-Submit in duplicate- Company: Address: Category of Booth. Tel: Fax: Authorized by: Signature: Date: Exhibition Name: Hall / Booth No.

Similar documents
Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines

NRF BOOTH GUIDELINES

Little Giant Comics OLD SCHOOL COMIC SHOW

The Events & Party Expo 2014 aims to offer potential exhibitors the following under one roof:

SF Certified International Shipping Customer Agreement V1.0

Canterbury Artisan Festival 2016 Juried Craft Fair Application

Windmill Village Homeowners Association

6-10 September September 2017, hrs. 10 September 2017, hrs. At Challenger Hall 1-3, IMPACT Muang Thong Thani,

BEMFV. Order on the procedure for providing proof as regards limiting exposure to. electromagnetic fields

IMPORTANT ADDITIONAL CONTRACTOR INFORMATION FROM THE OKLAHOMA TAX COMMISSION

The construction period is from February 26 th to March 5 th

19th Annual Holiday Craft Fair

PITKIN COUNTY STANDARDS for ELECTRONIC DRAWINGS and DOCUMENTS SUBMISSION

70% 26% HOW DOES ATMAE HELP ME? WHO ATTENDS OUR MEETINGS Annual Conference Sponsorship and Exhibitor Opportunities

SECTION 2 GENERAL REQUIREMENTS

Stand construction regulations

Unofficial Translation

PROCEDURE FOR INSPECTION OF ELECTRICAL INSTALLATIONS ABOVE 250KVA

Taiwan Sheet Metal & Laser Applications Expo 2018 Call for Applications!

SECTION SUBMITTAL PROCEDURES

AIA Continuing Education

THIRD SCHEDULE Form of Application For A Revised Disability Access Certificate Article 20E(2)

September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO.

BUILDING PLANS. BUILDING INSPECTIONS DEPARTMENT

SITE PLAN Application Packet (Required For All Non-Residential Development Projects)

Outdoor Arts Festival of the Bruce Museum

BOOTH CONSTRUCTION & DISPLAY REQUIREMENTS Huntington Convention Center Cleveland, Ohio February 7 9, 2018

APPENDIX C APPROVAL PROCESS SUBMISSION FORMS. HCJ/LJ/B100841/JR Issue J Nov 17. Appendix C

OIL INDIA LIMITED DULIAJAN

Inspection of aerial platforms in Poland

Ref: S935/gb. 13 th April 2012

Enforcement Regulations of the Pharmaceutical Affairs Law

FIT-OUT PERMIT REQUEST (GENERAL WORKS)

WGA DOCUMENTARY SCREENPLAY CONTRACT

WGA LOW BUDGET AGREEMENT

WGA LOW BUDGET AGREEMENT--APPLICATION

Planning Department APPLICANT S CHECKLIST

WP197 Capacity Market Metering Test

EXHIBIT/BOOTH SPECIFICATIONS

APPLICATION KIT. All applications processed on-line only at:

1 SERVICE DESCRIPTION

Sponsoring COMPUTEX 2018

ANTENNAS AND SATELLITE DISHES

APPLICATION KIT. June 5-9, 8. All applications are accepted on-line only at:

Application pack Level 3 Certificate in Housing Practice blended learning open access

RESIDENTIAL DEMOLITION PERMIT APPLICANT CHECKLIST

NATIONAL GOOD LABORATORY PRACTICE (GLP) COMPLIANCE MONITORING AUTHORITY APPLICATION FORM

Attachment A HERON RIDGE ESTATES RESIDENTIAL NEIGHBORHOODS PROCEDURE FOR OBTAINING DESIGN COMMITTEE APPROVAL

Amateur Radio Club Licence

ENTRY FORMAT AND FINALIST SELECTION:

West Virginia Library Association

A. STANDARD BOOTH. DEFINTION One or more standard units in a straight line.

A. STANDARD BOOTH. DEFINITION One or more standard units in a straight line

633 N. Saint Clair St., Floor 23 Chicago, IL (312)

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS

A. STANDARD BOOTH. DEFINTION One or more standard units in a straight line.

DNVGL-CP-0338 Edition October 2015

White Lake Township Building Dept Highland Rd. (248) White Lake, MI Fax (248)

NON-EXHIBITOR/Business MEMBERSHIP

SHARED TENANT SERVICE (STS) ARRANGEMENTS

Assemblies according to the Pressure Equipment Directive - a consideration provided by the PED-AdCo Group 1 -

Moline Illinois CODE OF ORDINANCES. Art. IX. Miscellaneous DIVISION 3. IN-BUILDING EMERGENCY RADIO SYSTEM COVERAGE

APPLICATION FORM (A)

Lodgement checklist: water heater (solar or heat pump)

DOWNTOWN DEVELOPMENT REVIEW BOARD APPLICATION

SUBMITTAL REQUIREMENTS FOR COMMERCIAL SIGNAGE PROJECTS

Exhibit Space & Booth Layout Guidelines

SEI Certification Program Manual

APPLICATION FOR CERTIFICATE OF APPROPRIATENESS IN THE HISTORIC DESIGN REVIEW DISTRICT

LARAMIE COUNTY PLANNING & DEVELOPMENT OFFICE 3966 Archer Pkwy Cheyenne, WY Phone (307) Fax (307)

ADDENDUM #2 September 12, 2018

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

APPLICATION FORM FOR INFRASTRUCTURE NOC

Exhibit Space & Booth Layout Guidelines

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST

ANNOUNCEMENT OF THE RESOLUTIONS OF THE BOARD OF DIRECTORS

Rules and Regulations on the use of TATRYSKI pass

2019 PP of Iowa Official Print Competition Rules PLEASE READ AS NEW CHANGES ARE IN EFFECT!! Instructions for All Entrants

19th Annual Primary Care in Paradise March 24-27, 2014 Hyatt Regency Maui Resort & Spa Lahaina Maui, Hawaii. Exhibitor Prospectus

OAK RUN BUILDING PERMIT

September 29 October 1, 2013 Indiana Convention Center 100 South Capitol, Indianapolis, Indiana 46225

BOOTH RULES & REGULATIONS

PROCUREMENT OF SERVO CONTROLLED VOLTAGE STABILIZER FOR STPI-NASIK

Landmarks Preservation Commission Tacoma Economic Development Department Culture and Tourism Division

OCNI/Bruce Power Suppliers Day

Information on the Industrial Exhibition and Advertising at the 17 th AMK

APPLICATION DESIGN REVIEW Please Print or Type

Measures for the Administration of Securities Investment within the Borders of China by Qualified Foreign Institutional Investors

NYC Birth Certificate Correction Checklist

DEPARTMENT OF COMMUNITY DEVELOPMENT SITE PLAN INFORMATION

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

1. Land survey Work. 2. Civil and Structural engineering services.

ZTE CORPORATION. (a joint stock limited company incorporated in the People s Republic of China with limited liability) (Stock Code: 763)

Application for Assessment of a full quality assurance system regarding Measuring Instruments in accordance with MID

Welcome to the 25th Annual AMAT Conference

47th Annual Holiday Craft Fair

UK Broadband Ltd - Spectrum Access 28 GHz Licence Company Registration no: First Issued 22 July Licence Number: /01/18

(Specifications A and B)

APPLICATION FOR SITE PREPARATION PERMIT

BERKELEY COUNTY ENGINEERING AND

Transcription:

FORM BUILDING APPROVAL FOR INDOOR SPECIAL DESIGN STAND DEADLINE: Please return form to: -Submit in duplicate- HAH Consulting & Exhibition Co., Ltd. Shanghai E2-2E1, 2345 Long yang Road Pudong New Area Shanghai 201204 P.R.C Tel.: +86 (0)21 28906633/34/35 +86 (0)21 28906000/28906050 Contact Person: Ms Lya Huang Email: hah@hahchina.com Category of Booth Email: Authorized by: Signature: Exhibition Name: Hall / Booth No.: According to the listed conditions enclosed in the form, we hereby apply for building the following facility during the exhibition (brief description on construction materials). Total Booth Area: Primary Material: Material Model: Other Material Details: Booth Builder: Contact: Name of Grade A Registered National Structural Engineer: No.: Mailing Add.: Remark: If the exhibitor/builder submits the drawings to re-inspection, please clearly fill in the field of Name of Grade A National Registered Structural Engineer. The above step can be ignored if the drawings are submitted to the HAH directly for inspection. Regulations on Booth Construction & Design Drawing Review: All Indoor booths with height of or above 4.5m or roof structure covering the booth area

above 50% must be reviewed and approved by Grade A National Registered Structural Engineer. If you need the services offered by assigned drawing inspector, please submit the following drawings: a. Booth perspective drawing (1front-side and 2 sides), b. Floor plan, c. Cutaway view, d. Elevation, e. Section (Side elevation), f. Detailed booth material checklist, g. Structural drawing, h. Structural calculation drawing stamped by Grade A registered National structural engineer, in quadruplicate ( re-inspection booths need ) i. Static test report or static load calculation Stamped by Grade A registered National structural engineer, in quadruplicate ( re-inspection booths need ) j. Certification of Grade A National registered structural engineer ( re-inspection booths need ) Note All drawings submitted to the assigned drawing inspector for review shall be dimensioned in Arabic numbers. DO NOT only specify by grid, in which case, the drawings may be returned without approval. The builder shall be responsible for any delay thus caused. All drawings must be specified in detailed dimensions (m). For construction and design drawings, if neither reviewed nor re-inspected by HAH Consulting & Exhibition Co., Ltd. Shanghai, the organizer, the exhibition center and HAH Consulting & Exhibition Co., Ltd. Shanghai are authorized to prevent the construction by such exhibitor in the scope of the exhibition center. HAH will start inspection upon receipt of drawings. Declaration by the Project Manager, Foreman or Site Manager responsible For implement of the special stand design I, the responsible Project Manager Site Manager (tick as application) Name: Hereby declare that the above exhibition stand complies with the statutory regulation and the terms of participation. Please fill out the form with the correct information, this will directly affect the safety of the structure being submitted for audit. If any of the submitted information are found to be false, the Shanghai New International Expo Centre reserves the right to stop booth facilities and supplies until the closure of the booth. Shanghai New International Expo Center and HAH Consulting & Exhibition Co., Ltd. Shanghai are not accountable for any liability arising therefrom.

HAH Consulting & Exhibition Co.,Ltd.Shanghai Notice Dear exhibitors and contractors: In order to avoid possible physical and property damage caused by the use and construction of the booth and to guarantee a successful exhibition, we hereby notify you in writing as follows: 1. The drawing and design plans of booth construction submitted by the exhibitor or the entrusted contractor must be examined and verified by the professional structural engineers of both Shanghai New International Expo Centre (hereinafter called SNIEC) and HAH Consulting & Exhibition Co., Ltd. Shanghai(hereinafter called HAH). Please refer to the Regulations on the Booth Construction of Large Exhibition presented along with this notice to understand the details of the range of the booth drawing and design plans. Please do not start construction either inside or outside the exhibition hall before the relevant drawing and design plans are approved. 2. After the drawing and design plans of the booth construction submitted by the exhibitor or the entrusted contractor are approved by both SNIEC &HAH, the construction must be implemented strictly in accordance with the Regulations on the Booth Construction of Large Exhibition and the Guidance on Design Audit given by SNIEC&HAH. Amending the structural requirements or adopting unconfirmed material without approval is forbidden. If any booth accidents occur otherwise, the exhibitor or the entrusted contractor must take full responsibilities. 3. The exhibitor should select the contractor with proven qualifications to construct the booth and are obliged to require the contractor to implement the construction in the light of the relevant regulations and construction specifications and carry out corresponding safety measures. 4. Though the drawing and design plans of booth construction submitted by the exhibitor or the entrusted contractor are approved by both SNIEC &HAH, still, the professional structural engineers and safety inspectors shall inspect the construction site to prevent the occurrence of safety accidents from time to time (Note: Safety inspections do not incur any fees or charges, they are not to be seen as final measures for eliminating safety hazards.). If any violation of the second regulation stipulated in this notice is discovered, SNIEC&HAH will forward a notice of rectification to the exhibitor or the entrusted contractor and a duplicate copy to the exhibition organizer. Upon receiving the notice of rectification, the exhibitor or the entrusted contractor shall complete the rectification as required before the deadline and inform SNIEC&HAH for confirmation. If the exhibitor or the entrusted contractor is negligent of the given notice of rectification, SNIEC&HAH, for exhibition safety considerations, will work together with the exhibition organizer to stop the booth construction till dismantle the booth, and the exhibitor shall bear the full responsibilities arising therefrom. 5. With a view to timely communication, all documents (including yet not confined to: Notice of Rectification, Notice of the Second Rectification, Statement of Liability Commitment ) related with the exhibition signed by the exhibitor or the entrusted contractor or the persons concerned are regarded as authorized by the exhibitor if there is no written notice by the exhibitor. Note: If the Notice is received by contractors, please be responsible for passing the copies of Notice and Regulations on the Booth Construction of Exhibition to exhibitors accordingly. ------------------------------------------------------------------------------------------------------------------------------------- Shanghai New International Expo Centre HAH Consulting & Exhibition Co., Ltd. Shanghai: Our company has received and fully understood the above-mentioned Notice and Regulations on the Booth Construction of Large Exhibition. Signature &Stamp:

FORM BUILDING APPROVAL FOR MULTI-STOREY AND OUTDOOR STAND DESIGN Please return form to: DEADLINE: -Submit in duplicate- HAH Consulting & Exhibition Co., Ltd. Shanghai E2-2E1, 2345 Long yang Road Pudong New Area Shanghai 201204 P.R.C Tel.: +86 (0)21 28906633/34/35 +86 (0)21 28906000/28906050 Contact Person: Ms Lya Huang Email: hah@hahchina.com Category of Booth Email: Authorized by: Signature: Exhibition Name: Hall / Booth No.: According to the listed conditions enclosed in the form, we hereby apply for building the following facility during the exhibition (brief description on construction materials). Total Booth Area: Primary Material: Material Model: 2 nd Floor Area: Primary Material: Material Model: Ground Floor Area: Primary Material: Material Model: Other Material Details: Accessible 2 nd floor area: SQM Estimated maximum load capacity of 2 nd floor: persons Booth Builder: Contact: Name of Grade A Registered National Structural Engineer: No.: Mailing Add.: Remark: If the exhibitor/builder submits the drawings to re-inspection, please clearly fill in the field of Name of Grade A National Registered Structural Engineer. The above step can be ignored if the drawings are submitted to the HAH directly for inspection.

Regulations on Booth Construction & Design Drawing Review: All double-floor booths must be reviewed and approved by Grade A National Registered Structural Engineer. If you need the services offered by assigned drawing inspector, please submit the following drawings: a. Booth perspective drawing (1front-side and 2 sides), b. Ground floor plan, c. 2 nd floor plan, d. Cutaway view, e. Elevation, f. Section (Side elevation), g. Detailed booth material checklist, h. Structural drawing, i. Structural calculation drawing stamped by Grade A registered National structural engineer, in quadruplicate ( re-inspection booths need ) j. Static test report or static load calculation Stamped by Grade A registered National structural engineer, in quadruplicate ( re-inspection booths need ) k. Certification of Grade A National registered structural engineer ( re-inspection booths need ) Note All drawings submitted to the assigned drawing inspector for review shall be dimensioned in Arabic numbers. DO NOT only specify by grid, in which case, the drawings may be returned without approval. The builder shall be responsible for any delay thus caused. All drawings must be specified in detailed dimensions (m). For construction and design drawings for double-floor booths, if neither reviewed nor re-inspected by HAH Consulting & Exhibition Co., Ltd. Shanghai, the organizer, the exhibition center and HAH Consulting & Exhibition Co., Ltd. Shanghai are authorized to prevent the construction by such exhibitor in the scope of the exhibition center. HAH will start inspection upon receipt of drawings. Declaration by the Project Manager, Foreman or Site Manager responsible For implement of the special stand design I, the responsible Project Manager Site Manager (tick as application) Name: Hereby declare that the above exhibition stand complies with the statutory regulation and the terms of participation. Please fill out the form with the correct information, this will directly affect the safety of the structure being submitted for audit. If any of the submitted information are found to be false, the Shanghai New International Expo Centre reserves the right to stop booth facilities and supplies until the closure of the booth. Shanghai New International Expo Center and HAH Consulting & Exhibition Co., Ltd Shanghai are not accountable for any liability arising therefrom.

HAH Consulting & Exhibition Co.,Ltd.Shanghai Notice Dear exhibitors and contractors: In order to avoid possible physical and property damage caused by the use and construction of the booth and to guarantee a successful exhibition, we hereby notify you in writing as follows: 1. The drawing and design plans of booth construction submitted by the exhibitor or the entrusted contractor must be examined and verified by the professional structural engineers of both Shanghai New International Expo Centre (hereinafter called SINEC) and HAH Consulting & Exhibition Co., Ltd. Shanghai(hereinafter called HAH). Please refer to the Regulations on the Booth Construction of Large Exhibition presented along with this notice to understand the details of the range of the booth drawing and design plans. Please do not start construction either inside or outside the exhibition hall before the relevant drawing and design plans are approved. 2. After the drawing and design plans of the booth construction submitted by the exhibitor or the entrusted contractor are approved by both SINEC &HAH, the construction must be implemented strictly in accordance with the Regulations on the Booth Construction of Large Exhibition and the structural designs given by SINEC&HAH. Amending the structural requirements or adopting unconfirmed material without approval is forbidden. If any booth accidents occur otherwise, the exhibitor or the entrusted contractor must take full responsibilities. 3. The exhibitor should select the contractor with proven qualifications to construct the booth and are obliged to require the contractor to implement the construction in the light of the relevant regulations and construction specifications and carry out corresponding safety measures. 4. Though the drawing and design plans of booth construction submitted by the exhibitor or the entrusted contractor are approved by both SINEC &HAH, still, safety inspectors shall inspect the construction site to prevent the occurrence of safety accidents from time to time (Note: Safety inspections do not incur any fees or charges, they are not to be seen as final measures for eliminating safety hazards.). If any violation of the second regulation stipulated in this notice is discovered, SINEC&HAH will forward a notice of rectification to the exhibitor or the entrusted contractor and a duplicate copy to the exhibition organizer. Upon receiving the notice of rectification, the exhibitor or the entrusted contractor shall complete the rectification as required before the deadline and inform SINEC&HAH for confirmation. If the exhibitor or the entrusted contractor is negligent of the given notice of rectification, SNIEC&HAH, for exhibition safety considerations, will work together with the exhibition organizer to stop the booth construction till dismantle the booth, and the exhibitor shall bear the full responsibilities arising therefrom. 5. With a view to timely communication, all documents (including yet not confined to: Notice of Rectification, Notice of the Second Rectification, Statement of Liability Commitment ) related with the exhibition signed by the exhibitor or the entrusted contractor or the persons concerned are regarded as authorized by the exhibitor if there is no written notice by the exhibitor. Note: If the Notice is received by contractors, please be responsible for passing the copies of Notice and Regulations on the Booth Construction of Exhibition to exhibitors accordingly. ------------------------------------------------------------------------------------------------------------------------------------- Shanghai New International Expo Centre HAH Consulting & Exhibition Co., Ltd. Shanghai: Our company has received and fully understood the above-mentioned Notice and Regulations on the Booth Construction of Large Exhibition. Signature &Stamp: