350mm-inside diameter. Alternatively, if this facility is not available in the bender, then from a 6 mm plate cut a ring of the above size. Step 7 - Outer Shell Locks Take flat iron 50 x 6 x 938mm (4 pieces). Tack-weld 2 pieces at the edges to ensure drilled holes line up perfectly. Mark and drill 11 mm holes as per the drawings (top and bottom holes at 33 mm from the top to centre, the rest at 110 mm centre to centre). After drilling, grind away the tack-welds to separate the two pieces. Repeat this for the other pair. Drill holes in the side plates for bolts. Mould Construction Guidelines.doc 20 Page 7 of

Step 8 Splitting the Shell Take the rings that were made in step 6 and fit them to the top and bottom of the cylinder made in step 1. Next, take the two flats made in the step seven and tack weld one on either side (the side of the joint and right opposite). Proceed to split the cylinder to produce the two shell halves, using a grinder or a jigsaw. Once split, join the 2 shells with 10 mm bolts. Step 9 Fitting Inner Core Take the core and place in the shells and centralize. Tack-weld the core and the shells together and proceed to drill 11mm holes as per the top plate. Remove the tack-welds and bolt the centre core to the shells. Step 10 Nose assembly and PVC pipe locking bolt For the nose plate, take the 10 x 180-x 6-mm plate. Cut the nose bottom plate size as per the drawing. Drill a 22-mm hole. Next weld the aligners (flat iron 25 x 3 x 25long). These ensure that the nose plate fits well to the nose itself. For the nose itself, take the 265mm x 265mm-x 2mm plate. Draw and cut as per template. Fold in centre and grind to shape. Mould Construction Guidelines.doc 20 Page 8 of

Next, take one of the outer shells. Tack-weld the nose and mark its position with a scriber. Make sure to position the bottom of the nose in the correct position measured from the top as per the drawings. Proceed to remove the tacks using a grinder or jig saw. In the outer shell, cut away the marked position of the nose. Having opened the mould, place the nose in position from the inside and weld both inside and outside. Take care to grind the inner side to a smooth finish. Take the flat for the nose plate lock (25 x 6 x 40 long). Drill a 13-mm hole and weld a M12 nut as per the drawing. Shown above is the completed nose with the nose plate installed and secured with the lock. Directly below and in line with the nose plate lock, drill a 13-mm hole 90mm from the bottom side of the mould and weld a M12 nut (see arrow for approximate position). Insert a suitable bolt: when making a filter this bolt will be used to press the PVC pipe flush with the inner core. Step 11 - Puller Take the 50 x 50 x 3mm square tube and drill a 30mm hole in the centre, as well as two 16.5mm holes on each side as per the drawing. Then take the 25 diameter x 300mm B.M.S rod and thread 250mm. Take the 40 diameter x 50 long B.M.S and drill a 20mm hole in the centre. Proceed to weld this to the threaded shaft (this is the puller bolt). Mould Construction Guidelines.doc 20 Page 9 of

Take the 16 diameter x 360mm B.M.S and taper the front ends slightly, next drill with a 16mm-drill bit the 2 pieces of 40 diameter x 10 long and weld as per drawing. Finally, take the two 40mm diameter x 50 mm long shafts and drill a 17mm hole. Take the 50 x 6 x 50mm long flats and drill an 11mm hole in the centre, then weld one each to the bush as per the drawing. Shown here is the completed puller. Step 12 - Testing the mould The completed core including the top stands made from square tubing. Next to it the outer shells. The outer shells detached. Mould Construction Guidelines.doc Page 10 of 20

A finished mould consists of the following parts: Rear half shell; Front half shell with nose; Nose Plate; Bolt M12 x 75; Bolt M12 x 50; Centre core; Puller; Handle; Bolts & nuts M10 x 25; Bolts & nuts M10 x 25, M10 x 40. It is advisable to test the mould by making one or more filters while still in the workshop. This way, problems can be easily rectified. For instructions on how to build a filter, please refer to the Filter Construction Guidelines, also available on www.biosandfilter.org. Additional information: This mould is also available ready-made. For more information, email info@biosandfilter.org. Credits: This mould was designed by Jitu Jawahar Patani and Adriaan Mol in Nairobi, Kenya in 2000 with funding from Medair. Mould Construction Guidelines.doc Page 11 of 20

United Kingdom The Shieling, Wreay Carlisle CA4 0RL Tel: +44 (0)1697 47 5369 Mobile: +44 (0) 7739 665 777 Email: info@biosandfilter.org Madagascar Libanona Americain PB 307 Fort Dauphin (614) Tel: +261 (0) 20 92 21405 Mobile: +261 (0) 3302 21405 Email: info@biosandfilter.org Annex 1: All Components Adriaan Mol, BioSandFilter.org May 7, 2004

Annex 2: Inner Core template 1 Mould Construction Guidelines.doc Page 13 of 20

Annex 3: Inner Core Template 2 Mould Construction Guidelines.doc Page 14 of 20

Annex 4: Mould Construction Guidelines.doc Page 15 of 20

Annex 5: Where to pour concrete Mould Construction Guidelines.doc Page 16 of 20

Annex 6: Puller drawing 1 Mould Construction Guidelines.doc Page 17 of 20

Annex 7: Puller drawing 2 Mould Construction Guidelines.doc Page 18 of 20

Annex 8: Insert PVC pipe Mould Construction Guidelines.doc Page 19 of 20

Annex 9: Bottom and top views of Outer Shells Mould Construction Guidelines.doc Page 20 of 20