YHS 50 FS Storefront System & Model 35H/50H Door Installation Manual

Similar documents
YES 40 FS/FI Storefront System Installation Manual

YHS 50 TU Storefront System & Model 35H Door Installation Manual

YES 45 TU Thermal Storefront System Installation Manual

YES 600 Thermal Clip Storefront System Installation Manual

YES 45 FS/FI Storefront System Installation Manual

YES 45 XT High Performance Thermal Storefront System

YWE 40 T Window Wall System Installation Manual

Swing Door Installation Manual

YSG 40/50/50T Window Wall System Installation Manual

YCW 750 IG Inside Glazed Curtain Wall System Installation Manual

YCW 752 Outside Glazed Curtain Wall System Installation Manual

YSD 400 Sliding Door System Installation Manual

YCW 750 OG Outside Glazed Curtain Wall System Installation Manual

YHC 300 SSG Structural Silicone Glazed Curtain Wall System Installation Manual

YHC 300 IG Inside Glazed Curtain Wall System Installation Manual

YCW 750 OG Outside Glazed Curtain Wall System Installation Manual

YSD 600 T/TH Sliding Door System Installation Manual

Installation Manual. YSD 600 T/TH Sliding Door. YSD 600 T/TH Sliding Door System

YOW 225 TU Window System

DHS-500 IMPACT SYSTEM INSTALLATION MANUAL

Storefront Installation Guide

14000 I/O Series Flush Glaze. Fabrication and Installation Instructions

4500 Series. Fabrication and Installation Instructions

YVS 400 TU Window System

INSTALLATION INSTRUCTIONS. Thermal Entrances AA 250/AA 425 THERMAL DOOR WITH TRIFAB 601/601T FRAMING

FG-5100T STORMMAX INSTALLATION AND GLAZING MANUAL NOTE:

14000 Series. Fabrication and Installation Instructions

INSTALLATION MANUAL STOREFRONT DOORS

INSTALLATION INSTRUCTIONS

14000 Series. Fabrication and Installation Instructions

Installation Instructions

NARROW, MEDIUM AND WIDE STILE, THERMASTILE AND DURASTILE. Installation Instructions

Series Sloped glazed Curtain wall. Installation Instructions

GENERAL INSTALLATION GUIDELINES

ELEPHANT DOOR SYSTEMS SERIES E1200

GENERAL INSTALLATION GUIDELINES

Heavy Wall Applied Stop Tube Frame and Door Installation

YOW 350 XT Thermally Broken Operable Window System

Series Advanced and alternate. Installation Instructions

Series Exterior glazed curtain wall. Installation Instructions

INSTALLATION INSTRUCTIONS 2 x 4 1/2 for 1 Glass

INSTALLATION INSTRUCTIONS TRIFAB VG SCREW SPLINE ASSEMBLY TRIFAB VG 450 TRIFAB VG 451 TRIFAB VG 451T

Thermally Broken Framing and Door Installation

INSTALLATION INSTRUCTIONS

Installation Instructions

Sliding Glass Door Assembly and Installation Guide

INSTALLATION INSTRUCTIONS ENTICE SERIES PREMIUM ENTRANCE SYSTEM EXTERIOR GLAZE

INSTALLATION INSTRUCTIONS TRIFAB 451UT SCREW SPLINE ASSEMBLY TRIFAB 451UT. AUGUST, 2010 (Part No. 452T-CG-970) EC

SERIES 5001 SLIDING GLASS DOOR PATIO DOORS INSTALLATION GUIDE

INSTALLATION INSTRUCTIONS

Storefront Installation Guide INSTALLATION INSTRUCTIONS

Note: Installation and Glazing Manuals are product specific. FOR REVIEW ONLY! May 2015

Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement

SECTION C1 INSTALLATION INSTRUCTIONS

Sun Control-Solar Eclipse-Solar Shelf

1/4 FRAMELESS DOOR WITH INLINE PANEL 1413A-1713A-1813A

Series 526 Thermal impact storefront. Installation Instructions

INSTALLATION INSTRUCTIONS 2 1/2 x 7 for 1 Glass

INSTALLATION INSTRUCTIONS

Heavy Wall Applied Stop Tube Frame and Door Installation

INOVO 2-LITE SLIDING PATIO DOOR

Note: Installation and Glazing Manuals are product specific. FOR REVIEW ONLY! FEBRUARY 2012

QCI0029 REV. 1 Page 1 of 11 Certified 07/06/05

INOVO 4-LITE SLIDING PATIO DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS

SERIES CF450 INSTALLATION INSTRUCTIONS. SERIES CF450 1¾ x 4½ - B1. Fabrication for Panel Assembly. High Performance Non-Thermal Storefront System

INSTALLATION INSTRUCTIONS. UNIT No. 160/760 THIN-LINE SHOWER ENCLOSURE

SERIES 406X. Installation Instructions. Place photography here. Don t go over grey area. (size w x h )

SERIES BW3250 BLAST WALL TABLE OF CONTENTS INSTALLATION INSTRUCTIONS GENERAL NOTES

C-Series & S-Series Classic Frame with Transom (Single or Pair)

Series 406 storefront. Installation Instructions

PIVOT DOOR 3400P INSTALLATION INSTRUCTIONS

SERIES CF451T INSTALLATION INSTRUCTIONS. SERIES CF451T 2 x 4½ - B2. Fabrication for Panel Assembly. High Performance Thermal Storefront System

Series 7600 Installation Instructions Aluminum Multi-Slide Door (Pocketing)

SERIES 3070-T MULTI-SLIDE ASSEMBLY & INSTALLATION INSTRUCTIONS

Vinyl Sliding Glass Door Assembly Instructions

TCR 250 THERMAL COMPOSITE RIBBON WINDOW

INSTALLATION INSTRUCTIONS. EnCORE CAPTURED & SSG SCREW SPLINE SHEAR BLOCK TYPE B LITHO IN U.S.A. JANUARY KAWNEER COMPANY, INC

FIXED PANEL SLIDER QCI5241

Series 525 impact storefront. Installation Instructions

INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5233

INSTALLATION INSTRUCTIONS

4-lite Patio Door. Installation Instructions

METL-VISION WINDOW SYSTEM FOR HORIZONTAL WALL PIONEERING INSULATED METAL PANEL TECHNOLOGY

Note: Installation and Glazing Manuals are product specific. FOR REVIEW ONLY! OCTOBER Phone: OLDCASTLE ( ) Web Address:

1200 SERIES 2 PANEL DOOR rev.1 DETAILED INSTALLATION INTRUCTIONS

INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS

Illustration Part Description Base List Weight/ Ft./ Box Number Price/S.L. S.L. S.L. Qty.

Installation Instructions for Vista Air Vertically Folding Walls

Table of Contents. Typical elevation & cut lengths. General construction notes. General installation notes. Typical jamb assembly

3-LITE PATIO DOOR INSTALLATION INSTRUCTIONS

Series 6000 THERMAL MULTI-PLANE INSTALLATION AND GLAZING MANUAL

SERIES 300 SINGLE HUNG WITH FIN WINDOW INSTALLATION

675 Quick N Stall Neo Angle Framed Hinge Shower Enclosure

Frameless Inline Door With Return QCI5263

SERIES 300 SINGLE HUNG WINDOW INSTALLATION

INSTALLATION INSTRUCTIONS. EnCORE CAPTURED & SSG SCREW SPLINE SHEAR BLOCK TYPE B. EnCORE FEBRUARY, 2012 EC PART NO.

Unit No. 135, 735 Deluxe Pivot Inline Door & Panel Shower Enclosure

Fold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE

INSTALLATION INSTRUCTIONS. Deluxe Continuous Hinge Inline Door & Panel Shower Enclosure QCI5230

Flushglaze For Framed Openings and Horizontal Panels. Window System Installation Guide

Transcription:

Installation Manual 2014 YKK AP America Inc. is a subsidiary of YKK Corporation of America.

TABLE OF CONTENTS Installation Notes... Page ii PARTS DESCRIPTION YHS 50 Framing Members... Page 1 YHS 50 Accessories... Page 2 to 3 FRAME FABRICATION Determine Frame Size... Page 4 Fabricate Sill Flashing... Page 5 to 7 Fabricate Vertical Mullions & Pocket Fillers... Page 8 to 9 Fabricate Jamb Mullions... Page 10 Fabricate Head & Horizontal Members... Page 10 Fabricate Sill Members... Page 11 Fabricate Glass Stops... Page 11 FRAME ASSEMBLY Install Structural Silicone Spacers... Page 12 Assemble Frames... Page 12 FRAME INSTALLATION Install Sill Flashing End Dams... Page 13 Install Sill Flashing... Page 14 Install Sill Flashing Splice Sleeve... Page 14 to 15 Install Storefront Frames... Page 16 Install Door Frames with Water Resistant Threshold... Page 17 to 22 Install Door Frames with Air Tight Threshold... Page 23 Install Water Deflectors... Page 24 Perimeter Sealant... Page 25 GLAZING Determine Glass Size... Page 26 to 27 Glazing... Page 28 to 32 INSTALL HARDWARE Adjust Alignment of Model 35H/50H Door... Page 33 Install Model 35H/50H Door Hardware... Page 33 Install Threshold Ramp for ADA Compliance... Page 34 to 35 Effective Date: April 4, 2014 02-4006-10 Page-i

Installation Notes 1. Do not drop, roll or drag boxes of aluminum framing. Move and stack boxes with proper support to prevent distortion. If fork lifts are used be especially careful about striking the boxes when lifting or moving. 2. Store in a dry, out of the way area. If rain exposure, condensation or any water contact is likely, then all packaging material should be removed. Wet packaging materials will discolor and may stain aluminum finishes and paints. 3. All materials should be checked for quality and quantity upon receipt, YKK AP must be notified immediately of any discrepancies in shipment. Check to make sure that you have the required shims, sealants, supplies and tools necessary for the installation. 4. Carefully check the openings and surrounding conditions that will receive your material. Remember, if the construction is not per the construction documents, it is your responsibility to notify the general contractor in writing. Any discrepancies must be brought to the general contractor s attention before you proceed with the installation. 5. Gather your shop drawings, materials, packing list, and this installation manual. Carefully review parts location, the sequence it goes therein, when you glaze it and how you seal it. Installation instructions are of a general nature and may not cover every condition you will encounter. The shop drawings and/or installation manuals were prepared specifically for the product. 6. Any material substitutions must be of equal or greater quality. 7. Make certain that material samples have been sent for compatibility testing for all manufacturer s sealants involved. Make certain sealants have been installed in strict accordance with the manufacturer s recommendations and specifications: A. Specified metal to metal joints use Dow Corning 795 or 995. B. All metal to glazing must use Dow Corning 995. 8. Remember to isolate, in an approved manner, all aluminum from uncured masonry or other incompatible materials. 9. System-to-structure fasteners are not supplied by YKK AP. Fasteners called out on shop drawings are to indicate minimum sizes for design loading. 10. Entrances are to be installed plumb, square, level and true. 11. If any questions arise concerning YKK AP products or their installation, contact YKK AP for clarification before proceeding. 12. YKK AP storefront and/or curtain wall framing is typically completed before drywall, flooring and other products which may still be in process. Take the extra time to wrap and protect the work that you have proudly produced, because no one else will. 13. Cutting tolerances are plus zero (0 ), minus one thirty second (-1/32 ) unless otherwise noted. 14. Check our website, www.ykkap.com, for the latest installation manual update prior to commencing work. Page-ii 02-4006-10 Effective Date: April 4, 2014

FRAMING MEMBERS / ACCESSORIES Head 2-1/2 x 5 E9-0601 Transom Bar Elastomer weathering E2-0051 included AS-0501 Horizontal 2-1/2 x 5 E9-0603 OHCC Transom Bar Use with AS-0218 Pile Weathering included AS-0520 Sill 2-1/2 x 5 E9-0615 Door Stop For OHCC Transom Bar Elastomer Weathering E2-0051 included AS-0218 Glass Stop E9-0608 Transom Glazing Pocket Filler E9-0505 Transom Glass Stop E9-0506 Jamb 2-1/2 x 5 E9-0604 Door Jamb Elastomer weathering E2-0051 included AS-0504 Heavy Duty Vertical 2-1/2 x 5 E9-0605 Threshold Trim Elastomer weathering E2-0051 included AS-0503 Shallow Pocket Filler Use with E9-0601 or E9-0604 *Not Metro-Dade Approved E9-0617 Water Resistant Threshold Gutter E9-0502 Deep Pocket Filler Use with E9-0605 & E9-0504 E9-0606 Threshold Ramp E9-0511 Flat Filler Use with 90 Corner Mullion E9-0659 E9-0657 Threshold Ramp E9-0512 90 Corner Mullion Use with E9-0656 and E9-0657 E9-0659 Threshold Ramp E9-0513 Sill Flashing E9-0619 Air Tight Threshold Elastomer weathering E2-0051 included AS-0487 Effective Date: April 4, 2014 02-4006-10 Page-1

ACCESSORIES Setting Block E2-0080 Water Deflector For Intermediate Horizontals E2-0079 OHCC Transom Bar Setting Block E2-0737 End Dam For Sill Flashing E9-0619 E1-1050 Door Setting Block E2-0086 Splice Sleeve For Sill Flashing E9-0619 E2-0070 Side Block E2-0094 Threshold Clip For Air Tight Threshold E9-0487 E1-1055 Exterior Glazing Gasket For 1/4 to 5/16 Glazing E2-0081 Anti-Walk Block For Jamb & Vertical Deep Pockets (Dry Glazed) E2-0546 Exterior Glazing Gasket For 3/8 to 7/16 Glazing E2-0082 Anchor Filler For Jamb at Anchor Locations, 2-1/2 Long E1-1068 Exterior Glazing Gasket For 1/2 to 9/16 Glazing E2-0083 Anchor Filler For Head & Sill at Anchor Locations, 11 Long E1-1071 Interior Glazing Gasket Use with 9/16 Laminated Glass for Dry Glazed Applications E2-0088 Shear Block For Use with AS-0520 OHCC Transom Bar E1-0370 Interior Silicone Spacer E2-0084 Steel Reinforcing E1-1062 Door & Reglaze Silicone Spacer E2-0085 Drill Fixture H-7202 Page-2 02-4006-10 Effective Date: April 4, 2014

FASTENERS #10 x 1/4 FHSMS For attachment of Threshold Clip E1-1055 FM-1004 #12 x 5/8 PPHSMS Type AB For attachment of end dam to flashing PC-1210 #10 x 1/2 FHSMS For attachment of AS-0503 Threshold Trim FC-1008 #12 x 1 PPHSMS Type AB For Screw Spline Attachment PC-1216 #10 24 x 1/2 FHMS Type F For attachment of Glazing Pocket Filler to Steel Reinforcing FF-1008-SS #14 x 1/2 PPHSMS Type AB For Threshold Gutter Attachment PC-1408 #10 x 5/8 FHSMS Type B For attachment of Transom Glazing Pocket Filler PB-1010 #14 x 1-1/2 PPHSMS Type AB For Sill Gutter Attachment PC-1424 #10 x 1-3/4 PHSMS Type AB For Attachment of E2-0370 Shear Block PC-1028 1/4 20 x 3/4 HWHMS Type F For attachment of Steel Reinforcing to Verticals HF-2512-W1 #12 x 3/4 FHSMS Type AB For attachment of OHCC Transom Bar to E2-0370 Shear Block FC-1212 Effective Date: April 4, 2014 02-4006-10 Page-3

STEP 1 DETERMINE FRAME SIZE FABRICATION Determine Frame Width: Measure Measure Note: Check the opening for squareness and plumb at both ends; unit must be installed in a true rectangle. Measure B A A=B 3/8 Frame width Masonry opening 3/8 Detail 1 -Measure the width of the masonry opening at the top, middle and bottom. -Select the smallest dimension measured and subtract 3/4 to determine the frame width size to be used. See Detail 1. Determine Frame Height: Detail 2 Measure Measure Masonry Opening up to 3/8 Caulk Joint Measure Measure Measure Frame Height -Measure the height of the masonry opening at several points along the entire length of the opening. -Select the smallest dimension measured and subtract 1-1/8 to determine the frame height: minimum 3/8 for the caulk joint at the head. 5/8 for the sill flashing E9-0619. minimum 3/8 for the caulk joint UNDER the sill (excluding FPA-HVHZ applications). 5/8 Sill Flashing Caution: Projects in Metro Dade County Florida, change the shim/caulk joint at the head from 1/2 to 3/8. Refer to current FPA-HVHZ for anchoring guidelines. See Detail 2. Page-4 02-4006-10 Effective Date: April 4, 2014

STEP 2 FABRICATE SILL FLASHING FABRICATION -Cut sill flashing, E9-0619, to the frame width dimension determined in Step 1 plus (+) 1/4. -For openings longer than 24-0, the sill flashing must be spliced every twelve to fifteen feet. Allow a 3/8 splice joint between members; see Detail 19 on Page-14. Splice is to be located at the center of the daylight opening between verticals. -Locate and mark the centerline of each vertical on the sill flashing. See Detail 3. Entrance Door with Water Resistant Threshold, E9-0502 CL CL CL D.L.O. = Day Light Opening D.L.O. D.L.O. D.O.W. D.L.O. D.O.W. = Door Opening Width 2-1/2 E9-0619 S.F. = Frame Width + 1/4 3/8 End of Sill Flashing D.L.O. + 3-7/8 D.L.O. + 2-1/2 D.L.O. + 2-1/2 End of Sill Flashing D.L.O. + 3-7/8 3/8 Detail 3 Entrance Door with Air Tight Threshold, E9-0487 CL CL CL D.L.O. D.L.O. D.O.W.* D.L.O. 2-1/2 E9-0619 E9-0619 3/8 End of Sill Flashing D.L.O. + 3-7/8 D.L.O. + 1-1/4 End of Sill Flashing D.L.O. + 2-5/8 3/8 *Note: The sill flashing, E9-0619, does not run underneath the door frame when the air tight threshold, E9-0487, is used. Effective Date: April 4, 2014 02-4006-10 Page-5

STEP 2 FABRICATE SILL FLASHING (Continued) FABRICATION -Locate and drill clearance holes in sill flashing for perimeter anchors. Refer to Florida Product Approval drawings or shop drawings for appropriate fastener and hole locations as determined by a qualified engineer or contact YKK AP. For Dade County Applications: -Refer to FPA-HVHZ. See Detail 4 for anchor hole locations. Without Steel Reinforcing E9-0619 C L E9-0604 E9-0605 C L E9-0606 E9-0606 C L E9-0504 With Steel Reinforcing E9-0619 C L E9-0604 E9-0605 C L E9-0606 E9-0606 C L E9-0504 Detail 4 Page-6 02-4006-10 Effective Date: April 4, 2014

STEP 2 FABRICATE SILL FLASHING (Continued) FABRICATION Notch Sill Flashing when UsingThreshold E9-0502: -Sill flashing back leg must be notch at all door threshold locations 1-1/4 from the top of the leg and run the length of the door opening width. -Sill Flashing must be notched to Door Opening Width + 1/8 on both sides. See Detail 5. Detail 5 D.O.W. 1/8 1/8 1-1/4 1-1/4 Fabricate weep holes in the sill flashing: -Measure 8 in each direction of the mullion centerline and mark on the front face of the sill flashing the location for the weepholes. -Drill a 3/8 diameter (#V drill bit) hole through both walls of the hollow in the sill flashing at each location marked. See Detail 6. CL Mullion C L Jamb 8 ø3/8 Weep Holes Through both walls of hollow 8 E9-0619 8 Detail 6 Effective Date: April 4, 2014 02-4006-10 Page-7

FRAME FABRICATION STEP 3 FABRICATE VERTICAL MULLIONS AND POCKET FILLERS -Cut all vertical members and pocket fillers to the frame height determined in Step 1: Masonry Opening minus( ) 1-1/8. Masonry Opening minus( ) 1 (For Dade County). Prepare verticals and glazing pockets for attachment of horizontal members and anchor fillers: -Using a short piece of each horizontal member as a template, center horizontal members on the face of verticals and mark locations. -Hole locations may also be determined by laying out locations along the face of verticals as shown below in Detail 7. -Drill 0.236 diameter (#B drill bit) holes at each location marked. Note: For vertical member, E9-0605, drill through both the front face and web of the mullion. It is also necessary to turn the mullion over and drill 1/2 dia. holes through the mullion web only, centered on the first holes drilled, to allow the screw heads to pass through. Front Face Detail 7 E9-0605 2-5/16 5/16 2-1/2 ø0.236 Top of Mullion Mullion Web ø1/2 ø0.236 2-5/16 2-5/16 27/32 1-21/32 5/16 3/16 1-3/16 2-5/8 1-3/16 2-1/2 2-1/2 Top of Horizontal Bottom of Sill Page-8 02-4006-10 Effective Date: April 4, 2014

FRAME FABRICATION STEP 4 FABRICATE VERTICAL MULLIONS AND POCKET FILLERS FOR STEEL REINFORCING -Measure in 6 from each end of the pocket filler and mark locations on the V -Groove. -Measure 18 on center thereafter and mark the locations on the V -Groove. Note: Coordinate with the location of horizontals so that the horizontals do not block these holes. 6 -Drill ø0.213 (#3) holes at each location marked. -Countersink for #10 flat head fastener (FF-1008). See Detail 8. These four holes will later be used to attach glazing pocket filler, E9-0606, to the formed steel channel, E1-1062, during frame installation. 18 Max. Detail 8 6 -Cut steel channel, E1-1062, 6 shorter than mullion length. -Layout and drill 0.281 diameter (#K drill bit) clearance holes in steel only. -Align steel channel, E1-1062, with E9-0605 as shown in Detail 9 and transfer hole locations to the vertical. -Drill 0.213 dia. (#3) tap holes in the vertical. Do not attach the steel channel at this time. Steel reinforcing is attached to the vertical just prior to snapping the frame portions together. See Step 15 on Page-16. Detail 9 *Dade County: Steel reinforcing must be attached 9 on center staggered. Effective Date: April 4, 2014 02-4006-10 Page-9

STEP 5 FABRICATE JAMB MULLONS Prepare jamb members for perimeter fasteners: -Drill and countersink jamb member, E9-0604, for required fastener. -Install anchor filler, E1-1068, at each anchor location and crimp the snap legs at the ends to hold it in place. -Match drill a clearance hole through anchor filler, E1-1068, at each anchor location for appropriate fastener. See Detail 10. FRAME FABRICATION *Refer to FPA drawings or shop drawings for appropriate fastener and hole locations as determined by a qualified engineer or contact YKK AP. (Flat Head Fasteners Only) STEP 6 FABRICATE HEAD & HORIZONTAL MEMBERS Detail 10 -Cut head and horizontal members to daylight opening between verticals. Fabricate the ends of head members for perimeter anchor fasteners: -Drill and countersink head member, E9-0601, for required fastener. -Install anchor filler, E1-1071, at each end of the head member and crimp the snap legs at the ends to hold it in place. -Match drill a clearance hole through anchor fillers, E1-1071, at each anchor location for appropriate fastener. See Detail 11. For Dade County: 3/8 Shim. *Refer to FPA drawings or shop drawings for appropriatefastener and hole locations as determined by a qualified engineer or contact YKK AP. (Flat Head Fasteners Only) Detail 11 Page-10 02-4006-10 Effective Date: April 4, 2014

STEP 7 FABRICATE SILL MEMBERS FRAME FABRICATION -Cut sill members to daylight opening between mullions. Fabricate sill member for sill gutter anchors: -Measure in 1-1/2 and 3 from both ends of sill members and mark locations along V -Groove. -Drill 0.281 diameter (#K drill bit) holes at each location marked for sill gutter anchor fasteners. -Install anchor filler, E1-1071, at each end of the sill member and crimp the snap legs at the ends to hold it in place. -Match drill 0.281 diameter (#K) holes through anchor fillers, E1-1071, at each anchor location. See Detail 12. E9-0615 E1-1071 ø0.281 for PC-1424 1-1/2 3 3 1-1/2 E9-0615 E1-1071 Detail 12 STEP 8 FABRICATE GLASS STOPS -Cut glass stops to daylight opening between verticals minus ( ) 1/32. Effective Date: April 4, 2014 02-4006-10 Page-11

FRAME ASSEMBLY STEP 9 (SKIP TO STEP 10 FOR DRY GLAZE APPLICATIONS) STRUCTURAL SILICONE GLAZE (SSG) APPLICATIONS INSTALL STRUCTURAL SILICONE SPACERS -Install all structural silicone spacers, E2-0084, in all horizontals and verticals prior to frame assembly. -Horizontal silicone spacers are to be cut to D.L.O. + 7/8 and must be notched as shown in Detail 13. -Vertical silicone spacers are to be cut to the full length of the vertical mullion and are not notched. Notch Ends Caution: Be careful not to stretch silicone spacers when installing. STEP 10 ASSEMBLE FRAMES -Clean all joints with isopropyl alcohol (50%) and wipe clean with white lint free cotton cloth using the two cloth method. -Apply sealant to each end of head, horizontal and sill members prior to attaching to vertical. -Attach head, horizontal, sill members and anchor fillers, E1-1071 to verticals and pocket fillers with PC-1216 fasteners. -Tool all sealant to ensure a water tight joint. 1/8 1/2 Horizontal Silicone Spacers E2-0084 Detail 13 Sealant 1/2 See Detail 14. E9-0601 Head E9-0603 Horizontal E9-0605 Vertical Apply & Tool Sealant PC-1216 E1-1071 Anchor Filler Detail 14 Sealant (SSG Application Shown, Dry Glaze Similar) E9-0615 Sill Page-12 Apply Sealant Prior to Snapping Filler into Mullion. Tool After Assembled. Note: In all metal to metal applications use Dow Corning 795 or Tremco Spectrum 2. 02-4006-10 Effective Date: April 4, 2014

STEP 11 INSTALL SILL FLASHING END DAMS FRAME INSTALLATION Note: The end dam tab must be bent in the correct position for the left or right end of the sill flashing. See Detail 15. E1-1050 -Clean all joint surfaces using Isopropyl Alcohol. -Insert backer rod into the front cavity of the sill flashing. Fill the cavity flush with silicone sealant. -Apply sealant to the end dam as shown in Detail 16. -Insert backer rod into the front channel and fill remaining cavity with silicone sealant. See Detail 17. -Slide the tab into the top portion of the sill flashing. -Tap the tab into place with a small tool until the end dam is snug against the end cut of the flashing. -Fasten the end dam to the sill flashing with two PC-1210 screws, starting at the back, followed by the front as shown in Detail 17. -Tool sealant along the joint between the end dam and the sill flashing as shown in Detail 18. -Seal over any exposed screw threads. Detail 15 Detail 16 Sealant Sealant PC-1210 Sealant Backer Rod Detail 17 Detail 18 Effective Date: April 4, 2014 02-4006-10 Page-13

STEP 12 INSTALL SILL FLASHING -Install the sill flashing with a maximum of 3/8 shim underneath. Sill flashing must be installed level. -Anchor the sill flashing to the structure a maximum of 4 from each end and then 18 to 24 on center, or per FPA drawings or P.E. calculations. -Apply and tool sealant to cover the heads of all anchor screws. STEP 13 INSTALL SILL FLASHING SPLICE SLEEVE FRAME INSTALLATION -After the sill flashing has been shimmed and installed to the building structure, insert a small backer rod under the sill flashing and inside the front cavities of the sill flashing as shown in Detail 19. -Position the Silicone Splice Sleeve against the back wall below the groove. -Bend the Silicone Splice Sleeve into the front on the channel as shown. Mark and cut the sleeve at this position. -Clean Sill Flashing and Silicone Splice Sleeve with isopropyl alcohol at the splice location -Seal the flashing at the splice location as shown in Detail 19, before positioning the flashing. Fill the two front cavities with silicone sealant prior to setting the silicone splice sleeve onto the sealant. -Tool sealant tight as shown in Detail 20, squeezing the sheet flat using a seam roller. -Thoroughly seal the small joint directly in front of the Silicone Splice Sleeve as shown in Detail 20. When using E2-0070, a compatible Silicone Sealant must be used at the splice. Compatible Silicone Sealants include Tremco Spectrum 2 and Dow Corning 795. E2-0070 Splice Sleeve (Trim to Fit) 3/8 Sealant Sealant E2-0070 Splice Sleeve Detail 19 Backer Rod Length Page-14 02-4006-10 Effective Date: April 4, 2014

FRAME INSTALLATION Seal Joint With Sealant End Dam E1-1050 3/8 Seal The Inside Face Of Splice Joint After Sill Has Been Installed Into System Detail 20 Seal Joint With Sealant STEP 14 SILL FABRICATION At every splice condition, apply bond breaker tape to the back of the sill member before it is placed into the sill flashing. See Detail 21. Bond Breaker Tape Detail 21 Effective Date: April 4, 2014 02-4006-10 Page-15

STEP 15 INSTALL STOREFRONT FRAMES FRAME INSTALLATION -Immediately before installing frames, apply sealant to face of back leg of sill flashing. Note: Only apply sealant to areas being installed so that sealant does not cure. See Detail 23. -Snap the pocket filler framing portions to the vertical mullion framing portions to complete the frame. Note: Mullions cannot be unsnapped once installed. -When using steel reinforcing, attach steel to mullion with HF-2512 fasteners and attach pocket filler, E9-0606, to the steel with FF-1008 fasteners. See Detail 22. Note: Steel reinforcing must be attached to mullions before framing portions are snapped together. -Set frame into place on the sill flashing. -Always shim anchor locations at head, sill and jambs: 1/4 maximum at 1/4 shim. 3/8 maximum at 5/16 shim. -Attach head and jamb members to the structure with flat head fasteners: Wood: 5/16 or 1/4 Tapcons. Steel: 1/4 or 5/16 Tapcons. Concrete/Masonry: 5/16 or 1/4 Tapcons. Refer to FPA drawings for other substrates. Detail 22 Anchor sill member to sill flashing: -Match drill sill flashing for sill gutter anchors using holes already drilled in the sill members from Step 7 on Page-11. -Drill 0.201 diameter (#7 drill bit) holes and attach sill member using PC-1424 fasteners. Detail 23 1-3/8 1-3/8 Concrete/ Masonry 1-1/4 1-1/4 *Use specified fasteners in Dade County. Structure must be capable of resisting all loads imposed by fasteners and anchors. Page-16 02-4006-10 Effective Date: April 4, 2014

FRAME & DOOR INSTALLATION STEP 16 INSTALL YHS 50 DOOR FRAMES WITH WATER RESISTANT THRESHOLD Doors are shipped assembled, and door frames will be fabricated and shipped k.d. -Before assembly of head, transom bar, and jambs make sure that silicone spacer, E2-0084, and elastomer weathering, E2-0051, are installed. -Apply sealant to the ends of the head and transom bar. Seal the intersections of the jambs with the head and transom bars. See Detail 14 on Page-11. -Attach the head horizontal, transom bar, and threshold members to the frames with PC-1216 fasteners at each end. See Detail 24. PC-1216 E2-0084 E9-0505 E9-0504 E1-1071 E9-0601 E2-0084 E2-0080 E9-0501 -Attach steel reinforcing as required after horizontal members are attached to the frame. See Step 4 on Page-9. E2-0051 -Run silicone sealant along the back edge of the sill flashing, E9-0619. -Set assembled door frame onto the sill flashing within ten minutes of applying sealant. -Assembled door frame must be installed plumb, square, level, and true for the door to swing properly. Shim as required. Detail 24 E9-0502 E2-0051 E9-0504 Note: If the door frame needs to be cut down, cut from the top of the frame and follow instructions in Step 3 on Page 8 to fabricate the door jamb to accept the head member. E9-0619 (Notched) Effective Date: April 4, 2014 02-4006-10 Page-17

FRAME & DOOR INSTALLATION STEP 16 (Continued) INSTALL OVERHEAD CONCEALED CLOSER IN OFFSET PIVOT & BUTT HINGE FRAMES -Assemble the frame by first attaching the transom bar/closer shear block to the pivot jamb of the frame. -Complete the assembly and installation of the frame following the standard installation instructions. -Install the overhead concealed closer into the frame. -Attach the cover plate and the offset arm. -The top door rail has been routed out to clear the offset arm of the closer. -Locate the arm cover package that is in the frame box and attach it to the bottom of the transom bar with #10-32 x 2 fasteners provided (three for singles and four for pairs). See Details 9 & 10. Arm Cover E9-0215 Shear Block For OHCC #10-32 x 2 FHMS Transom Bar For OHCC 1/4-20 x 1/2 HHMS FM-1006 #10 x 3/8 Cover Anchor Cover Plate Center Pivot 1/4-20 x 1-1/4 FHMS Detail 25 Page-18 02-4006-10 Effective Date: April 4, 2014

FRAME & DOOR INSTALLATION STEP 16 (Continued) INSTALL YHS 50 DOOR FRAMES WITH WATER RESISTANT THRESHOLD Anchor water resistant threshold to sill flashing: -Match drill the two holes at each end of the threshold, E9-0502, to sill flashing, E9-0619. -Drill ø0.201 (#7) holes and attach using PC-1408 fasteners. See Detail 26. -Match drill the three weep holes at each end of the threshold using a ø0.236 (#B) drill bit to sill flashing. -Run sealant along the sill flashing notch of the back edge and up the door jamb at the sill flashing. -Slide next frame section into place and snap together. -Attach sill member to sill flashing as shown in Step 15 on Page 16. -Run sealant along the top leg of E9-0502 before attaching E9-0503. Detail 26 Effective Date: April 4, 2014 02-4006-10 Page-19

STEP 16 (Continued) INSTALL YHS 50 DOOR FRAMES WITH WATER RESISTANT THRESHOLD FRAME & DOOR INSTALLATION Dade County Applications without Steel Reinforcing: -The door frame must be installed plumb, square, level and true. -Shim as required (3/8 caulk joint at head and jambs). -Anchor the frame to the structure according to Detail 27 & 28: = Sill Flashing Anchor: Wood: #14, 1/4 or 5/16 Wood Screw Concrete: 1/4 or 5/16 Tapcon Fastener = Head Anchor: Wood: #14, 1/4 or 5/16 Wood Screw Concrete: 1/4 or 5/16 Tapcon Fastener = Threshold Gutter Anchor: Wood: #14, 1/4 or 5/16 Wood Screw Concrete: 1/4 or 5/16 Tapcon Fastener = Sill Gutter Anchor: Wood: #14, 1/4 or 5/16 Wood Screw Concrete: 1/4 or 5/16 Tapcon Fastener = Jamb Anchor: Wood: #14, 1/4 or 5/16 Wood Screw Concrete: 1/4 or 5/16 Tapcon Fastener = Door Jamb / T-Bar w/o Transom Lite Anchor: Wood: #14, 1/4 or 5/16 Wood Screw Concrete: 1/4 or 5/16 Tapcon Fastener Detail 27 E9-0501 Refer to FPA Drawings for other substrates. 1-3/8 1-3/8 Concrete/ Masonry 1-1/4 1-1/4 Structure must be capable of resisting all loads imposed by fasteners and anchors. Page-20 02-4006-10 Effective Date: April 4, 2014

FRAME & DOOR INSTALLATION E1-1068 E1-1068 E9-0504 E9-0604 Detail 28 Effective Date: April 4, 2014 02-4006-10 Page-21

FRAME & DOOR INSTALLATION STEP 16 (Continued) INSTALL YHS 50 DOOR FRAMES WITH WATER RESISTANT THRESHOLD -Slide elastomer bulb E2-0051 into threshold trim E9-0503. -Install threshold trim by hooking the outside edge and rotating towards the inside. -Match drill top countersink holes to E9-0502 using a ø0.161 (#20) drill bit. -Fasten the inside edge with FC-1008 fasteners. See Detail 29. -Carefully align the holes in the butt hinges with the holes in the back plates and secure the door to the frame using fasteners supplied with door package. Completely support door during this step. -Assembled door frame must be installed plumb, square, level, and true to swing properly. Detail 29 Page-22 02-4006-10 Effective Date: April 4, 2014

STEP 17 INSTALL YHS 50 DOOR FRAMES WITH AIR TIGHT THRESHOLD (E9-0487) FRAME & DOOR INSTALLATION -Fasten E1-1055 steel angles to door jambs, E9-0504, using three FM-1004 screws. -Apply sealant to the ends of the heads and transom bars and to the intersections of the jambs with the head and transom bar. See Detail 14 on Page-12. -Install backer rod into the front cavities at each end of the sill flashing and seal with sealant. -Install sill flashing according to Step 12 on Page-14. -Position and drill installation anchor holes in predrilled air tight threshold, E9-0487. -Caulk all three recessed tracks on the underside of threshold and anchor to structure. -Prior to installing the frame, seal the ends of the sill flashing to the door jambs as shown below. See Detail 30. E9-0504 E9-0619 FM-1004 1/4 Tapcon Screw E1-1055 E9-0487 Seal Off Ends Of Sill Flashing Caulk Detail 30 Completely Fill Jamb Cavity With Sealant and Ramp Onto Sill Flashing Effective Date: April 4, 2014 02-4006-10 Page-23

STEP 18 INSTALL WATER DEFLECTORS YHS 50 FS requires the installation of a water deflector, E2-0079, at the ends of every intermediate horizontal to keep water away from the glass. E2-0079 -Peel away the protective paper from the bottom of the water deflector, E2-0079, and install the water deflector at the ends of each horizontal. See Detail 31. -Position the vertical leg of the water deflector against the end of the horizontal. Note: For best adhesion, make sure that the horizontal is clean and dry. Detail 31 Ramp Sealant Detail 32 Detail 33 -Apply and tool sealant along the edges of the water deflector and down onto the horizontal. See Detail 32. -Seal the ramp of the water deflector to the interior side of the glazing pocket. See Detail 33. Page-24 02-4006-10 Effective Date: April 4, 2014

STEP 19 PERIMETER SEALANT FRAME INSTALLATION -Must be applied at interior and exterior. -Position backer rod around perimeter of frame. -Apply and tool sealant to the joint between frame and masonry at both interior and exterior. -Make sure all screw heads are sealed. See Detail 34. Detail 34 Effective Date: April 4, 2014 02-4006-10 Page-25

STEP 20 DETERMINE GLASS SIZE GLAZING Typical Framing: Glass Width = Daylight Opening plus(+) 1-1/8" Glass Height = Daylight Opening plus(+) 1-1/8" Model 35H Door Monolithic and Insulating Glazing Threshold Allowance Included: Air Only - 3/8", Air & Water - 1-3/4". Glass Type Monolithic Entrance System Model 35H Single/ Pair Using Bottom Rail 7-5/16" E9-0221 8" (Standard) E9-0235* 10" E9-0233 12" E9-0235, E9-0238 Glass Formula Height Air Only Threshold Air & Water Threshold D.O. -[minus] 11-3/8" D.O. -[minus] 12-3/4" D.O. -[minus] 12-1/16" D.O. -[minus] 13-7/16" D.O. -[minus] 14-1/16" D.O. -[minus] 15-7/16" D.O. -[minus] 16-1/16" D.O. -[minus] 17-7/16" Width Model 35H Single D.O. -[minus] 8-7/16" Model 35H Pair (D.O./2) -[minus] 8-7/16 Transom D.L.O. +[plus] 1-1/8" D.L.O. +[plus] 1-1/8" Insulating 8-3/16" D.O. -[minus] 12-1/16" D.O. -[minus] 13-7/16" Model 35H Single Model E9-0251 D.O. -[minus] 8-7/16 35H 10-3/16" D.O. -[minus] 14-1/16" D.O. -[minus] 15-7/16" Single/ E9-0252 Model 35H Pair Pair 12" E9-0235, D.O. -[minus] 16-1/16" D.O. -[minus] 17-7/16" (D.O./2) -[minus] 8-7/16 E9-0238 Transom D.L.O. +[plus] 1-1/8" D.L.O. +[plus] 1-1/8" Refer to http://www.ykkap.com/productmaster (Entrances, Model 35H, Details) for D.O. and D.L.O. reference points. * Effective 8/13/2012, doors ordered with a hard part number will receive this bottom rail. For monolithic doors ordered before 8/13/2012 with 10-17/32" bottom rails, use this glass formula for height: Air Only Threshold D.O. -[minus] 14-19/32" Air & Water Threshold D.O. -[minus] 15-31/32" Page-26 02-4006-10 Effective Date: April 4, 2014

STEP 20 DETERMINE GLASS SIZE GLAZING Typical Framing: Glass Width = Daylight Opening plus(+) 1-1/8" Glass Height = Daylight Opening plus(+) 1-1/8" Model 50H Door Monolithic and Insulating Glazing Threshold Allowance Included: Air Only - 3/8", Air & Water - 1-3/4". Glass Type Monolithic Entrance System Model 50H Single/ Pair Using Bottom Rail 7-5/16" E9-0221 8" (Standard) E9-0235* 10" E9-0233 12" E9-0235, E9-0238 Air Only Threshold Height Glass Formula Air & Water Threshold D.O. -[minus] 12-1/2" D.O. -[minus] 13-7/8" D.O. -[minus] 13-3/16" D.O. -[minus] 14-9/16" D.O. -[minus] 15-3/16" D.O. -[minus] 16-9/16" D.O. -[minus] 17-3/16" D.O. -[minus] 18-9/16" Width Model 50H Single D.O. -[minus] 10-11/16" Model 50H Pair (D.O./2) -[minus] 10-11/16 Transom D.L.O. +[plus] 1-1/8" D.L.O. +[plus] 1-1/8" Insulating 8-3/16" D.O. -[minus] 13-3/16" D.O. -[minus] 14-9/16" Model E9-0251 Model 50H Single D.O. -[minus] 10-11/16 50H 10-3/16" D.O. -[minus] 15-3/16" D.O. -[minus] 16-9/16" Single/ E9-0252 Model 50H Pair Pair 12" E9-0235, D.O. -[minus] 17-3/16" D.O. -[minus] 18-9/16" (D.O./2) -[minus] 10-11/16 E9-0238 Transom D.L.O. +[plus] 1-1/8" D.L.O. +[plus] 1-1/8" Refer to http://www.ykkap.com/productmaster (Entrances, Model 50H, Details) for D.O. and D.L.O. reference points. * Effective 8/13/2012, doors ordered with a hard part number will receive this bottom rail. Effective Date: April 4, 2014 02-4006-10 Page-27

GLAZING E2-0083 E2-0084 E9-0605 E9-0606 E9-0608 E2-0080 E2-0084 E2-0094 E9-0603 Detail 35 E2-0083 Page-28 02-4006-10 Effective Date: April 4, 2014

STEP 21 (Continued) GLAZING GLAZING -Apply masking tape to the aluminum and glass according to Detail 36. Note: Apply tape to the glass 1/8 away from the aluminum to provide a 30º bevel. -Apply Dow Corning 995 structural silicone sealant from the bottom to the top of joint. -Use positive pressure so that sealant completely fills the cavity between glass and aluminum. -Using a 30º nylon beveled spatula, or other non-scratching implement, tool the structural silicone sealant immediately after running the joint. Exert positive pressure while tooling sealant to ensure that the silicone makes complete contact with all surfaces. Note: Be careful not to remove too much silicone. The finished joint should be 30º beveled around the glass. -Immediately remove masking tape while wet; do not allow silicone to skin. Masking tape must be removed within 10 minutes of tooling. Glazing Options 995 Silicone Sealant 30 Bevel E2-0082 E2-0084 E9-0608 E2-0080 1/8 3/8 or 7/16 Glass (Large Missile) E2-0083 E2-0084 E2-0084 E9-0603 1/8 9/16 Glass (Large Missile) E2-0083 E2-0088 E2-0083 9/16 Glass (Large Missile) Masking Tape Detail 36 9/16 Glass (Small Missile) Effective Date: April 4, 2014 02-4006-10 Page-29

GLAZING STEP 22 (SKIP TO STEP 24 FOR SSG APPLICATIONS) GLAZING: DRY GLAZING APPLICATIONS The interior glazing gaskets must be installed prior to the glazing process. -Using a small brush clean out any dirt that may have accumulated in the gasket reglets. Vertical glazing gaskets must be installed first: -Cut vertical glazing gaskets to Daylight Opening plus(+) 1/4 for each foot of length. -Trim both ends of the exterior leg of glazing gasket 3/8 as shown below. -Insert the gasket into the reglet at each end first, and then insert the gasket at the midpoint of the opening. -Push the gasket into the reglet starting at the midpoint and work towards each end. Apply Sealant To Horizontal Gasket Ends Glazing Gasket 3/8 Glazing Gasket 3/8 Tool Sealant at Gasket Corners Detail 37 Install horizontal glazing gaskets next: -Cut horizontal glazing gaskets to Daylight Opening plus(+) 1/4 for each foot of length. -Apply sealant to each end of the horizontal glazing gasket prior to inserting into the reglet. -Insert the gasket into the reglet at each end first and push each end tight against the vertical gasket. -Then insert the gasket at the midpoint of the opening and push the gasket into the reglet starting at the midpoint and work towards each end. -Tool the excess sealant at the gasket corners to ensure a watertight seal. See Detail 37. Page-30 02-4006-10 Effective Date: April 4, 2014

STEP 22 (Continued) GLAZING -Install E2-0094 side block into the shallow pocket at center of D.L.O. See Detail 39. 3/8 -Carefully install the glass into the opening: Insert the leading side of the glass into the deep mullion pocket and rotate the trailing edge in the center of the glazing pocket. Slide glass into the shallow pocket to its fi nal position. -Carefully lift lite of glass, install setting blocks at quarter points of horizontal D.L.O. or according to engineering calculations. -Make sure the glass is correctly positioned on all setting blocks. -Insert the leading side of the glass into the deep mullion pocket and rotate the trailing edge in the center of the glazing pocket. Slide glass into the shallow pocket to its final position. See Detail 38. E2-0080 Setting Block E2-0088 Daylight Opening (D.L.O.) 9/16 Glass Bite 9/16 Glass Bite Detail 38 Effective Date: April 4, 2014 02-4006-10 Page-31

STEP 22 (Continued) INSTALL ANTI-WALK BLOCKS GLAZING YHS 50 Dry Glaze applications require the installation of an anti-walk block, E2-0546, in the vertical deep glazing pocket of each lite centered along the daylight opening. -Flatten the anti-walk block against the exterior surface of the glass and push it into the opening between the glass and the mullion until it is released into the glazing pocket. See Detail 39. Deep Pocket Shallow Pocket Deep Pocket Daylight Opening (D.L.O.) E2-0546 D.L.O. Equal Equal C L Anti-Walk Block E2-0546 1/4 Points Side Block E2-0094 Setting Blocks Detail 39 Glazing Gasket E2-0083 Exterior Glass Stop STEP 23 INSTALL EXTERIOR GLASS STOPS & GLAZING GASKETS -Install exterior glass stop E9-0608 as shown in Detail 40. -Install the exterior glazing gaskets using the same technique described in Step 22 on Page-29. Always install the vertical glazing gasket first. Detail 40 Repeat Steps 20 through 22 until all lites are installed. Page-32 02-4006-10 Effective Date: April 4, 2014

INSTALL HARDWARE STEP 24 ADJUST ALIGNMENT OF MODEL 35H/50H DOORS -If necessary, adjust the alignment of the door by turning the screw located in the top rail of the door: Clockwise to raise corner. Counterclockwise to lower the corner. See Detail 41. -Check the alignment of the door with frame. -Apply structural silicone to interior glass stop according to instructions in Step 21. Note: Door must be adjusted before applying structural silicone. STEP 25 INSTALL MODEL 35H/50H DOOR HARDWARE Hinge Stile Detail 41 Hinge Stile Attach pull handle: -Remove from the door carton the push/pull hardware and accessory package. -Fasten the pull handle to the lock stile with the 2-7/8 shoulder bolt at the top and with the 3 oval head machine screw at the bottom. Make sure the washer is properly seated under the screw head. Attach push bar: -Attach the end cap to the pivot stile with the FM-2512 3/4 machine screw. -Insert the straight end of the push bar into the end cap and swing the curved end onto the shoulder bolt head. Tighten the set screws at each end of the push bar using a 1/8 Allen wrench. See Detail 42. -Install the door closer according to manufacturer s instructions. Pull Handle End Cap Set Screw Lock Stile 1/4 20 x 2-7/8 Shoulder Bolt Push Bar Set Screw FM-2512 1/4 20 x 3/4 Flat Head MS 1/4 20 x 3 Oval Phillips MS with Washer Pivot Stile Detail 42 Effective Date: April 4, 2014 02-4006-10 Page-33

INSTALL HARDWARE STEP 26 INSTALL THRESHOLD RAMP FOR ADA COMPLIANCE -ADA designated entrances require additional considerations: Frames that employ the water resistant threshold, E9-0502, and are designated as ADA entrances require a 1:12 sloped ramp, or a maneuvering clearance* on both sides of the door. Maneuvering surfaces must be level and free of obstructions. Note: Maneuvering surfaces on the exterior must drain water away from the entrance. -YKK AP recommends a threshold ramp whenever the E9-0502 threshold is selected. -Follow the instructions below for the installation of a threshold ramp offered by YKK AP. -Assemble the fabricated threshold and anchor to the structure according to Details 43 & 44. Note: Threshold ramp anchors are to provide a minimum of 1-1/2 embedment into structure. *For maneuvering clearance requirements and other hardware considerations contact YKK AP. 7-1/2 3-7/8 2-3/4 5-1/4 3-7/8 7-1/2 E9-0511 E9-0512 E9-0513 E9-0502 E9-0513 E9-0512 E9-0511 Detail 43 7-1/2 3-7/8 2-3/4 E9-0511 E9-0512 E9-0513 E9-0502 Page-34 02-4006-10 Effective Date: April 4, 2014

INSTALL HARDWARE STEP 26 (CONTINUED) INSTALL THRESHOLD RAMP FOR ADA COMPLIANCE 18 5 41-1/8 18-1/8 24 Minimum At Lock Side Approach Inside & Outside 101 36 D.O.W. Single Door Shown, Pair Similar Detail 44 Effective Date: April 4, 2014 02-4006-10 Page-35

YKK AP America Inc. 270 Riverside Parkway Suite A Austell, Georgia 30168 www.ykkap.com