Hubble GOTO Installation Instruction (1.3, 04/30/2014)

Similar documents
Code Product Qty 1 Top Vertex 3 2 Hot End Housing 1 3 Bottom Vertex 3 4 Print Platform Lock 3 5 End Stop Holder 3 6 Filament Feeder Motor Bracket 1 7

Astro-Physics Inc. 400QMD Lubrication/Maintenance Guide

GlideRite Retractable Cover System For Hot Spot Spas (SE & SLX only)

GlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas)

Installation Instruction

TIRE RACK INSTALLATION INSTRUCTIONS Dodge Sprinter

3,500/4,500lb. Vertical Cable Feighner Lift

Hubble Optics Ultra Portable UP 12 Dobsonian instruction manual

Assembly Instructions 10 X 10 Aluminum Roof Support

Hubble Optics Ultra Light UL 16 Dobsonian instruction manual

M2 Assembly. M2 Sub-Assemblies mm Belt Sub-Assembly mm Belt Sub-Assembly Spider Sub-Assembly... 4

3D PRINTER. Pack 11. Anything you can imagine, you can make! 3D technology is now available for you at home! BUILD YOUR OWN

400GTO Lubrication Guide

BABY WOLF LOOM. Assembly Instructions for Knocked-Down Looms

Side Mount INSTRUCTION BOOKLET #C122 BED STYLE: PARK CITY

Installing the Partridge RA Extension on Losmandy G11

SPARE PARTS LIST MODEL NO. LB1200F PAGE 1 ITEM PART NO. DESCRIPTION QTY NOTE

Original Gallery System

Assembly Instructions 10 X 10 Aluminum Frame Building

WILDING WALLBEDS INSTALLATION INSTRUCTION Side Mount

ABM International, Inc.

General Features. Low Profile. The SMART BOXX stands only 1.5 off of the bed of your truck so cargo space is maximized

INSTRUCTION BOOKLET #C20

ABM International, Inc. Navigator Assembly Manual

1503 Follow Spot Yoke, Source Four LED


INSTRUCTION BOOKLET #C21. For Wallbed models: KING SIZE

INSTALLATION INSTRUCTIONS

RYOBI. 10 in. (254 mm) TABLE SAW MODEL NO. BTS15 REPAIR SHEET

1) Place the reactor stand on a sturdy bench with the bottom plate facing toward the front.

MM540 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

MM340 Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

Gared Pro-S Portable Backstop

MantelMount. TM1A Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

FLIP TARP SINGLE & DOUBLE UNDERBODY TRAILERS


N. 15th Street, Middlesboro, KY FLIP TARP DUMP BODY INSTALLATION INSTRUCTIONS


Nancy s Knit Knacks LLC 4 Yard Option Upgrade Kit Assembly Instructions and User Manual


400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS FOR SL-LB MANUAL LIFT BARRIER GATE ARMS

Spring Loaded All Season Roll-Up Doors

3/8-16 x 3/4 cap screw. 3/8-16 hex nut for above screws. 1/4-20 x 3/4 socket cap screw. 3/16 short arm hex key (not to scale)

The Mind Project s Iris 1 Robotic Arm. Assembly instructions Step 1

MOTORIZED STANDARD SHADE WITH CABLES Installation Instructions

INSTRUCTION BOOKLET #34. For Wallbed models: KING SIZE SIERRA WITH STORAGE HEADBOARD

Side Winder R o u t e r L i f t.

Preference Collection 5580 Treatment Console INSTALLATION GUIDE

Warnings. Description. Prior to Installation Tools Needed

ATLANTIS RAIL Contact Information

Equilibrium. Conference Table. Installation Instruction. Revision B 11/07/16

LEG CURL IP-S1315 INSTALLATION INSTRUCTIONS

11 6 Round Building Assembly Instructions

PFW 6851 Display Wall Mount, Turn & Tilt 80 kg INSTALLATION INSTRUCTIONS

Page 1. SureMotion Quick-Start Guide: LARSACC_QS 1st Edition - Revision A 03/15/16. Standard Steel Bolt/Screw Torque Specifications

INSTALLATION INSTRUCTIONS FOR FRONT CASTING DECK RAIL Ranger

Note: Parts without part numbers are for reference only and cannot be purchased individually.

Metroboard Pulley Replacement Procedure

IDR assembly instructions:

DC3210. Recommended Closer Size

SERVICE PARTS LIST PAGE 1 OF 6 BASE ASSEMBLY SPECIFY CATALOG NO. AND SERIAL NO. WHEN ORDERING PARTS 12" SLIDING COMPOUND MITER SAW

MODEL 83 Pail Handler

Special Z-Axis Ballscrew Replacement

PRS Retro Z-Axis Installation

This instruction manual is an in-depth look and explanation of how to assemble and install the Murphy Bed properly and efficiently.

Pantry IMPORTANT NOTE Carefully remove all the parts from the carton and put them individually on a soft cloth to prevent scratches or oth

RBP-1215B-RX DODGE RAM QUAD CAB RX3

Depending on the size you ordered you will have either 5 Foot sections which will build the 10 Foot frame or 6 Foot sections which will build the 12

F i t t i n g t h e N e w L a n d i n g G e a r t o Y o u r S k y J i b V 1

SM-RAZOR-F-M/L/XL. Strong Low Profile Fixed Mount for Ultra-Thin Flat-Panel TVs INSTALLATION MANUAL

INSTALLATION INSTRUCTIONS

TABLE OF CONTENTS REQUIRED TOOLS

Installation Manual for Metal Toilet Partitions Standard Series

ELECTRIC TOOL PARTS LIST

25-200H. 12 Planer / Jointer. with Helical Cutterhead. Parts List.

Interactive Monitor Arm

Projector Ceiling Mount

M4 Foot Operated Underpinner Instruction Manual

Rudder Pedal Kit. Assembly Manual. V1.0 July 2010.

Mounting a BalanceBox 400 to a brick wall

AndyMark DART 12.

WALLBED Assembly Instructions

ELECTRIC TOOL CORPORATION

HQ Pole Upgrade Kit for HQ Adjustable Table and HQ QuilTable Assembly Instructions 1

HD38, HD58, HD78 REV

SERVICE PARTS LIST PAGE 1 OF 6 BASE ASSEMBLY SPECIFY CATALOG NO. AND SERIAL NO. WHEN ORDERING PARTS 12" DUAL BEVEL COMPOUND MITER SAW B27B

Post-Paint>Fuselage>Interior>Controls>Fit rudder pedals

W-Pressing Assembly. the top W roller thus creating a uniform and constant pressure between and throughout both top and lower W rollers.

SAM. Model: STV-C65 LCD Mobile Visualized Stand Instruction Manual. Weight Capacity: 1251bs / 56.7kg Suits LCD Flat Panel Display: 42"-55" Page 20

Brother Industries, Ltd. Nagoya, Japan

WOLF PUP LOOM TM & WOLF PUP LT LOOM TM

MODEL NO.: MI PARTS BREAKDOWN

EZ-Lock Assembly Manual

IMPORTANT: installation. FLOOR ANCHORED CEILING HUNG OVERHEAD BRACED FLOOR-TO- CEILING ANCHORED

Mast and Antennas for Field Day & Emergencies

REPAIR INSTRUCTIONS: CABLE

Installation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 60" Plasma Screens

Privacy Wall Glass Selections - Polished Edge Slider Door

Transcription:

Hubble GOTO Installation Instruction (1.3, 04/30/2014) 1. Preparation... 1 1.1 Tools required... 1 1.2 AZ GOTO Drive Parts List...1 1.3 ALT GOTO Drive Parts List... 1 2. The Azimuth motor drive installation...2 3. The ALT motor drive installation...14 1. Preparation Before starting your installation, please make sure that you have all the required tools and all the parts in the Parts Lists. This manual only cover the mechanical installation of the GOTO system. For the installation, wiring and configuration of SiTech controller, please refer to SiTech Quick Start Guide for Hubble Optics ULs. 1.1 Tools required Hand drill with 4mm and 10mm bits (Not required if the system is GOTO ready) Metal saw and round steel file (Not required if the system is GOTO ready) Philips screw drivers Tape measure Crescent wrench Hex key set 1.2 AZ GOTO Drive Parts List AZ geared motor assembly with mounting plate 2 tension springs 10mm spacer 3 AZ spoke arms AZ encoder mounting plate One brass AZ encoder housing Mounting screws AZ quick release clamp 1.3 ALT GOTO Drive Parts List ALT geared motor assembly with mounting plate 2 meter long SS strand cable 1 tension spring (the strongest one) Grooved ALT bearing Teflon pads (2) Mounting screw ALT quick release clamp ALT extension module There are total of 3 tension springs. The strongest one is for the ALT axis, while the two weaker ones are for the AZ bearing axis. Page 1

2. The Azimuth motor drive installation 1. Remove the secondary cage and all truss tubes from the OTA. Then carefully remove the mirror from the mirror box and place the mirror in a safe place. 2. Lift the mirror box off the rocker and rest it on the side. Please do not rest the mirror box on the ALT bearing surface; you may damage the laminate surface. 3. This step is only needed for the system without the GOTO ready option. You need to drill 3 holes, a 4mm and a 16.5mm through holes and a M6 threaded hole, as shown in the following drawings. For the 16.5mm hole, please drill a small 4mm diameter pilot hole first; then enlarge it with the 10mm pit and finally use a round steel file to further enlarge it to the required 16.5mm diameter. For the 25mm diameter half circle at the bottom of the rocker frame, it will be much easier to use a metal saw to cut a triangle open first, and then use a steel file to round it to the required half circle. To avoid causing any damage to the AZ bearing, you must remove the AZ bearing from the Rocker before doing the drilling! Figure 1: Drilling positions Page 2

Figure 2: UL14 and UL16 drilling positions Please note the center of the half circle is 72 mm from the centerline for UL14 and UL16, and 160mm for UL18 and UL20. Page 3

Figure 3: UL14 and UL16 drilling positions Figure 4: UL18 and UL20 drilling positions Page 4

Figure 5: UL18 and UL20 drilling positions Figure 6: UL18 and UL20 drilling positions 4. Install the 1 diameter brass AZ encoder housing into the center holes of the three stainless steel Azimuth spoke arms as shown below using a M6 x10 hex screw. Do not tighten them too tightly yet. Page 5

Figure 7: AZ Spoke Arms 5. Install the three stainless steel Azimuth spoke arms to the inner AZ bearing ring with three M6 screws (You may have to drill and tap three roughly evenly spaced M6 holes on the inner AZ bearing ring if they are not pre-drilled and tapped). Please make sure the encoder housing is precisely placed at the AZ bearing center by making sure the scale readings on all three AZ spoke arms are exactly the same at the edge of the AZ inner bearing. Tighten three M6 screws and the center screw to lock the encoder housing to the AZ arms tightly. You can install the AZ spoke arms in the same three holes used by the three footers, and use the same wing nuts to lock the spoke arms. Page 6

Figure 8: AZ Spoke Arm Installation 6. Install the AZ encoder arm assembly by carefully inserting the encoder shaft into the center hole of the brass encoder housing. Adjust the depth so the threaded shank of the encoder does not, but just about to touch the housing; a 0.5-1.0mm gap is fine. Tighten the Nylon setscrew on side of the brass housing onto the shaft. Page 7

Figure 9: AZ encoder Arm Installation Page 8

7. Center the AZ encoder arm anchor slot with the anchor hole on the Rocker frame. Then install the provided M5 screw into the anchor hole and tighten firmly. You may want to wrap a few layer of tape around the head of anchor screw if the anchor slot is a bit larger than the screw head. Make sure the slot is snuggly fit with screw head. 8. Now install the AZ motor assembly. First, center the installation hole on the AZ motor assembly plate with the installation hole on the rocker frame. Then, insert the provided10mm diameter spacer into the AZ motor assembly installation hole. Figure 10: Center the installation holes Page 9

Figure 11: Insert the provided 10mm diameter spacer Then place a larger spacer on top of the 10mm spacer on the AZ motor assembly plate. Figure 12: Installation of the AZ motor assembly Finally insert a hex head screw into the installation hole, and tighten it with a wrench. You may need to add more spacers to make sure the screw does not touch the AZ inner bearing ring. Page 10

9. Install the AZ quick release clamp. Page 11

10. Insert the provided M4 eyebolt into the hole next to the AZ quick release clamp. Then add a spacer on the outside of the eyebolt and install a wing nut on top of it. Page 12

Page 13

Then install the 12mm spring as shown above, and adjust the wing nut to apply the tension. You may want to hook two springs for more tension. 11. Install all AZ motor and encoder cables as shown in Appendix A of SiTech GOTO Quick Start Guide 3. The ALT motor drive installation 1. Make sure to complete the AZ motor installation first before doing the ALT motor installation 2. Replace 2 of the regular Teflon pads with 2 new grooved Teflon pads. Make sure the top of the crosshead screws are lower than the bottom of the grooves. Page 14

Page 15

3. Remove the upper section of the ALT bearing. Drill and tap a M4 hole on the front tip of the left altitude bearing as shown below. Page 16

Page 17

4. Place the mirror box on the side and remove the lower left ALT bearing from the mirror box 5. Install the ALT GOTO extension module to the lower left ALT bearing with one M6 cross head screw. You will need to use a socket head screw and nut if the hole on the bearing is not tapped. Center another hole with the corresponding hole on the bearing, but leave it open. 6. Re-install the ALT bearing back to the mirror box. Please note that you will need to remove or replace one of the spacer with a thinner spacer to compensate the thickness of the extension block. Page 18

7. Re-install the ALT upper bearing section back to the mirror box Page 19

8. Remove two of screws on the rocker as shown below, and install the ALT motor assembly in these two holes. Page 20

9. Place the SS cable along grooved ALT Teflon pads; make sure that the SS cable rests in the groove on the Teflon pads. You can use some small pieces of scorch tape to keep the cable in place. But do not put the tape on the Teflon pads! You may not be able to completely remove the tape! 10. Carefully place the mirror box back on the rocker, and tighten the mirror box to rocker with the provided Nylon strips to avoid any mirror box movement (You must un-tighten these strips before operating the GOTO). Make sure the SS cable is restricted in the grooves on the Teflon pads. 11. Lock the upper end loop of the SS cable with the screw as shown in the following picture. Page 21

12. Hold the SS cable and wrap it around the AZ drive roller twice, and then hook the SS cable to the end of the tension spring. Make sure to release the clamp when doing so, and then push the clamp back to the "engaged" position. You can adjust the end nuts on the clamp "U" bracket to adjust the tension when needed. Make sure the tension is no more and no less, just enough to avoid the SS cable slipping from the brass drive roller. Page 22

Page 23

13. ALT Encoder Installation Install the 1 diameter brass AZ encoder housing into the one of center holes of the ALT encoder holder bracket as shown below using a M6 x10 hex screw. Page 24

A: for UL14 B: for UL16 C: for UL18 D: for UL20 Recommended positions; however you may use different position for your scope to make sure that the encoder is indeed centered. Page 25

Install the ALT encoder holder to the mirror box with the M6 knob screws Page 26

Install the Azm encoder&arm assembly by carefully inserting the encoder shaft into the center hole of the brass encoder housing. Adjust the depth so the threaded shank of the encoder does not touch the housing. Tighten the Nylon setscrew on side of the brass housing onto the shaft. Adjust the ALT encoder bracket to position to make sure it is centered at the ALT bearing axis: Once the encoder is centered, then set the mirror box to zenith, 45 degree, and then 90 degree, you should see the pivoting screw hole at the bottom remain at the same location at the ALT encoder bracket Page 27

Mirror Box at Zenith Mirror Box at 45 degree Page 28

Mirror Box at 90 degree 14. Follow the UL SiTech Quick Start Guide to connect the motor and encoder wiring and configure the SiTech controller Page 29

WARNING! Your scope should be well balanced before GOTO operation. Otherwise, the motor will get into blinking mode (manual mode) and the gearbox may be damaged Page 30