PEPPER PIKE ARCHITECTURAL BOARD OF REVIEW

Similar documents
Checklist for Minor Plan Modification

Procedure for Obtaining Design Review Committee Approval

Developer Design Review Submittal Requirements - SECTION 5

5.7 Plan Documentation and Supporting Information.

Mailing Address: Fax number: City: State: Zip: Property Owner: City: State: Zip: City: State: Zip:

The Bluffs at Eagle. Design Review Application. Date Bluffs Lot Number Street Address. Address. and/or fax. Address. Owner (if different) Phone

ARB Submittal Package Checklist

Applying for a Site Development Review

CITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP 9611 SE 36 th Street, Mercer Island, WA (206)

SMALL PROJECTS & IMPROVEMENTS: DOG RUNS, PATIO ENCLOSURES & FENCES, EXTERIOR IMPROVEMENTS (Abbreviated Design Review Application)

Checklist for Tentative Subdivision Map

City of Santa Paula Planning Department

What Plans Do I Need for a Building Permit?

SUBMITTAL CHECKLIST ARCHITECTURAL COMMITTEE APPLICATION WOODMOOR HOMEOWNERS ASSOCIATION

DEPARTMENT OF COMMUNITY DEVELOPMENT SITE PLAN INFORMATION

DESIGN REVIEW COMMITTEE AGENDA ITEM

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS

Architectural Design Process

APPLICATION FOR CERTIFICATE OF APPROPRIATENESS IN THE HISTORIC DESIGN REVIEW DISTRICT

City of Miami Planning and Zoning Department UDRB SUBMITTAL CHECK LIST

SITE PLAN APPLICATION

CLIPPER ESTATES HOMEOWNER S ASSOCIATION DESIGN GUIDELINES

Community & Economic Development Department Planning Division Frederick Street PO Box 8805 Moreno Valley, CA SUBMITAL REQUIREMENTS

Certificate of Appropriateness (CoA) Checklist

CHICAGO LANDMARKS PERMIT APPLICATION AND PRE-PERMIT SUBMISSION REQUIREMENTS

APPLICATION DESIGN REVIEW Please Print or Type

CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET

Modifications Committee Guidelines

NEW SINGLE FAMILY HOMES

Home Improvement Application. Type of Improvement

1 copy of all plans in pdf format and I copy of this form must be submitted, or it will be returned because it is an incomplete submittal.

R 1 Design Review Application

Site Plans. City of Hopkins Inspections Division st Street South, Hopkins, MN Fax

SUBMIT YOUR PIC APPLICATION:

DESIGN REVIEW BOARD APPLICATION EXTERIOR PLAN / LANDSCAPE PLAN

I. REQUEST: The undersigned petition the Village of Matteson, Illinois to approve the application(s) submitted.

Example Plans: Business Signs (Not For Construction)

SITE PLAN Application Packet (Required For All Non-Residential Development Projects)

Attachment A HERON RIDGE ESTATES RESIDENTIAL NEIGHBORHOODS PROCEDURE FOR OBTAINING DESIGN COMMITTEE APPROVAL

Architectural Review Application

AHWATUKEE BOARD OF MANAGEMENT ARCHITECTURAL REVIEW COMMITTEE PROCEDURES AND GUIDELINES AMENDED AND RESTATED Dec. 10, 2008 Effective April 1, 2009

DESIGN REVIEW PROCESS AND APPLICATION

CERTIFICATE OF APPROPRIATENESS APPLICATION INSTRUCTIONS AND CHECK LIST

Pacifica San Juan Pearl Site PACIFIC POINT DEVELOPMENT PARTNER, LLC A0.0 THE PEARL PACIFICA SAN JUAN SAN JUAN CAPISTRANO, CA. DEVELOPMENT SUBMITTAL

Owner / Architect Certification of Complete Documentation for the Additions and Remodels Conditional Approval Review

Architectural Review Application New Application Processing Improvements

SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV

City of Del Mar Planning Department Submittal Checklist ADR ADMINISTRATIVE DESIGN REVIEW PERMIT

City of Whitefish Planning & Building Department PO Box E 2 nd Street Whitefish, MT Phone: Fax:

Promontory Architectural Review Committee

Town of Mount Pleasant PRELIMINARY Design Review Submittal Check List June 1, 2014

ADMINISTRATIVE DESIGN REVIEW Information

City of Whitefish 418 E 2 nd St PO Box 158 Whitefish, MT Phone: Fax:

City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA Phone: Fax:

SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT

Niguel Shores Community Association Architectural Committee (AC) EXTERIOR MODIFICATION SUBMITTAL (EMS) FINAL APPLICATION

PLANNING DEPARTMENT SUBMITTAL REQUIREMENTS FOR CONDITIONAL USE PERMITS CLASS 4 DEVELOPMENT REVIEW PROCESS. A. Written Material

CITY OF BURLINGAME - PLANNING COMMISSION SUBMITTAL REQUIREMENTS RESIDENTIAL DESIGN REVIEW

CONSTRUCTION PERMIT APPLICATION

CHECKLIST FOR DEVELOPMENT PLAN REVIEW & SUBDIVISION MAPS

ARCHITECTURAL REVIEW COMMITTEE TOWN APARTMENT CONSTRUCTION SUBMITTAL FORM AND APPLICATION

IMPORTANT ADDITIONAL CONTRACTOR INFORMATION FROM THE OKLAHOMA TAX COMMISSION

INCOMPLETE APPLICATION WILL NOT BE ACCEPTED COMPLETE ALL INFORMATION BELOW. Construction Value: $

Article 4.0 Measurements and Exceptions

Planning Permit Application LAND USE PRELIMINARY APPLICATION (LUP)

For Office Use: Filing Date: Case Number: Zoning District: LIST ALL ADDRESSES INVOLVED IN YOUR PROJECT:

OVER-HEIGHT FENCE/RETAINING WALL CERTIFICATION APPLICATION

Nacoochee Hills Property Owners Association, Inc. PO Box 356 Sautee-Nacoochee, GA 30571

A. ARTICLE 4 SKETCH PLAN REQUIREMENTS, MAJOR SUBDIVISION AND/OR LAND DEVELOPMENT

dpd client assistance memo CAM Plot Plan Requirements Basic Plot Plan What is a Plot Plan?

Conceptual, Preliminary and Final Site Plan Review in Holladay City

TOWN OF HILLSBOROUGH SAN MATEO COUNTY

Landscaping Tutorial

Estimated Cost of Project Contractor License No. Contractor Qualifier No.

Please Print Clearly. Applicant s Signature: Date:

MONTECITO BOARD OF ARCHITECTURAL REVIEW

CITY OF DES MOINES, IA PERMIT AND DEVELOPMENT CENTER 602 Robert D Ray Drive Des Moines, IA Phone:

ADMINISTRATIVE REGULATION Governing The Submittal and Review of Unified Commercial/Mixed Use Development Use Permit Applications

CITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS

City of Hamilton INFORMATION FOR CONDITIONAL USE PERMIT

HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review

DEVELOPMENT REVIEW COMMENTS LAND DISTURBANCE PERMIT (LDP) CLEARING CLEARING & GRUBBING GRADING. Date Reviewed by. Project Name

ARCHITECTURAL REVIEW COMMITTEE HOMESITE CONSTRUCTION SUBMITTAL FORM AND APPLICATION

CITY OF CAPE CANAVERAL COMMUNITY APPEARANCE BOARD APPLICATION PACKET

PLANNED SIGN PROGRAM SUBMITTAL REQUIREMENTS

6.05 acres acres Single-family attached

KELLY WEST HOMEOWNERS ASSOCIATION c/o CAS, Inc N. Salem Street Apex, NC Phone: (919) <> Fax: (919)

Applying for a Site Development Review (Sign CVCBD only)

City of Romulus Administrative Review Committee (ARC) Sketch Plan Submittal Checklist and Review Process

LARAMIE COUNTY PLANNING & DEVELOPMENT OFFICE 3966 Archer Pkwy Cheyenne, WY Phone (307) Fax (307)

Operating Standards Attachment to Development Application

INDIGO LAKES HOA ARCHITECTURAL REVIEW COMMITTEE REQUEST FOR MODIFICATION

SUBMITTAL REQUIREMENTS RCV D REJECT PENDING

CHECKLIST THE FOLLOWING INFORMATION AND DOCUMENTATION MUST BE SUBMITTED TO DEVELOPMENT SERVICES BEFORE YOUR APPLICATION CAN BE PROCESSED.

REQUIRED MATERIALS FOR RESIDENTIAL ACCESSORY STRUCTURE PERMITS (Garages, Sheds, and other structures over 200 sq ft or on a permanent foundation)

DEVELOPMENT PERMIT / SPECIAL USE PERMIT or MAJOR MODIFICATION TO ABOVE APPLICATION SUBMITTAL INSTRUCTIONS

NON-RESIDENTIAL DEVELOPMENT

Below is a list of items that are required to accompany the application prior to review by the Architectural Review Committee.

CITY OF EL MIRAGE DEVELOPMENT APPLICATION PROCESS

ARCHITECTURAL GUIDELINES

Transcription:

PEPPER PIKE ARCHITECTURAL BOARD OF REVIEW All structures, fences, or additions must be approved by the Architectural Board of Review (ABR) prior to issuance of a building permit. The purpose of the Board is to evaluate all projects to avoid excessive dissimilarity, or excessive similarity to other buildings; and to avoid inappropriate designs or those which may produce harmful effects on the neighborhood. Additional information about the Board may be found in Chapter 1450 of the codified ordinances of Pepper Pike, available online. Plans will not be reviewed without a representative present at the meeting. Additional requirements apply for Building Dept. review - see Residential/Commercial Submittal Packets. All submissions must include the ABR application and payment as noted. Minimum submission requirements for review: NEW FENCES, submit two sets of the following: Property line survey showing location of fence, house and driveway. Survey may be hand-drawn if replacing an existing fence. or fence more than 4 from property lines. Photos of house Drawings or photos of proposed fence, color, and materials NEW SHEDS, submit two sets of the following: Property line survey showing location of shed, house and driveway. Survey may be hand-drawn if shed is more than 3 from setback requirements. Photos of house

Drawings or photos of proposed shed, with list of colors and materials SIGNS, submit two sets of the following: Site plan showing location of sign and adjacent streets Photos of building for which sign is proposed Scale drawing of sign, indicating dimensions, colors, and construction HOUSE ADDITIONS, submit two sets of the following: All drawings to be accurately drawn to scale. Site plan showing location and shape of house, driveway, property lines, and proposed addition. Land contours should be shown if significant. Indicate landscaping changes 1 = 20 scale or larger Legible full photos of all four sides of the house Floor plan showing existing and new construction 1/4 = 1-0 Full elevation of the main facade of the house where addition will be attached Elevations of all sides of the proposed addition, showing materials 1/4 = 1-0 Samples of new materials if different from existing house NEW HOUSES (minimum two reviews), submit two sets of the following: Schematic site plan showing proposed house, driveway, property lines and tree removal area Photos of adjacent houses and houses across the street Preliminary floor plans of all levels

Preliminary elevations of major facades Final review: All drawings to be accurately drawn to scale Site plan showing location and shape of proposed house, driveway, and property lines. Land contours should be shown. Indicate new landscaping and any large trees to be removed 1 = 20 scale or larger. Submit FOUR sets Floor plans of each level 1/4 = 1-0 Complete final elevations of all sides of the building, showing materials and correct grade along building perimeter 1/4 = 1-0 Samples of all major exterior materials to be used CONDOMINIUMS OR CLUSTER HOMES (minimum three reviews), submit two sets of the following: Conceptual review: Preliminary approval of General Development Plan by Planning Commission Site plan to scale, showing different building types and location of all adjacent buildings, as well as all requirements of Planning Commission submission Photos of adjacent buildings and those across street from development Preliminary floor plans and elevations or renderings of all building types All drawings to be accurately drawn to scale Scale site plan as above with landscape design proposal, nature and size of plantings Scale floor plans and elevations of all building types Color palettes and material selections for each building type Elevation views of development along new and existing streets

Final review: Scale site plan as above, showing final grading and final proposed landscaping, final building type distribution and colors as approved by Planning Commission Scale floor plans and complete elevations of each building showing all materials and features at 1/4 = 1-0 Samples and listing of all major exterior materials to be used Scale drawings or illustrations of entry features, light poles, fences, and any other amenities or features COMMERCIAL OR INSTITUTIONAL BUILDINGS: (minimum three reviews), submit two sets of the following: Conceptual review: Site plan to scale, showing the building shape and location of all adjacent buildings, as well as all driveways, parking areas and conceptual landscaping Photos of adjacent buildings and those across street Preliminary floor plans and elevations or renderings of the building Scale site plan as above with landscape design proposal, nature and size of plantings Scale floor plans and elevations of all building facades Color palettes and material selections Final review: Scale site plan as above, showing grading and final proposed landscaping, final building, parking, and ancillary features 1 = 20 minimum Scale floor plans and complete elevations of all sides of building showing all materials 1/4 = 1-0

Samples and listing of all major exterior materials to be used Scale drawings or illustrations of entry features, light poles, fences, and any other related amenities or features MISCELLANEOUS STRUCTURES DECKS AND PATIOS (if more than 6 above grade), submit two sets of the following: Site plan showing location of deck or patio, shape of house, proximity to property lines. Plan and elevation drawings to scale Photos of affected sides of house POOLS, submit two sets of the following: Site plan showing property lines, location of house and pool and pool deck and fence, and location and screening of pool equipment. Site plan must show distance to neighboring houses and all dimensions for pool and surrounding paving. Fence may be separate submittal or include required info for fence review SIDING MATERIAL CHANGE, submit two sets of the following: Photo of existing siding and full front of house Samples or brochure describing proposed new material and color Drawing to indicate area of siding to be changed MOVING/ADDING/ALTERING WINDOWS OR DORMERS, submit two sets of the following: Photos of affected sides of house, existing windows or dormers Scale drawing of house with proposed change GENERATORS, submit two sets of the following: Site plan drawing showing generator location relative to house If generator is not in rear yard, include photo of location area, show proximity to neighboring houses, and landscape screening