Mounting instructions for multiplay equipment gravis2

Similar documents
Assembly instructions

Profiles for floors of same height Proclassic Proclassic F

QUICKLOCK ASSEMBLY TYPE #2 INSTRUCTIONS

Kent Waterford Recessed Tree Pit

AQUA ULTRA SHOWER DOOR & TUB DOOR INSTALLATION INSTRUCTIONS

miramondo Technical Informations 1/6 Passepartout Concrete

Kent Angle Frame Tree Pit

SHIPLOCK CLADDING PRODUCT GUIDE INSTALLATION TECHNICAL SPECIFICATIONS CARE & MAINTENANCE

UNIDOOR/UNIDOORLUX/UNIDOOR PLUS

UNIDOOR LUX (STYLE E)

Kent Airport Bollard KDCT-140/3

INSTALLATION GUIDE DECKING.

ELEGANCE SHOWER DOOR/ENCLOSURE INSTALLATION INSTRUCTIONS. Style A Style B Style C Style D

PRISM LUX / PYRAMID SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

Kent Light Rail Balustrade Curved

miramondo Technical Informations 1/10 Hop Hop

Kent Slope Top Bollard KST-101/3

Kent Madrid Bench KMB6000

QWALL 5.2 (2 Back Panels)

UNIDOOR (STYLES B&C)

Cleaning & Maintenance Advice Textured Glass.

VITREO X SHOWER / TUB DOOR INSTALLATION INSTRUCTIONS

Installation Guide. Cabinet Surface Mount for Single Display

miramondo Technical Informations 1/7 La Strada

Kent Fold Down Bollard

MIRAGE-X / BELLA. Shower Door Installation Instructions

QWALL 4 ACRYLIC SHOWER WALL INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS FOR STANDING SHOWER CABIN OWNER'S MANUAL PLEASE READ INSTRUCTIONS BEFORE PROCEEDING Packing List. Door (pc) 2. Hinge (2pc) 3

SHOWER ENCLOSURE INSTALLATION

INSTALLATION INSTRUCTION Square-Top gully

31 / 39 / 59 Basin 31 / 39 / 59 Basin Frame Introduction Parts supplied - basin frame

Solids Content Sensor OUS 41 / OUS 41-W

Kent Airport Balustrade

Floor-Mounted Tubfiller

Installation Guide Mounting Kit Philips MP70/EGM/FMS on Dräger Fabius Tiro

UNIDOOR (STYLE B & C)

miramondo Technical Informations 1/7 La Superfine

Retrofit Apron Front Farm Sink With Dual Mount Capability Installation Instructions

IPA BESLAG FOR SCHÜCO ALU INSIDE NORDIC A/S J. PETERSENS BESLAGFABRIK JACOB PETERSENSVEJ 9, DK-9240 NIBE TEL: (+45)

Install Instructions. SCR-48N Crash Rail. Please read these instructions thoroughly prior to beginning the SCR-48N Crash Rail installation!

CORNERVIEW / FRENCH CORNER

Installation Guide. Resysta Flooring. 15 Years Guarantee. swell-free crack-free splinter-free rot-free. Version 1 / July 2010 / English.

*** All chrome surfaces should be cleaned using a clean damp cloth. *** No abrasive cleaning agents or materials should be used.

INSTALLATION INSTRUCTIONS

FLEX 28 / 32 / 42 x 72

IPA FITTINGS FOR SCHÜCO ALU INSIDE NORDIC A/S J. PETERSENS BESLAGFABRIK JACOB PETERSENSVEJ 9, DK-9240 NIBE TEL: (+45)

SHOWER DOOR INSTALLATION & CARE GUIDE

assembly instructions

DASHLEY COLLECTION GAZEBO

ESSENCE. Shower / Tub Door Installaion Instructions

CAVALIER. Shower Door Installation Instructions

WEAR SAFETY GLASSES WHEN INSTALLING THIS KIT.

INFINITY-Z SHOWER DOOR / TUB DOOR INSTALLATION INSTRUCTION. MODEL #s 01-Chrome

Installation Instructions

QUATRA LUX SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

Vinyl Windows and Doors Manufactured by VPI Quality Windows

KENT FLAT TOP BOLLARD KFTB101/3

UNIDOOR PLUS (STYLE F)

Installation Guide for Andersen 400 Series Tilt-Wash Transom and 200 Series Narroline Transom Windows

Kent Ventilated Bollard

Installation Guide Philips MP40/50/60/70 Installation Kit for Penlon Anesthesia Machine

Vinyl Windows Manufactured by VPI Quality Windows

KITCHEN INSTALLATION GUIDE

INSTALLATION INSTRUCTIONS

KITCHEN INSTALLATION GUIDE

SHELDON Versatile seating

Solid Laminate Worktops Installation and Aftercare Instructions

Kent Glazed Balustrade

SAYSU GmbH Outdoor Fitness Equipment. Weitzesweg 16 A Bad Vilbel/ Germany. Tel.: 0049 (0) Fax: 0049 (0)

31593IN-N /16 (98.2cm) 14 3/16 (36cm)

UNIDOOR X (STYLE L1)

Constable Oak Extension Dining Table

Section 1 Cubicles. Section 2 IPS Duct Panel Systems. Section 3 - Vanity Units Components & Assembly 12. Section 4 Basic Maintenance.

INSTALLATION INSTRUCTIONS

VANITY INSTALLATION INSTRUCTIONS

Fitting Instructions

Installation Guide Philips MP80/90 Installation Kit for Penlon Anesthesia Machine

Panel Assembly and Installation

8/7/ HP SWING DOOR INSTALLATION INSTRUCTIONS

= Furniture Solutions =

Masking: Each mirrored sheet is well protected by a durable paint backing and

model: CHARISMA SHOWER/TUB DOOR INSTALLATION INSTRUCTIONS

Maintenance and other important non-personal injury and non-material damage instructions or statements that should be observed.

Installation and Operational Instructions for ROBA -DS couplings Type 95. _ (disk pack HF) Sizes

Step-by-step Installation Guide

PRIME SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

20270IN-* 800MM KOHLER WHITE. 19 5/16"(49 cm) C 20 1/16 (51) 28 1/8 (71.4) 35 13/16 (91) 11 13/16"(30 cm)

Ambient Light Rejecting Fixed Frame Screen. (3.9 width frame) User s Guide

Installation Guide Installation Kit for Mounting Philips MP20/30/40/50 on Datex-Ohmeda Aisys Anesthesia Machine

HOME GYM Owner s Manual

Installation and Care Instructions: Rear Windshield - CFMOTO UForce 800

miramondo Technical Informations 1/6 Il Posto L

s23ss sloped bollard with reflective bands

Installation Guide Philips IntelliVue MP20/30/40/50/60/70 MX400/450/500/550/600/700/800 M-Series Arm Mounting Kit for Dräger Primus Anesthesia Machine

ESSENCE - H SHOWER / TUB DOOR INSTALLATION INSTRUCTIONS

PolyCarb has good resistance to many chemicals. Some chemicals may harm the PolyCarb sheets. Contact us when in doubt about any chemical.

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Sliding Door Enclosure. Telephone Cleaning. Please retain this manual after installation for future reference and maintenance.

INSTALLATION INSTRUCTIONS

Transcription:

Artikel-Nr. 515516401 tower bow climbing net frame climbing bow Diagram 1: Overall view of play equipment with description of individual elements stilum GmbH, 56271 Kleinmaischeid Tel. +49 (0) 2689 92790-0 Alle Rechte und Produktmodifikationen vorbehalten Stand: 12.06.2015 S. 1

400 450 3313 Spielebene Play level 1458 600 3936 Erde Ground Diagram 2: Rear view with dimension details gravis2 Beton Concrete stilum GmbH, 56271 Kleinmaischeid Tel. +49 (0) 2689 92790-0 Alle Rechte und Produktmodifikationen vorbehalten Stand: 12.06.2015 S. 2

foundation frame 1930 climbing bow Kletterbogen 1479 Gestell 1. Select the play equipment location in consideration of the required safety area (see Diagram 4: 6314mm x 6960mm). bow Hangelbogen 1161 150 2321 2321 2321 600 700 600 1401 climbing net Kletternetz 2. Carry out excavation work for foundation as shown in Diagram 2a and 3a. After excavation, compress the foundation floor. Note: Cover the foundation holes with the safety cover required for the height of fall indicated.the combination equipment is built in on the play level. Pay attention to items marked game level of play equipment! 3. Set up the 5 main concrete foundations (LxWxH 600 x 600 x 400 mm) and the slide foundation (LxWxH 1700 x 700 x 400 mm) acc. to the dimensions indicated in diagram 2a in the quality class C 20/25. Reinforcement plan: Concrete foundation with reinforcement connection tower 770 260 1700 Main foundation: BSt 500S Ever 4 stirrups Ø 8 mm lengthwise and cross Concrete cover h = 3 cm Concrete quality class C 20/25 Anbindung Turm Diagram 3a: Foundation plan Foundations for attachment parts are no-reinforced 4. After a setting period of 10-14 days, depending on weather conditions and foundation size - clean the surface of the foundations and start with the installation of the combination equipment. 5. Connect the tower at the intended locations acc. to the Diagram 1,3a and 5. Please fasten the parts using the screws including in the delivery. Diagram 3b: Frame stilum GmbH, 56271 Kleinmaischeid Tel. +49 (0) 2689 92790-0 Alle Rechte und Produktmodifikationen vorbehalten Stand: 12.06.2015 S. 3

6960 1500 R1500 1500 6314 1500 Diagram 4: safety zone stilum GmbH, 56271 Kleinmaischeid Tel. +49 (0) 2689 92790-0 Alle Rechte und Produktmodifikationen vorbehalten Stand: 12.06.2015 S. 4

Delivery contents and addition of the single elements connection climbing bow Anbindung Kletterbogen Anbindung Hangelbogen connection bow connection climbing net Anbindung Kletternetz 6. Place the pre-assembled tower as shown in the overview and in the Diagram 2a and 3a on the main foundation and do a rough aligning. Note: Do not screw the base plates onto the foundations yet! Diagram 5: connection part tower Anbindung Gestell connection frame stilum GmbH, 56271 Kleinmaischeid Tel. +49 (0) 2689 92790-0 Alle Rechte und Produktmodifikationen vorbehalten Stand: 12.06.2015 S. 5

Delivery contents and addition of the single elements Rohrenden horizontal aufgesteckt an Gravis2 Turm und mit Linsenkopfschrauben M8x25verschrauben Rack the pipe ends horizontally at the tower and screw with cheese-head screws M8x25 Rohrende aufgesteckt an Gravis2 Turm und mit Linsenkopfschrauben M8x25 verschrauben Rack the pipe end horizontally at the tower and screw with cheesehead screws M8x25 Diagram 6: connection part bow Diagram 7: connection part climbing bow 7. Connect the tower at the intended locations acc. to the Diagram 1,3a and 5. Please fasten the parts using the screws including in the delivery. 8. Connect the other modules (bow, climbing bow and climbing net) with the tower at the intended locations acc. to the Diagram 5-7. Please fasten the parts using the screws including in the delivery. stilum GmbH, 56271 Kleinmaischeid Tel. +49 (0) 2689 92790-0 Alle Rechte und Produktmodifikationen vorbehalten Stand: 12.06.2015 S. 6

3x shackles for M8 according to DIN 82101 3x Schäkel nach DIN 82101 für M8 tower connection L=2064mm Herkulestau ø16 L=2122mm L=2122mm L=800mm L=890mm L=982mm 3x Schäkel nach 3x shackles for M8 according DIN 82101 für M8 to DIN 82101 9. Connect the climbing net with the tower at the intended locations acc. to the Diagram 2 and 8 and place the flat steel on top of the foundation. Please fasten the parts using the screws including in the delivery. 10. Align the play equipment more on the foundations. Note: The climbing net should be placed with tension. hook onto floor plate 11. Drill holes into all foundations and screw the play equipment into the foundations with the included heavy-duty dowels. 12. Seal the foundation with the safety cover required for the height of fall indicated. Critical drop height: 1500 mm. Recommended surface material: sand, bark mulch, gravel, synth. fall protection. 13. After 3 months, check the screws at the joints and retighten them if necessary. 14. Do not allow children to use the equipment before the installation has been finished. Attention: If the play equipment has been incompletely installed or partly dismantled when carrying out maintenance and repair work, this may lead to particular risks of injury for the user. For this reason, make clearly visible that the equipment shall not be used in such cases. stilum GmbH, 56271 Kleinmaischeid Tel. +49 (0) 2689 92790-0 Alle Rechte und Produktmodifikationen vorbehalten Stand: 12.06.2015 S. 7

NOTE: Play equipment, which contain components made of stainless steel should not come with normal steel parts in contact. Those steel parts may rub off and leave small steel particles in combination with moisture brown rust stains. If such corrosion occur on stainless steel parts, they are fine to remove with an abrasive (240 grit). Please take care when transporting and setting up the fact that the components are made of stainless steel with no normal steel parts in contact. In order to preserve a good visual appearance of your stilum playground equipment over a long period one should take care of maintenance of the stainless surface even despite of their corrosion resistance. Especially areas, which can not be reached by rainfall, should be frequently cleaned from dirt and deposits due to air pollution and dirt caused by the atmosphere. Light soiling can easily be removed by using a high pressure cleaner. For persistent deposits use a clean cloth moistened with a special liquid cleaner (e.g. on phosphoric acid) and rinse off with clear water after a short application time. During cleaning with mild abrasive components, only wipe over stainless steel surface in polishing direction. For heavily soiled surfaces, polishes can be used (e.g. for cleaning chrome on cars) or for greasy and oily dirt alcoholic cleaning agents and solvents (e.g. ethyl alcohol, isopropyl alcohol or acetone). However, it should be noted that the dissolved soiling is not spread over the surface again. Do not use any chloride or hydrochloric containing cleaning products nor scouring powder, bleaching - or silver polish cleaner. Cleaning intervals depend on type and degree of soiling as well as on demands made on optical characteristics. Therefore cleaning is advisable at intervals of six to twelve months whereby in the case of strong soiling it is appropriate to clean the playground equipment at intervals of 3 to 6 months. stilum GmbH, 56271 Kleinmaischeid Tel. +49 (0) 2689 92790-0 Alle Rechte und Produktmodifikationen vorbehalten Stand: 12.06.2015 S. 8