BT-4000 LIGHT WORKOVER UNIT

Similar documents
SWS Ultra deepwater drillship

Mærsk Deliverer. Ultra deepwater drilling and development. semi-submersible

MSV Seawell. The vessel that pioneered subsea light well intervention

Engineering. Drafting & Design. Regulatory Interface. Project & Construction Management. Marine Operations Services

Offshore Drilling Rigs

Dry trees for cost effective solution with the Wellhead Barge: WHB

Speaker at the Americas: Decommissioning and Well Abandonment. September 23, 2015

Noble Corporation. Don Jacobsen Senior Vice President Industry & Government Relations Marine/Offshore Industry Conference 29 March 2012

June 24, 2010 RPSEA Project 1502 Thomas E. Williams int.com

Well Intervention Vessels Used in the G.O.M. Macondo Incident Response. Helix - Well Ops June 2011

HELIX ENERGY SOLUTIONS

Company Update. Spill Containment Fast Response to GOM Subsea Oil Spills. Changing the way you succeed.

Marginal Project Development

DEA Technology Forum 17 Nov. 2011

A marginal field (re-)development using several alternative methodologies 1

Marine Risers. Capability & Experience

The Future of Offshore Drilling: Beyond Ultra Deep. Chris Beckett, CEO Pacific Drilling S.A. September 22, 2014

Floating Systems. Capability & Experience

Technip Floating Production: A Comprehensive Portfolio

Global and China Offshore Rig Industry Report, Dec. 2011

TZ400 Self - elevating Drilling Unit General Specification (Revision: B1)

Investor Relations Presentation April 30, 2013

Hans J Lindland FMC Kongsberg Subsea Innovative Technologies, Creative Solutions

Dagang Zhang China-America Frontiers of Engineering Symposium San Diego, USA

James Fisher Offshore. Your specialist partner in the delivery of subsea and topside projects.

Offshore & onshore drilling market for LV AC drives

Personalized Service, Industry Expertise. Franklin Howard

China Shipbuilding Industry s Offshore Business & Views on Shipbuilding VS. Offshore

Oil & Gas T T S O I L & G A S.

Low Cost Field Development using Hybrid Risers. Learn more at

Pareto Oil & Offshore Conference August 2011 Tong Chong Heong Chief Executive Officer

COSL MEXICO OVERVIEW SERVICE LINES IN MEXICO INTEGRATED SERVICES

Offshore Development Concepts: Capabilities and Limitations. Kenneth E. (Ken) Arnold Sigma Explorations Holdings LTD April, 2013

Offshore.

ROV/IMR - OFFSHORE SUPPORT VESSEL

Riser Installation in Deep & Ultra Deep Water

MODUs as MOPUs: Low cost field development using hybrid risers

Offshore Support Vessels Located in the US Gulf of Mexico in March 2018

An Introduction to Oil & Gas Drilling and Well Operations

Development. JOGMEC Techno Forum November 2014 Japan Drilling Co., Ltd. Drilling Technology Department Masahiro Nakamura

INTEGRATED SERVICES AND PRODUCTS ACROSS THE FIELD LIFE CYCLE

The intent of this guideline is to assist the Drilling Engineer in his preparation of the deepwater drill stem test design and procedure.

Send your directly to

Pareto Oil & Offshore Conference 2010

QUARTERLY UPDATE Q2 FY13

Deep Water Definitions

Use of a Ship-Shaped Floating Production Unit for the Phoenix Development

Geoprober Drilling Moving from Ideas To Reality (Status August, 2005)

MARS. Multiple application reinjection system

ENSCO 8500 Series. 11 April Mark Burns Senior Vice President Western Hemisphere. David Hensel Vice President North and South America

NORWAY. Norwegian Industrial Property Office (12) APPLICATION (19) NO (21) (13) A1. (51) Int Cl.

Drilling Market Outlook

IMR in Subsea 7 for Statoil, past and future, the new IMR vessel Seven Viking

Increased Safety & Efficiency from a Dedicated Light Well Intervention Vessel on Deepwater Subsea Wells

i-tech SERVICES DELIVERING INTEGRATED SERVICES AND PRODUCTS ACROSS THE FIELD LIFE CYCLE

Well Abandonment Services. Plug into a New Approach

Deepwater Precommissioning Services

Intervention/Decommissioning

Swiber Holdings Limited 1Q FY08 Results Briefing

Marine Well Containment Company. Charlie Miller, Chief Technology Officer

BP SWOPS Single Well Oil Production System. Sandy Meldrum CEng, MIMechE

Sinking of the Deepwater Horizon. 11 perish and 115 survive

Learn more at

INTRODUCTION OF KEY STAFF

Riserless Subsea P&A. Deepwater Decommissioning Workshop 2016 W I L D W E L L C O N T R O L S U B S E A I N T E R V E N T I O N

Subsea Production Market and Industry Teaming. Presented by: Bruce Crager Executive Vice President: Expert Advisory Group Endeavor Management

Kuala Lumpur 3 October 2012 State of the Industry of Riserless Light Well Interventions (RLWI)

Floating LNG facilities

QUARTERLY UPDATE. Summary

FPS Spending: $20 Billion a Year and Growing By Bruce Crager

Title of Presentation. Presenter s Name Date of Presentation

Risk - A Drilling Contractor s Perspectives. Anton Dibowitz, Vice President Marketing Paris, September 20 th 2011

SBI VOL. 8 ISSUE ShipBuilding MARINE PROPULSION. EDT Jane. German Production TAILORED INNOVATION. Ndurance & Ndeavor

Subsea Structural Engineering Services. Capability & Experience

Doing More With Lightweight. Well Intervention Subsea Europe Drummond Lawson. London, 30 th October Managing Director

Robust Solutions for New Frontiers Chow Yew Yuen

Encana Corporation Expression of Interest (EOI)

Discipline. Technology TECHNOLOGY DEVELOPMENT. Technology WITHIN SBM OFFSHORE

Well Abandonment & Field Decommissioning. Product Catalogue Destini Oil Service 1

Investor Presentation

Offshore. Christian Tribout Senior Vice President, Offshore. Investor Presentation Paris, October 17, New York, October 19, 2007

Click to edit Master title style

4 DEVELOPMENT AND PRODUCTION SCENARIOS

Introduction to Subsea Production Systems. What is Subsea? 02 What is Subsea? DNV GL DNV GL 2013 August 2015

Offshore Energy Solutions. Technologies and products

Subsea Well Engineering

Siem WIS. Siem WIS AS. Closed Loop Drilling CLD. August Siem WIS AS.

Deepsea technologies INTEGRATED INTERVENTION SYSTEMS. Lowering Costs and Risks with Customized Tools and Application Expertise

Baker Hughes Offshore Opportunities

The World Floating Production Report

Introduction to Subsea Production Systems. What is Subsea? 02 What is Subsea? DNV GL DNV GL 2013 September 2014

GTSC Rig for Hands-on Training

Deepwater riserless (RLWI) enablers for increased oil recovery. Bringing shallow water experience to deepwater.

Sanford Bernstein Strategic Decisions Conference. May 2014

Simmons & Company International European Energy Conference 2013

SUBSEA WELL CONTAINMENT. Global Basis. Deepwater & Emerging Technologies Group (DETG) AADE Houston Chapter 25 January 2012

Moving Boundaries Within Offshore Drilling Pareto's 18th annual Oil & Offshore Conference, Oslo, 31 th August 2011

3D OFFSHORE PROJECT SIMULATION. Singapore Shipyard. Replace all chain. Adding a riser

Design and Concept Integration- MPD Technology in Deepwater Rigs. Julmar Shaun S. Toralde, Global Deepwater Managed Pressure Drilling Champion

Mid-Atlantic Investor Meetings. February 2013

Transcription:

BT-4000 LIGHT WORKOVER UNIT

BT-4000 LIGHT WORKOVER UNIT DESIGNED TO IMPROVE EFFICIENCY DURING WELL INTERVENTION OPERATIONS The BT-4000 LWO is the new generation DP-3 semi-submersible for efficient light workover/well intervention operations in water depths up to 2,400 m (7,879 ft) in environment areas offshore Brazil, in Gulf of Mexico, West of Africa and South East Asia. The BT-4000 LWO is designed for efficient and fast changeover between various well intervention operations with maximized off critical path preparation of upcoming operations. The range of operations the BT-4000 LWO is designed for includes: Workover operations, including coiled tubing and wire line/ slick line through an open water intervention riser system (high pressure riser up to 10,000 psi) with a surface BOP Through tubing drilling and completion with coiled tubing or optional rotary drilling Top-hole rotary drilling Installation and retrieval of X-mas trees and different subsea equipment Installation and retrieval of electric submersible pumps in wells and subsea pumping modules Well-testing and well-clean-up Pumping and circulation of various types of fluids through the workover/completion riser and into the well, including the handling of high pressure fluids from a well stimulation vessel Killing of a well Installation, handling and operation of a subsea capping stack ROV operations. To facilitate effective operations, the BT-4000 LWO has been designed with access to the derrick from three sides, allowing different operations to be prepared and carried out independently of each other. For handling and transport of subsea equipment the Unit is arranged with a skidding system accessing the well center from three sides, which together with the flush drill-floor hatch (moon-pool door) design improves material handling efficiency and increases safety. Skidding system is also used to transport the advanced coiled tubing frame in and out of the well center, facilitating pre-stabbing of the coil and testing in advance, further increasing the operational efficiency.

GENERAL Class Rules and regulations Operational areas POB XA1 Column-Stabilized Drilling Unit, XAMS, XACCU, XDPS-3, ENVIRO OS, CRC, UWILD IMO MODU Code, MARPOL, Load Line, flag State and Brazilian continental shelf requirements Brazil, Gulf of Mexico, West of Africa, SE Asia 130 people in 1+2 bed cabins Heli deck Sikorski S-92, S-61N, AW-101, CAP 437 DESIGN CRITERIA Water depth Drilling depth Environmental criteria MAIN DIMENSIONS Length over all Beam over all Height to box bottom Height to upper deck Pontoons (2) Length Beam abt. 117.5 m abt. 79.7 m 26.0 m 34.5 m 100.1 m 15.6 m Height 9.1 m Columns (4) Horizontal section Draughts Operation Survival Transit Displacement Operation PAYLOAD CAPACITIES Deck payload, operation/survival Total payload, operation/survival Total payload, transit 200 to 2,400 m 8,500 m 10-year GOM hurricane, 100-year Brazil storm 13.65 x 14.3 m 17.5 m 14.5 m 8.8 m 32,600 tonnes 3,700 tonnes 8,000 tonnes 3,100 tonnes STORAGE CAPACITIES Liquids Mud/brine pits in upper hull 500 m 3 3,140 bbls Mud/brine tanks in pontoons 680 m 3 4,200 bbls Total liquid mud/brine storage 1,140 m 3 7,090 bbls Base oil tanks 300 m 3 1,800 bbls Drill water tanks 1,770 m 3 11,100 bbls Fuel oil tanks 3,000 m 3 18,850 bbls Fresh water tanks 300 m 3 1,800 bbls Bulk Bulk cement 214 m 3 7,500 cu ft Bulk barite/bentonite 214 m 3 7,500 cu ft MAJOR EQUIPMENT Installed power 6 x 5,200 kwe 31,200 kwe Thrusters 6 x 3,500 kw 21,000 kw Derrick Active/passive crown mounted compensator Height 186 ft Static 1,500 kips 1000 kips False rotary 49 ½ Drawworks Riser tensioners Mud pumps Knuckle-boom cranes OPERATIONS 4,430 hp 8 x 160 kips each, 50 ft stroke 2 x 1,600 hp 2 x 100 tonnes Light workover and well intervention operations Workover operations Drilling and workover operations Through tubing drilling and completion Through tubing live well intervention Wire lining/slick line Through tubing live well intervention operations Rotary drilling of top holes without fluid return to top side Installation and retrieval of X-mas trees, adaptors and tree caps, lower riser package Installation and retrieval of electric submersible pumps in wells and subsea pumping modules Well testing Killing of a well ROV operations BT-4000 by

ETESCO INTERVENTOR BT-4000 LWO FOR PETROBRAS BUILT AT DSIC Brazilian oil service contractor Etesco together with partners signed a contract to build a BT-4000 Light Workover semi-submersible at DSIC Offshore, China, for delivery in 2017. Etesco, founded in 1956, is involved in various segments of the Brazilian oil service industry including operation of drilling units and FPSOs. Etesco has entered into a charter and service contract with Petrobras for light workover operations offshore Brazil in Campos and Santos Basin. With specialized light workover units it is forecasted that Petrobras will reduce their well intervention cost and further increase well productivity. DSIC Offshore is one of China s leading turnkey EPC contractors for offshore construction. It is the offshore arm of Dalian Shipbuilding Industry Corporation, one of the world s largest shipyard groups, which has the longest offshore constructing history and track record in China. It has delivered ships and offshore units to international clients since the mid eighties. DSIC Offshore has over the years successfully delivered more than 30 offshore units including jack-ups, semi-submersibles and FPSOs to international and domestic clients. In 2009 DSIC Offshore moved to a dedicated new offshore construction yard, which includes a 180 x 120 m dry dock. DSIC contracted Bassoe Technology to provide the class approved design for the BT-4000 Light Workover Unit, Etesco Interventor. DSIC has previously built several Bassoe Technology designed units.

A LEADING DESIGNER OF ADVANCED MOBILE OFFSHORE UNITS www.logiken.se April 2017 Bassoe Technology is a recognized designer of advanced mobile offshore units, such as semi-submersibles and drillships, offering concept and basic design, FEED and engineering services. Bassoe Technology has developed an extensive design portfolio of technically optimized and purpose designed units and vessels for tender drilling, well intervention, drilling, accommodation, floating production and offshore wind, wave and current energy. As experts in design of mobile offshore units, we can offer designs tailored to the client s need. With a background from the shipbuilding and offshore engineering industry in Gothenburg, Sweden, our engineers have long experience in design and construction of offshore drilling units for harsh environment and floating production semis for various worldwide areas. In recent years, we have successfully cooperated with yards in Asia for construction of several offshore units. Designs also include wind energy applications for offshore locations. The wind measurement mast located on the Bassoe Technology designed jack-up platform is an example of utilizing our offshore experience for new applications. BT-MTB BassDrill Alpha Completed 2010 BT-3500 BassDrill Beta Completed 2013 BT-4000 Etesco Interventor Completed 2017 Helix ESG Q5000 Completed 2015 BT-UDS Designed for Sigma Drilling Ltd BT-HTB Atlantica Gamma Completed 2014 Emma Completed 2012 BT-3500 Atlantica Delta Completed 2015 Bassoe Technology AB Visiting address: Östra Hamngatan 17, Gothenburg, Sweden Postal address: PO Box 11130, SE-404 23 Gothenburg, Sweden Tel: +46 31 855 800 Email: mail@basstech.se www.basstech.se Bassoe Technology is an independent designer of advanced mobile offshore units. Since 2013 owned by CIMC Offshore, with the largest semi-submersible drilling rig manufacturing center in China Yantai CIMC Raffles Shipyard. MEMBER OF CIMC GROUP