RRevo. Written By: Bradley Hanstad TOOLS: PARTS:

Similar documents
Assembly Instructions 10 X 10 Aluminum Roof Support

TRAILMATE METEOR ASSEMBLY MANUAL

Assembly Instructions 10 X 10 Aluminum Frame Building

Thor Audi A4/S4 Skid Plate Installation Instructions

Depending on the size you ordered you will have either 5 Foot sections which will build the 10 Foot frame or 6 Foot sections which will build the 12

This manual will aid in the assembly of the FireBall V90 and FireBall X90. The assembly of both machines will be identical, unless specified.

OPERATIONAL MANUAL V1.0. Removing/Replacing Blades

MAG-CONV Basic, 48, 48R & Midline Front Mount

INSTALLATION INSTRUCTIONS

AndyMark DART 12.

Orbital Test Stand. Operations and Assembly Manual. Department of Mechanical Engineering Northern Arizona University Flagstaff, AZ 86011

Metroboard Pulley Replacement Procedure

Budget Robotics Octabot Assembly Instructions

STEP 1 : DESTROYER FRONT BUMPER INSTALL GATHER YOUR TOOLS AND LAY OUT YOUR PARTS... *shorty bumper to show hardware* Tools Required:

INSTALLATION OF WELLS SUPER QUICK CHUCK LEFT HAND ON BALDOR LATHE

MobileTrak5 Installation Instructions

TOOL LIST FOR TAILGATE HIDDEN LATCH & LINK ASSY FOR FORD FLARESIDE TRUCKS

Installation Instructions for FC2 & FC15 Forward Controls for the Super Magna

JK Rear Inner Fenders

RBP-1215B-RX DODGE RAM QUAD CAB RX3

Thank you for considering "cutting edge technology."

INSTRUCTION BOOKLET #C20

Ford Pick Up Rear leaf Spring Kit Installation Instructions

RPS. XR Front Drive Updates CORPORATION

COYOTE ENTERPRISES, INC. RIMLOC BLAST WHEEL MAINTENANCE & ASSEMBLY MANUAL

Legacy Woodworking Machinery a division of Phantom Engineering. The Legacy CNC. Assembly Manual

Ford Raptor Venom Front Bumper Installation Instructions

Motorized M3 AX7200 Rotary-Style Gasket Cutter Operating Instructions

VERSION 1.0 JANUARY 5, 2013 R2-ATL MOTOR MOUNT KIT ASSEMBLY GUIDE ASTROMECH DRIVE SYSTEM

Workbench Instructions for Assembly

All Terrain Flares 2014 Chevy Silverado

JK TrailGate JK TrailGate

Page 1. SureMotion Quick-Start Guide: LACPACC_QS 1st Edition - Revision A 03/15/16

INSTALLATION INSTRUCTIONS DODGE RAM 2 & 4WD 1500 PART # P5058

ABM International, Inc. Navigator Assembly Manual

OPERATIONS MANUAL. Port-O-Slitter

WILDING WALLBEDS INSTALLATION INSTRUCTION Side Mount

AUTOMATIC ADVANCE MANUAL

Pickup Box Utility Rack Package Installation (Instruction ID: )

15MM LINEAR MOTION SYSTEM

Replacing the Reciprocator on the SWF Compact Series Machine (601C and 1201C)

INSTALLATION INSTRUCTIONS GRILLE GUARD RAM 1500 PART # 5058/5058-2

INSTRUCTION BOOKLET #34. For Wallbed models: KING SIZE SIERRA WITH STORAGE HEADBOARD

PARTS INCLUDED IN FIXED STAIR CABLE RAIL KIT:

Pack Mount Instructions:

INSTRUCTIONS

RC4WD R2 Disconnect Transmission parts replacement guide

The Phoenix. Professional Quilting Frame. Copyright January 1, 2016 Jim M. Bagley, GraceWood, Inc (Reproduction Prohibited) Version 2.

Side Mount INSTRUCTION BOOKLET #C122 BED STYLE: PARK CITY

REPAIR INSTRUCTIONS. Cat. No Cat. No MILWAUKEE ELECTRIC TOOL CORPORATION. SDS Max Demolition Hammer. SDS Max Rotary Hammer

Hardware and Components:

Warnings. Description. Prior to Installation Tools Needed

INSTRUCTION BOOKLET #C21. For Wallbed models: KING SIZE

N. 15th Street, Middlesboro, KY FLIP TARP DUMP BODY INSTALLATION INSTRUCTIONS

Chain Drive Vise. Installation Instructions. (revised 05/04/2016)

INSTALLING YOUR NEW SPRING LIFT ARM KIT

Astro-Physics Inc. 400QMD Lubrication/Maintenance Guide

KIT. Assembly Instructions. HayDay, LLC

Honda Gold Wing GL1800 Floorboards Installation Instructions #GL18020

IDR assembly instructions:

FLIP TARP SINGLE & DOUBLE UNDERBODY TRAILERS

ORTOP Modular Robot v3.0 Arm Assembly

Chain Drive Vise. Installation Instructions. (revised 11/29/2018)

HQ Pole Upgrade Kit for HQ Adjustable Table and HQ QuilTable Assembly Instructions 1

Medium Pro Table Top Stand

RIPPER PEDAL. Bearing / Axle Replacement. ( Disassembly )

Strata. urniture. Adriana Instructions. Parts in the Arm Box: Parts in the Body Box: Watch our assembly videos at

Rugged Ridge Engine Transmission Skid Plate JK

Honda. Pioneer 1000 & U.H.M.W. Skid Plate / Under Armor package. Installation guide

This instruction manual is an in-depth look and explanation of how to assemble and install the Murphy Bed properly and efficiently.

Polaris General 1000 EPS 2016

O W N E R ' S M A N U A L

C L A S S I C. Deluxe. Snow Thrower Cab. Assembly and Care Instructions

TMA812 Tilt Mount Adapter for NEAR A8 and A12 Loudspeakers Installation Instruction Manual


Tools Required: - Utility knife - 11/16 Deep socket - Ratchet - 11/16 Crescent wrench - Ratchet Extension - 1/4 socket - Electrical tape

V4 Premium Kit. Prusa i3 Build Guide

Installing CNC Stepper Motor Mounts On A Sherline Lathe

PROSTEER BALL JOINT REBUILD INSTRUCTIONS V1.0

RC4WD Diablo V2 Instruction Manual

The Mind Project s Iris 1 Robotic Arm. Assembly instructions Step 1

CRP700 Benchtop Basic CNC Machine Assembly Instructions. Updated 10/24/2014 SHEET 1 of 24

JK Rear Crusher Flares

Shapeoko XXL Assembly Guide

Equilibrium. Conference Table. Installation Instruction. Revision B 11/07/16

Horizontal Cable Systems

PRS Retro Z-Axis Installation

FACTORY CAT TOMCAT CORPORATION


Product Instruction Booklet

Hatchback Wing Riser Kit

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS

======================================================================================== ( DR / DR) JK WRANGLER MOD RACK

HQ Studio2 Frame. Assembly Instructions. Table of Contents. What s Included

B B B

Kai Installation Instructions

`48-`56 Ford Pickup Rear leaf Spring Kit Installation Instructions Tech Line:

3/8-16 x 3/4 cap screw. 3/8-16 hex nut for above screws. 1/4-20 x 3/4 socket cap screw. 3/16 short arm hex key (not to scale)

OPERATIONS MANUAL. Port-O-Slitter

HQ Studio2 Frame. Assembly Instructions. Table of Contents. What s Included

Transcription:

RRevo RRevo Robot Kit Version 2 Complete build and setup guide for the RRevo Robot Kit. From 15 pound combat to robot hockey, this kit is designed to be the perfect starting platform to get in the competition with robust parts that are intended to last you into your own designed bot! Written By: Bradley Hanstad TOOLS: Set of standard allen/hex wrenches (1) 2.5mm hex wrench (1) Medium Grit Sand Paper (1) 5/16" nut driver / wrench (1) PARTS: AA Batteries (8) Top cover/plate (1) Armor! (1) Weapon! (1) 2017 rrevo.dozuki.com Page 1 of 19

Step 1 RRevo Robot Kit V2 Robots can be dangerous to yourself and others, always work with others and use personal safety gear at all times to prevent injury. Never test a robot outside of a safety box. DO NOT OPERATE ROBOT OR ATTEMPT TO CHARGE THE BATTERY UNTIL YOU HAVE GONE THROUGH THIS GUIDE AND THE ELECTRONICS/BATTERY CHARGING PORTION OF THIS GUIDE. Step 2 Mock-up You can begin the build by taking the aluminum frame pieces and mock them up so you have a visual on the overall final shape. These pieces all interconnect in a puzzle piece like system relying heavily on the strength of these connections with 6-32 nut strip blocks to lock the frame together. If some of the pieces do not fit or are too snug to lightly tap in with a rubber mallet, sand the edges and faces of the interlocking pieces with medium grit sandpaper. The waterjet process can produce slight offsets and differences frame to frame 2017 rrevo.dozuki.com Page 2 of 19

Step 3 Start with an inner frame rail as shown in the picture. Align a gearmotor with the back of the frame rail piece making sure to position the 10-32 threaded holes face the back of the robot. Use 4 of the M4 1/2" long button head screws to fasten the motor in place. Only tighten these, and ever fastener for the rest of the build, hand tight to allow for wiggle room. 2017 rrevo.dozuki.com Page 3 of 19

Step 4 Repeat with the other inner frame rail Step 5 Take this time to assembly the wheels There are two types of sprockets. One features a bushing that is destined for the deadshaft that is the 3/8" shoulder bolt and free spins on that shaft, the other has a 3/8" bore with keyway Tighten these 8-32 3/4" long screws snug and then 1/2 turn more 2017 rrevo.dozuki.com Page 4 of 19

Step 6 Take one of the 3/8" shoulder bolt and unscrew the nut and obtain five(5) black nylon washers and put them on a motor shaft Next we need to see how the wheel sits on the motor's shaft. You can see that with the keyways lined up you need to get your keystock ground to snugly fit in this position. Traditionally the keystock fits more tightly in the shaft's keyway, but due to some manufaturing quality issues the keystock sits in the opposite position of the sprocket's keyway It can be a little time consuming to properly file/grind/sand the keystock to fit properly in the sprocket, but if building the kit with multiple people this task should be started as the rest of the kit comes together 2017 rrevo.dozuki.com Page 5 of 19

Step 7 Next we will work to link the two inner frame rails using the cross supports Make sure the two small holes that are asymmetric on the cross support rail pieces are facing up or to the top of the robot. The orientation doesn't matter as long as you designate which direction is up. Showing how and where these puzzle cut pieces align and 6-32 nut strip blocks sit in place Step 8 Now align the front facing cross support with it's common position This front can also be moved back to shorten the frame or just the inner compartment Align all 4 main frame rail pieces 2017 rrevo.dozuki.com Page 6 of 19

Step 9 Time to insert all the nut strip blocks and 6-32 button head screws Take note of the two smaller nut strip blocks, as they will be assigned to the "bottom" of the robot 2017 rrevo.dozuki.com Page 7 of 19

Step 10 This process will be repeated throughout the build Insert a nut strip block into a corner keyway Align the holes of the nut strip block with the frame holes on the side rails. Take special note of the orientation by counting the number of threaded holes on the nut strip block Thread in the 3 6-32 button heads to each hole of the frame passing through into the nut strip block Repeat this step for all 8 corners of the frame 2017 rrevo.dozuki.com Page 8 of 19

Step 11 Take the two shorter 2 pieces of nut strip block and fasten them to the center position of the front and back frame rails considered the bottom of the robot The position of these nut strip blocks will be on the opposite side of the 2 asymmetric holes for the front and back frame rails Picture shows the wrong side to put it on, use the side without the extra two holes offset (bottom of picture) Step 12 Using 10-32 socket cap screws, thread in and loosely tighten to secure the gearboxes' additional mounting points. 2017 rrevo.dozuki.com Page 9 of 19

Step 13 Now take the 4 hexagonal standoffs and using 2 per side rail attach them in their positions with the 1/4-20 button heads on the inside of the frame rail Repeat this step to both sides of the robot Step 14 Should now have something that looks like the picture If everything is lined up properly and square, you can take this time to back out screws and use some thread locker for some additional battle hardening. Do not over-tighten screws 2017 rrevo.dozuki.com Page 10 of 19

Step 15 Place the base plate and line up the mounting holes Start with lining up the 6-32 button cap screws by placing one screw in a corner, and go to the opposite corner for the next screw. These screws go through the base plate and into the nut strip blocks. This helps to make sure everything lines up. Step 16 If you haven't yet ground the keystock and fitted it inside the wheel and sprocket, now if the time to do so. Now place five(5) black nylon washers on the drive motor shaft and line up the sprocket and wheel and slide it on so that the sprocket faces the inside of the robot. Note that the keystock should not stick out on either side of the wheel and sprocket union. 2017 rrevo.dozuki.com Page 11 of 19

Step 17 Repeat this for the opposite side Step 18 Depending on how well the frame pieces align, you may need to enlarge some of the outer frame rail holes. Take the 3/8" inner diameter bushing and place it at the back gearbox shaft support hole of the outer frame rail The flange, or lip of the bushing will always face inside or towards the wheels of the robot 2017 rrevo.dozuki.com Page 12 of 19

Step 19 Now remove all the remaining washers from the 3/8" shoulder bolts and slide the bolts through the outer frame rails as shown Insert 4 black nylon washers and then a wheel assembly with a 3/8" bushing installed. Make sure to face the bushing flange towards the inside of the robot or the inner frame rail Add 4 black nylon washers onto the shoulder bolt Step 20 Add 3 black nylon washers to the motor shaft with the keyed wheel assembly (adjust amount of washers as needed) Using your finger to hold the nylon washers in place, align the outer frame rail with the hole for the threads of the 3/8" shoulder bolt as well as the hexagonal standoffs earlier attached to the inner frame rail. 2017 rrevo.dozuki.com Page 13 of 19

Step 21 Temporarily use the 5/16-18" nut to hold the deadshaft in position as you check the alignment with everything Check the alignment at this point and see if any modification is required. The front wheel should spin freely. Remove or add washers as needed Then remove the nut and pull the outer rail away from the frame 2017 rrevo.dozuki.com Page 14 of 19

Step 22 Now take a look at the provided #25 roller chain and find the provided master link Un-clip the master link and slide through the ends of the chain followed by the flange and then the clip The side of the masterlink that has the retaining clip should always face towards the wheel, or away and to the outside of the robot. Step 23 Drape the chain over the sprocket that is attached directly to the gearbox Now loop the chain to the front wheel and as you let it rotate freely, re-align the outer frame rail as you did before. Hand tighten the gold colored 5/16"-18 nut to the deadshaft once more. 2017 rrevo.dozuki.com Page 15 of 19

Step 24 Now use the 1/4"-20 button head screws to fasten the outer frame rail to the standoffs Step 25 Repeat steps 18-24 for the other side of the frame 2017 rrevo.dozuki.com Page 16 of 19

Step 26 Check the chain tension. Depending on manufacturing of chain and the frame offsets you may need to adjust the link amounts of the chain using a combination of removing a link and/or adding a "halflink" Additionally there are holes in the inner and outer frame rails that align that can be used to create chain tensions out of something as simple as UHMW round stock Don't allow the chain to sag too low under the robot or it may catch on something and during combat rip the chain apart Step 27 Now moving on to the inside of the robot, gently place all the components inside the robot to get a feel for where they will sit giving space between them while still allowing you to access as many screws/connections as possible. Temporarily connect the servo lines of the Ragebridge speed controller to the receiver's channel 1 and 2 2017 rrevo.dozuki.com Page 17 of 19

Step 28 Attach the large patch of hook-and-loop to the underside of the battery pack Attach the smaller strip of hook-and-loop to the underside of the Ragebridge Now with the alignment in mind from step 27, attach the other side of the hook-and-loop to the baseplate. Allow the hook-and-loop adhesive to setup before prying apart the components from the baseplate too many times Step 29 Take your main power switch and orientate just as the picture indicates Use two 4-40 screws to attach it to the back of the cross support frame rail. Do not over-tighten these screws. 2017 rrevo.dozuki.com Page 18 of 19

Step 30 Your RRevo robot kit is now fully mechanically assembled! PLEASE watch videos of Electronics hook-up/ Radio Binding/ Battery charging as well as a short video on potential quick modifications. Videos can be viewed at http://www.youtube.com/playlist? list=plc... This document was last generated on 2017-06-24 06:27:58 PM. 2017 rrevo.dozuki.com Page 19 of 19