Unless otherwise directed, traditionally cast lead sheet is required.

Similar documents
Basic Fitting Details No. 1

Installation guide for 20/20

TECHNICAL BULLETIN 28

Special Roofs and Vertical Slating

Slate Shingle Specifications

Recommended Slating Tools

Three layer Felt Roofing using cold applied adhesive

Shingle Installation Guide

REDLAND DRY VALLEY. Installation Instructions for Redland Dry Valley. Version: 6. Date: May Redland Technical Solutions

ROOF FRAMING INFORMATION BATTEN INSTALLATION CORONA SHAKE INSTALLATION ACCESSORY INSTALLATION ESTIMATING DATA GENERAL INFORMATION

ROOFING DESIGN AND FIXING GUIDE

Inspire Aledora Slate Application Guidelines

Brava Old World Slate Installation Guide

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION

technical bulletin Roofline Installation Details No.7 Fascia Installation Details Typical Eaves Details K16 Fascia & 9mm Vented Soffit

Installation Guide. Titan Old World Slate REV Titan Manufacturing Phone: (407) Fax: (866)

Ulltraclad Aluminium Cladding. Contents. 1.0 General Information Design Information Installation Information 7. 4.

technical bulletin Roofline Installation Details No.7 Fascia Installation Details Typical Eaves Details K16 Fascia & 9mm Vented Soffit

50948-RHN Putney. 06 January This document includes: Aluminium strip/ sheet coverings/ flashings 1. Code Section Revision Dated

AIA Specification. Section Slate Shingles PART 1 GENERAL

OHearneAssociates.com

SANERI 3 º. Self-adhesive SBS-elastomer bitumen cap sheet

Turada Hardwood Shingles and Shakes Installation instructions

eco-shake INSTALLATION INSTRUCTION

Installation Guide. Cedar Shake. Distributed by: BEST MATERIALS LLC, Phoenx AZ

BUILDERS RESPONSIBILITY

Roll-Fix Kit The complete dry hip kit RFIG

PROJECT INSTRUCTIONS Roofing

Craftsman s Guide to Rolled Lead Sheet

StormMaster Slate General Instructions 1.) GENERAL INSTRUCTIONS 2.) ROOF DECK VENTILATION 3.) ROOF DECK

PROFESSIONAL PITCHED ROOFING ANCILLARIES

Inspire Slate Starter Piece Hip and Ridge. 13 1/2" Height: 13 ½" Width: 12" Squares/ Pallet. Bundles/ Square

installation guide Villa

2 Fibre cement slates fixing guide

BARRELL VAULT BATTENLESS

HERITAGE LAMINATED ASPHALT SHINGLES Frederick, MD

ROOFING City of Grand Rapids Building Safety Division

1 Exam Prep NRCA Roofing Manual: Steep-Slope Roof Systems 2013 Tabs and Highlights

BARDOLINE INSTALLATION INSTRUCTIONS

Timberline and Sovereign Expanded Fastener Placement Area

PREMIUM LAMINATED ASPHALT SHINGLES Dallas, TX Tuscaloosa, AL Phillipsburg, KS

GLOSSARY. A useful collection of definitions for commonly used terms in tile roofing.

DIRECTIONS FOR APPLICATION

3-Tab Shingle Instructions DURA-SEAL 20 DURA-SEAL 25

Multi-Width Shake. Widths: 9", 8", 7", 6", 4" Length: 22" Thickness at butt: 5/8" Single-Width Shake. Widths: 9" Length: 22" Thickness at butt: 5/8"

Resysta 6 and 4 Flat Board Siding System Assembly Installation Guidelines

TYPICAL BARGE DETAIL - CROSS SECTION

Stone coated steel roof tile INSTALLATION GUIDE

PREMIUM LAMINATED ASPHALT SHINGLES Frederick, MD

b) Symphony comes pre-packaged in color and width blends. There is no need to mix Symphony at the job site. Currently Symphony is available in the

Shingle Installation Guidelines

4. Metal roof jacks at penetrations and attachments

A. Rough carpentry includes but is not limited to the following:

Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications.

SUPER-UNDERLAY SHEET

SG-30 A P P L I C A T I O N I N S T R U C T I O N S. Directions For Application

SECTION PVC THATCH SHINGLE ROOFING SYSTEM PART 1 GENERAL 1.01 SUMMARY

External cladding technical instructions

Table of Contents. Roof to Head Wall w/ Side Flashing DECRA Shake XD Roof Overview Roof Penetration - Pipes & Vents...

Tapersawn Shake Installation Instructions

Hatteras Shingles. CertainTeed Shingle Applicator s Manual. YOUR OBJECTIVE: To learn the correct procedures for installing Hatteras shingles

Barrel Vault Counter Batten and Batten

DaVinci SlateTM INSTALLATION

ENGINEERED SLATE 2018 INSTALLATION GUIDE

ROOFING APPLICATION STANDARD (RAS) No. 130 INSTALLATION CRITERIA FOR WOOD SHINGLES AND SHAKES APPLICATION

ROOFING APPLICATION STANDARD (RAS) No. 130

Shapes Siding. Perfection Shingles. Chalk Line

SECTION 9: ROOF STRUCTURE, ROOFING MATERIALS AND FLASHING, GUTTER, DOWNSPOUTS, AND SKYLIGHTS. Background

Polytegola N. Bitumen Roof shingles. Application guide

SLATE & SHINGLE INSTALLATION

A P P L I C A T I O N I N S T R U C T I O N S

Dry Verge System. For more information on CEMEX visit

Installer s Handbook. Pocket Guide to Roofline & Cladding Installation BBA BRITISH BUILDING PRODUCTS

INSTALLATION GUIDE LEARN MORE AT DECRA.COM

Tuff-Rib Install Guide

Five Star Panel Installation Instructions

DIRECTIONS FOR APPLICATION

AQUAGARD EPDM FLAT ROOFING SYSTEMS INSTALLATION GUIDE THE MECHANICALLY FIXED SYSTEM

Capstone Application Instructions

REGAL. Installation Manual

C e r t a i n T e e d S h i n g l e A p p l i c a t o r s M a n u a l. and Carriage House STEEP. Slope Application. (over 21/12)

Fibre Cement G C. Batten Fixing Setout ST-01. Jan 2014 A4 PROFILE DATE SCALE DETAIL DETAIL NO. Plank joint. 600mm stud crs.

ARMORTAB R SUPER TM Shingles Installation Instructions

Multi-Width Slate. Single-Width Valoré Slate Widths: 12"

DIRECTIONS FOR APPLICATION

SECTION ROUGH CARPENTRY

Cambridge English Application Instructions

INSTALLATION GUIDE SLATE NOTE TO INSTALLER

Installation Instructions for Standard Lap and Self-Aligning Lap Siding

SmartVent Eave Edge Installation Instructions

Installation Guide. Guardian Slate Roof System. England, Scotland & Wales

IKO0716 July Roofing Shingles. Selector & Fixing Guide

Contents. Stage 1. Preparation of the aperture 9. Interior finishing 25

The Leka System Installation Guide

RESIDENTIAL ROOFS ADDENDUM NUMBER ONE. August 28, 2017

GlassMaster General Instructions - Ardmore, OK & Hampton, GA <br /> Atlas Roofing

F-WAVE REVIA SYNTHETIC ROOFING SHINGLES

Fibre cement slates fixing guide

NEW equinox INSTALLATION GUIDE Issue

Transcription:

LEAD ROOFING 1.0 SPECIFICATION OF LEAD SHEETING Unless otherwise directed, traditionally cast lead sheet is required. 2.0 STRIPPING Carefully strip old defective lead and existing coverings from roofs where directed, load and transport from site and credit certified weights at rates to be agreed. 3.0 RE-CASTING 3.1 Cut out and remove all solder and impurities. Carefully cut out any inscriptions, etc., and set aside for re-use as directed. Re-cast to weights for new work as table below. Include for carriage to and from lead-casting works. 3.2 Cast new inscription and date plaque, as directed by the CA. Fix this and salvaged inscriptions on the new roof covering. 4.0 NEW LEAD SHEETING 4.1 New lead sheet is to conform to quality laid down in BS1178: 4.2 Thicknesses are to conform to the following table. Flat roofing Code 8 Parapet Gutters Code 7 Swept and pitched roofs Code 6 Vertical cladding Code 5 Back gutter to chimneys Code 5 Flashings Code 5 Soakers Code 4 Hip and ridge saddles Code 5 Valley gutters Code 6 Weathering to cornices, etc. Code 6 RE-LAYING LEADWORK Page 1 of 5

Except when otherwise agreed by the CA, the work is to be carried out by registered plumbers. All new lead is to be neatly dressed, without injury, securely fixed with copper nails, joints where necessary being welted or burned and not soldered, and provision made for expansion and contraction. 5.0 SHEET SIZES New sheet sizes are not to exceed 2.4m (Code 7) in length or 2 sq.m in area. The distance between either hollow roll or timber covered rolls shall normally be a maximum of 600mm. 6.0 SUBSTRUCTURE 6.1 New timber for boarding and for repairs to substructure to be of wellseasoned white softwood. Boarding and supporting timbers are to be treated and the moisture content when laid is to be no greater than 14%. Timbers with an average ph less than 5.5 are to be rejected. 7.2 The Client may request the taking of 5 No.drilled samples from each batch of timber and sending to a laboratory for testing. The Client will separately pay for the laboratory fee. 7.3 All projecting nail heads are to be punched below the supporting surface and projecting edges planed off. Unless otherwise indicated the boarding to be ex 150 32mm plain edged, butt jointed, sawn finished on the upper surface and regularised by planing the under side. Boards are to be skew nailed (alternate directions) with 75mm ring-shank stainless steel nails and to be laid with penny gaps (1-2mm apart). All nails are to be punched below the surface before the lead is laid. 7.4 Unless otherwise specified it should be assumed that the rolls will be replaced on a like for like basis (timber for timber, hollow for hollow). The rolls on a newly leaded roof are generally to be laid the same way as those on the previous covering, i.e. if the previous rolls were at right angles to the ridge and eaves the relaid sheet should be the same. Similarly, if the previous rolls were at an angle to the ridge and eaves the new lead should be similarly relaid, but the plumber is to get a written confirmation on this from the CA for each roof slope. 7.5 In conjunction with the above the roof space must be well ventilated, throughout, direct to the outside air. 7.0 LEAD SHEET PREPARATION 7.1 Lead is to be laid directly onto the boards, sand face down, and without an isolating layer. Page 2 of 5

8.2 A single coat of chalk enhanced emulsion is to be applied to the underside of all the lead sheets prior to laying. The emulsion is to be based on ICI Dulux Weathershield and/or Mouldshield white external Masonry Paint (smooth). 5 litres of the paint should be mechanically mixed with approximately 1 litre of water and then 5 litres of a fine powdered chalk (SF100 or BM200 grade) should be slowly added to create a uniform thick slurry. After 30 minutes 100 mls of a water based green dye should be added followed by a further 30 minutes of mechanical mixing. The emulsion should then be left to settle for 24 hours before use. Alternatively, a ready mixed version is available from Rowan Technologies Ltd, 216 Church Road, Urmaston, Manchester (0161-748-3644). 8.3 The sand-cast underside lead surface should be dry cleaned and roughened using a wire brush and generally bossed into shape. The cleaning should remove any mill scales, oxidation layers or previously formed corrosion products. All the sheets should then be stood up and coated with a, well-stirred, single coat of the chalk-enhanced emulsion to a depth of at least 200 micrometers (coverage of approximately 5m²/litre). 8.4 In order to avoid possible capillary attraction of rainwater: do not apply chalk to the bottom 70mm on a 60 degrees slope, 160mm on a 30 degrees slope or 220mm on a 10 degrees slope. apply the coating only three quarters of the way around the inside of the roll (with or without splashlaps) leaving a 30mm uncoated allowance on the edge. treat drips and other details similarly. 8.5 The lead sheets should be left to fully dry before replacing on the roof and final bossing into shape. Any spillages on the top surfaces should be removed using warm water. 8.6 Do not use patination oil. 8.0 FIXING 8.1 New sheets are to be fixed at the head with two staggered rows of copper nails with 10mm flat heads at 75mm centres and 75mm apart. Drips at the joint between the top of each sheet and the next are to be provided, each of 50mm depth (with an anti-capillary groove) or 75mm splayed, as directed by the CA. 8.2 The sides of all sheets are to be fixed with 0.6mm thick copper tingles at least 50mm wide by 150mm long, securely fixed using 2no. brass or stainless steel screws and turned into hollow rolls. Alternatively, where directed, joints can be formed by dressing around wooden rolls with bossed ends. 9.0. VERTICAL ABUTMENTS Page 3 of 5

9.1. Against all vertical abutments, form 150mm min. upstands and protect with cover flashing inserted 25mm into walling, new grooves being cut for the purpose where necessary. 9.2. Cover flashings are to be secured with lead wedges at 450mm centres pointed with hydraulic lime mortar (NHL 3.5) and dressed down at least 100mm over upstands. Sheets are not to exceed 1.8m length, to be lapped at least 100mm, and supported at intervals of not more than 750mm by means of stainless steel clips securely fixed to walling behind flashings, and dressed up 25mm over outer face. 10.0 VALLEYS 10.1 Valley boarding, adapted and repaired as directed, is to be recovered with Code 6 lead, dressed to slope of boarding. Tilting fillets are to be provided, fixed to the boarding to trim the roof battening and in a position to give a distance of a minimum 125mm between the raking edges of the roof covering and an overhang of 25 50mm (depending upon covering) from the fillet to the raking edge. 10.2 The lead lining is to be dressed over the fillet and finished with a welted edge. The lining is to be taken up the roof slope on each side, adequately supported, to give 150mm min. measures vertically between the sole of the gutter and the edge of the sheet. 10.3 Sheets should not exceed 2.25m between joints in length (Code 6) or 1.8m between joints (Code 5). Sheets should be secured with a row of copper clout nails at the head of each piece and a third of the way down each edge, 150mm apart. Over-nailing is to be avoided. Sheets are to be lapped 150mm minimum. 11.0. RIDGES AND HIPS To be covered with Code 5 lead in sheets not exceeding 1.8m in length (or 1.5m in the case of hips) with 150mm lap at joints 9100mm for hips) dressed over rolls and 150mm to 165mm down slates on each side. All dressings to be firmly held at 600mm intervals by double lead clips 50mm wide (copper clips hot-dip coated with high lead content solder to be used for exposed situations) fixed under rolls and carried down under wings, then dressed back 25mm along upper face. 12.0. GUTTERS Tapered gutters are to be formed in accordance with the CA s detailed site instructions, with drips at intervals as specified above, and from width at least 225mm at lowest point. Before re-fixing of slating/tiling, re-dress gutters with Code 7 lead carried 150mm up slope and over continuous tilting fillet and form welted edge. Form upstands and cover flashings at abutments as specified above. Page 4 of 5

13.0 DORMERS Materials and Workmanship, Lead Roofing 13.1 Boarding to be made good by General Contractor, all as directed. 13.2 Cheeks to be recovered with Code 5 lead sheet dressed over top board and nailed thereto a reverse and also supported by wiped lead dots as specified above. The front edge to be dressed around the corner post, securely copper nailed and welted back over nail heads. Tops of dormers to be recovered with 5lb lead as for flats, with lead or copper fixing tabs at all exposed edges. 13.3 Dormer and chimney aprons to be dressed at least 100mm around angles and to have 230mm inclined apron supported by lead clips at not more than 750mm intervals. Soakers against dormers and chimneys to be 25mm longer than slates and turned up under cover flashings and dormer cheek leadwork. 14.0 DRESSINGS TO CORNICES AND LEDGES Copper clips incorporated into the welted joints and clips to retain front edges. The amount of fixing required will depend upon exposure and is to be agreed with the CA. Traditional dot intermediate fixings are to be avoided wherever possible. 15.0 REPAIRS 15.1 Thoroughly inspect and check over all remaining existing leadwork to roofs throughout and repair as directed in detail by the CA. 15.2 Cut out all soldered or inadequate patching; repair by lead-brazing on new pieces all of weight to match existing. Re-dress and refix all loose and displaced leadwork as directed, making up with new lead or copper clips and copper nails where these are deficient or inadequate. 16.0. COMPLETION All roof plumbing works are to be inspected in detail by the CA before the plumbers leave the site. Leave all leadwork in a sound and weather-tight condition and remove all tools, plant and equipment and unused materials. Carefully clean out all gutters, wash down and leave tidy on completion. Page 5 of 5