Anne Arundel County Dept. of Inspections and Permits Water Sewer Plan Checklist

Similar documents
Anne Arundel County Dept. of Inspections and Permits Storm Drain Checklist

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST

Town of Westlake Construction Plans Review Checklist

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST

ACWWA DRAWING SUBMITTAL INFORMATION - UTILITY DRAWING REQUIREMENTS

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS

Sewer Line Extension Permit Design Checklist

Grease Interceptor Design Checklist

Plan Submittal and Review Checklist

Clarifications in italics added July 2018

UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1

CITY OF MUSKEGO DRAFTING STANDARDS

LOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee)

ACSA PLAN REVIEW CHECKLIST (Guideline Only) (4) Standard water and sewer general plan notes (attached).

DEVELOPMENT PLAN CHECKLIST

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST

1.1 GENERAL RECORD DRAWING REQUIREMENTS

Lincoln County Public Works Water and Sewer Submittal Application

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006

Authorized Agent: City of Manassas Check List Attached: Contact: Address: Phone Number: Fax Number: Developer s Name: Phone Number:

Oil-Water Separator Design Checklist

City of Beaumont. Public Works Engineering. Street Improvement Plan Checklist REV 4/18/16

B17. Sewer Site Plans BULLETIN

3. DESIGN SPECIFICATIONS

10010 RECORD DRAWING INFORMATION

MAJOR GRADING PLAN CHECKLIST

September 21, Mannik Smith Group 1771 North Dixie Highway Monroe, Michigan RE: LA Fitness City File No.: CVLP

Minimum Drawing & Electronic Submittal Requirements For Record Drawings /As-Builts

WATER & SEWER CONSTRUCTION SITE PLAN DESIGN SUMMARY COMMERCIAL & RESIDENTIAL

3. The PAC (Permit Application Center) will notify the design professional of plan review results.

NEWTON COUNTY WATER AND SEWERAGE AUTHORITY RESIDENTIAL, COMMERCIAL, INSTITUTIONAL AND INDUSTRIAL SUBDIVISIONS CONSTRUCTION PLANS CHECK LIST

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST

SECTION III SUBMITTALS AND APPROVALS

City of Massillon Site Plan Checklist

B-PERMIT PLAN CHECK MANUAL

Washington County Road Engineering Plan Submittal/Review Checklist

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360)

PRECISE GRADING PLAN CHECKLIST

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

SECTION 9.00 AS-BUILT DRAWING REQUIREMENTS SUB-INDEX

Porter County Plan Commission

MINIMUM DRAWING REQUIREMENTS FOR WATER AND SEWER LINE PROJECTS

List of Figures. List of Forms

APPENDIX 1: CONSTRUCTION PLAN CHECKLIST

SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS

PLANNING AND DEVELOPMENT

APPENDIX K DEPARTMENT OF PLANNING AND CODE ENFORCEMENT SUBDIVISION APPLICATION CENTER SUBMITTAL CHECKLIST

Project Name: County File No.: Checked by: For: Date:

Survey Requirements. Design Guidelines and Standards. June Office of the University Architect

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

STATE UNIVERSITY CONSTRUCTION FUND

PRELIMINARY PLAT CHECK LIST

APPLICATION FOR SITE PREPARATION PERMIT

CHAPTER 3 INFORMATION REQUIRED FOR PUBLIC IMPROVEMENT CONSTRUCTION PLANS TABLE OF CONTENTS

DEPARTMENT OF COMMUNITY DEVELOPMENT SITE PLAN INFORMATION

Guidelines and Checklist For SAWS Sanitary Sewer. Developmental Engineering Division

Charlotte County Utilities DESCRIPTION

CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION:

CITY OF REEDLEY NEW DEVELOPMENT PLAN REVIEW CHECK LIST

Existing and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards.

SUBDIVISION APPLICATION FOR DRT SUBMITTAL PUBLIC WORKS DEPARTMENT

KC Water Rules and Regulations For Water Main Extensions and Relocations

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS

Chapter 13 Plan Submittals

Babcock Ranch Water Utilities as operated by Town & Country Utilities and Babcock Ranch Irrigation

Subdivision Application Checklist

Please type or print legibly using blue or black ink. Incomplete applications cannot be accepted. Project Information. Address or Location:

Community & Economic Development Department Planning Division Frederick Street PO Box 8805 Moreno Valley, CA SUBMITAL REQUIREMENTS

Appendix E-4. City of Fort Collins. Requirements for Utility Plans

CHAPTER 11. Plan Standards

SECTION 2.0 PREPARATION OF MASTER PLANS, CONSTRUCTION PLANS, AND RECORD DRAWINGS

1. Land survey Work. 2. Civil and Structural engineering services.

CONCEPT REVIEW GUIDELINES

DOCUMENT MINIMUM CONSTRUCTION DRAWING REQUIREMENTS FOR PRELIMINARY REVIEW/APPROVAL 1.2. GALVESTON COUNTY CONSOLIDATED DRAINAGE DISTRICT (GCCDD)

TOWN of LAKESHORE SITE PLAN CHECKLIST

SITE PLAN Application Packet (Required For All Non-Residential Development Projects)

Public Works City of Lebanon, Tennessee; Department of Public Works

Section 101. Street Design

Record Drawing Standards for Projects Version 2.1

SECTION SITE SURVEYS

CITY OF DES MOINES, IA PERMIT AND DEVELOPMENT CENTER 602 Robert D Ray Drive Des Moines, IA Phone:

Phone Number: Address:

Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project

Applying for a Site Development Review (Sign CVCBD only)

Oakland County Michigan Register of Deeds Plat Engineering, GIS, & Remonumentation Dept. Ph: (248) Fax (248)

Survey Data and TOPO Checklist

Construction Documents (CDs) Checklist

Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS

Essential Skills: Reading and Interpreting Maps and Plans

SUBDIVISION PLAT APPLICATION

Residential Room Addition / Remodel Submittal Requirement Checklist

SECTION II PLAN FORMAT AND REQUIREMENTS WATER AND SEWER

HAMILTON SOUTHEASTERN UTILITIES, INC. SANITARY SEWER COMPLETION SPECIFICATIONS

City of Hamilton INFORMATION FOR CONDITIONAL USE PERMIT

Peters Township Sanitary Authority 3244 Washington Road McMurray, PA 15317

GENERAL RESPONSIBILITIES, REQUIREMENTS AND PROCESSES 1.1 ENGINEER OF RECORD REQUIREMENTS & RESPONSIBILITIES. A. Requirements

REQUIREMENTS. for ENGINEERING SERVICES PUBLIC CONSTRUCTION PROJECTS

SITE PLAN APPLICATION

Transcription:

Project Name Project Number Engineer Plans are to be designed based on the standards set forth in the Anne Arundel County Design Manual Standards and Specifications, and all other manuals as stipulated in the Anne Arundel County Code. This checklist is being provided as a general guide for identifying the minimum features that should be addressed prior to submitting the plans for review. The design consultant by assigning his/her seal and signature certifies that the plans were completed in accordance with the current design standards. Plans that are incomplete as per the checklist items will result in an incomplete review. Plans will be returned to the consultant and the resubmittal will be considered a first submittal in the review process. Engineer's Certification (Seal, Signature and expiration information) Instructions: 1. The checklist must be submitted with the first submittal. 2. Packages submitted without the completed checklist will not be reviewed and will be returned to the applicant. 3. Applicant should insert into each box either of the following: a. This item has been addressed b. N This item does not apply to this project 4. All boxes must be checked. 5. The review engineer will upon review of the plans verify by inserting either of the following: a. This item has been adequately addressed or agree that it does not apply. b. X This item has not been adequately addressed. (Use the remarks column to indicate via letter designation, which item needs to be addressed or if a more detailed response is required then indicate in the remarks column that the item is addressed in the comment letter). 6. A copy of the checklist will be returned to the applicant as an attachment to the comment letter. 7. The Checklist must be returned with the second submittal utilizing the same check format indicated in item 3 above. Water-Sewer Checklist 2015.xlsx Review Engineer Date 1 of 5

1 First Cover Sheet Title block (Anne Arundel County Office of Planning and Zoning title block required on all sheets) shall include: A) Project Name and number; B) Sheet Title; C) Date; D) Tax Map, Block and Parcel; E) Assessment District; F) Zoning 2 Vicinity Map (minimum 4" x 4" Scale 1"=2000') (Title Sheet) A) Located in upper right hand corner; B) North arrow shown to top; C) Scale shown; D) Roads labeled; E) Site shaded and labeled Location Plan - A) Scale 1"=200'; B) North arrow shown; C) Existing and Proposed water and sewer lines shown and labeled; D) Existing and Proposed Manholes shown and labeled; E) Existing and 3 Proposed Fire Hydrants shown and labeled; F) Fire Hydrant Coverage shown; G) Coverage of individual plan sheet delineated; H) All road names shown 4 Index of Drawings Table - All drawing titles are shown in table and labeled accordingly. 5 General Notes A) Appropriate General Notes included for project type; B) Project specific notes added; C) Agency titles and phone numbers correct; D) Pipe material and material class correct Benchmark - number, description and elevation. Vertical Control NAVD 1929 or NAVD1988, 6 consultant must indicate which is used. Horizontal Control NAD83. 7 Signature block with design consultant information Legal name, address, and telephone number of the owner, developer, applicant, and design 8 consultant 9 Revision Block 10 Bill of Materials - showing quantity, type, and size of all mains and appurtenances All Plan Sheets 11 Street names and type of road surface 12 Lot numbers 13 Adjacent owners and tax account numbers up to 60 feet beyond end of main Right of Way/Easement - A) bearings and distances shown; B) labeled public or private; C) labeled 14 existing (Include Liber/Folio) or proposed 15 Legend including all line types used on plans 16 Existing utilities using proper symbols 17 Label all existing water, sewer, and storm drain with appropriate County Public Drawing numbers 18 North Arrow, scale, at least three coordinate ticks shown 19 Engineer's seal and signature 20 Scale 1"=40' (Alternate scale must be approved in advance by OPZ) Water-Sewer Checklist 2015.xlsx Review Engineer Date 2 of 5

First Sewer Plan 21 Plan shown above profile on same sheet 22 Proposed sewer shown by bold, heavy line weight 23 Size and type of pipe shown in accordance with Design Manual 24 Show drawing numbers for all existing sewer 25 Manholes numbered and stationed 26 Manhole at end of all collection lines (no terminal cleanouts permitted) 27 Drop manholes shown and labeled with Type A or B (determined by distance of drop) 28 Watertight manholes provided in non-traveled right-of-way 29 Proposed sewer shall be 4' from the edge of existing pavement in existing development without curb. 30 Sewer shall not be placed under existing or proposed curb 31 Special bedding requirements shown where required 32 Call out method of connection to existing sewer (e.g. Kor-n-Seal, connect to existing stub, install manhole over existing sewer) 33 Mains extended to limits of property (along frontage, or through easements on site) 34 Show distance from proposed main to edge of pavement, centerline, or property line 35 Show distance from proposed main to existing and proposed water mains (min. 10' horizontally) 36 Structure schedule including coordinates for each manhole 37 Proposed sewer encased in concrete where appropriate 38 Proposed sewer house connections at least 10' from existing or proposed water house connections House connections - A) shown for all lots; B) located at low end of middle of lot frontage; C) 39 connected to manhole where possible; D) no more than three connections per manhole; E) Typical house connection detail shown; F) minimum SHC size correct (4" for residential, 6" for commercial); G) max. cleanout spacing correct; H) located at middle of road frontage Sewer Profile 40 Scale 1"= 40' horizontal scale and 1"= 4' vertical 41 Proposed sewer shown by bold, heavy line weight 42 Proposed sewer crossings at least 1' min. below existing or proposed water lines. 43 Special bedding requirements shown where required First floor elevations shown on profile (invert at sewer main should be equal to house first floor 44 elevation minus 2' plus 2% times the distance from the main to the farthest point on the house - or [FFE-(2'+(0.02)d)] 45 Call out method of connection to existing sewer (e.g. Kor-n-Seal, connect to existing stub, install manhole over existing sewer) 46 Crossing and parallel utilities shown and record drawing referenced 47 Size, type and slope of pipe shown in accordance with Design Manual 48 Minimum grade and maximum manhole spacing requirements met 49 Manholes numbered and stationed; inverts labeled (upstream and downstream) 50 Profile labeled "Street Name" or R/W 51 Minimum and maximum cover requirements met 52 Watertight manholes provided in non-traveled right-of-way and clearly identified 53 House connections - A) shown for all lots; B) shown where connected to manholes or at "y" connections to main; C)minimum SHC size correct (4" for residential, 6" for commercial) Water-Sewer Checklist 2015.xlsx Review Engineer Date 3 of 5

First Water Plan 54 Plan shown above profile on same sheet; if block plan provided with profiles on separate sheet, plan view shall indicate where each profile can be found 55 Proposed water shown by bold, heavy line weight 56 Size and type of pipe shown in accordance with Design Manual 57 Call out all valves that must be closed to make necessary connections 58 Coordinates and bearings shown along centerline of water line. 59 All fittings shown 60 Proper location of valves and hydrants 61 Crimp radius, beginning and ending stations, and offsets, for curved water lines are shown 62 Dead end water mains do not exceed maximum length for size 63 Special bedding requirements shown where required 64 Adequate cover over pipe is provided Fire hydrants - A) as a blow-off shall be at the end of each line - teed off five feet prior to end cap; B) 65 located at road intersections where possible; C) three valve shut off provided to eliminate flow to hydrant; D) spacing meets Fire Code requirements 66 Mains extended to limits of property (along frontage, or through easements on site) 67 Minimum main size with hydrant correct (8") House connections - A) shown for all lots; B) located at low end of middle of lot frontage, 15' min. 68 from property line unless twin setting is used; C) minimum WHC size correct (1-1/2" with W25 or W25A meter); D) twin service connections used where feasible 69 Meters - A) specified for each connection; B) adequate size for proposed water meter/vault; C) easement provided where meter is not located within right-of-way Water Profile 70 Scale 1"= 40' horizontal scale and 1"= 4' vertical 71 Proposed water shown by bold, heavy line weight 72 Size and type of pipe shown in accordance with Design Manual 73 Proposed water services to be at least 10' min. horizontally from existing or proposed sewer connections 74 Special bedding requirements shown where required 75 House connections - shown for all lots 76 All utility crossings shown 77 All fittings shown (symbol, label incl. size) Water-Sewer Checklist 2015.xlsx Review Engineer Date 4 of 5

First Anne Arundel County Dept. of Inspections and Permits Grinder Pumps - (only complete this section if public grinder pumps are proposed) 78 Sewer Study submitted 79 Sewer lines labeled "Public" or "Private" 80 Grinder Pumps labeled "Public" or "Private" 81 All public grinder pumps shown in right-of-way or in 20'x20' easement 82 No double grinder pumps proposed 83 First floor elevations shown (sewer must be 4" min. gravity to grinder pump) 84 Service valve shown at property line 85 Grease traps/oil & grit separators shown on commercial sites 86 Access depth from finished grade to grinder pump inlet shall not exceed 10' 87 Public grinder pump electrical control panel shall be located in line of sight from grinder pump without any sight obstructions 88 All existing and proposed discharge manholes must be shown and labeled 89 Notes shall be provided requiring that the first two discharge manholes must be epoxy coated inside and outside. 90 Design flow shall be shown 91 Velocity in low pressure sewer shall be between 1.5 fps and 15 fps 92 Maximum head for grinder pump checked against manufacturer's specifications 93 Computations checked for hydraulic profile; all assumptions for the design numbers of simultaneous pumps operating at the same time Miscellaneous 94 Quality control A)Information shown in computations is same as on plans B) Corresponding information on plan view is same as on profile. 95 Plat - check easements/right-of-way shown on plans are shown on applicable plats. 96 Traffic Control Plan (see section VIII, Anne Arundel County Dept. of Public Works Design Manual, January 2001). Water-Sewer Checklist 2015.xlsx Review Engineer Date 5 of 5