Paramount Enclosure. Installation Guide

Similar documents
Eaton Data Center Racks

Mighty Mo GX Series Cabinet Installation Guide. OR Rev /11

PROFILE Flat Panel Console System Installation Manual

STOP. V00029AC Rev. 04 READ ALL OF THE FOLLOWING INSTRUCTIONS BEFORE REMOVING CABINET FROM SKID TOOL LIST. NET-ACCESS S-Type Network Cabinets

REC Series Rack Installation Guide

CM340B STOP READ ALL OF THE FOLLOWING INSTRUCTIONS BEFORE REMOVING SERVER CABINET FROM SKID

Copyright Black Box Corporation. All rights reserved Park Drive Lawrence, PA Fax

LAN Locker Adjustable Shelves

EF-Series EuroFrame Gen 2 Cabinet System User Manual

V00029KX READ ALL OF THE FOLLOWING INSTRUCTIONS BEFORE REMOVING CABINET FROM SKID

NetShelter VS Enclosure. User s Manual

Interactive Monitor Arm

Assembly Instructions

Linear Hook- on Worksurfaces

S6 User s Manual USER S MANUAL ver. 1.0

MobileTrak5 Installation Instructions

Copyright Black Box Corporation. All rights reserved Park Drive Lawrence, PA Fax

NetShelter VX. Four-Post Open Frame. User s Manual

N-Series TeraFrame Gen 3 Cabinet System User s Manual

Gared Pro-S Portable Backstop

CM543 STOP READ ALL OF THE FOLLOWING INSTRUCTIONS BEFORE REMOVING CABINET FROM SKID

6MM ALLEN KEY FOR ROOF CLIPS PHILLIPS HEAD BIT FOR SCREWS FOR DOOR FRAME SPIRIT/LASER LEVEL TO LEVEL THE UNIT

End of Row Doors. Revision Number 1

SAM. Model: STV-C65 LCD Mobile Visualized Stand Instruction Manual. Weight Capacity: 1251bs / 56.7kg Suits LCD Flat Panel Display: 42"-55" Page 20

Assembly Instructions

compile system INSTALLATION GUIDE Updated January 2019

Interra Installation Manual

Setting Up the Polycom RealPresence Group Series Media Center

RH-412 STEEL DOORS INSTALLATION INSTRUCTIONS

OXYGEN INSTALLATION. Revision date

The Bowflex Revolution XP Home Gym Assembly Instructions. P/N: Rev ( /0 )

INSTALLATION INSTRUCTIONS

GF-Series GlobalFrame

Workbench Instructions for Assembly

PULL-THRU USER S MANUAL

LEG CURL IP-S1315 INSTALLATION INSTRUCTIONS

13MM FLAT WRENCH FOR LEVELING THE GLIDES OF STRUCTURE 6MM ALLEN KEY FOR ROOF CLIPS PHILLIPS HEAD BIT FOR SCREWS FOR DOOR FRAME

TOOLS REQUIRED: HARDWARE INCLUDED: 13MM FLAT WRENCH FOR LEVELING THE STRUCTURE RATCHET WITH 5MM HEX BIT FOR CORNER SCREWS ON TOP TRAVERSE BEAMS

Workbench Instructions for Assembly

Oxford Stalls Installation Instructions

Topo Freestanding Applications - Private Office

P.O. Box 8400 Green Bay, WI (920)

FlexFrame - Storage Components and Skins

Before Assembling the Storage Wall

INSTALLATION INSTRUCTIONS RH 412 STEEL DOORS

MPA-9000 Universal Ceiling Projector Mount Kit

Passage 4 Bike Hitch Rack

Star Trac Turbo Trainer Assembly & Setup

EmagiKit. Privacy Pod Plus. Quiet. Easy. Affordable. INSTRUCTIONS ASSEMBLY

Z4- Series SeismicFrame

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS HEAVY DUTY TILT WALL MOUNT Model: PPH-2000

Revised

Installation for Full Size Polaris Ranger Crew Doors

INSTRUCTION SHEET. PIECE INVENTORY - MOBILE BASES Refer to the diagram for part identification.

Select Lab Fixed Height Workstation

Important Loading Information. Tools Required. Meridian Lateral Files Instructions

MK52 Series ULTRA-LOW FREQUENCY VIBRATION ISOLATION WORKSTATION ASSEMBLY AND OPERATION INSTRUCTIONS

Technical Environment Systems INSTALLATION MANUAL

STORAGE & SHELVING SYSTEM - INSTALLATION GUIDE

Franklin Mills Stackable Movable Lateral Instructions

LOW-PROFILE WALLMOUNT CABINETS

CleanBench Laboratory Tables

WEIGHT ADJUSTABLE ESPREE. Model 2ESP-WA-C48- Model 2ESP-WA-C60- 2ESP-WA Rev B 8/17 ASSEMBLY AND OPERATION

Assembly Instructions

TOOLS REQUIRED FOR ASSEMBLY. Rubber Mallet or Plastic Tip Hammer PARTS REQUIRED FOR ASSEMBLY OF SINGLE ENTRY STARTER.

Installation Instructions for Vista Air Vertically Folding Walls

Installation Instructions

bridges Installation Manual

Models 2230 and 2240

Kawasaki Teryx 750 Cab Kit* Caution: Before using this product, read this manual and follow all Safety Instructions.

Range height adjustable assembly

Angled Side Flush with Panel Face

LF Series Assembly Instructions

Powerware Series. Eaton Rail Kit 9- and 12-Slot Cabinets Installation Guide

VACUSEAL MODEL 200. HOT TUB PRODUCTS 233 Carrington Road Bethany CT

IMPORTANT: installation. FLOOR ANCHORED CEILING HUNG OVERHEAD BRACED FLOOR-TO- CEILING ANCHORED

Privacy Wall Glass Selections - Polished Edge Slider Door

RMD5000 Rackmount Kit Instructions

WORKSURFACE ASSEMBLY

TITAN INDUSTRIAL RACK 6-FOOT TALL / 4-SHELF

Assembly Instructions

IAC INDUSTRIES 895 BEACON STREET BREA, CA Phone (714) Fax (714) Workmaster Assembly Instructions

Preference Collection and Treatment Console INSTALLATION GUIDE

OB1U INSTALLATION INSTRUCTIONS. Interactive Flat Panel Over White Board Mount

TOOLS REQUIRED Metal Wood Wood and Metal Screws. #16 Drill #12-24 Tap. 1/8 Drill

READ BEFORE INSTALLING UNIT INSTALLATION WARNINGS AND CAUTION

Installation Instructions

INSTALLATION INSTRUCTIONS DODGE RAM 2 & 4WD 1500 PART # P5058

Installation Instructions

Assembly Instructions Signature Choral Riser 4-Step Model

Depending on the size you ordered you will have either 5 Foot sections which will build the 10 Foot frame or 6 Foot sections which will build the 12

Select Lab Adjustable Height Workstation

Footprint Mobile Assembly Instructions

Side Mount INSTRUCTION BOOKLET #C122 BED STYLE: PARK CITY

RAMPAGE P R O D U C T S. INSTALLATION INSTRUCTIONS BRONCO ZIPPER FASTRACK TOP PART #984xx BRONCO TOOLS REQUIRED

VACUSEAL MODEL 300 & 400

Installation Instructions

Be sure any accessory used will fit with the soft upper doors before installing. Not all accessories will be compatible.

INSTALLATION INSTRUCTIONS

Transcription:

Paramount Enclosure Installation Guide Wright Line LLC 160 Gold Star Boulevard Worcester, MA 01606 Tel: 800-225-7348 508-852-4300 Fax: 508-365-6178 info@wrightline.com All products and company names are trademarks or registered trademarks of their respective holders. Every effort has been made to ensure that the information contained herein is correct. The company reserves the right to modify product specifications without prior notice and assumes no responsibility for any error which may appear in this publication.

1. Product Overview In today's world, network equipment is one of the most important investments a business can make. How you store and protect this equipment is just as crucial. With constant technological changes, an enclosure must not only be flexible, but must be able to protect your long-term investment. The right choice, is simply, Paramount. Paramount, the indisputable industry leader, is compatible with virtually all major servers, both tower-style and rackmount equipment. It can safely store 2,200 lbs. of equipment and provides user-friendly cable management within the cabinet, cabinet-to-cabinet, and raised via floor or overhead access. Split rear doors provide easier access and maneuverability in data center environments. Offered in both standard perforated and fan door designs (both 120V and 208V), Paramount provides a level of cooling that will give you peace of mind. When coupled with a very broad range of enclosure accessories, power distribution, switches, and monitoring products, Paramount provides a platform that you can depend on to support your business. Paramount Features Multi-vendor server compatibility Integrated cable management 40, 44 or 51U rack space Three widths - 24", 30" and 48" Computer grade ventilation Split rear doors (perforated or fan) 2,200 lb. static load Standard to advanced security options Segmented bays for co-location applications Tool-less adjustable rack-mount rails Field-reversible doors NuGrey, Black, Two-tone, or Custom Colors Custom configurations Lifetime warranty 1

2. Important Safety Information WARNING SYMBOLS This WARNING! Symbol calls attention to a procedure or practice which, if not adhered to, could result in personal injury. Do not proceed beyond a WARNING sign until the indicated requirements are fully understood and met. This symbol calls attention to important clarifying point of information which will help insure a successful installation. WARNINGS! Failure to adhere to the following warnings may cause personal injury or damage to your enclosure rack. 1. WARNING! Paramount Enclosure components can be very heavy. It is recommended that several people take part in the unpacking process. When lifting Paramount components or electronic equipment, there should be at least one person for every 40 lbs. of weight to be lifted. 2. WARNING! The enclosure rack must be stabilized before installing any roll-out type accessory component or electronic device into the rack. Failure to stabilize the rack before installing equipment may cause the enclosure to tip over. Refer to the instructions on page x for stabilization methods. 3. WARNING! Load the heaviest electronic devices and accessory components into the enclosure rack first, and place them near the bottom of the enclosure to prevent the enclosure from becoming top-heavy. 4. WARNING! Never extend a roll-out type electronic device or accessory component from an enclosure rack that is supported by casters. Doing so may cause the enclosure to tip over. If your cabinet is supported by casters, refer to the instructions on page x for stabilization methods. 5. WARNING! Never extend more than one roll-out type electronic device or accessory from a stabilized enclosure rack at a time. Doing so may cause a stabilized enclosure rack to tip over. 6. WARNING! Do not sit, stand, or climb on any extended roll-out type electronic device or accessory. 7. WARNING! To reduce the risk of overload, do not load any Power Distribution Unit (PDU) with more than 80 percent of its rated amperage capacity. 8. WARNING! There must be an uninteruptable safety earth ground from the main power source to the Power Distribution Unit s (PDU) power cord set. Whenever it is likely that ground has been impaired, disconnect the PDU s power cord until the ground has been restored. 2

3. Installation Overview Factory Assembled Enclosures Paramount Enclosures are usually shipped as fully configured and assembled cabinets, ready for installation into your data center. Only a few simple steps are required to prepare the cabinet for the installation of your electronic equipment. If you are preparing factory assembled units, many of the procedures in this manual will not apply to your installation. Follow the steps in the Unpacking a Factory Assembled Enclosure and Setting Up Factory Assembled Enclosures sections on page x and x. After your enclosures have been positioned, stabilized and ganged, refer to the Field Assembled Components section for any additional accessories that may require installation. Field Assembled Enclosures To meet the needs of some users, Wright Line may ship the Paramount Enclosure Frames in a partially disassembled state, requiring additional field assembly procedures. Refer to the Field Assembled Enclosure Frames section on page x and the Field Assembled Components section on pages x for frame and accessory assembly instructions. After you have completed the frame and accessory assembly, return to the Setting Up Factory Assembled Enclosures section on page x for instructions on stabilizing and ganging the enclosures. Contents of This Packet In addition to the Installation Manual, this packet contains a 1-3/8 wrench and a 5/32 allen wrench. Use the 1-3/8 wrench to adjust the enclosure s leveling feet. Use the 5/32 allen wrench to assemble knock-down style enclosure frames. 5/32 Allen Wrench 1-3/8 Wrench 3

Fasteners and Hardware #54348 1/4-20 x 1/2 Hex Washer Head Screw #82031 #10-32 x 1/2 Phillips Pan Head Screw #87398 1/4-20 x 5/8 Button Head Cap Screw #86425 15/16-18 x 1/2 Button Head Cap Screw #53956 1/4-20 x 3/4 Pan Head Machine Screw #81645 1/4-20 x 1.00 #82555 #10 x 1/2 Philips Flat Head Self-Tapping Screw #59103 #10 x 3/4 Phillips Pan Head Wood Screw #66714 #10-24 x 3/8 Phillips Pan Head Thread Forming Screw #55617 #10-24 x 1/2 Phillips Pan Head Screw #62152 5/16-18 Self Locking #18209 1/4-20 Self Locking Nut #18242 #10-24 Self Locking Nut #87442 #10-32 x 5/8 Screw w/nylon Washer #84397 #10-32 Clip Nut #2232X Hole Plug 4

4. Unpacking a Factory Assembled Enclosure WARNING! Use two or more people to unpack and de-skid an enclosure. The shipping weight of the enclosure can range from 200 to 500 pounds, depending on the size and configuration of the enclosure. Use extreme caution in the de-skidding process to ensure safety. If a Paramount enclosure is to be populated with electronic equipment and then re- shipped to another location, the use of a Heavy Duty Pallet is recommended. (See page x.) The standard shipping pallet shown below in figures x and x is intended for the shipment of an empty enclosure. STANDARD SHIPPING PALLET 1. Immediately inspect all shipping containers for evidence of physical damage. If a shipping container is damaged, immediately contact your Wright Line sales representative and request the carrier s agent to be present when the unit is opened. Keep all of the contents and packaging material for the agent s inspection. 2. Carefully remove the packaging material. Cut the plastic wrap along one of the corrugated corner protectors to avoid damage to the unit. 3. If this unit has a ramp built into the pallet, remove the ramp by lifting it upward out of the slots in the pallet. See figure x. 4. Place the ramp into the open end of the pallet. Make sure that the beveled edge of the ramp is resting on the floor. See figure x. 5. Use two or more people to move the enclosure off of the pallet. Do not push on the center of doors or side panels. See figure x. 6. Do not use a walking method pushing side-to-side on the enclosure to move it to its final position. Always transport an un-packaged unit with a two-wheel dolly. Use blankets or cardboard to protest the surfaces of the enclosure. Enclosure Ramp Shipping pallet Ramp Bevel Figure 1 Figure 2 5

HEAVY DUTY SHIPPING PALLET WARNING! An enclosure that is going to be populated with electronic equipment and then reshipped on the heavy duty pallet should be specified to have casters. Do not attempt to move a loaded enclosure off of the heavy duty pallet unless the enclosure is equipped with casters. 1. Immediately inspect all shipping containers for evidence of physical damage. If a shipping container is damaged, immediately contact your Wright Line sales representative and request the carrier s agent to be present when the unit is opened. Keep all of the contents and packaging material for the agent s inspection. 2. If this unit has a ramp built into the pallet, remove the strap that holds the ramp in place. Save the strap for reuse if the enclosure is going to be reshipped on the heavy duty pallet. See figure x. 3. Carefully remove the corrugated packaging material. Avoid damaging the packaging material if the enclosure is going to be reshipped on the heavy duty pallet. 4. Place the ramp fittings into the holes in the front edge of the pallet. See figure x. 5. Remove the shipping brackets from the front and rear of the enclosure. A 3/8 and 9/16 wrench is required. 5. Use two or more people to roll the enclosure off of the pallet. Do not push on the center of doors or side panels. See figure x. Enclosure Corrugated packaging Ramp Ramp Band Ramp Pin Hole Figure 1 Heavy duty pallet Enclosure Figure 2 Screws Shipping bracket Figure 3 Figure 4 6

UNPACKING A FACTORY ASSEMBLED PTOC ENCLOSURE 1. Follow the unpacking and de-skidding instructions in the Standard Shipping Pallet section on page x. 2. To allow the PTOC enclosure to be rolled off of the shipping pallet, the rear PTOC frame is attached in a shipping position. The shipping position of the rear PTOC frame is approximately 1 higher than the normal functional position of the frame. 3. Unlock and open the rear door. Locate the six screws that attach the rear PTOC frame to the enclosure frame. Loosen the six screws to allow the rear frame to drop down to the functional position. Then re-tighten the screws. See figure 7. PTOC frame Screw Move down Figure 7 7

5. Site Requirements For Standard Enclosures Enclosure Space Requirements Select a location for the enclosure that will provide adequate room for opening doors and side panels, and operating and servicing slide-out electronic products. The enclosure must be positioned so that there is unrestricted air movement for all ventilated surfaces. Enclosure Dimensions Enclosure heights: 77.00, 84.00 and 96.00 Enclosure width: 24 wide rack: 24.00 30 wide rack: 30.00 48 wide rack: 48.00 inches (no additional width is gained when ganging racks together) Side Panels: add.56 (9/16 ) to the enclosure width for each Side Panel Enclosure frame depths without doors: 34.50 and 39.25 (excluding trim) Enclosure depth with doors: 40.06 and 44.80 (includes door handles) Floor Loads Each enclosure bay, when loaded to its maximum capacity, can weigh up to 2500 lbs. (The actual weight can vary somewhat, depending on the actual component selection.) Each enclosure bay is supported on four leveling glides. Each glide has a floor contact area of 1.1 square inch. WARNING: IT IS THE CUSTOMER S RESPONSIBILITY TO ENSURE THAT THE FLOOR HAS A STRUCTURAL LOAD CAPACITY THAT WILL SAFELY BEAR THE WEIGHT OF THE PARAMOUNT ENCLOSURE SYSTEM. 8

6. Site Preparation for PTOC Enclosures A 5 x 20 hole must be cut into the raised floor tile to allow cool air to flow into the PTOC enclosure s bottom front fan unit. To ensure structural integrity of the tile, the edges of the hole must be a minimum of 2 from the edges of the tile. Refer to figure 8 for the dimensional location of the hole relative to the enclosure frame. After the PTOC enclosure is positioned and stabilized, additional adjustments are required. See page x. 5 2 2 20 Extension Frame 2 Toe Plate Figure 8 9

7. Setting Up Factory Assembled Enclosures STABILIZING AND GANGING THE PARAMOUNT ENCLOSURE WARNING! All enclosure racks must be stabilized before installing any accessory or electronic device into the rack. Failure to stabilize an enclosure before installing equipment may cause the enclosure to tip over. WARNING! Never extend a roll-out type electronic device or accessory from an enclosure rack that is supported by casters, unless the enclosure has been stabilized as described below. Doing so may cause the enclosure to tip over. The Paramount enclosure must be positioned on a reasonably level, solid floor surface. After positioning the enclosure in its intended position, use one or more of the following procedures to stabilize a Paramount enclosure. 1. For all enclosures, including enclosures with casters, always extend the enclosure s four leveling feet until they all firmly contact the floor. Use the leveling feet to level enclosures that are on an uneven floor. See figure 9. 2. Additional stabilization may be gained by anchoring the enclosure(s) to the floor. See figure 10. 3. Additional stabilization may be gained by fastening two or more adjacent enclosures together (known as ganging). See figure 11. 2. It is recommended that all single (non-ganged) enclosures that are not bolted to the floor be equipped with an extendable Anti-tip Stabilizer Foot. See page x. LEVELING THE ENCLOSURE Each enclosure is equipped with four leveling feet. Use the 1-3/8 wrench supplied with this Installation Manual to adjust the leveling feet. Ensure that each foot is in firm contact with the floor. Using a spirit level, adjust the leveling feet as required to level the enclosure. For enclosures that have casters, extend the leveling feet so that the casters are approximately 1/8 off the floor. Leveling foot Figure 9 10

ANCHORING THE ENCLOSURE TO THE FLOOR Holes are provided in the bottom cross member of the enclosure frame for threaded anchor rods. The anchoring hardware required will depend on the type of floor. Consult your facility engineer or a Wright Line installation representative for anchoring advice. Optional insulation hardware is available to electrically isolate your enclosure from the floor. Nut Insulation washer (optional) Base frame Flat washer Anchor bolt Isolating leveler (optional) Base frame Figure 10 11

GANGING THE ENCLOSURES Vertical Cabinet Dividers must be installed before ganging adjacent enclosures frames together. Refer to page x for Vertical Cabinet Divider instructions. Standard Ganging (Non-electrically Isolated) 1. Position and level the adjacent enclosure frames. Ensure that the frames are precisely aligned both vertically and front-to-back. 2. Bolt the adjacent frames together with six 5/16-18 x ½ button head cap screws and 5/16-18 locking nuts. See figure 11. 3. The enclosures top trim channels may be loosened and aligned if required. 4. Insert filler strips between adjacent frames, one at the front and one at the rear. See figure 12. 5/16-18 self-locking nuts Vertical cabinet dividers (Install before ganging frames. See page 34.) 5/16-18 x 1/2 button head cap screws Enclosure uprights (top view) Top trim channel Filler strip Figure 12 Enclosure frames Figure 11 12

Optional insulation hardware is available to electrically isolate adjacent frames. To electrically isolate enclosure frames 1. Install plastic plug bumpers into the sides of each adjacent enclosure top panel. See figure 13. Ensure that the bumpers are staggered as shown so adjacent bumpers do not oppose one another. 2. Gang adjacent enclosure frame together using the isolation hardware kit. See figure 14. 3. Insert filler strips between adjacent frames, one at the front and one at the rear. See figure 12. Enclosure top panel Plastic plug bumpers Enclosure top panel Figure 13 Enclosure uprights (top view) Shoulder washer Washer Shoulder washer Washer 1/4-20 self-locking nuts Isolation pad 1/4-20 x 3/4 pan head machine screw Figure 14 13

GROUNDING THE ENCLOSURE Grounding points are provided on of the major Paramount components so that they an be electrically bonded to the enclosure frame. See figure 15. Figure 15 14

USING THE RACK MOUNT RAILS All Paramount Rack Mount Rails are adjustable, so that they can be positioned to accommodate the specific depth requirements of a various servers and other electronic devices. Simply loosen the wing knobs and slide the rails to the desired position, and then re-tighten the knobs. See figure 16. All Rack Mount Rails have printed numbers next to the EIA hole pattern. Each number indicates an industry standard U space. See figure 17. Some Rack Mount Rails have an EIA pattern of 3/8 square holes. Mounting equipment to this type of rail requires the use of #10-32 or #12-24 threaded cage nuts. When installing cage nuts, they should be oriented with their gripping ears engaging the vertical edges of the square holes. See figure 18. Wing knob EIA hole pattern Rack mount rail Figure 16 Figure 17 Cage nut Rack mount rail Figure 18 15

WIRE MANAGEMENT Integrated Cable Troughs Integrated Cable Troughs are built into the top structure of the Paramount enclosure frame. The continuous troughs allow uninterrupted passage of cables between adjacent ganged enclosures. Access ports in the troughs allow passage of cables into the enclosure. To gain access to the troughs remove the segmented snap-on covers. See figure 19. Cable Rings Mounting holes for cable rings are punched into most of the Paramount enclosure frame members. Assemble each Cable Ring with two #10 x 3/8 Phillips pan head self tapping screws. See figure 20. Cable Pass-Thru Bushings Cable ports are punched into the Paramount frame members to allow passage of cable into, and between adjacent frames. Snap bushings into the cable ports before running wires. See figure 21. Segmented snap-on cover Cable ring Cable trough #10-24 x 3/8 phillips pan head self-tapping screws Figure 19 Pre-punched holes Figure 20 Frame member Cable pass-thru bushing Figure 21 16

8. Field Assembled Enclosure Frames TO ASSEMBLE A PARAMOUNT ENCLOSURE FRAME If your enclosure requires casters, for convenience they can be assembled to the enclosure base before the entire frame is assembled. See page x. 1. Slide two left handed and two right handed corner posts onto the base frame. Loosely attach each corner post to the base frame with four ¼-20 x 5/8 button head cap screws. See figure 22. 2. Position the top frame onto the top of the uprights. Loosely attach each corner post to the top frame with four ¼-20 x 5/8 button head cap screws. See figure 23. 3. Now tighten all of the screws. A 5/32 allen wrench is supplied with this instruction packet. The frame must be held square while the assembly screws are being tightened. The preferred method to check squareness is to take diagonal measurements of the frame. The frame is square when the diagonal measurements are equal. See figure 24. 4. Assemble two center rails, one to each side of the frame, with #10 x ½ phillips flat head self tapping screws. See figure 25. 5. Assemble each kick plate to the base frame with two #10 x 3/8 phillips pan head self tapping screws. See figure 26. Corner upright (L.H.) Corner upright (R.H.) Top frame Base frame Upright 1/4-20 x 5/8 button head cap screws 1/4-20 x 5/8 button head cap screws Figure 23 Figure 22 17

Figure 25 Figure 24 Base frame Bottom Trim plate #10-24 x 3/8 phillips pan head self tapping screws Slot Bracket tab Figure 26 18

HEAVY DUTY CASTERS Assemble one caster bracket to each corner of the base frame. Use four ¼-20 x ½ hex head self tapping screws for each bracket. Note the position of the side flange of the bracket in figure 27b. The flange should be positioned on the outside of the frame as shown. Position one flange on the Mounting bracket behind the rack mount rail track flange. 1/4-20 x 1/2 hex head self tapping scews Caster/Mounting bracket assembly Caster/Mounting bracket assemblies Base frame Figure 27a Figure 27b 19

INTERMEDIATE FRAMES FOR 48 WIDE ENCLOSURES An Intermediate Frame is used to divide a 48 wide enclosure into two 24 wide sections. Each 24 wide section will accommodate the same doors and internal components that would normally be used on a standard 24 wide frame. 1. Remove all of the door latching hardware and bumpers from the 48 wide frame, (if applicable). 2. Assemble the two intermediate frame posts to the 48 wide frame. Use eight ¼-20 x ½ hex head self tapping screws for each post. See figure 28. 3. Assemble four rail mount brackets to the intermediate frame posts, two at the top and two at the bottom, with #10 x 3/8 phillips pan head self tapping screws. See figure 29. 4. Assemble two center rail brackets to the intermediate posts with #10 x ½ phillips flat head self tapping screws. See figure 29. Rack mount rail bracket Center rail bracket 1/4-20 x 1/2 hex head self tapping screws Intermediate frame post Intermediate frame post #10 x 1/2 phillips flat head self-tapping screws Intermediate rail bracket Figure 28 Figure 29 (frame not shown for clarity) 20

9. Field Assembled Components TOP PANELS Loosen the factory installed top panel attachment screws so that they are protruding 1/8. Lower the top panel into place and then tighten the screws. See figure 30. Top panel Slots Factory installed attachment screws Figure 30 LOCKING SIDE PANELS 1. Loosely assemble the side panel top cap to the enclosures corner posts using four #10 x ½ phillips flat head self tapping screws. Adjust the top cap so that it aligns with the front and rear top trim channels, and then tighten the four screws. See figure 31. If necessary, loosen and adjust the top trim channels to aid in the alignment of the top cap. 21

2. From the inside of the enclosure, fasten the top cap with #10 x ½ phillips pan head screws (2 are required on 34 deep frame 3 are required on the 40 deep frame). See figure 29. 3. Install two latches into each corner post. See figure 31. 4. Engage the side panel s bottom hooks into the slots in the corner posts. Verify the alignment of the latches and adjust as required. Push on the side panel to engage the latches. See figure 32. Latch Side panel Slot Bottom hook Figure 32 22

ENCLOSURE DOOR FRAMES 1. Assemble the door hinges to the enclosure corner post with ¼-20 x ½ hex head self tapping screws. Position the hinges flush with the inner surface of the corner post. See figure 33. 2. Retract and lock the hinge pins on each hinge. See figure 34. 3. Position the door onto the hinges then release and engage all of the hinge pins to retain the door. See figure 35. 4. Loosen and adjust each hinge as required to align the door frame with the enclosures corner posts. Door hinge (pins retracted) Hinge flush with edge of upright Door hinge 1/4-20 x 1/2 hex head self-tapping screws Door Figure 33 Figure 34 Door hinge (pins released) Figure 35 23

5. Install the door latches into the corner post. See figure 36. Adjust the male portion of the latch to smoothly engage the female latch. 6. Assemble a lock strike to the corner post adjacent to the door lock. Use two #10 x 3/8 phillips pan head screws. See figure 37. #8 x 1/2 phillips pan head sheet metal screw Spacer Latch #10-24 x 3/8 phillips pan head self-tapping screws Door Corner upright Lock strike Lock cam Door Figure 37 Figure 36 24

DOUBLE DOORS FOR 48 WIDE ENCLOSURES 48 wide double door sets cannot be used on a 48 wide enclosure frame that has intermediate uprights installed. If intermediate uprights are installed, use standard individual door frames. The door latching mechanisms for double door sets are typically shipped pre-assembled to the top and bottom enclosure frames. 1. Assemble both door frames following steps 1, 2 and 3 in the preceding section. The door with the locking mechanism should be on the right. 2. Loosen and adjust the two double door frames so that they are aligned with the enclosure s corner posts and there is parallel 9/32 gap between the door frames. 3. Loosen and adjust the roller catch mechanisms on each door for smooth engagement. The doors should be held firmly against the rubber door bumpers. See figure 38. Roller catch Door bumper (Actual size template) Door Figure 38 25

DOOR FRAME INSERTS Three types of door frame inserts are available: fully perforated, partial perforation with a plexiglass insert, and a fan insert. All door frame inserts have the same basic installation procedure. Fasten the insert into the door frame with #10 x 3/8 phillips pan head self tapping screws. See figure 39. Door frame #10 x 3/8 phillips pan head screws Door frame insert Figure 39 26

SPLIT REAR DOORS 1. Assemble the door hinges to the enclosure corner posts with ¼-20 x ½ hex head self tapping screws. Position the hinges flush with the inner surface of the corner post. See figure 40. 2. Retract and lock the hinge pins on each hinge. See figure 41. 3. Position the door onto the hinges then release and engage all of the hinge pins to retain the door. The door with the lock should be on the right. See figure 42. 4. Loosen and adjust each hinge as required to align the doors. There should be a parallel 1/8 gap between the doors, and the tops of the doors should be aligned. See figure 43. Door hinge (pins retracted) Hinge flush with edge of upright Door hinge 1/4-20 x 1/2 hex head self-tapping screws Door Figure 40 Figure 41 Door hinge (pins released) 1/8 gap Split rear doors Aligned Lock Figure 42 Figure 43 27

5. Assemble two latch strikes, one to the top trim channel and on to the bottom kick plate, with #10 x 3/8 phillips pan head self tapping screws. See figures 44 and 45. 6. Adjust the roller catches on the right hand door so that the door closes smoothly, yet is firmly retained against the door bumpers. See figure 46. Top trim channel #10 x 3/8 phillips pan head self tapping screws Lock strike Lock strike #10 x 3/8 phillips pan head self tapping screws Figure 44 Kick plate Figure 45 R.H. door Roller catch Figure 46 28

ANTI-TIP STABILIZER FOOT 1. Fasten the Stabilizer Foot guide channel to the base frame with four ¼-20 x ½ hex head self tapping screws. See figure 45. 2. Install an edge liner to the bottom edge of each guide slot. See enlarged detail. 3. Fasten the left and right kick plates to the base frame with #10 x 3/8 phillips pan head self tapping screws. See figure 45. 4. Slide the Stabilizer Foot through both guide holes. Install one #10 x 3/8 phillips pan head self tapping screw into the end of the tube. See figure 46. 5. Slide the Stabilizer Foot all the way out. Adjust the contact screw so that it contacts the floor. See figure 46. Edge liner 1/4-20 x 1/2 hex head self-tapping screws Extension foot guide channel L.H. Partial kick plate Base frame #10-24 x 3/8 phillips pan head self-tapping screws R.H. Partial kick plate Figure 45 #10-24 x 3/8 phillips pan head self-tapping screw Guide plate Extension foot tube Contact screw Figure 46 29

RACK MOUNT RAILS 1. Loosely install ¼-20 carriage bolts, washers, and wing knobs into the rectangular mounting holes in the rails. See figure x. Longer rails typically have 3 mounting points; shorter rails have 2 mounting points. Reducer style rails require 4 carriage bolts instead of the standard 1 bolts. Rails that are to be installed into Network style enclosures require a stand-off spacer and a 4 bolt at the center mounting position. See figure x. All Rack Mount Rails have printed numbers next to the EIA hole pattern. Each number indicates an industry standard U space. Orient the rails with the lower numbers towards the bottom. Interior mounted divider panels should be installed before installing rack mount rails. See page x. Frame mounted cable management kits should be installed before installing rack mount rails. See page x. 2. Engage the carriage bolt heads into the guide slots in the enclosure s rail brackets. Slide the rails into position and then tighten the wing knobs. 1/4-20 carriage bolt Rack mount rail bracket Guide slot 1/4-20 carriage bolt Washer Wing Knob Spacer Rack mount rail Network rail bracket Figure 47 Figure 49 Figure 48 30

RACK MOUNTED FIXED SHELF 1. A Rack Mounted Fixed Shelf requires 1 U space. Using the numbers on the rails as a guide, locate the three holes that define a U space at your desired shelf level. If your rails have a 3/8 square hole pattern, then snap three #10-32 clip nuts onto each rack mount rail at the same U level. Clip nuts are not required on rails with pre-threaded EIA holes. See figure 50. 2. Assemble four shelf brackets to the shelf with #10 x 3/8 phillips pan head self tapping screws. Adjust the position of the brackets to match the outside measurement of your rail spacing. See figure 51. 3. Fasten the shelf to the rails using #10-32 x ½ phillips pan head machine screws. See figure 52. Rack mount rail Use this hole Use this hole Use this hole EIA hole pattern 1-1/4 (1.25 ) Clip nuts Figure 50 Lock nuts Clip nuts #10-24 x 3/8 phillips pan head screws Fixed shelf Fixed shelf Shelf bracket Figure 51 Adjust brackets as required #10-32 x 5/8 Screw w/nylon washer 31 Figure 52

RACK MOUNTED ROLL-OUT SHELF WARNING! The enclosure rack must be stabilized before installing any roll-out type accessory component or electronic device into the rack. Failure to stabilize the rack before installing equipment may cause the enclosure to tip over. See page x. 1. Refer to figure 53 and then using the numbers on the rails as a guide, locate the four holes that define your desired shelf level. If your rails have a 3/8 square hole pattern, then snap four #10-32 clip nuts onto each rack mount rail at the same U level. Clip nuts are not required on rails with pre-threaded EIA holes. See figure 53. 2. Disengage the Slides from the roll-out shelf. The Chassis Disconnect Slide member will remain fixed to the shelf. See figure 54. 3. Adjust the rear slide brackets to accommodate the front-to-back measurement of your rack mount rails. EIA hole pattern Rack mount rail Use this hole Use this hole Use this hole Use this hole 1-3/4 (1.75 ) Clip nuts Figure 53 Roll-Out shelf R.H. Slide Push in to disengage Pull to disengage Figure 54 R.H. Chassis member 32

4. Loosely assemble each slide to the rails with eight #10-32 x ½ phillips pan head machine crews. See figure 55. 5. Re-engage the shelf into the cabinet mounted slides. Push the roll-out shelf in until each slide locks with an audible click. See figure 55. 6. Tighten all of the screws and test the shelf for proper function. #10-32 x 1/2 phillips pan head screws Slide assembly Roll-Out shelf Figure 55 33

ENCLOSURE VERTICAL DIVIDER PANELS Exterior Mounted Vertical Divider Panels Position the divider panel against the outside of the enclosure s corner posts and fasten with six #10 x 3/8 phillips pan head self tapping screws. See figure 56. Cover Exterior vertical cabinet divider #10-24 x 3/8 phillips pan head self-tapping screws Figure 56 Interior Mounted Vertical Divider Panels Position the divider panel against the inside of the enclosure s corner posts and fasten with two #10 x 3/8 phillips pan head self tapping screws. See figure 57. #10-24 x 3/8 phillips flat head self-tapping screws Interior vertical cabinet divider Enclosure frame Interior vertical cabinet divider Figure 57 34

COLOCATION ENCLOSURE DIVIDER 1. Install three #10 x 3/8 phillips pan head self tapping screws into each center rail bracket. Leave the screws protruding 1/8. See figure 58. 2. Lower the Colocation Enclosure Divider onto the screws. Then tighten the screws. See figure 58. Horizontal cabinet divider Center rail bracket #10-24 x 3/8 phillips pan head self-tapping screws Center rail bracket Figure 58 BOTTOM PANEL Use four #10 x 3/8 phillips pan head self tapping screws to attach the Bottom Panel to the bottom frame of the enclosure. See figure 59. #10-24 x 3/8 phillips pan head self-tapping screws Bottom panel Figure 59 Base frame 35

VERTICAL CABLE MANAGER 1. Loosely install a ¼-20 carriage bolt, washers and wing knob into the two rectangular mounting holes in the cable manager. See figure 60. 2. Engage the carriage bolt heads into the guide slots in the enclosure s rail brackets. Slide the cable manager into position and then tighten the wing knobs. See figure 61. 3. Assemble the cable rings to the cable manager with #10 x 3/8 phillips pan head self tapping screws. See figure 62. 1/4-20 carriage bolt Vertical cable manager Wing Knob Washer Figure 60 Rack mount rail bracket Guide slot #10 x 3/8 phillips pan head screws Vertical cable manager Cable ring Figure 61 Figure 62 36

PANDUIT STYLE CABLE MANAGER The Panduit CMBRC5 style cable manager can be assembled to any standard EIA hole pattern. Use three 10-32 phillips pan head machine screw for each manager. Rack mount rails with 3/8 square holes will require 10-32 cage nuts. See figure 63. Rack mount rails that are installed into the Network style enclosure frames have a separate pattern of holes adjacent to the standard EIA holes for mounting the Panduit cable manager. See figure 64. Network style enclosure Rack mount rail Cage nuts Cable manager #10-32 phillips pan head machine screws Cable manager #10-32 phillips pan head machine screws Figure 63 Figure 64 Network style enclosure 37

RACK MOUNTED FRONT-TO-BACK CABLE RING BRACKET The Rack Mounted Front-to-Back Cable Ring Bracket cannot be assembled to Network style rack mount rails. Assemble the Rack Mounted Front-to-Back Cable Ring Bracket to the rack mount rail using two #10-32 clip nuts and two #10-32 x ½ phillips pan head machine screws. See figure 65. Rack mount rail 1-3/4 (1.75 ) Rack mount front-to back cable ring bracket Cable ring Clip nuts Figure 65 #10-32 x 1/2 phillips pan head screw #10-24 x 3/8 phillips pan head self-tapping screws RACK MOUNTED CABLE RING RUN Assemble the Rack Mounted Cable Rin Run to the rack mount rails using four #10-32 clip nuts and four #10-32 x ½ phillips pan head machine screws. (Clip nuts are not required on pre-threaded rails.) See figure 66. Rack mount rail Rack mount cable ring run bracket 1-3/4 (1.75 ) Cable ring Clip nuts Figure 66 38 #10-32 x 1/2 phillips pan head screw #10-24 x 3/8 phillips pan head self-tapping screws

FRAME MOUNTED FRONT-TO-BACK CABLE RING BRACKET Frame mounted components mount directly to the enclosure s corner posts. They do not require rack mount rails. Assemble the Front-To-Back Cable Ring Bracket to the enclosure s corner posts at the desired height with four ¼- 20 x ½ hex head self tapping screws. See figure 67. 1/4-20 x 1/2 hex head self-tapping screws Front-to-back cable ring bracket Corner upright Cable ring #10-24 x 3/8 phillips pan head self-tapping screws Figure 67 39

FRAME MOUNTED CABLE RING RUN Frame mounted components mount directly to the enclosure s corner posts. They do not require rack mount rails. Assemble the Frame Mounted Cable Ring Run to the enclosure s corner posts at the desired height with four ¼-20 x ½ hex head self tapping screws. See figure 68. 1/4-20 x 1/2 hex head self-tapping screws Frame mount cable ring run bracket Corner upright #10-24 x 3/8 phillips pan head self-tapping screws Cable ring Figure 68 40

FRAME MOUNTED FIXED SHELF Frame mounted components mount directly to the enclosure s corner posts. They do not require rack mount rails. 1. Determine the desired height of the Fixed Shelf and then attach two fixed shelf brackets to the enclosure s corner posts using ¼-20 x ½ hex head self tapping screws. See figure 69. 2. Position the fixed shelf onto the brackets with the cable ring mounting holes facing the rear of the enclosure. Attach the shelf to the brackets with four #10-24 x ½ phillips pan head machine screws and four #10-24 lock nuts. See figure 70. Bracket 1/4-20 x 1/2 hex head self-tapping screws Bracket Slots Figure 69 #10-24 x 3/8 phillips pan head screws Fixed shelf platform #10-24 keps locking nuts Figure 70 41

FRAME MOUNTED WORKSURFACE Frame mounted components mount directly to the enclosure s corner posts. They do not require rack mount rails. 1. Determine the desired height of the Fixed Worksurface and then attach two fixed worksurface brackets to the enclosure s corner posts using ¼-20 x ½ hex head self tapping screws. See figure x. 2. Position the worksurface onto the brackets. Attach the worksurface to the brackets with four #10 x 3/4 phillips pan head wood screws. See figure 71. Fixed worksurface #10 x 3/4 phillips pan head wood screws Figure 71 42

FRAME MOUNTED ROLL-OUT SHELF WARNING! The enclosure rack must be stabilized before installing any roll-out type accessory component or electronic device into the rack. Failure to stabilize the rack before installing equipment may cause the enclosure to tip over. See page x. Frame mounted components mount directly to the enclosure s corner posts. They do not require rack mount rails. 1. One left handed and one right handed bracket is included with a Frame Mounted Roll-out Shelf. (The 48 wide Frame Mounted Roll-out Shelf has a double slide bracket to support a higher load.) Orient the brackets so that the slides extend out the front of the enclosure. See figure 72. 2. Install two ¼-20 x ½ hex head self tapping screws into each corner post at the desired shelf height. Leave the screws protruding 1/8. See figure 72b. 3. Engage the brackets onto the screws and then tighten the screws. See figure 72a. 4. Extend the slides. Assemble the roll-out shelf to the brackets with four #10 x 3/8 phillips pan head screws and four #10-24 locking nuts. See figure 73. #10-24 x 3/8 phillips pan head screws Roll-out shelf platform Figure 44b 1/4-20 x 1/2 hex head self-tapping screws Roll-out slide bracket #10-24 keps locking nuts Figure 73 Figure 72a 43

FRAME MOUNTED ROLL-OUT WORKSURFACE WARNING! The enclosure rack must be stabilized before installing any roll-out type accessory component or electronic device into the rack. Failure to stabilize the rack before installing equipment may cause the enclosure to tip over. See page x. Frame mounted components mount directly to the enclosure s corner posts. They do not require rack mount rails. 1. One left handed and one right handed bracket is included with a Frame Mounted Roll-out Worksurface. (The 48 wide Frame Mounted Roll-out Worksurface has a double slide bracket to support a higher load.) Orient the brackets so that the slides extend out the front of the enclosure. See figure 74a. 2. Install two ¼-20 x ½ hex head self tapping screws into each corner post at the desired shelf height. Leave the screws protruding 1/8. See figure 74b. 3. Engage the brackets onto the screws and then tighten the screws. See figure 74a. 4. Extend the slides. Assemble the roll-out worksurface to the brackets with four #10 x 3/4 phillips pan head wood screws. See figure 75. Figure 74b Roll-out worksurface platform 1/4-20 x 1/2 hex head self-tapping screws Roll-out slide bracket #10 x 3/4 phillips pan head wood screw Figure 75 Figure 74a 44

LACING BAR (Text to be determined) 45

10. Side Cable Chase SIDE CABLE CHASE FRAME ASSEMBLY Assemble the cable chase frame laying on its side on the floor. Stand the frame up after assembly. 1. Slide all of the cable chase frame components together as shown in figure x. Then fasten the components together using ¼-20 x 5/8 button head cap screws. A 5/32 allen wrench is supplied with this instruction packet. 2. Assemble the top trim channels to the top of the frame with #10 x 3/8 phillips pan head self tapping screws. See figure x. 1/4-20 x 5/8 button head cap screws Figure xx Cable Chase Frame Leveling feet Cable chase frame Top trim channel #10 x 3/8 phillips pan head self tapping screws Figure xx 46

3. Engage the T shaped tab on the bottom kick plate into the slot in the base frame. Fasten the kick plates with #10 x 3/8 phillips pan head self tapping screws. See figure x. Cable chase frame Slot #10 x 3/8 phillips pan head self tapping screws T shaped tab Kick plate Figure xx 47

GANGING THE SIDE CABLE CHASE 1. Position the cable chase next to the adjacent enclosure frame. Adjust the cable chase leveling feet so that it is precisely aligned with the enclosure frame. See figure x. 2. Bolt the cable chase to the enclosure with four 1/4-20 x 5/8 button head cap screws and ¼-20 locking nuts. Place a spacer on each fastener, between the cable chase and the enclosure frame. See figure x. 3. The cable chase s top trim channels may be loosened and aligned with adjacent enclosure top trim channels if required. Enclosure frame Cable chase frame 1/4-20 locking nuts 1/4-20 x 5/8 button head cap screws Spacer Figure xx 48

SIDE CABLE CHASE DOORS 1. Assemble two hinges to the cable chase corner post with #10 x ½ phillips flat head self tapping screws. See figure x. 2. Position the door onto the hinges and install two hinge pins to retain the door. See figure x. Cable chase corner post Cable chase frame Door hinge Door hinge #10 x 1/2 phillips flat head self tapping screws Figure xx Cable chase frame Door Door Hinge pin Door hinge Figure xx 49

3. Assemble a lock strike to the cable chase corner post with two #10 x ½ phillips pan head self tapping screws. See figure x. 4. Install a female door latch into the cable chase corner post. Loosen and adjust the male portion of the latch for smooth engagement. See figure x. Cable chase frame #10 x 1/2 phillips pan head self tapping screws Lock strike Cable chase corner post Figure xx Cable chase frame Cable chase corner post Female door latch Figure xx 50

SIDE CABLE CHASE VERTICAL CABLE MANAGER 1. Loosely install a ¼-20 carriage bolt, washers and wing knob into the two rectangular mounting holes in the cable manager. See figure x. 2. Engage the carriage bolt heads into the guide slots in the cable chase accessory brackets. Slide the cable manager into position and then tighten the wing knobs. See figure x. 3. Assemble the cable rings to the cable manager with #10 x 3/8 phillips pan head self tapping screws. See figure x. 1/4-20 carriage bolt Vertical cable manager Wing Knob Washer Cable chase accessory bracket Figure xx #10 x 3/8 phillips pan head screws Vertical cable manager Figure xx Cable ring Figure xx 51

4. The Panduit CMBRC5 style cable manager can be assembled to front of the vertical cable manager. Use three 10-32 phillips pan head machine screw for each manager. See figure x. Vertical cable manager Cable manager Cable chase frame #10-32 phillips pan head machine screws Figure xx CABLE SPOOLS 1. Assemble Cable Spool brackets to the Cable Chase Vertical Cable Manager with #10 x 3/8 phillips pan head self tapping screws. See figure x. The full width style cable spool bracket requires two cable managers set at the same depth in the Cable Chase. See figure x. 2. Assemble the Cable Spool to the bracket with two #10 x ½ phillips pan head machine screws. See figure x. 52

CABLE SPOOLS 1. Assemble Cable Spool brackets to the Cable Chase Vertical Cable Manager with #10 x 3/8 phillips pan head self tapping screws. See figure x. The full width style cable spool bracket requires two cable managers set at the same depth in the Cable Chase. See figure x. 2. Assemble the Cable Spool to the bracket with two #10 x ½ phillips pan head machine screws. See figure x. Vertical cable manager #10 x 3/8 phillips pan head self tapping screws Cable spool bracket Figure xx Vertical cable managers Cable spool Full width cable spool bracket Cable spool bracket #10 x 3/8 phillips pan head self tapping screws Figure xx #10 x 1/2 phillips pan head machine screws Figure xx 53

SIDE CABLE CHASE POWER BRACKETS 1. Loosely install a ¼-20 carriage bolt, washers and wing knob into the two rectangular mounting holes in the power bracket. See figure x. 2. Engage the carriage bolt heads into the guide slots in the cable chase accessory brackets. Slide the power bracket into position and then tighten the wing knobs. See figure x. Refer to the Power Distribution Accessories section on page x for installation methods for various power distribution units (PDU s). 1/4-20 carriage bolt Washer Wing Knob Power bracket Figure xx Cable chase accessory bracket Power bracket Figure xx 54

SIDE CABLE CHASE CABLE WATERFALL Assemble the waterfalls to the top of the cable chase frame with three ¼-20 x ¾ phillips pan head machine screws. See figure x. 1/4-20 phillips pan head machine screws Waterfalls Cable chase frame Figure xx 55

11. Power Management Accessories WARNING! To reduce the risk of overload, do not load any Power Distribution Unit (PDU) with more than 80 percent of its rated amperage capacity. WARNING! There must be an non-interruptable safety earth ground from the main power source to the Power Distribution Unit s (PDU) power cord set. Whenever it is likely that ground has been impaired, disconnect the PDU s power cord until the ground has been restored. WARNING! Wright Line s PDU devices are intended for indoor use only. WARNING! Do not use extension cords or adapters with any Wright Line PDU device. SINGLE CIRCUIT PDU PDU Mounting Bracket Installation The PDU mounting brackets can be assembled to the PDU to allow either a horizontal or vertical orientation of the outlets. The horizontal orientation is required for rack mounting, the vertical orientation is required if the PDU is to be mounted to the Front-to-Back PDU Bracket. Orient the bracket as shown in either figure x or x and then assemble the brackets with the provided phillips pan head screws. PDU PDU End tab Figure xx End tab Figure xx 56

FAN TRAY 1. Install nine #10-32 clip nuts to the opening in the top panel fan aperture. See figure x. 2. Attach the power supply cord to the power cord connector on the side of the fan tray. Make sure that the cord is full seated. See figure x. 3. Place the fan tray into the fan aperture. Then position the fan tray cover onto the fan tray, aligning the edges. See figure x. 4. Attach the fan tray and cover to the top panel with nine #10-32 x 5/8 phillips head machine screws. Screws Fan tray cover 6 Cord set Fan tray G-Clips Figure xx Fan top 57

13. Field Assembled PTOC Components PTOC FRONT FRAME Front Plenum Assembly Assemble the front plenum to the door with four #10 x 3/8 phillips pan head self tapping screws. The open end of the plenum should be toward the bottom of the door. See figure x. #10-24 x 3/8 phillips pan head screws Door Front plenum assembly Figure xx 58

PTOC Front Frame Assembly 1. Hold the PTOC front frame in position against the enclosure frame. Use the keyhole shaped slots in the PTOC front frame to identify the appropriate screw holes in the enclosure frame. 2. Install a ¼-20 x ½ hex washer head self tapping screw into each mounting hole. Leave the screws protruding 1/8. See figure x. 3. Engage the PTOC front frame onto the screws. Lower the frame so that the screws seat into the narrow end of the keyhole slots. Then tighten the screws. See figure x. Detail A 1/8 Front frame assembly 1/4-20 x 1/2 hex Washer head screw Detail A Figure xx 1/4-20 x 1/2 hex Washer head screw Keyhole slot Front frame assembly Figure xx 59

PTOC REAR FRAME Rear Plenum Assembly Assemble the rear plenum to the door with six #10 x 3/8 phillips pan head self tapping screws. The open end of the plenum should be toward the top of the door. See figure x. #10-24 x 3/8 phillips pan head screws Door Rear plenum assembly Figure xx 60

PTOC Rear Frame Assembly 1. Hold the PTOC rear frame in position against the enclosure frame. Use the keyhole shaped slots in the PTOC rear frame to identify the appropriate screw holes in the enclosure frame. 2. Install a ¼-20 x ½ hex washer head self tapping screw into each mounting hole. Leave the screws protruding 1/8. See figure x. 3. Engage the PTOC rear frame onto the screws. Lower the frame so that the screws seat into the upper narrow end of the keyhole slots. Then tighten the screws. See figure x. Detail B Rear frame assembly 1/8 1/4-20 x 1/2 hex Detail B Figure xx 1/4-20 x 1/2 hex Washer head screw Rear frame assembly Keyhole slot Figure xx 61

HANGING THE PTOC DOORS WARNING: PTOC doors can be very heavy. Use at least two people to lift and hang the door. The hanging procedure for PTOC doors is the same as for standard doors. Follow the door assembly instructions on page x. SITE PREPARATIONS FOR PTOC ENCLOSURES A 6 x 20 hole must be cut into the raised floor tile to allow cool air to flow into the PTOC enclosure s bottom front fan unit. To ensure structural integrity of the tile, the edges of the hole must be a minimum of 2 from the edges of the tile. Refer to figure x for the dimensional location of the hole relative to the enclosure frame. 62

ADJUSTING THE PTOC ENCLOSURE Adjusting The PTOC Front Fan Tray 1. Remove the bottom front kick plate from the PTOC front frame. (The kick plate may be a either a snap-on style or screw-on style plate.) 2. Loosen the four phillips head screws that hold the fan tray in place. See figure x. 3. Slide the fan tray down until the tray s bottom gasket contacts the floor, then tighten the four screws. The gasket should surround the 6 x 20 hole that was cut into the floor tile. See figure x. 4. Replace the bottom front kick plate. PTOC front frame Screws Kick plate Fan tray Fan tray 63