PROBAD. Code-based Strength calculations of Pressure parts. PROBAD Release January 2018 New Features and Improvements

Similar documents
SIGMA Ingenieurgesellschaft mbh

Calculations per ABS Code along with ASME Sec. VIII Div.1 XXXX

MT-VESS MECHANICAL CALCULATION OF PRESSURE VESSELS

PROPOSAL PAGE 1 OF 5 Revision 3, 4/21/2016. Inquiry: Is it permissible in Section I construction to utilize

Kerkau Manufacturing. B16.5 Flange Book

Chapter VI Vessel Supports

FORM A-1P MANUFACTURER'S DATA REPORT FOR PLATE HEAT EXCHANGERS As Required by the Provisions of the ASME Code Rules, Section VIII, Division 2

0.20. Record Page 1 of 19

TR2000 Piping and Valve Materials under PED. The usage of this standard based on ASME B31.3

SECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING

ISO INTERNATIONAL STANDARD. Petroleum, petrochemical and natural gas industries Shell-and-tube heat exchangers

SECTION VIII. ASME Boiler and Pressure Vessel Code An International Code. Div ision 1 ASME BPVC.VI I I

Essex County College - West Essex Campus Addition And Renovations dlb # / SECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING

This specification describes the minimum requirements for piping systems for the following service:

HSB Global Standards ASME Code Changes and Discussions

A. Compatibility: Products shall be suitable for piping service fluids, materials, working pressures, and temperatures.

Stock Programme Scope of Supply. v

PIPING NOMENCLATURE. Header Branch connection Valve Flange Expansion joint Expansion loop Pipe support Reducer Elbow

High pressure solutions for urea plants

ASME Boiler and Pressure Vessel Code AN INTERNATIONAL CODE VIII. Rules for Construction of Pressure Vessels. Division 1

PV Elite. Quick Start. Version 2013 (15.0) November 2012 DICAS-PE A

SECTION VIII. ASME Boiler and Pressure Vessel Code An International Code. Div ision 2 A lter n ative Ru les ASME BPVC.VI I I.

Fluid Sealing Association

AMPreVA Pressure Vessels and Heat Exchangers

Asme B31 1 Power Piping Design Standard Certification

Learn How to Optimize Heat Exchanger Designs using Aspen Shell & Tube Mechanical

This specification describes the minimum requirements for service water piping systems (ie: cooling water, process water, etc.), located on surface.

Geometry Controls and Report

Engineering Policy & Procedure

bolts: G Cr-1/5Mo (A193 B7) 16 x M20 (EN ISO 4014) MPR GASKET 'SP' PETRO 4,0mm 363 x 323 x 4,5 mm (2 pieces)

ISO INTERNATIONAL STANDARD. Hot-rolled steel sections Part 14: Hot-finished structural hollow sections Dimensions and sectional properties

QUALITY ASSURANCE SPECIFICATION

Advance Steel. Tutorial

Shell-and-Tube Heat Exchangers API STANDARD 660 NINTH EDITION, MARCH 2015


METAL FABRICATION SECTION 8: METAL FABRICATION SCOPE MATERIAL.

ISO INTERNATIONAL STANDARD

Note: Do not bury sulphur dioxide lines Use stainless steel pipe and fittings only where specified on project drawings.

ISO 7438 INTERNATIONAL STANDARD. Metallic materials Bend test. Matériaux métalliques Essai de pliage. Second edition

SCREW THREADS. = minor diameter. d 3. d 2. = pitch diameter

COMPLETE REVISION October Process Industry Practices Piping. PIP PNFJ8000 Jacketed Piping Fabrication and Installation Details

Electrical height adjustment. ... easy & reliable. Multilift II telescope Multilift II. Synchron

This specification describes the minimum requirements for piping systems for the following service:

Alfa Laval Material Standard T

This specification describes the minimum requirements for piping systems for the following service:

ASME B31.3 INTERPRETATIONS NO.9,

DETAILED ENGINEERING OF PROCESS PIPING SYSTEMS

ANSI ORIFICE FLANGES METAL-KOREA

ASME B31.3 INTERPRETATIONS NO. 13

Advance Steel suite 6.1 / SP2

AEROSPACE MATERIAL SPECIFICATION

Table of Contents. What's New in GRAITEC Advance BIM Designers 2018 R2 ADVANCE BIM DESIGNERS CONCRETE SERIES... 4

Annexure - V. Specifications, Typical Drawing & Data Sheet for Split TEE (Hot Tapping Material)

PIP STF05121 Anchor Fabrication and Installation Into Concrete

Installation and Operational Instructions for ROBA -DS couplings Type 95. _ (disk pack HF) Sizes

Dimensioning. Dimensions: Are required on detail drawings. Provide the shape, size and location description: ASME Dimensioning Standards

MEFA mounting accessories

Stepping ahead in technology & innovation PIPING INSTITUTE OF TECHNOLOGY & ANALYSIS SOLUTIONS

This specification describes the minimum requirements for piping systems for the following service:

ISO INTERNATIONAL STANDARD

Designing in the context of an assembly

TECHNICAL CORRECTION October Process Industry Practices Structural. PIP STF05121 Fabrication and Installation of Anchor Bolts

Pressure Vessel FEA Consulting Services

Failure of Engineering Materials & Structures. Code 34. Bolted Joint s Relaxation Behavior: A FEA Study. Muhammad Abid and Saad Hussain

Shell & Tube Heat-Exchangers

UNIT 9b: SCREW FASTENERS Introduction Functions Screw Features Elements Terms of a Thread Profile

ISO INTERNATIONAL STANDARD. Non-destructive testing of welds Radiographic testing of fusionwelded

Microprotol Insight. Microprotol Pressure Vessels and Shell & Tubes Heat Exchangers

WATERFLUX 3000 Quick Start

AVEVA PDMS. Business Benefits. Accurate and clash-free 3D plant design

Module 1G: Creating a Circle-Based Cylindrical Sheet-metal Lateral Piece with an Overlaying Lateral Edge Seam And Dove-Tail Seams on the Top Edge

TECH SHEET PEM - REF / AXIAL THREAD CLEARANCE. SUBJECT: Method for providing adequate axial thread clearance

ISO INTERNATIONAL STANDARD. Non-destructive testing of welds Radiographic testing Part 1: X- and gamma-ray techniques with film

SVENSK STANDARD SS-ISO

RADIOGRAPHIC EXAMINATION PROCEDURE

Coriolis Massflowmeter

Finite Element Analysis per ASME B31.3

ISO INTERNATIONAL STANDARD. Fasteners Torque/clamp force testing. Éléments de fixation Essais couple/tension. First edition

McKissick 380 Series Easy Reeve Crane Blocks

Operating instruction for the quick-change tap holders type:

Welding 2 go. alhuzaim_af [Type the company name] 8/2/2012

WATERFLUX 3000 Quick Start

HEADLINE BUILDING MATERIALS

Modification Of High Precision Tube Roller Mill Tool For Higher Production

US80 ID CLAMPING PORTABLE TUBE AND PIPE BEVELING MACHINE TUBE AND PIPE BEVELING MACHINE

Activating Your Ideas. In Stainless Steel Pipe

Unit4 31. UnitS 39. Unit 6 47

Technical. Toolholding & Tapping. Product Warranty

PARTS LIST. Model MFT-HD Cleco

Product Guide Specification

SECTION THERAPEUTIC POOL ACCESSORIES

INSTALLATION MANUAL IOWA MOLD TOOLING CO., INC. BOX 189, GARNER, IA MANUAL PART NUMBER:

Hours / 100 Marks Seat No.

Pole Mount Installation Manual

2001 Academic Challenge

Fasteners. Bolts. NAPA FastTrack Counter Sales Training Fasteners Page 1. Figure 1. Typical Measurements for a Bolt or Hex Head Cap Screw

International Journal of Advanced Engineering and Management Research Vol. 2 Issue 2, 2017

Standard Specification for Carbon and Alloy Steel Nuts [Metric] 1

The Stamina of Non-Gasketed, Flanged Pipe Connections

Midsteel Flanges & Fittings Ltd

Transcription:

PROBAD Code-based Strength calculations of Pressure parts PROBAD Release January 2018 New Features and Improvements The program system PROBAD is checked and modified continuously within the scope of the maintenance agreement. List of innovations, improvements and corrections of the new PROBAD-Releases ASME I und ASME VIII/1, Edition 2017 ASME B31.1 and ASME B31.3, Edition 2016, and ASME-Piping Series Software Development, Sales and Support Bertha-von-Suttner-Allee 19 59423 Unna, Germany www.rohr2.de / Sales Tel.: +49 (0)2303 332 33-0 Fax: +49 (0)2303 332 33-50 sales.probad@rohr2.de Support Tel.: +49 (0)2303 332 33-45 Fax: +49 (0)2303 332 33-50 support.probad@rohr2.de PROBAD release 2018 Info Page 1

Materials in acc. to ASME II-D, Edition 2017: The following new materials have been integrated into the PROBAD material file: PROBAD Nominal Product Specific. Type/Grade Number Composition Form No Class No. 41618 Cr-8Ni Plate SA-240 304L No. 70316 Cr-12Ni-2Mo Welded Tube SA-249 TP316L No. 704/705 16Cr-12Ni-2Mo Welded Tube SA-249 TP316 No. 70625 Cr-7Ni-4Mo-N Forging SA 182 F53 Materials according to ASME II-D, Edition 2017 A complete documentation of all available materials can be found on the installation-cd under the name ASME_II_Material_A_Edition_2017.pdf (yield strength values) ASME_II_Material_B_Edition_2017.pdf (allowable design stresses) In these documents the sources (pages in ASME II-D) for all materials and modifications compared with the last release are listed. The following new materials have been integrated into the PROBAD material file: PROBAD Nominal Product Specific. Type/Grade Number Composition Form No Class No. 41618 Cr-8Ni Plate SA-240 304L No. 70316 Cr-12Ni-2Mo Welded Tube SA-249 TP316L No. 704/705 16Cr-12Ni-2Mo Welded Tube SA-249 TP316 No. 70625 Cr-7Ni-4Mo-N Forging SA 182 F53 Materials according to ASME B31.1, Appendix A, Edition 2016: Materials according to ASME B31.3, Appendix A, Edition 2016: Materials according to ASME B31.3, Appendix K, Edition 2016: A complete documentation of all available materials can be found on the installation-cd under the name ASME_Material_B31_Ed_2016.pdf In this document the sources (pages in ASME B31) for all materials and modifications compared with the last release are listed. The following new materials were integrated into the PROBAD-Material File: PROBAD Nominal Product Specific. Type/Grade Number Composition Form No. Class Nr. 703 16Cr-12Ni-2Mo Welded Pipe & Tube A 249 TP316L Nr. 704/705 16Cr-12Ni-2Mo Welded Pipe & Tube A 249 TP316 Nr. 492 22Cr-5Ni-2Mo-N Bar A 479 PROBAD release 2018 Info Page 2

ASME I, Edition 2017, Release 4.07 Result Documentation In the new release for ASME I a short and a long documentation of results is available now: The short results are in tabular form and fit on one page usually. The first page of the long results always contains the tabular short form, followed by the detailed results including calculation factors, required wall thicknesses ect. The long form of results can also be demanded including the protocol of the input data. In the results documentation input values are now marked by an asterisk *. Edition 2017: Adjacent openings and Nipple fields ASME I, Edition 2017 now contains clear rules to decide, whether more than 2 adjacent openings have to be regarded as nipple field and thus reinforced via a efficiency factor E: If the reinforcement zone of more than 2 openings overlap and if the center distance between any 2 of these openings is greater or equal 4/3 d, according to PG-38.2 for each 2 openings a common reinforcement calculation according to PG-38.1 is sufficient. If these openings are part of a definite pattern, then according to PG-38.4 the sectional areas between each 2 openings have to be controlled additionally according to Figure PG-38.4-1. However if at least one center distance is smaller than 4/3 d, the reinforcement calculation has to be done either for an assumed opening enclosing all such openings, or according to PG-38.4 the openings have to be regarded as nipple field and thus have to be reinforced via the correspondent efficiency factor E according to PG-52 and PG-53. The new release was modified as follows: If the reinforcement zone of more than 2 openings overlap and if the center distance between at least 2 of these openings is smaller than 4/3 d, a warning is displayed, that these openings have to be calculated either by an enclosing opening or as nipple field. If the reinforcement zone of more than 2 openings overlap and if the center distance between any 2 of these openings is greater or equal 4/3 d, it is pointed out via a hint, that, in case of being part of a definite pattern, an additional check of the sectional areas between each 2 openings has to be done according to Figure PG-38.4-1. In the new release this additional check can be done by entering the type of reinforcement = Nipple field p >4/3 d for these openings. If a nipple field is entered with all center distances greater equal 4/3 d, a hint is displayed, that this nipple field may be regarded as adjacent openings and the reinforcement calculation may be done according to PG-38.1. Mostly this method results in a smaller shell thickness. Edition 2017: Forged flat head In the new release according to ASME I, Edition 2017 a forged flat head according to Figure PG-31 (b-2) with factor C = Max { 0.33 m ; 0.2} is now available. Up to now this type of head was described in Code Case 2697. Rename of orders or drawings Via the menu File > Order > rename or File > Drawing > rename the name and number of an existing order or drawing can now be modified. In the following calculations the new names and numbers are documented. PROBAD release 2018 Info Page 3

Maximum allowable calculation pressure In the new release the maximum allowable pressure is even documented for insufficient dimensions. In this case of source the allowable pressure is less than the calculation pressure. Saturation temperature According to ASME I, PG-27.4, Note 2 for unheated tubes PROBAD determines the allowable design stress for the calculation temperature, but at least for the saturation temperature. In the new release the saturation temperature is documented in the results, if one of the components (header and/or nozzle) was defined as unheated tube. ASME VIII/1, Edition 2017, Rel. 7.07 Edition 2017: Reinforcement according to Appendix 1-9 and 1-10 In ASME VIII, Edition 2017 the Appendix 1-9 and Appendix 1-10 were deleted. Thus the correspondent reinforcement calculation of openings is no longer available in the new PROBAD release. Edition 2017: Calculation in SI-Units For calculations in SI-units those correspondent dimension limits are relevant, which are documented in brackets in the ASME-Code. Edition 2017 now documents more exact bracket values (e.g. in UG-36). These values are checked in the new release now. Edition 2017: Heat Exchangers according to Section UHX In the new release for fixed tube sheet heat exchangers with bellows expansion joints the axial displacement DeltaJ of the expansion joint is now determined according to UHX-16 for all load cases and is documented in the results. Additionally the resulting maximum axial displacement range is documented. Rename of orders or drawings Via the menu File > Order > rename or File > Drawing > rename the name and number of an existing order or drawing can now be modified. In following calculations the new names and numbers are documented. Conical Shell with attached cylinder For conical shells with attached cylinder the limit angle Delta according to ASME VIII/1, Appendix 1-5 or Appendix 1-8 is documented additionally in the results of the new release. Flange Up to now in case of K= A/B > 5 the calculation factors T,U,Y,Z according to Figure 2-7.1 were determined for K = 5 (incl. message). Since ASME VIII contains no explicit limit for K, also for K > 5 the factors T,U,Y,Z are determined via the correspondent formulas in the new release. Up to now in case of h/h0 > 2 the values F,V,FL,VL,f according to Figure 2-7.2 up to 2-7.6 were determined for h/h0 = 2 (incl. message). Since ASME VIII contains no explicit limit for h/h0, also for h/h0 > 2 the values F,V,FL,VL,f are determined via the correspondent formulas of Table 2-6.1 in the new release. In the new release now also metric bolts with small diameter M6, M8 or M10 can be selected. PROBAD release 2018 Info Page 4

Nipple fields In PROBAD ASME VIII up to now for nipples the section UG-45 was not taken into account. But since according to Interpretation VIII-1-15-10 also nipples must have a minimum nozzle neck thickness according to UG-45, the PROBAD calculation was modified. ASME B31.1, Edition 2016, Rel. 4.00 ASME B31.3, Edition 2016, Rel. 2.00 New user interface SIGMA designed a new user interface for the PROBAD modules ASME B31.1 and ASME B31.3. Die entire graphical user interface has been converted to the Microsoft standard interface. All program commands are explained by tooltips. The administration of orders, drawings and data sets has been changed into project files where several orders can be managed in one file. The number of project files is not limited any more. Files can be stored anywhere. The drawings of two (and in the future of all) calculation modules can be managed in one order. Calculation modules can be selected and licensed when the program is executed. PROBAD now supports the import of input files of the previous release and conversion into the new data format. - An unlimited number of orders, drawings and data sets can be integrated into one project file - orders, drawings and data sets from both calculation modules can be migrated into one project file. If possible the inputs of one assembly are combined to one screen page. The inputs of subordinate components (e.g. nozzles ) are shown on the next pages in this case. Already during the input process required input parameters are pointed out. Inputs are checked during the input process and if incorrect they are highlighted and commented by adding a tooltip. Text inputs now can be of unlimited size: if the text amount can t be handled by the calculation process a warning occurs. In this case a shortened text is transferred to the calculation core.,. Reports (output files) can be created in PDF- and RTF- (MS Word) format. Reports can be generated for single components, complete drawings and the list of pressure parts. Th input and the calculation can be carried out in SI units and in US units. Units can be selected independently either in the input process or calculation. The graphical interface can be used in German or English language The material selection dialog has been replaced by a user interface completely equipped with filters and list functions. For each selected material a data specification can be shown and stored in pdf format. The material data sheet can be added to a calculation report ( pdf reports only) Results Documentation In the new release for both PROBAD modules a short and a long documentation of results is available now: The short results are in tabular form and fit on one page usually. The first page of the long results always contains the tabular short form, followed by the detailed results including calculation factors, required wall thicknesses etc. The long form of results can also be demanded including the protocol of the input data. PROBAD release 2018 Info Page 5

ASME-Piping series, Release 1.08 Renaming a project Via the menu File > Project > rename the name and number of an existing project can now be modified. In following calculations the new project name and project number are documented. Material Selection In the selection list for ASME materials the product type of the single materials is only displayed in contracted form. In the new release the complete product form is displayed in a window after marking one of the selection lines. Nozzles The schedules of the wall thickness of the main pipe and of the nozzle are documented in the results now. Flanges according to ASME B16.5 Now according to ASME B16.5, Edition 2017 for Class 150 600 also the standard dimensions of flanges NPS 22 are available additionally. Also for material group 1.18 the rating table at T = 650 C (1200 F) was revised according to ASME B16.5, Edition 2017. Blinds according to DIN 2626 Up to now the thickness of blinds were designed in steps of millimeters or 1/32 inch respectively, if no thickness was entered. In the new release the dimensions according to DIN 2626, Edition 06/2016 are available additionally. ASME VIII, Edition 2017: Reinforcement according to Appendix 1-9 and 1-10 In ASME VIII, Edition 2017 the Appendix 1-9 and Appendix 1-10 were deleted. Thus the correspondent reinforcement calculation of openings is no longer available in the new PROBAD release. PROBAD release 2018 Info Page 6