J-BOLT ANCHOR INSTALLATION

Similar documents
Assembly and Operation Guide

BIKE DEPOT Parts List B UPRIGHT BACK WELDMENT B (12) 1/4 SELF-DRILL SCREWS (4) 1/2 BOLTS TRUSS WELDMENT C

ADJUSTABLE BASKETBALL SYSTEM ASSEMBLY INSTRUCTIONS AND OWNER'S MANUAL

PRE-FAB GRILL ISLAND ASSEMBLY INSTRUCTIONS AND OWNER S MANUAL D(C,H)430-XX(R,D)-75XX D(C,H)790-XX(R,D)-108XX

Wave Bike Rack specs SPECS AND INSTALL INSTRUCTIONS. Deluxe Wave Style Bike Rack. Series Names & Model # s. Product maintenance. Thermoplastic Coating

HSDC High School Discus Cage

NOTE: Landscape Forms is not responsible for site preparation, footings, or electrical wiring.

4 BAY Low Profile-Dual Displays WALL MOUNT CABINET

NEC Display Solutions of America, Inc.

Inigo Sconce INSTALLATION INSTRUCTIONS P _2_A 1 of 5

INSTALLATION INSTRUCTIONS

AAE Model No. PVS-HSX High School Premier Pole Vault Standards

Steady Freddy Vinyl Gate REALLY. Important stuff to know about installing your WamBam gate

Peeping Tom Vinyl Gate REALLY. Important stuff to know about installing your WamBam gate

Jiminy Picket Vinyl Gate REALLY. Important stuff to know about installing your WamBam gate

TP4463. ASSeMBly INSTruCTIONS FLAT PANEL TV MOUNTING SYSTEM OPTION 1 OPTION 2 OPTION 3

BASEBALL FOUL POLES GROUND SLEEVE MOUNTED

Supports up to 100 lbs / 45 kg

ADJUSTABLE BASKETBALL SYSTEM ASSEMBLY INSTRUCTIONS AND OWNER'S MANUAL

The Nantucket Legacy Arbor

4 BAY Low Profile - SINGLE XL DISPLAY WALL MOUNT CABINET

WALL UNIT. Assembly Guide For Internal Use: FI.WR.INS.034_WKIN00124_WALL_ _1Dr_Rev4.indd

Installation and Assembly - Articulating Swivel Double-Arm for 42" - 71" Plasma Screens

Gared Pro-S Portable Backstop

4 BAY Low Profile WALL MOUNT CABINET

INSTALLATION INSTRUCTIONS / DODGE RAM CREW CAB 2500/3500

Installation and Assembly - Vision Point LCD Screen Pedestal Stand - 75/100 mm Adapter Plate

Tools & materials required for each application. Hammer drill Shovel. Masonry bits: Concrete mixing. 7/32", 5/16" equipment

BOLBASE INSTALLATION INSTRUCTIONS

NEC Display Solutions of America, Inc.

EXTENSION COLUMN (SOLD SEPARATELY)

SolidStep 3.0 OEM INSTALLATION MANUAL

INSTALLATION INSTRUCTIONS for the JOMY RETRACTABLE LADDER. If there are any questions, please call (800)

Installation Instruction

WALL UNIT. Assembly Guide Tall 1 Door. 200 Tall. 350 Tall. 150 Tall. 300 Tall. 400 Tall. 450 Tall. 500 Tall. 600 Tall

Vir Stil Console Lavatory INSTALLATION INSTRUCTIONS

TV WALL MOUNT ASSEMBLY GUIDE RF-TVMLPT01V2

Parts List D E. Installation and Assembly- Encore Projector Mount Protected by U.S. Patent No. 6,042,068. Model: PJRL411

DOCK WEDGE - STANDARD

Bollard Chain Eye 3/8" (Powder Coated) Quick Link Connector 5/16" (Powder Coated) Optional Accessories:

Nervous Nelly Vinyl Gate REALLY. Important stuff to know about installing your WamBam gate

EXCEL 5000 System Styled Cabinet Rings and Subpanels

(W) INSTALLATION INSTRUCTIONS 3" ROUND & 4" OVAL SIDEBAR (90-DEG BENT END) DODGE RAM 1500 QUAD CAB PART #DZ /DZ /DZ /DZ

6 BAY AV CREDENZA WITH DUAL DISPLAY MOUNT

Football Goal Posts MODEL SERIES: FGP400 and FGP600 series

Installation Instructions Model # TEL-100 / 200 Manual Locking or Self Locking

MSP-DCCLFSD LCD Flat Screen Swing-Down Mount

Installation and Assembly: Projector Ceiling/Wall Mount

Plain Jane Vinyl Gate REALLY. Important stuff to know about installing your WamBam gate

INSTALLATION GUIDE Ceiling TV Mount MHP-52

(2) 12mm x 40mm Bolt Plate (long) pictured w/plastic retainer. (6) 12mm x 40mm Bolt Plate (short) Support Bracket Driver/left Front

Thank you for purchasing our product! *Please read these instructions and follow them step by step.*

2.0 INSTALLATION PROCEDURE. 2.1 Open the Speaker Post. 2.2 Install the Speaker and Microphone Grills. Figure 2. SPP2 rear view

Toll Free: INSTALLATION MANUAL. Copyright 1996 Revision 1 November 2004

INSTALLATION INTRUCTIONS

Exponents Bench Cushion

Swerve Rack CUSTOM RACKS AVAILABLE

Installation and Assembly: Flat \ Tilt Wall Mount for VESA 400x400

Napoli - Shoe Storage

Before Assembling the Storage Wall

Bol FEATURES: SPECIFICATIONS: 8' 24' Round Tapered and Straight Wood Poles STRUCTURA INC. FIXTURE TYPE: PROJECT NAME:

Installation and Assembly: LCD UPRIGHT STAND FOR PEDESTAL CABINETS

Tuxedo Console Table INSTALLATION INSTRUCTIONS P73037, P73038, P _2_B Page 1 of 5

HOOP RACK HEAVY DUTY Setbacks WALL 36" WALL 42" 36" STREET 59" STREET Dero

AS-TX86. Please read these instructions carefully before using. This model will hold most Flat Panel TVs. Load capacity: 60kg (132Lbs).

Installation and Assembly: Mount - Wall/Ceiling Mount

Installation and Assembly: Flat Panel Pull-out Swivel Wall Mount

Not including the type of fabric used (clear pvc or shade mesh), there are three main types of side screen.

VIEWPOINT ALUMINUM RUNNING BOARD TOYOTA RAV4

CM543 STOP READ ALL OF THE FOLLOWING INSTRUCTIONS BEFORE REMOVING CABINET FROM SKID

Track Rack. * Track Racks are not lockable

BILCO Sloped Wall Basement Door Installation Instructions

FIXED MOUNTING SHUTTERS INSTALLATION

Equilibrium Credenza

3 BAY AV CREDENZA WITH SINGLE DISPLAY MOUNT

(6) Plastic Retainers. Passenger/Right. Passenger/Right Support Brackets

Installation & Assembly: Suspended Ceiling Kit

Installation and Assembly Manual: PRS, RTR Series Projector Mount

Assembly Instruction Item No. : HF SKU No. : Description: 48IN CHERRY CORNER FIREPLACE

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

Gen 2.0 Side Patio Rail Kit OEM INSTALLATION MANUAL

Assembly & Installation Instructions

BASEBALL FOUL POLES SURFACE MOUNTED

Walk-in Greenhouse. Assembly instructions. 6x4. 6x6. 6x8. Model GH0490 Model GH0491 Model GH1040. Model GH0492 Model GH0493 Model GH1041

5/16" Flange nut. Bolt Keeper Plate (8" Sq. SYS.) (3) 1/2" x 3" Hex head connector zinc plated bolt w/ washers and nut. Anchor 3" sq. 7 Ga.

MobileTrak5 Installation Instructions

Installation & Assembly: Two Piece Suspended Ceiling Plate

INSTALLATION INSTRUCTIONS DODGE RAM 2 & 4WD 1500 PART # P5058

Passenger/Right Center and Rear Support Brackets. Driver/Left Center and

INSTALLATION GUIDE. Flat Panel Arm Mount MLA100-L. VESA 100x100 compatible. Support 10" to 24" Screens Max Load Capacity: 30 lbs (15 kg)

Storage Cabinets 9000 Series Assembly Instructions

ADJUSTABLE BASKETBALL SYSTEM ASSEMBLY INSTRUCTIONS AND OWNER'S MANUAL

Installation Manual for Metal Emperor Lockers

Mod-E Pro Electric L-Shaped Standing Desk

A-dec 541 and 545 Delivery System Mount on Preference Collection 5580 I NSTALLATION GUIDE

Clopay Models 835/837 Sliding Door System Installation Guide

Assembly instructions. 6x4. Model GH1354A. 6x6. Model GH1357A. 6x8. Model GH1360A. 6x10. Walk-in Greenhouse. Model GH1363A

PHTM200 - Phantom 200 Flat Screen Wall Mount with Wafer Thin Projection Fits Screens up to 50 lbs with 200mm Mounting Patterns

Showpiece Cabinet Integrated Stand For 32" - 52" LCD HDTV

Dry Toilet, Version 2.0 June 17, 2015

Transcription:

instlltion INSTRUTIONS electrician in accordance with the National lectrical ode 1. Install supplied J-bolt anchor (galvanized J-bolt 1/2-13 thread, 14 inches long) assembly over electrical supply conduit stub-outs [by others] and into a concrete pad pour form [by others]. The electrical supply conduit stub-outs must pass through the center of the template bracket of the J-bolt anchor assembly. lectrical supply conduit stub-outs should be no higher than 3" (76mm) above grade with supply wires at a recommended 12" (305mm) minimum length. Maximum conduit stub-out number and size: Two (2)- ¾ (25mm) conduit stub-outs or three (3)- ½ (20mm) conduit stub-outs. The concrete pad pour form should be a minimum of 9" across the top in any direction and a minimum of 18" deep. 2. Orient the J-bolt anchor assembly to ensure that the access door of the 3100 bollard is in the desired location when the bollard is installed. For proper bollard installation, the top of the template bracket must be flush and level with final grade. See reverse side of this sheet for recommended J-bolt anchor assembly orientation. 3. Fill the concrete pad pour form [by others] with concrete [by others] to the top surface of the template bracket. For best results, ensure that top surface of concrete is smooth and level. For proper bollard installation, the nchor olt Top Fasteners must be above grade and removable. These will be used later to secure the bollard 3100 bollard to the J-bolt anchor assembly. 4. llow concrete pad to cure securing J-bolt anchor assembly into the pad before installing 3100 series bollard fixture. Protect J-bolt and conduit stub-outs from damage prior to installation of 3100 bollard fixture. J-OLT NHOR INSTLLTION Supply Wires 12 (305 mm) Minimum Length onduit Stub-outs 3 (76 mm) Maximum Height J-olt ssembly (galvanized J-bolt 1/2-13 thread, 14 inches long) oncrete 18 (457 mm) Minimum epth lectrical onduit Stub-Out nchor Template racket nchor olt Top Fasteners ccess oor ny dimension on this sheet is to be assumed as a reference dimension: inspection requirements. (NSI Y14.5-1973) 9144 eering venue hatsworth, 91311

instlltion INSTRUTIONS electrician in accordance with the National lectrical ode 120 10 3 PLS 4-1/2 1.5 + 0.5 3 PLS 14 (356) ny dimension on this sheet is to be assumed as a reference dimension: inspection requirements. (NSI Y14.5-1973) 9144 eering venue hatsworth, 91311

instlltion INSTRUTIONS electrician in accordance with the National lectrical ode 1. Verify that the power is off at the conduit supply wires. onduit stub-outs are to be no more than 3 (76 mm) above final grade with supply wires at 12 (305 mm) minimum length. 2. Remove the anchor bolt top fasteners and rear bollard access plate before installing the bollard. Remove all shipping packing material. 3. Place the bollard F upright onto the anchor bolts. Route supply wires through center access hole of the base plate. 4. Secure the fixture to anchor bolts using the supplied anchor bolt top fasteners. Fasteners should remain partially loosened until final leveling is complete. 5. Position the bollard as required. djust each of the three (3) leveling pad bolts G until the bollard is properly leveled. 6. Secure the bollard by tightening the anchor bolt top fasteners. onfirm that bollard is properly leveled. 7. Verify that supply voltage matches fixture voltage. Make electrical connections to the fixture inside the bollard housing. ll electrical splices are to be made as prescribed by the National lectrical ode or other relevant codes. ttach ground wire to an approved ground source. 8. Re-install the rear bollard access plate securely with the supplied fasteners. 9. Remove the top lid louver assembly H and install the proper lamp type as defined by the label inside fixture. (Lamp sold separately). 10. Re-install the top lid louver assembly H securely with the supplied fasteners. NOT: Verify alignment of top lid louver assembly prior to installment. Secure fasteners evenly. o not overtighten. MOUNTING (ROUN S SHOWN) H F J-olt ssembly lectrical onduit Stub-Out nchor Template racket nchor olt Top Fasteners G F Rear ccess Plate ollard Fixture G Leveling Pad olts H Lid Louver ssembly ny dimension on this sheet is to be assumed as a reference dimension: inspection requirements. (NSI Y14.5-1973) 9144 eering venue hatsworth, 91311

ROUN - 3110, 3120 instlltion INSTRUTIONS electrician in accordance with the National lectrical ode Top View, ccess oor on back side ccess oor Top View, ccess oor on front side ccess oor Top View, ccess oor on right side Top View, ccess oor on left side ccess oor ccess oor ny dimension on this sheet is to be assumed as a reference dimension: inspection requirements. (NSI Y14.5-1973) 9144 eering venue hatsworth, 91311

SQUR - 3130, 3140, 3150 instlltion INSTRUTIONS electrician in accordance with the National lectrical ode Top View, ccess oor on back side ccess oor Top View, ccess oor on front side ccess oor Top View, ccess oor on right side Top View, ccess oor on left side ccess oor ccess oor ny dimension on this sheet is to be assumed as a reference dimension: inspection requirements. (NSI Y14.5-1973) 9144 eering venue hatsworth, 91311