Windsor Arbor. Parts List: General Information: Tools required: Assembly & installation Instructions

Similar documents
#11179 Wellington ARBOR

#11178 Providence ARBOR

#11179 Wellington ARBOR

Queensbrook Pergola. General Information. Tools Required. Model# Assembly Instructions. Qty

The Vienna Trellis. Tools You Will Need. General Information

The Camden Privacy Screen

The Westchester Arbor

The Newport Arbor ASSEMBLY INSTRUCTIONS. Material You Will Need (Not Included) 4 in x 4 in x 4 ft Pressure Treated Lumber (4)

The Nantucket Legacy Arbor

The Fairfield Deluxe Arbor

The Devonshire Arbor 85 in

10x10 Trellis Pergola

10x10 Trellis Pergola

SECTION 19: Endwood Fusion Welded Gate Installation Guide

Cottage Picket Gate. 6 in in in in

The Nantucket Legacy Arbor

Cottage Picket Gate A S S E M B LY I N S T R U C T I O N S

SHADOWBOX INSTALLATION FOR: Standard 6 H x 8 W Shadowbox Fence 5 x 5 Routed Posts Dog Ear or Straight-Edge Pickets 1.75 x 3.5 Rail

6 1/2 x 6 1/2 Wood Grain Flat Top Pergola

The Cambridge Raised Planter Extension Kit

6 1/2 x 6 1/2 Wood Grain Flat Top Pergola

TRADITIONAL & SCALLOP PICKET INSTALLATION INSTRUCTIONS

Vinyl Fence Installation Instructions. Privacy Fence Installation Instructions

UNIVERSAL PANEL AND GATE

PRIVACY INSTALLATION FOR: Standard 6 H x 8 W Privacy Fence 4 x 4 Post Sleeve & Brackets Dog Ear or Straight-Edge Pickets 1.75 x 3.

Installation Instructions for. Handrail Component System

Yardistry. External Display YP *Time required for assembly approximately 1.5-2hrs

6 1/2 x 6 1/2 Wood Grain Flat Top Pergola

Downtown Rack. Custom logo option available

Assembly Instructions

Swerve Rack CUSTOM RACKS AVAILABLE

CABINETRY Assembly Instructions

HOW TO INSTALL HORIZONTAL ROD RAILING TREX SIGNATURE STANDARD

GREENHOUSE 6'x8' ASSEMBLY INSTRUCTIONS. (Internal Dimensions) Overall Dimensions (Approx.) L 193 W 200 H cms 97.5" L 76" W 78.

Oceanside Outdoor Vinyl Shower Kit (3 x 3 Enclosure)

How To Measure Your Finished Opening

Installation Fence Guide Kodiak Iron. Exceptional Fencing Extraodinary Customer Service

Double Beam Freestanding Pergola Installation Guide

Installation Guide. Capped Cellular PVC Fencing. Table of Contents. Storage and Handling Tools Needed Fence Layout and Locating Posts

Fence System Components

Trackstar Manual Folding Shade Installation Instructions

Under Seat Storage Drawer Installation Instructions

Zippity. Zippity Pet or Garden Enclosure Kit (8 x 8 x 30 H) ASSEMBLY INSTRUCTIONS. Ver 1.1/070116

Installation manual. For setting in concrete/on base plates - Panel height 1830

RANCH RAIL FENCE INSTALLATION INSTRUCTIONS

SEMI-PRIVACY PANEL AND GATE INSTALLATION INSTRUCTIONS

6 1/2 x 6 1/2 Flat Top Pergola

The Festival Assembly Instructions

IMPORTANT: CHECK THE INSIDE OF THE LARGER PIECES IN YOUR BOX FOR OTHER MATERIALS PACKED INSIDE.

Laminate Cabinet Installation Instructions

Assembly Instructions. Important!

PVC Fencing Install Instructions

NEXUS SERIES CABINETS

INSTALLATION INSTRUCTIONS FOR ULTRA LATTICE AND ALUMAWOOD ARBORS

How to Install Custom Real Wood and Faux Wood Blinds

ASPEN STYLE. ORNAMENTAL FENCE INSTALLATION GUIDE 3 Rails, Pressed Top/Flat Bottom Model No. NBR7958-NPF

Installation Instructions. Oakmont Folding Doors

FLEX 48 x 72 / 60 x 72

Country Estate Railing Installation Guide

PRO-RIB FENCE PANELS INSTALLATION GUIDELINES. Virtually Maintenance Free Available in 24 Colors Custom Heights Available by the Inch

FENCE INSTALLATION GUIDE 8 HIGH WALLS

TREX REVEAL RAILING Installation Instructions

Rockwell 4-in-1 Sliding Door

PVC Composite Railing & Stair Kit

12 x 24 Flat Top Pergola

Assembly Instructions. Important!

12 x 12 Flat Top Pergola

Aluminum Pre-Built Fence For Standard & Heavy-Duty Series

Clearview Railing System Installation Instructions

12 x 12 Flat Top Pergola

ASPEN STYLE. ORNAMENTAL GATE INSTALLATION GUIDE 3 Rails, Pressed Top/Flat Bottom Model No. EGBR5842-N2P

TV/Media Stand- Mission Oak Finish. Assembly Instructions

Belham Living Harbor Bay Pergola

Panel & Shelf Identification

Equilibrium. Conference Table. Installation Instruction. Revision B 11/07/16

10 x 10 Flat Top Two Tone Pergola

HOW TO INSTALL HORIZONTAL ROD RAILING TREX SIGNATURE STANDARD

935 RODA VINESSE NEED INSTALLATION HELP? DOUBLE ROLLERS FRAMELESS DOOR INSTALLATION INSTRUCTIONS QCI XX/XX/XXXX. Call BASCO ( )

TREX REVEAL RAILING Installation Instructions

OPEN PICKET PANEL AND GATE INSTALLATION INSTRUCTIONS

IMPORTANT!!! ASSEMBLY ASSEMBLY INSTRUCTIONS. (Internal Dimensions)

Box Track INSTALLATION INSTRUCTIONS

12 x 12 Flat Top Pergola

1531 Fort Add On **!!IMPORTANT-PLEASE READ!!**

Frameless Bypass Slider

Parts Included: T-Feet Assembly

ASSEMBLY INSTRUCTIONS FOR STORETTE STA42

TREX SIGNATURE (FORMERLY REVEAL) RAILING Installation Instructions

Walk-in Configurations

Installation Manual for Metal Toilet Partitions Elite & Elite Plus Series

INSTALLATION INSTRUCTIONS LS X 12-2 X 7 1/2 FRAME LOAFING SHED

10 x 10 Flat Top Pergola

12 x 12 Flat Top Pergola

INSTALLATION INSTRUCTIONS

TREX ENHANCE RAILING (Also Applies to Trex Select Railing) Installation Instructions

Ranch Rail Vinyl Fence

Vinyl Privacy & Picket Gates

Ripple Hanger ASSEMBLY INSTRUCTIONS

8 x 8 Flat Top Pergola

PLAYLAND 72 SPIRAL SLIDE 3.5 Posts, 3.5 Posts / 48 Grid and 5 Posts

Transcription:

Windsor Arbor Assembly & installation Instructions Parts List: General Information:» Read through carefully before beginning assembly.» When assembling components, place on a clean, flat, non-abrasive surface to avoid scratches.» In the event of missing or defective parts, please call our customer service department directly at 1-877-258-6020 Tools required:» Cordless Drill with #2 phillips bit» Hammer» Tape Measure» Shovel» Post Hole Digger (recommended) Part # Description Qty 1 4 sq. x 84 Left Post 2 2 4 sq. x 84 Right Post 2 3 2 sq. x 29¾ Top/Bottom Cross Rail 4 4 2 sq. x 29¾ Center Cross Rail 8 5 ⅞ x 1½ x 59½ Vertical Rail 6 6 1½ x 4 x 72 Arbor Top Rail 2 7 ⅞ x 1½ x 72 Overhead Rail 2 8 2 sq. x 26¾ Arbor Top Cross Rail 5 9 4 sq. Flat Post Cap 4 10 24 U-channel Ground Anchor 4 11 Hardware Kit (includes): PVC Glue Can 1 4 Arbor Top End Cap 4 ⅞ x 1½ Overhead Rail End Cap 4 1½ Kappet Screws 26 Kappet Screw Caps 26 1 Self-tapping White-hdead Screws 8 FIGURE 1 Product dimensions & Part identification FIGURE 2 Ground Anchor Layout for installation

1 Lay out one right post (part 2). Starting at bottom, insert one top/ bottom rail (part 3) and four center rails (part 4). 2 Slide three vertical rails (part 5) through center rails and into top/ bottom rail. 3 Insert one top/bottom rail (part 3) into right post, sliding three vertical rails into top/bottom rail. 4 Slide left post (part 1) over corresponding top/bottom and center rails. DO NOT screw arbor panel together. REPEAT steps 1-4 for the second arbor panel.

With arbor panels lying down and screw pilot holes of each arbor panel facing out, slide two arbor top rails (part 6) all the way through both routed holes at the top of each arbor panel. 5 Note: 2 sq. holes should line up with 2 sq. holes in the top of the arbor panels. This will leave 7 of overhang on each side of the arbor. 6 Insert five arbor top cross rails (part 8) into arbor top rails and arbor panel posts by carefully separating posts just enough to insert the five rails. When inserting rails, insert with screw pilot holes facing up. Note: Outer two arbor top cross rails are inserted into posts, and then lock into the arbor top rail. 7 Using 1½ kappet screws, screw together both arbor panels. Be sure that all parts are fully inserted into posts before securing. Snap kappet screw caps over screw heads.

8 Using 1½ kappet screws, insert screws through holes of two overhead rails (part 7). Fasten screws to screw pilot holes of the five arbor top cross rails. Snap kappet screw caps over screw heads. 9 Apply PVC glue to inner edges of the four flat post caps (part 9) and place on top of each post. Glue four 4 arbor top end caps onto ends of each arbor top rail. Glue four overhead rail end caps onto ends of each overhead rail.

ARBOR INSTALLATION 10 Option 1 Slide one 24 steel u-channel ground anchor into bottom of each post. Slide ground anchor until it meets bottom cross rail. For increased stability, unfasten bottom screws separate bottom of arbor panel just enough to slide ground anchor further into post. It is recommended to leave at least 16 of ground anchor exposed. Using 1 selftapping white-head screw, fasten post to ground anchor. drawing (figure 2), dig holes approximately 16 deep. Set arbor in holes and level. Back fill with soil removed from holes. For permanent installation fill with cement. Option 2 drawing (figure 2), pound ground anchors into ground according to dimensions. When pounding into ground, use block of wood to prevent ground anchor from bending. Slide arbor over ground anchors. Using 1 self-tapping white-head screw, fasten post to ground anchor. Option 3 drawing (figure 2), dig holes 16 deep according to dimensions. Fill with cement and place ground anchors in wet cement. Be sure that ground anchors are straight and in accordance with dimension of ground anchor installation layout drawing. Allow cement to dry. NOTE: There is very little room for error with this installation method. Slide arbor over ground anchors. Using 1 self-tapping white-head screw, fasten post to ground anchor.