Mould Precision Co., Ltd

Similar documents
Tooling Approving Report

Mould Precision Co., Ltd

This Injection Mold Standard is used for the design and fabrication of Plastic Injection Molds.

PROVIDENT DESIGN CHECKLIST

AGS TOOL #: DESCRIPTION: TOOL SHOP: *Changes or clarifications from 10/07/08 revision are highlighted in red. SECTION I: PLAQUES

This is trial version

TOOL STANDARDS MANUAL

PS Injection Mold Tool Standards

Revision Level: 07 Revision Date: March 29, Tiercon Mould Standard

General Tooling Standard

.01 undercut. Ø.187 locating dowel hole (Ø.1875 x.50 pin included)

DESIGN & ASSEMBLY GUIDE. D-M-E Collapsible Core and Collapsible Mini-Core

Mold Design. 5. Mold Structure. Bong-Kee Lee School of Mechanical Engineering Chonnam National University

Example 33, Three-Plate Injection Mold with Stripping Device for a Precision Magazine

Multiple Gate Nozzles (MGN)

Clamping devices 521

Parting Line Best Practices for Injection molded parts. Cusanno, Bergadano TAG, Engineering Quality & Craftsmanship

Trade of Toolmaking. Module 5: Press Tools, Jigs & Fixtures, Mouldmaking Unit 7: Injection Moulds Phase 2. Published by

OTECO INC. MODEL ,000 PSI 4-1/16 PORT DM GATE VALVE MAINTENANCE MANUAL

Dual clip mould In the following exercise you will create a full 2 cavity mould of your dual clip mould component.

Info PSR-PSM-MRT. Slide Retainers

Vardhman Dies And Mould Tools

Wire Electric Discharge (ED) Machining

B-Too Drilling and Tapping Machine Instruction and Maintenance Manual

WPS crew Doors Installation instructions

Fig Remove chain cover plate bolts. Fig Remove hammer member. Fig Loosen set screws at base of 12-tooth sprocket.

General Four-Way Operation, Maintenance & Service Manual

AR-15 Armorer s Essentials Kit. Product # Instructions # Revision: B

N. 15th Street, Middlesboro, KY FLIP TARP DUMP BODY INSTALLATION INSTRUCTIONS

COMPETENCY ANALYSIS PROFILE MOULD MAKER 431A (All unshaded skill sets must be demonstrated/completed)

DESIGN AND DEVELOPMENT OF MOULD CALCULATION SOFTWARE MUHAMAD IDZWAN BIN LATIF

MINI-LATHE QUICK CHANGE TOOL POST

SERVICE PARTS LIST. M18 FUEL SAWZALL Reciprocating Saw F56A BULLETIN NO CATALOG NO

Connector Technology, Shelf Supports Connection Fittings

Sunrise Deck Assembly Instructions for Kingston Left

Assembly Instructions 10 X 10 Aluminum Frame Building

Shim (2) Supplied. Strike Plate. (3) x 5/8" PFHMS or 10 x 1" PFHWS. Top Latch. (3) x 1/4" PRHMS. Latch Cover. (2) 8 x 3/8" PFH AB SMS

FLIP TARP SINGLE & DOUBLE UNDERBODY TRAILERS

Quick-Release Front Vise 05G34.01

Fisher 667 Diaphragm Actuators Size 80 and 100

PEDESTAL OVERHAUL. Some of the tools for a pedestal overhaul. Pedestal work stand

Design of Singe Impression Injection Mould for Lower Bearing Cover

D3976 RECESSED EXIT INSTALLATION INSTRUCTIONS

MSR/MSB Mechanical Setting Tool

535A. Main Components. Pipe and Bolt Threading Machine. Printed in U.S.A. Ridge Tool Company/Elyria, Ohio, U.S.A.

YALE FIGURE 500 & 500R CLOSURE OPERATION AND MAINTENANCE INSTRUCTIONS

MUELLER. Improved, Centurion Series, Modern Improved, and 107. Fire Hydrants. Inserting Extension Sections. Reliable Connections

18000 HDL FOUR POST LIFT LB CAPACITY INSTALLATION AND OWNER'S MANUAL

Trade of Toolmaking. Module 5: Press Tools, Jigs & Fixtures, Mouldmaking Unit 10: Mould Assembly Phase 2. Published by

SAVVY OFF ROAD GAS TANK SKID INSTALLATION INSTRUCTIONS

0445 DESIGN AND TECHNOLOGY

Water Line and Water Line Assembly Gasket

IM /2013 Rev. 0 POWER WAVE STT module CE

Mold Assembly and Machine Settings for Models, 22HF, 16HF, and 1600

FMT 250; FMT 250Q; FMT 250QSL. Repair instructions FMT 250Q / FMT 250QSL. Page 1 of 30

TO OPERATE AUTO-GUIDE POWER. 24 Gauge Pittsburgh Operating Instructions FLANGING ATTACHMENT

Installation Manual Flat Track Series

MUELLER. Improved, Centurion Series, Modern Improved, and 107. Fire Hydrants. Inserting Extention Sections. Reliable Connections

SR-1.0 Manual, a.doc 11/14/2006 Page 1 of 17

AMETAL SHAPER is indispensable for certain METAL SHAPER FOR YOUR SHOP. By S. S. Miner

ASSEMBLY INSTRUCTIONS FOR MAR-K BEDSIDES AND GM FLUSH TAILGATE WITH HANDLE

Zero Point Clamping System. ZERO lock BALL lock

Gared Pro-S Portable Backstop

Repair Manual MK40A-MK45A-MK50A MK55A-MK60A-MK65A. Ref Rev.C General Pump is a Member of The Interpump Group

Installation Instructions ED4400, ED4400M & ED4400MA Series Surface Vertical Rod Exit Devices

PO STYLE AIR CLUTCH INSTALLATION AND MAINTENANCE MANUAL

Profiform 200 Profiform 320. Operating manual

Dublin Stalls Installation Instructions

Molds & technologies. die. casting. molds

Workbench Instructions for Assembly

S48-L12-SC AND G48-L12-GC STEEL PORTA-DOCK S82 SC 6 X 12 PLATFORM AND G82 GC 6 X 12 PLATFORM

Why Use. Pilot Assemblies. The New Industry Standard

I-W07/W77. Couplings DETAIL A WARNING. Photo Showing Pipe with Weld Seam Ground 6 inches/152 mm Back from Pipe End and an AGS Groove

Operating, Servicing, and Safety Manual Model # 100 Standard Hydraulic Tubing Notcher Model #100-U Heavy Duty Hydraulic Tubing Notcher

Installation Instructions for Harrison Design Ejectors BEFORE YOU GET STARTED REMOVE OLD EJECTOR

Unit4 31. UnitS 39. Unit 6 47

VACUSEAL MODEL 300 & 400

Factors to Consider in Plastic Molded Design

Installation for Full Size Polaris Ranger Crew Doors

...thoroughly tried and tested!

Introduction. Rocky Mountain Westy Swing Away Carrier Kit Installation Instructions

ED5800 (A) Series. Installation Instructions. Concealed Vertical Rod. Exit Device WARNING

PRODUCT SERVICE MANUAL FOR CIG Mechanical Seal Triple Pumps

Powersafe Termination Guide

RZ 200 Parts Diagram. To avoid confusion during installation remove this page and router being installed pages, return others to box.

Tech Unit No: Approved By: Quality Engineer Date: Lock-Set Packer

3.1 MUELLER LARGE DRILLING MACHINES

3.1 MUELLER LARGE DRILLING MACHINES

MetFit MECHANICAL FITTINGS

FASTENERS. Fasteners. Steel fasteners. Hexagon socket screws. Steel fasteners MC6S

All About Die Casting

TRUE TECHNICAL SERVICE MANUAL - ALL MODELS. DOORS/DRAWERS/LIDS

535-Manual. Main Components. Pipe and Bolt Threading Machine. Printed in U.S.A. Ridge Tool Company/Elyria, Ohio, U.S.A.

Form No Assembly & Operating Instructions for: SAFETY PRECAUTIONS

QB78 CO 2 Pellet Rifle

Chain Drive Vise. Installation Instructions. (revised 05/04/2016)

HARDINGE Installation booklet For:

a.k.a. casegoods instructions

Transcription:

Mould Precision Co., Ltd Program Name: Part Name: Tool Name: Tool source: Tool Steel: Resin: Finished Mould Checklist Program No.: MP15016 NL00326-2G rev04 Part No.: MP15016 Tool No.: MP15016 Customer: 1.2344 No. of Cavities: 1X4 ABS Chimei PA 757 Machine Size: 250T CAVITY What is the customer required core hardness? HRC 48-52degree 50 degree Is the material type and hardness stamped on bottom surface of each cavity block? Yes No What is the required surface finish on the cavity? What is the cavity surface finish? Is any EDM visible on cavity surface? Yes No Does the cavity surface have a good visual appearance free of marks, dints, and machining marks deemed unexceptable? Yes No Are cavity molding surfaces free of scratches? Yes No Are cutter marks visible on the cavity surface? Yes No Does the cavity require texturing Yes No What is the customer required texture? Is the cavity textured? Yes No If so what is the texture type? Is any EDM visible in the ribs? Yes No Are cutter marks visible in the ribs? Yes No CORE What is the customer required core hardness? HRC 48-52degree 50 degree Is the material type and hardness stamped on bottom surface of each core block? Yes No What is the required surface finish on the core? What is the core surface finish? Is any EDM visible on core surface? Yes No Does the core surface have a good visual appearance free of hammer marks, dints, and machining marks deemed unexceptable? Yes No Are core molding surfaces free of scratches? Yes No Are cutter marks visible on the core surface? Yes No Does the core require texturing Yes No What is the customer required texture? Is the core textured? Yes No If so what is the texture type? If so what is the texture and depth? Is Recycle Logo required Yes No Are ribs polished in line of draw? Yes No Is any EDM visible in the ribs? Yes No Are cutter marks visible in the ribs? Yes No 1 OF 6

SLIDES Are slides tight? Yes No Are slides loose? Yes No Are the seal off angles under the slides >5? Yes No If not what angle is it? Yes No Are grease fittings installed? Yes No Are the slides spring loaded? Yes No Is there a positive locking method for open position? Yes No What is it? Is it capable of holding the slide weight? Are slides equiped with hydraulics? Yes No If so are limit switches installed? Yes No Slide Finishes What is the customer required hardness? HRC 48-52degree 50degree Is the material type and hardness stamped on a non molding surface of each lifter or slide? Yes No What is the required surface finish on the molding sufaces? What is the surface finish? Are ribs polished in line of draw? Yes No Is any EDM visible in the ribs? Yes No Do the slides have a good visual appearance free of hammer marks, dints, and machining marks deemed unexceptable? Yes No Are the molding surfaces free of scratches? Yes No Are cutter marks visible in the ribs? Yes No LIFTERS Are guide bushing installed? Yes No Are grease fittings and lines installed? Yes No Do square lifter have grease groove? Yes No Are the square lifters made with P20? Yes No If so are they nitrided? Yes No Are the square lifters made with H13? Yes No What is the customer requested hardness? What is the actual hardness? Lifter Finishes What is the customer required hardness? Is the material type and hardness stamped on a non molding surface of each lifter or slide? Yes No What is the required surface finish on the molding sufaces? What is the surface finish? Is any EDM visible in the ribs? Yes No Do the lifters have a good visual appearance free of hammer marks, dints, and machining marks deemed unexceptable? Yes No Are the molding surfaces free of scratches? Yes No Are cutter marks visible in the ribs? Yes No 2 OF 6

INSERTS What is the customer required hardness? HRC 48-52degree 50degree Is the material type and hardness stamped on a non molding surface of each lifter or slide? Yes No What is the required surface finish on the molding sufaces? What is the surface finish? Is any EDM visible in the ribs? Yes No Do the inserts have a good visual appearance free of hammer marks, dints, and machining marks deemed unexceptable? Yes No Are the molding surfaces free of scratches? Yes No Are cutter marks visible in the ribs? Yes No Is any EDM visible in the ribs? Yes No Are cutter marks visible in the ribs? Yes No PARTING LINE Parting lines width surface finish of parting line Relief depth -land width. Is any EDM visible in the ribs? Yes No Do the inserts have a good visual appearance free of hammer marks, dints, and machining marks deemed unexceptable? Yes No VENTING Parting line vent width & depth 4X0.2 Are ejector pins vented? Yes No Are runners vented? Yes No Are guide pin bushings holes vented? Yes No Is last place to fill vented? Yes No VISUAL APPEARANCE OF PLATES 3 OF 6

WELDING Is weld map included? Yes No Is there any other welding not on the map? Yes No If welding was done specify the type of rod used and process RUNNER & GATES Is the runner to customer specified size and shape? Yes No What is the customer specified size? What is the customer specified shape? Runner Runner surface finish? Are cutter marks visible on the core surface? Yes No Gate Gate surface finish What is the required gate surface finish? Is any EDM visible in the gate? Yes No Are cutter marks visible in the gate? Yes No ELECTRICAL, HOT RUNNER Are customer specified electrical plug/plugs used? Yes No Is the customer specified wiring diagram followed? Yes No Is electrical box/boxes installed? Yes No Is it the customer specified box? Yes No Is the wiring plaque on the operator side of the mold? Yes No Hot tips, manifold, heaters, thermocouples - bench tested. Yes No Hot tip - drafted, polished in the line of draw. Yes No Is the customer specified surface contact between the hot drop and cavity? Yes No Hot tip, flush/recessed when hot. Yes No Wires in channels with hold downs and protected? Yes No COLD RUNNER Is a sprue puller undercut machined into core? Yes No Is the sprue puller polished in line with ejection? Yes No is the ejector pin land 1" below sprue puller undercut Yes No If not what is it? EJECTION SYSTEM Is the Core sequencing provided on an attached plaque? Yes No If no why? Are pressure transducers required? Yes No Are pressure transducers installed? Yes No Is mould equipped for Alba connectors? Yes No Knock out pullback stud - flush with clamp plate Yes No - correct thread Yes No - correct thread depth Yes No - correct counterbore depth Yes No Are knockout rod extentions required by the customer? Yes No If so are they installed, and flush to the surface? Are switches mounted and wired? Yes No Is part and runner designed to fall clear? Yes No If so does it fall clear? Yes No Is part and runner designed for robot pickup? Yes No If so does it stay on the mould? Yes No If not why not? Does it come freely off the mould? Yes No Do we have enough space for robot? Yes No Ejector system - moves freely for the full stroke? Yes No Are the ejector pin holes in the core square to base? Yes No Ejector pins guided square to ejector system? Yes No Do the ejector pin holes in the ejector plate line up with the ejector pin bores in the core? Yes No 4 OF 6

Cavity ejection 2 stage ejection Does the mold have multi stage ejection Yes No Do the latches pocket into the core and cavity plates Yes No Does the multi stage ejection use spring loaded latches Yes No pocketed into cavity plate? Yes No Is so are shoulder bolts installed? Yes No Is the surface to seat the shoulder bolt spotted flat? Yes No HYDRAULIC SYSTEM Does the mold have hydraulic ejection? Yes No Are Flow dividers installed? Yes No Are switches mounted and wired? Yes No Ejector system - moves freely? Yes No Ejector pins guided square to ejector system? Yes No COOLING Are water lines stamped to customer specifications? Yes No Are water lines numbered to customer specifications? Yes No Are water lines correct size to customer specifications? Yes No Are waterlines counterbored? Yes No Are the o-rings pocketed on the core retainer plate? Yes No Are the o-rings pocketed on the core? Yes No Describe o-ring fit in groove Are thequality of all o-rings good enough? Yes No Have water lines been pressure tested (10 bars, half hour)? Yes No Are there any water leaks? Yes No If so where? Do the water lines match the plaque? Yes No Are all the baffles and plugs installed? Yes No Are Jiffy connectors installed? Yes No Are the customer specified fitting installed? Yes No Fitting names and model numbers Is there enough space between fitting to install all the fitting easily? Yes No Are extention pipes used? Yes No If so why? Water lines connected internally? Yes No Water lines connected hard tubing Yes No If so why? Are water jumpers installed? Yes No Are water lines sealed by socket tappedd screw? Not use swarf. Yes No MOULD FIT TO PRESS Any obstructions on bottom surface of mould? Yes No If so what are they? Is the customer specified locating ring installed? Yes No What is the customer specified locating ring size? 10mm Is the locating ring at least 4MM higher than mold surface? Yes No Is the customer specified sprue bushing installed? Yes No What is Sprue radius orifice and size? R12 Are the eyebolts balance so the mould hangs straight? Yes No Safety Straps (2) (Red or contrasting Yellow). Yes No Clamp slot size and locations Are they to customer spec.? Yes No Mould Length, Width, Height. 320x300x281 To swing mould, record corner to corner size. 515mm What is customer specified K.O. holes size and pattern size? The diameter is 40mm Mould K.O. holes size and pattern size. same 5 OF 6

MISCELLANEOUS Should all screws not be machined and cut? Has allbeen hardened? Yes No Guide pin length. 145mm Is the customer specified Leader pin fit and installation done? Yes No What is the Leader Pin fit and installation process? Return pin length. (nothing contacting cavity) 136mm Are return pins spring loaded? Yes No Pry bar slots. Yes No Plates numbered and lettered. Yes No Insulation plate. Yes No Gate type used side gate Is cashew gate being used Yes No cashew gate type (Name of manufacture or homemade) Is ejection stroke long enough to fully eject cashew gate? Yes No Is shot counter required? Yes No Is shot counter installed? Yes No Are all screw heads below the surface? Yes No Are eyebolt hole threads deep enough to fully seat eyebolt? Yes No If no describe situation Are there threaded lifting holes in all parts over 50 lbs (22.7kg) Yes No Have all mold workpieces and spare part been inspected with record? Yes No Does the mold have a good visual appearance free of hammer marks, dints, and machining marks deemed unexceptable? Yes No Are angled seal that are <5 at least 4rc different or 1 side nitrided? Yes No Is the material type and hardness stamped on bottom surface of each mold part Yes No Is the customer specified Horn pin fit and installation done? Yes No What is the Horn Pin fit and installation process? Has the mold used the correct material and treatment with certificate? Yes No Has the mold drawing been printed and copied in two copies? Yes No Have the molding condition sheet and sample inspection report preparied? Yes No Are the both ends of the lifting bar at least 1MM shorter than mold? Yes No Are date clocks fastened by screws? Yes No MOULD IDENTIFICATION Are the following mold plaques on the operator side of the mold? Mold Nameplate Yes No Mould sequence Yes No Hydraulic schematic Yes No Waterline schematics Yes No Electrical schematics Yes No Thermocouple schematics Yes No special instructions Yes No Is "TOP OF MOULD". Stamped on the top of the mould? Yes No Is the mould painted the customer specified colour? Yes No What colour is it painted? Comments: Completed by: Date: 6 OF 6