TRILENNIUM STRIKE PLATE INSTALLATION - HAND ROUTING

Similar documents
TRILENNIUM FULL SCOPE (FS) TEMPLATE INSTRUCTIONS

INSTALLATION INSTRUCTIONS REPLACING EXISTING DEADBOLT ASSEMBLY

Entry Mortise Handleset

How To Measure Your Finished Opening

Installation Guide. Cue Front Unit (Code and Key) Cue Front Unit (RFID) Cue Rear Unit (Latch and Bolt)

ED5800 (A) Series. Installation Instructions. Concealed Vertical Rod. Exit Device WARNING

Door Hardware Installation Instructions. For Assistance Call:

* * 98/9950WDC. Fire-Rated Devices include these. additional components. 1-Point Latch (LBL)

Installing Your Electronic Deadbolt

Installation Instructions For The 8850FL Series Mortise eboss

INSTRUCTIONS TS93 GSR PT RIGHT HAND ACTIVE LEFT HAND INACTIVE RIGHT HAND INACTIVE LEFT HAND ACTIVE

Two Panel Frameless Bypass Door

INSTRUCTIONS FOR HIT LOCK MORTISER

ED1300/1300F SERIES CONCEALED VERTICAL ROD DEVICE INSTALLATION INSTRUCTIONS

Please read and understand all instructions before beginning. These instructions cover impact and non-impact aluminum French Door 650/750.

Stage 2: Preparing the door (read in conjunction with Hole Drilling Options on back of Template).

SCHLAGE SENSE. Smart Deadbolt. Installation Instructions. Download the Schlage Sense app to get started!

Before Lock Installation Surface Mount Installation. Door Preparation

Please read and understand all instructions before beginning. These instructions cover the non-impact aluminum French Door 101.

Shim (2) Supplied. Strike Plate. (3) x 5/8" PFHMS or 10 x 1" PFHWS. Top Latch. (3) x 1/4" PRHMS. Latch Cover. (2) 8 x 3/8" PFH AB SMS

LATCHBOLT FILLER PLATE ASA FILLER PLATE A. SINGLE DOOR B. DOUBLE DOOR WITH MULLION C. DOUBLE DOOR WITHOUT MULLION END COVER MOUNTING BRACKET

INSTALLATION INSTRUCTIONS FOR INSTALLING T-SERIES EXTRA HEAVY DUTY LEVER LOCKSET

WOOD DOOR INSTALLATION

SMART ROUTING KIT. Sliding Arm. Perpendicular Stops* Control the movement along the Y-axis. Traveler Two slots for positioning on the Guide Rail

Entry Mortise Lock Set Lever to Lever

INSTRUCTIONS FOR HIT-41 SERIES ELECTRIC STRIKE TEMPLATES WHEN USING POWER TOOLS ALWAYS WEAR EYE AND EAR PROTECTION!!

VYTEX PREMIUM SLIDING GLASS DOOR. Table of Contents. Precautions and Safety 2. Tools Required...3. Inspect and Prepare Door...4

INSTRUCTIONS FOR HIT TEMPLATE FOR ALARM LOCK DL3500 MORTISE LOCK

Installation Manual Flat Track Series

COMBINATION SLOT HEAD FIXTURE

Installing DoorSense August Smart Lock Pro

INSTRUCTIONS FOR HIT TEMPLATE FOR SALTO XS-4 MORTISE & CYLINDRICAL LOCKS

SALICE AIR TEMPLATE KIT

Installation Instructions ED4400, ED4400M & ED4400MA Series Surface Vertical Rod Exit Devices

INSTRUCTIONS FOR HIT TEMPLATE FOR CYLINDRICAL LOCK PREPS

Installation Instructions for 45H & 47H Mortise Locks

SwingSafe Swing-Away Mailbox Support Diagram

Installation Guide. Cue front unit (code and key) Cue rear unit (latch and bolt)

HIT-30 ALUMINUM DOOR SERIES OWNERS MANUAL

Installation Instructions for 45HW & 47HW Electrified Mortise Locks

OVERVIEW. Mounting Post (2 places) Cylinder Cam. Handing Pin

Installation Instructions 50 (06-09) 1-15/32 15/32 21/32. 1/4-20 x 5/8" FHMS or #14 x 1/2" FHWS 1/16 1/4. Floor Plate

Passage Mortise Lock Set Lever to Lever

7110(F), 7170(F)(LBR) Surface Vertical Rod Exit Device Series Installation Instructions

Installation Instruction

Instructions for Prepping an Opening for SOSS Invisible Hinges

P USHbutton 500 series

Evertune ET001F and ET001T Router Template Instructions

SWINGING SCREEN DOOR FIELD INSTALLATION INSTRUCTIONS

Hinge Mortising Jig. One of the make it or break it parts of building a. 6 ShopNotes No. 74

BEST PRACTICE GUIDE. Socket Bases. Working with Concrete Slabs

Installers guide Deadbolt 02.

Installation Instructions

SCHLAGE SENSE. Smart Deadbolt. Installation Instructions. Download the Schlage Sense app to get started!

Installation Instructions 3040 (05-09) 9/16 9/ /32 9/32. Checking Adjustments

Before Lock Installation Surface Mount Installation. Door Preparation. For door thickness measuring between.01" -.91" (0.2 mm - 23 mm)...

D3976 RECESSED EXIT INSTALLATION INSTRUCTIONS

Preference Collection and Treatment Console INSTALLATION GUIDE

Installation Instructions TK-2/3 and TKS-2/3

7210 Surface Vertical Rod Exit Device Installation Instructions. Outside Trim

Acoustical Surfaces, Inc.

3-LITE PATIO DOOR INSTALLATION INSTRUCTIONS

Side Light Frame Pack Assembly Instructions

33/3550AWDC. Fire-Rated Devices include these. additional. components. 1-Point Latch (LBL) Metal Edge Wrap required for 60 and 90-minute applications

NARROW, MEDIUM AND WIDE STILE, THERMASTILE AND DURASTILE. Installation Instructions

Fretboard Wednesday, January 16, :36 PM

Series----SP3600A SHOWER DOOR

Tools Required. * When installing on a fire door, please see instructions below. *

Side Light Frame Pack Assembly Instructions

INSTALLATION INSTRUCTIONS

Preference Slimline 5536 Utility Console

ESA-200 Fixed Sidelite

ESA-100 Fixed Sidelite/Non Breakout

WINDLOAD POST WayneMark 8000, 8100 INSTALLATION INSTRUCTIONS

1200 SERIES 2 PANEL DOOR rev.1 DETAILED INSTALLATION INTRUCTIONS

TOOLS REQUIRED Metal Wood Wood and Metal Screws. #16 Drill #12-24 Tap. 1/8 Drill

CL4500 Installation Instructions

smart hot runner solutions

Endura All-Aluminum Z-Articulating Cap Sill Retrofit Kit for French Doors

Versatrac Bypass Door Units, Conventional and Top Track, 300 and 400 Series

End of Row Doors. Revision Number 1

Model 6100 Illustrated Installation Instructions Contractors Wardrobe

Notification System Installation Guide

Custom Wood Frame Overlay for Glass Doors Installation Instructions

INSTRUCTIONS FOR HIT TEMPLATE FOR BEST 34H-37H MORTISE LOCK

INSTALLATION INSTRUCTIONS

98/ Customer Service # Dogging Key (use to lock down pushbar)

CrossOver X25 Lock Installation Need another copy of these installation sheets? You can download one at

Vanity Installation Instructions

CMT Enlock Jig Owner s Manual

Preference Collection 5580 Treatment Console INSTALLATION GUIDE

INSTALLATION INSTRUCTIONS. UNIT No. 160/760 THIN-LINE SHOWER ENCLOSURE

Assembly Instructions

Ultimate Trilennium Astragal Prehanger Installation Instructions

PRODUCT: LOKI INSTALLATION INSTRUCTIONS. Product is covered by U.S. patents. For more information visit

High Density Sports Storage

SLIDING GLASS DOOR ASSEMBLY INSTRUCTION Series 680/780

Vigilant Cigar Humidor Vault. Assembly Instructions

INSTALLING YOUR NEW SPRING LIFT ARM KIT

INSTRUCTIONS FOR HIT TEMPLATE FOR SCHLAGE AD MORTISE LOCK

Transcription:

OVERVIEW Parts Included in System: Templaco Jamb Right Templaco Jamb Left Templaco Jamb Dust Box Through-Hole All parts above available in Endura Part#: TC- TEMP-TEMPLACO Dust Box Templaco Jamb Dust Box Through-Hole Reinforcing Plate Plate 1/2 Router Bit 5/8 OD Router Guide and Nut Templaco Jamb Right Hand Templaco Jamb Left Hand Additional Parts Required: Router 1/2 Router Bit 5/8 OD Router Guide and Nut Hammer Hand drill Pencil Measuring tape/ Ruler Clamps Plates Reinforcing Plates Dust Boxes 1 of 13

Router Setup In order to make use of Templaco System and not damage them in the process, a 5/8 OD Router Guide must be used. To install 5/8 OD Router Guide, align Nut with opening on router base. Align and insert Guide into the Nut, and tighten until secure. 2 of 13

1. Aligning A. Measure and Mark Lever Centerline. B. Located Centerline Leverbore 3-5/8 Locate the Leverbore centerline on the jamb. Measure 3-5/8 toward the top of the jamb from Lever Centerline and Mark. This is your Plate Centerline. Note Orientation Left Hand 8/0 Top 6/0 Top Center Bottom Right Hand 3 of 13

1. Aligning Cont. C. Align Centerline of with the Center Plate Centerline Mark. Centerline D. Using a Hammer, Secure Locking Pins into Jamb. E. Secure with Claps at each End. Secure to the table to ensure no movement will occur. 4 of 13

2. Routing for the Plate Assembly. A. Set Router Depth to 1/8 B. Route Slots for Plates. Trace the perimeter of the strike template then make several passes across the middle until the entire strike area is removed to the 1/8 depth. CAUTION : Be sure to let the router comes to a complete stop before removing to prevent damage to the template system C. Repeat for All Three Required Locations Left Hand 8/0 Top 6/0 Top Center Bottom 3-5/8 8/0 Top 6/0 Top Center Leverbore Bottom Right Hand 5 of 13

2. Routing for Dust Box Hole C. Remove Clamps and. D. Disengage Locking Pins. Release Clamps securing template to table. Using the claw end of the hammer release locking pins from jamb. 3. Routing for Dust Box Hole A. Install Dust Box. Note: Be sure the red plastic guide sits inside the strike plate cut out. 6 of 13

3. Routing for Dust Box Hole B. Using Hammer, Secure with Locking Pins. C. Secure with Dust Box to Work Table with Clamps. 7 of 13

3. Routing for Dust Box Hole Cont. D. Adjust Router Bit. E. Route Dust Box Hole. Measure and adjust drill bit to 17/16 depth. CAUTION : Be sure to let the router comes to a complete stop before removing to prevent damage to the template system F. Remove. Remove clamps securing template to working surface. Using the claw end of the hammer release locking pins from jambs. I. Repeat Routing for Remaining Locations. Repeat steps A-F for the remaining locations. 8 of 13

4. Mounting Plates A. Assemble Plates. Dust Box Plate 3/4 Screws Attaching Dust Box and Reinforcing Plate Dust Box feet Reinforcing Plate Arms Reinforcing Plate Attach the Dust Box to the Reinforcing Plate. Align the 3 holes on the Plate with the Reinforcing Plate. Orient as shown. Reinforcing plate arms Dust Box Feet The Dust Box feet should align with the groves parallel to the roller. The Reinforcing Plate plate arms should sit inside the Dust Box. B. Attach Plate Assembly to Jamb. Install (2) 3/4 screws into each strike assembly, and leave the 2-1/2 center screw for the field installation 9 of 13

5. Trilennium Compatible Astragal Plate Preparation. The Trilennium Compatible Astragal requires clearance pockets behind the astragal s strike plates in order for the deadbolts to be thrown into the extended position. Without these clearance pockets, the deadbolt will come in contact with the door and will not lock. Correct Application Incorrect Application Deadbolt Deadbolt Astragal Astragal 1/2 1 Panel Panel 10 of 13

5. Trilennium Compatible Astragal Plate Preparation. A. Determine Lever Crossbore Centerline. B. Determine the center strike plate centerline. Measure and determine the passive doors crossbore centerline. Top Measure 3/8 up from the leverbore centerline towards the top of the panel. This is the center strike centerline. Top Center Center 3/8 Lever Crossbore Lever Crossbore 3/8 Bottom Bottom 11 of 13

5. Trilennium Compatible Astragal Plate Preparation. C. Determine the lower strike plate centerline. D. Determine the Upper strike plate centerline. Measure from the center strike centerline down 24-5/16 toward bottom of door and mark. This is the lower strike plate centerline. From strike centerline measure up and mark at: 33-3/32 for 8/0 doors 23-1/32 for 6/8 doors Top Upper Top 8/0: 33-3/32 6/8: 23-1/32 Center Center 24-5/16 24-5/16 Lower Lower Bottom Bottom 12 of 13

5. Trilennium Compatible Astragal Plate Preparation. E. Drill deadbolt clearance pocket. Determine the center point on the upper center and lower strike plate center lines and mark the location. Using a 1 spade bit drill a 1/2 deep hole at each center point. Clear debris from stile. Install Trilennium Compatible Astragal. Upper Top Upper Centerline Top Upper Center Centerline Center Center Lower Centerline Lower Bottom Lower Bottom 13 of 13