installation instructions

Similar documents
installation instructions WC Frame 1180mm with Dual Flush Cistern

installation instructions WC Frame 820mm with Dual Flush Cistern _INST

Installation Instructions

This product is designed for a water supply pressure range of 20 psi (137kPa) minimum to 80psi (550 kpa) maximum.

Bathroom Installation Guide

Installation Instructions. Walk-in Shower Screen. with 180 Return Panel

STORAGE & SHELVING SYSTEM - INSTALLATION GUIDE

37.5 M6. If the basin chain hole is not used, please cover it with the screw and nut supplied.


Stuff-Your-Stuff Platform Bed (Twin and Full)

Pickup Box Utility Rack Package Installation (Instruction ID: )

SHELTON THERMOSTATIC SHOWER PANEL

P a r k c o n s o l e s i n k a s s e m b l y i n s t r u c t i o n s

Pocket Door Kit PD1 / PD2 Installation Instructions. Kit Contents.

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

installation guide 1 GUIDE#: pwb-assault-001

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

ASSEMBLY INSTRUCTIONS DIY WALL BED KIT QUEEN BI FOLD DOOR CABINET & MECHANISM. Tools Required For Assembly. 6.5mm Masonry Drill Bit

Section 11 CABLE & ROD SYSTEMS, SIGN FIXING & SIGN STANDOFFS. Web. acrylicdesign.ie .

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

Installation Instructions 8115F 8115SF

ASSEMBLY INSTRUCTIONS FOR SL500A AND SL500AL

Insolroll Clutch Operated Shades Installation Instructions Installation Instructions

Installation Instructions

HILGARD Part Number Spectrum Lane ~ Missoula MT ~

Curium 19H Installation Instructions & Parts List

The Bowflex Revolution XP Home Gym Assembly Instructions. P/N: Rev ( /0 )

Tools Required Page 1. KIT CONTENTS: Smoking Shelter Page 1-2 Smoking Shelter Optional Extras Page 3

CAELI THERMOSTATIC SHOWER PANEL

Fig. 2 DORMA-Glas Stand/Issue 02/03 Seite/Page 1/7

Xceed ASSEMBLY MANUAL

Constable Oak Extension Dining Table

Acrylic Claw Foot Tub

installation guide 1 GUIDE#: pwb-assault-004

Interactive Monitor Arm

CleanBench Laboratory Tables

Power Train Lift Max. Capacity: 1,250 lbs.

MOTORIZED STANDARD SHADE WITH CABLES Installation Instructions

Queen Wingback Bed King Wingback Bed

OWNER S MANUAL CONTENTS. The only table saw fence with Automatic Positioning Control TM

Bathroom Installation Manual

IF INSTALLING ANY OF THE PORTMAN SELF CLOSING SYSTEMS, PLEASE READ THE CORRESPONDING FITTING INSTRUCTIONS SUPPLIED WITH THE CLOSING SYSTEM FIRST

Product must be installed as shown using the screws and brackets provided. Use of incorrect hardware could result in damage to the product.

WILLIS WALL-MOUNT FAUCET INSTALLATION

TYPHOON ASSEMBLY AND INSTALLATION INSTRUCTIONS

CALLAS THERMOSTATIC SHOWER SET

INSTALLATION INSTRUCTIONS SIDE BAR FORD ESCAPE & MAZDA TRIBUTE PART #

Installation Guide. Mounting Kit for Mounting Philips Avalon CTS Cordless Fetal Transducer System on Wall, 2'' Post, Rail, or Slide-on Mounting Plate

Hawko LED Flex & Accessories Installation Instructions

BIFOLD FUTON FRAME TRINITY ARM. Seat Rails and Slats x 1. *Note: Use 4pc of 100mm Bolts and 4pc of 60mm Bolts to attach the arms to the Stretchers.

SUPER PRO GUN & SUPER PRO GUN II

Assembly Instructions and Parts Manual JPSF-1 Fence and JPSR Rail Set

Installation Instructions

Model 209 Fireback Replacement

Serial Number Location

Curium 19.4H Installation Instructions & Parts List

Bumper Sign INSTALLATION INSTRUCTIONS

MK52 Series ULTRA-LOW FREQUENCY VIBRATION ISOLATION WORKSTATION ASSEMBLY AND OPERATION INSTRUCTIONS

IAC INDUSTRIES 895 BEACON STREET BREA, CA Phone (714) Fax (714) Workmaster Assembly Instructions

ONASSIS SHOWER SET INSTALLATION

OWNER S MANUAL CONTENTS. The only table saw fence with Automatic Positioning Control TM

Gared Pro-S Portable Backstop

2&3 SECTION LOFT LADDER

WARNING BX1514. Serial Number Buick LaCrosse Installation Instructions

B A T H R O O M G L A S S

Portofino Installation Guide

Section 1 Cubicles. Section 2 IPS Duct Panel Systems. Section 3 - Vanity Units Components & Assembly 12. Section 4 Basic Maintenance.

PROFESSIONAL LOFT LADDER

1. TOOLS + MATERIALS REQUIRED

Assembly Instructions

caroma marc newson wall basin mixer

Top Mount Ultra Modern Hanger

6 Foot/ 1800mm Aisle Width Net-Contain Aisle Containment for N-Type and S-Type Cabinets

Vanity Installation Instructions

This instruction manual is an in-depth look and explanation of how to assemble and install the Murphy Bed properly and efficiently.

Installation Instructions

READ BEFORE INSTALLING UNIT INSTALLATION WARNINGS AND CAUTION

ABM International, Inc.

MALEKO WALL-MOUNT FAUCET INSTALLATION

Hawko Zhaga Systems Installation Instructions

v1.0 ASSEMBLY GUIDE Mia Wide Bookcase

Joiner Kit For Models N388, C450, E402B, E411T, E415H, E440T, E442B, E521T and E522B

Introduction. Rocky Mountain Westy Swing Away Carrier Kit Installation Instructions

Warnings. Description. Prior to Installation Tools Needed

31 / 39 / 59 Basin 31 / 39 / 59 Basin Frame Introduction Parts supplied - basin frame

THANK YOU FOR PURCHASING FROM HERITAGE PATIOS

Installation Instructions

WARNING: Prior to installation, turn the power off to the vending machine and unplug it from its power source. Also, make sure to level the machine.

Tech Sheet. T4 Interior conversion kit how to - fitting instructions. 1. Rear seat belts. 2.

STOP. V00029AC Rev. 04 READ ALL OF THE FOLLOWING INSTRUCTIONS BEFORE REMOVING CABINET FROM SKID TOOL LIST. NET-ACCESS S-Type Network Cabinets

H20. ISOTOPE FUME HOOD with Vertical Rising Sash. Fume Hoods. Installation Instructions. 48"- 60"- 72"- 96" long

MAG-CONV Basic, 48, 48R & Midline Front Mount

Installation Instructions

Fan, Eden/Northfield, GS Installation Instructions (SKU ) Packing List

WPS crew Doors Installation instructions

EXIRA SHOWER SET INSTALLATION

a.k.a. casegoods instructions

Installation Instructions

Laminate Cabinet Installation Instructions

Transcription:

installation instructions Easi-Plan WC Frame 820mm with Dual Flush Cistern ref: EPWC-05-1005 Easi-Plan WC Frame 980mm with Dual Flush Cistern ref: EPWC-05-1505

EASI-PLAN installation instructions Parts supplied A B C D E 1 x WC Frame with Dual Flush Cistern (incorporating 1 No. Universal Ball Valve 1 No. Wire Activated Siphon, 1 No. Brass Water Inlet Valve & 1 No. Universal Filling Hose) 2 x Rubber Sound Deadening Pad for Feet 6 x M6 x 65mm Coach Bolt 6 x White Wall Plug 10mm F G H I J 6 x M6 Washer 2 x M10 x 180mm Bolt 2 x M10 x 110mm Bolt 2 x M8 x 30mm Bolt 2 x M8 Washer 2 x Unistrut Fixing K L M N O 2 x Wall Fixing Foot 2 x Bolt Location Block 2 x Bolt Retaining Clip 6 x M10 Push Fit Fastening Nut 2 x Pan Fixing Bolt 1

P Q R S T 2 x Pan Fixing Nut 1 x Corrugated Tile Guide & Flush Plate Mount (including Blanking Plate & 2 x Nylon Rod) 6 x Round Head Screw 4mm x 20mm 1 x Cistern Fascia Panel U V W X Y 1 x 90 Pan Connector 1 x Soil Pipe Extension & Rubber Cone 1 x Debris Stopper for Soil Pipe Extension 1 x Flush Pipe Extension & Corrugated Rubber Cone 1 x Debris Stopper for Flush Pipe Extension 1 x Greased Sponge Z AA AB AC 1 x Self Adhesive Fixing Pad 2 x Clear Pan Fixing Bolt Shroud 2 x WC Pan Installation Bung 2 x Chrome Cover Cap 2

Tools required (not supplied) Tape Measure Level Pencil Electric Drill 10mm Drill Bit Screwdriver PH3 Screwdriver PH2 Large Straight Blade Screwdriver Spanner / Socket Set Hacksaw Retractable Blade Knife PTFE Tape Important Information PLEASE READ THESE INSTRUCTIONS THOROUGHLY BEFORE STARTING INSTALLATION. Check the pack and make sure you have all the parts listed. Remove all cardboard protection attached to the frame prior to installation. All floor types need to be as flat and level as possible. When drilling or fixing into walls or floor it is essential that you check for pipes or wires before commencing. Site Preparation All floor types need to be clean, dry and dust free. All floor types need to be as flat and level as possible. Floor boards must be securely fixed down prior to installation. Adjusting the frame The frame feet can be adjusted to allow for uneven floors and finished floor build up. The frame allows for an additional 280mm adjustment on the standard height. Using a spanner or socket, loosen the bolts just above the feet and extend the feet to your desired height. Ensure that the frame is square using a level before tightening the bolts using a socket or spanner. Before You Start The first phase of installation is the securing of the frame to wall and floor. There are two methods of installation; either individual fixing or unistrut (rail) mounted fixing. The unistrut (rail) mounted system is normally used where multiple frames are to be mounted next to each other, i.e., a basin frame next to a WC frame or a row of frames. This is also the best option when fixing to stud walls rather than solid walls. Bypass Step 2 if you plan to individually fix the frame. Note: The rail kit is an optional extra and can be purchased from the Sales Office on 0845 8 50 50 40. 3

Step 1 Important! Set the frame to the WC manufacturer s recommendations for the soil & flush pipe and the fixing bolts location / spacing. The soil pipe height can be manually adjusted by loosening the two pan head screws on either side of the soil pipe internal frame. Ensure that the screws are re-tightened when the desired height is achieved. The pan bolts can be set at either 180mm or 230mm centres. The flush pipe height is fixed although can be raised or lowered by adjusting the frame feet accordingly. In addition the relationship between the bolt height and flush pipe height is also fixed. Step 2 First ensure that the rail is the correct length for the frames to be mounted. If necessary, cut the rail to the required length (standard sizes available are 1.08m, 1.8m & 3.0m) using a hacksaw. Mark a horizontal line 80mm lower than the top of your frame using a pencil i.e., if the frame is the standard height of 820mm, you should mark your horizontal line at 740mm. Using the pencil line as the centre point for the rail, secure it to the wall using the fixings supplied and ensure that it is mounted evenly using a level. Note: For individual installation please omit this step. Step 3 Fix the Rubber Sound Deadening Pads (B) to the WC Frame (A) feet. These help reduce noise transmission. Step 4 Space the frame off the back wall to the required distance. The minimum installation depth is determined generally by the width of the frame leg plus the services running behind the frame. A tolerance of 120-265mm from wall to front face of the frame can be achieved with standard in the box parts. Note: An extension set is available which offers a further 160mm and can be purchased from the Sales Office on 0845 8 50 50 40. 4

Mark through using a pencil Solid floor application Timber floor aplication Step 5 Using a pencil, mark through the four holes in the Basin Frame (A) feet the fixing hole positions. Timber floor application Secure the feet into position by fixing the four M6 x 65mm Coach Bolts (C) and four M6 Washers (E) using a PH3 Screwdriver or Spanner and the pencil marks as a guide. In the event of the Coach Bolts (C) being unsuitable for your particular application, please replace these items with your choice of comparable fixing. Solid floor application Drill four holes in the floor using a drill and 10mm drill bit using the pencil marks as a guide. Insert the four 10mm White Wall Plugs (D) into the holes. Secure the feet into position by fixing the four M6 x 65mm Coach Bolts (C) and four M6 Washers (E) using a PH3 Screwdriver or Spanner and the Wall Plug locations as a guide. 5

Fig. 1 Step 6 Place the two Bolt Location Blocks (L) into either side of the top frame profile. Dependant on the depth required and measured in Step 3, take either the two M10 x 180mm Bolts (F) for a tolerance of 120-200mm, or the two M10 x 110mm Bolts (G) for a tolerance of 190-265mm. Thread the two bolts (F) or (G) through the Bolt Location Blocks (L). Fasten the two Wall Fixing Feet (K) to the bolts (F) or (G) to the desired depth measured in Step 3. The wall fixing feet can be fixed to the wall in a number of ways. Generally they should be installed with the screw hole pointing downwards for unistrut (rail) or individual fixing, however where achievable, they can be installed with the screw holes pointing outwards for ease of fixing. Insert the two Bolt Retaining Clips (M) into either side of the top frame profile with the raised face to the front. This captivates the bolts whilst still allows for tightening with a flat bladed screwdriver as needed. Fit two M10 Push Fit Fastening Nut (M) per bolt; the first at either end of the thread to lock the bolt into position. Note: To achieve a minimum depth of 120mm you should only affix one M10 Push Fit Fastening Nut (M) per bolt and not two as instructed above. 6

Step 7 Using a pencil, mark through the two holes in the Wall Fixing Feet (K) the fixing hole positions. Solid wall fixing Drill two holes in the wall using a drill and 10mm drill bit using the pencil marks as a guide. Insert the two 10mm White Wall Plugs (D) into the holes. Secure the feet into position by fixing the two M6 x 65mm Coach Bolts (C) and two M6 Washers (E) using a PH3 Screwdriver and the Wall Plug locations as a guide. Step 8 Connect the cold water connection to the Brass Water Inlet Valve pre-fixed to the Cistern wall using a thick layer of PTFE Tape. Note: The Brass Water Inlet Valve has an integrated shut off valve and the water supply into the cistern can be isolated by a clockwise turn of the valve either using a straight bladed screwdriver or by hand. Unistrut (Rail) Fixing Insert the two unistrut fixings (J) into the unistrut (rail), then attach the Wall Fixing Feet (K) to the unistrut using one M8 x 30mm Bolt (H) and one M8 Washer (I) per Wall Fixing Foot (K). 7

Step 9 The flush plate can be installed either for frontal access or top access; whichever suits your application. Frontal Access Fix the Cistern Fascia Panel (S) to the top face of the cistern using two Round Head Screws 4mm x 20mm (R). Remove the two Nylon Rods and Blanking Plate attached to the Corrugated Tile Guide & Flush Plate Mount (Q) and put aside for later use. Attach the Corrugated Tile Guide & Flush Plate Mount (Q) to the front face of the cistern using four Round Head Screws 4mm x 20mm (R). Fix the two nylon rods securely into the guide holes located on the corrugated tile guide. Clip the Blanking Plate to the Corrugated Tile Guide & Flush Plate Mount (Q) to act as a debris stopper. Top Access Fix the Cistern Fascia Panel (S) to the front face of the cistern using two Round Head Screws 4mm x 20mm (R). Remove the two Nylon Rods and Blanking Plate attached to the Corrugated Tile Guide & Flush Plate Mount (Q) and put aside for later use. Attach the Corrugated Tile Guide & Flush Plate Mount (Q) to the top face of the cistern using four Round Head Screws 4mm x 20mm (R). Clip the Blanking Plate to the Corrugated Tile Guide & Flush Plate Mount (Q) to act as a debris stopper. Step 10 To install the 90 Pan Connector (T) within the cradle, slightly loosen one of the screws holding the top section of the cradle in place and remove the other screw temporarily and keep to one side. This should allow you to rotate the bracket high enough to install the 90 Pan Connector (T). Clamp the top section back into place and replace and the screw removed earlier and tighten both securely. Connect the 90 Pan Connector (T) to the soil pipe. Note: The soil adapter is suitable for push fit 110mm pipe. A Straight Adapter is also available as an optional extra and can be purchased from the Sales Office on 0845 8 50 50 40. 8

Step 11 Connect the Debris Stopper for Flush Pipe Extension (X) to the Cistern Flush Pipe. Connect the Debris Stopper for Soil Pipe Extension (V) to the 90 Pan Connector (T). Step 12 Attach the two Pan Fixing Bolts (O) taking note of the recommendations in Step 9. These can wound down to the appropriate length as set out by the WC pan manufacturer using a straight bladed screwdriver. Install any other pre-wall frames as required and install either timber or metal studwork either side of the frame/ before then plaster boarding and tiling. Note: The frame comes with holes in either leg; these can be used to fix a screw into the studwork at either side for added strength as required. * The frame is now ready for 2nd Fix Installation * Step 13 Discard the Debris Stopper for Flush Pipe Extension (X) and the Debris Stopper for Soil Pipe Extension (V). Apply grease liberally around the Cistern Flush Pipe and 90 Pan Connector (T) using the Greased Sponge (Y). Step 14 Remove the backing paper from the Self Adhesive Fixing Pad (Z) and apply to the tile face in the proposed WC location with the adhesive face forward (so it will stick to the rear of the WC Pan). This will help with sound dampening and provide a cushion between the sanitaryware and the tiled wall. 9

Step 15 Cut down the Flush Pipe Extension & Corrugated Rubber Cone (W) and Soil Pipe Extension & Rubber Cone (U) according to the WC pan being installed. If the two Pan Fixing Bolts (O) need any further adjustment at this stage they can be wound down to the desired length using a straight bladed screwdriver. Place the two Clear Pan Fixing Bolt Shrouds (AA) over the two Pan Fixing Bolts (O) and cut to suit the length of the bolts but also to allow for the two Pan Fixing Nuts (P). Step 16 Install the WC Pan (not supplied) and fix to the wall using the two WC Pan Installation Bungs (AB) and two Pan Fixing Nuts (P). Place the two Chrome Cover Caps (AC) over the two WC Pan Installation Bungs (AB) and carefully remove any excess visible foam from the Self Adhesive Fixing Pad (Z). Step 17 Important! The two nylon rods which are clipped into the corrugated tile guide as in Step 9 are required for the fixing of the Flush Plate. Please ensure these are clipped firmly into place and ensure that these are kept in a safe place until the plate is being fitted. ** The frame is now ready for the Flush Plate installation (available separately; contact the Sales Office on 0845 8 50 50 40) ** 10

11 Maintenance Assistance Should you ever need access to the cistern to isolate the incoming water supply or to inspect / change the siphon or ball valve, the cistern is fully maintainable from behind the Flush Plate without a secondary access panel. With two hands apply gentle pressure to the underside or left hand side of the Flush Plate (depending on Flush Plate style) and carefully remove this and put safely to one side. To Remove the Ball Valve Important! Before removing or inspecting either the Ball Valve or Siphon, please ensure that the water supply to the cistern has been isolated. The has an integrated shut off valve and the water supply into the cistern can be isolated by a clockwise turn of the valve either using a straight bladed screwdriver or by hand. Carefully unscrew the Flexi Pipe that connects the Ball Valve to the Brass Water Inlet Valve using a spanner. The Ball Valve is held in position against the rear wall of the Cistern with a plastic clip. Apply a little pressure to the top and bottom of the clip and carefully remove the Ball Valve from the cistern via the frontal access point. Following inspection or replacement, the Ball Valve can be clipped back into position and connected to the Flexi Pipe using a spanner. The Ball Valve float can be adjusted to raise or lower the water level within the cistern if required. The threaded rod connecting the float to the top hinge can be adjusted either by hand or using a PH2 Screwdriver; clockwise to raise the float (raise the water level within the system) or anti-clockwise to lower the float (lower the water level within the system).

To Remove the Siphon Important! Before removing or inspecting either the Ball Valve or Siphon, please ensure that the water supply to the cistern has been isolated. The has an integrated shut off valve and the water supply into the cistern can be isolated by a clockwise turn of the valve either using a straight bladed screwdriver or by hand. The Siphon is held in place against the rear wall of the cistern by an integrated clip that pushes up against a small button within the Cistern. Apply a little pressure to the rear of the clip to release it from the button. The Siphon can then be removed from the cistern via the frontal access point. Following inspection or replacement, the Siphon can be clipped back into place by applying a little pressure to the rear of the clip as before to relocate it against the button. The siphon can be modified to provide a full flush of either 6L / 3L (standard) or 4.5L / 3L. At the base of the Siphon is a small red switch; applying gentle pressure, switch fully to the left for 6L full flush or to the right for 4.5L full flush. If you require any assistance or advice, please contact the Helpline on 0845 8 50 50 40 12